Loading...
HomeMy WebLinkAboutContract 45374 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § City Secretary Contract No. 1/cc°17) WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements. Developer and Project Information: Developer Company Name: D.R. Horton — Texas, Ltd. Address, State, Zip Code: 6751 N. Freeway, Fort Worth, TX 76131 Phone, E-Mail: (817)230-0800, dallen@drhorton.com Authorized Signatory/Title: Don E. Allen, Assistant Secretary Project Name and Brief Description: Water, Sewer, Paving, Storm Drain and Street Lights to serve Santa Fe Trails Ph. 6 Project Location: South of Basswood Blvd., East of Robert W. Downing Plat Case No.: FP-013-043 Plat Name: Parr Trust Council District: 2 City Project No: 02181 CFA: 2013-085 DOE: 7125 To be completed by staff* Received by: (h, Date:tO) ` RECEIVItD FE 192014 1 OFFICIAL RECORD ::IISi Y SECRETARY in. WORTH, IX NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water• (A) _X_, Sewer (A-1) _X_, Paving (B) X, Storm Drain (B-1) _X_, Street Lights & Signs (C) X . E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. 11. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces and not to install or relocate any sanitary sewer, storm drain or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries. death or damages are caused, in whole or in part. by the alleged negligence of the City of Fort Worth, its officers. servants. or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. If applicable, the City's obligation to participate (exclusive of front foot charges) in the cost of the Improvements shall terminate if the Improvements are not completed within two (2) years; provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Santa Fe Trails Ph. 6 CFA No.: 2013-085 DOE No.: 7125 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 511,366.25 $ 230,164.95 281,201.30 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total $ 738,849.37 $ $ $ 583,257.62 90,821.00 64,770.75 Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one I Bond = 100% 'Completion Agreement = 100% / Holds Plat 'Cash Escrow Water/Sanitary Sewer= 125% 'Cash Escrow Paving/Storm Drain = 125% 'Letter of Credit = 125% w/2yr expiration period $ 1,250,215.62 $ $ $ $ $ $ 10,227.33 10,227.33 20,454.66 26,963.14 13,481.57 2,590.83 2,205.00 45,240.54 $ 65,695.20 $ Choice Amount (ck one) 1,250,215.62 V 1,250,215.62 639,207.81 923,561.71 1,562,769.53 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretaiy, with the corporate seal of the City affixed, and said De eloper has exec d t is instrument in quadruplicate, at Fort Worth, Texas this -Li dayof7 J p . 20 • CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi- abulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. iv 64,-- Date: ATTEST: ary J. Kayse City Secreta ATTEST: Signature (Print) Name: Mark Allen Title: Land Dev. Project Manager Transportation & Public Works Department i Douglas W. Director I � V ` 1 V iersig, P.E. Approved by City Manager's Office 47.0nwes‘ Fernando Costa Assistant City Manager yr ‘, rtlY.VAI t) Q13 .‘)3NigV1Wr-\-\3\_crl no Warn) inZ DEVELOPER: D.R. Horton — Texas, Ltd., a Texas Limited Partnership By: D.R. Horton, Inc. a Delaware Corporation Its authorized agent Signature (Print) Name: Don E. Allen Title: Assistant Secretary Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included EZ El 1>31 El Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs hstimate (Remainder of Page Intentionally Left Blank) 9 BAILEY - BOS NELL 61 SITE \ss>/ SAG INAW,. cc Z ca « p WESTERN CENTER BLVD FH / V U DOE NO. 7125 CITY PROJECT NO. 02181 BASSWOOD BLVN 28 NORTH NOT TO SCALE SANTA FE TRAILS PHASE 6 DATE: JANUARY, 2014 OWNER / DEVELOPER: DR HORTON-TEXAS, LTD 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 F=€ PELOTON 11111 LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 r-- 1-I 16"_' I- _ - 11I EX 30 ATER ( I III EASEMENT IlI EX 20'IGAS— — _ I EASEMENT J EX 15 WATER — EASEMENT III \\ \\ /i j �'/ \ �'5?, ' i 7/ �- e. 4 —t-- — /7 EX VARIABLE DRAINAGE EASEMENT 25' DRAINAGE EASEMENT LOT 34X BLOCK SS PELADA 2 U 4 LOT 1X PRIVATE OPEN SPACE EX20'GAS EASEMENT r71- OQdRTO R�--- \\\\ B�R�F� Rat goc� 1 \ \ \\ \ /' III \ EXHIBIT A — WATER 0 NORTH 300' \ 49/0 NN \\ N\ \\ \NN \ \ \ \\ \\ \ \ \\ \ 25 LOT 1X PRIVATE OPEN SPACE \\ I y\\\ •\\\\ II II N \ \ II I 20' DRAINAGE \ \ N \I\I EASEMENT \ \1-I 25' DRAINAGE •� I I EASEMENT 20'SANITARY N I SEWEREASEMENT I // - // WeP PGEMI1 cry a-M 40- EXIST 20' SANITARY SEWER EASEMENT LEGEND PROPOSED GATE VALVE EXIST GATE VALVE PROPOSED FIRE HYDRANT EXIST FIRE HYDRANT NOTE: ALL PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE NOTED OWNER / DEVELOPER: SANTA FE TRAILS DR HORTON—TEXAS, LTD PHASE 6 GRAPHIC SCALE DATE: JANUARY, 2014 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 HUI PELOTON iis' 11111 LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 — BASSW/O,Fp IOULEVARD / LI 4 FX IT_OLZ L — EX 30' ATER , EASEMENT I — — EX 20' GAS EASEMENT— EX 15WATER— EASEMENT J w OT IX PRIVATE OPEN SPACE EX 20' GAS EASEMENT / 7 < \ \ EX VARIABLE DRAINAGE EASEMENT EX _12SS_ SU'itk_\Sd'r 1>10411-koSoRc\q.,,s SOINFeRNONN AN_ v.01 — • • • 25' DRAINAGE EASEMENT EaTA ELADA EXHIBIT Al - WASTEWATER 19 / • N N NN, N N.„ N • N N 20' DRAINAGE EASEMENT 25' DRAINAGE EASEMENT 20' SANITARY SEWER EASEMENT 4 EX 12" SS wso-tfAsk \Nes-cello-1'5 a‘owN 1 EXIST 20' SANITARY SEWER EASEMENT LEGEND p. PROPOSED SEWER LINES EXIST SEWER LINES SDR 26 SERVICES NOTE: ALL PROPOSED SANITARY SEWER LINES ARE 8" SDR-26 UNLESS OTHERWISE NOTED 0 NORTH 300' SANTA FE TRAILS PHASE 6 GRAPHIC SCALE DATE: JANUARY, 2014 OWNER / DEVELOPER: DR HORTON-TEXAS, LTD 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 11111 PE LOTON NI LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 I -- _in Eli I if / I 1 II I EX 30' WATER 1 11 EASEMENT J 1/ I EX 20' GAS I EASEMENT— 1 1 EX 1I5' WATER ER I EASEMENT 12 04 W o 3 CO 9 80 2 0 \ / y\\ N \ / \/\/ \ —F.S'IL E-AWAY 2 3 © 5 I 5 T EX 20' GAS GFTU�ia®RA DR 14 EASEMENT I I guRI-O RAIOw C,� 1 II I II I II I� II II II EXHIBIT B - PAVING EX VARIABLE DRAINAGE EASEMENT •25' DRAINAGE EASEMENT LOT34X BLOCK 55 PELADA 37' B-B / 60' ROW 39' B-B / 60' ROW 28' B-B / 110' ROW 1/2 OF DIVIDED \\ \\ \\ \\\ \ 25 LOT 1X PRIVATE OPEN SPACE 20' DRAINAGE EASEMENT 25' DRAINAGE EASEMENT 20' SANITARY SEWER EASEMENT 4 WEST eo G 041 ovCEN'CER LEGEND — EXIST 20' SANITARY SEWER EASEMENT 29' B-B / 50' ROW (TYP) SIDEWALK BY DEVELOPER SIDEWALK BY HOMEBUILDER H.C. RAMPS BY DEVELOPER 0 NORTH 300' GRAPHIC SCALE SANTA FE TRAILS PHASE 6 DATE: JANUARY, 2014 OWNER / DEVELOPER: DR HORTON-TEXAS, LTD 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 PELOTON I'III LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 f-- r[jh 140 4 22 SY RIPRAP 24' SLOPiNG // EX 30' ATER I I EASEMENT EX 20GAS EASEMEN1 EX 15' WA\TE EASEMENT Tt II I I I I I I I I LOT 1X PRIVATE OPEN APACE AY 7 1- 8 EX20' GAS EASEMENT V NN V , \ • V V \V\ ,odc) S EX VARIABLE DRAINAGE EASEMENT 25' DRAINAGE OcTorg, EASEMENT 18 SY RIPRAP 24" SLOPING HDWL 25' DRAINAGE EASEMENT PELADA - 01 I LE 14 15 Ps no \--001q \ • I I , v,s1d1 - • \ • I I e gia\ \ ois • \ • • • I I • EXHIBIT B1 - STORM DRAINAGE F 19 NN N • N N \ N N 10\INLET LOT 1% PRNATE OPEN SPACE N N NN N N NN N N N N \\ \\ \\ 36" '.1.:0P•ING \\ \\ HDWL -------------- . \\ 36" --\_—*\N N NN NN NN N NN • N NN • N NN N NN N NN I I N NN I I N NN 20' DRAINAGE \ N N ! i EASEMENT \ N \ N I I QNk 25 SY RIPRAP Ns I 20' SANITARY SEWER EASEMENT / 30" SLOPING HDWL 25' DRAINAGE EASEMENT 11 I I I 1 I 1,‘‘Gi'sL Isc'-‘ce-rev( \Nes-leiks14-' EXIST 20' SANITARY SEWER EASEMENT LEGEND PROPOSED STORM DRAIN INLET EXIST STORM DRAIN INLET PROPOSED STORM DRAIN MANHOLE PROPOSED STORM DRAIN HEADWALL PROPOSED RIPRAP 0 NORTH 300' =MIME SANTA FE TRAILS PHASE 6 GRAPHIC SCALE DATE: JANUARY, 2014 OWNER / DEVELOPER: DR HORTON-TEXAS, LTD 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 P E LOTO N himLAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 EX 30' EASEM I ---- EX 0' GAS —EASEM I I EX15 WkrE1R— EASE ENT / I (1 TER_] J 41 j II 0 tI 3 (/) r I 2 ° OT IX PRIVATE OPEN SPACE II 1 1 1 1 ...,-\ -rvVs lip__ — — \ \ • I I I 1 Oil i I sOP' ..cic z,`--- • \ • \ • \\ \ / / / 7 </\ \ • \ \ ' \ 7•.' ---- , --:-,- ,--- 0% --,---- ..-- .---- --- \ ---- AY 7 8 EX20' GAS EASEMENT 7'' NN 7 7 7 7 EX VARIABLE ( DRAINAGE EASEMENT 25' DRAINAGE EASEMENT BLOCKOS PELADA 1 EXHIBIT C - STREET LIGHTS x \ \ \ 4S3/0 Pos, NN NN \ NN NN NN NN NN Oft NN 'Op. NN rksir \\\ \ 25 LOT I X PRIVATE OPEN SPACE // \\ • \\ --\-\ N \ N N NN N N. 'N. 1 II • N NN • N N N \\. \ N. N \ N , N NNN NNN N 20' DRAINAGE EASEMENT N N 1 11 Kil N1* 25' DRAINAGE • 1 1 EASEMENT 20' SANITARY SEWER EASEMENT 1 1 1 4 1 I 1 1 I k I I I I I I E_ EXIST 20' SANITARY OGP1- SEWER EASEMENT eS1.5eValC114G‘‘\15:& • LEGEND PROPOSED STREET LIGHTS EXIST STREET LIGHTS 0 NORTH 300' GRAPHIC SCALE SANTA FE TRAILS PHASE 6 DATE: JANUARY, 2014 OWNER / DEVELOPER: DR HORTON-TEXAS, LTD 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 in PE LOTO N 11111 LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 EX 30 EASEM EX Z�00 GAS EAS MF`tRi I i EX 15 WAitK EASEMENT -/ i \ \ '/ / i<-.'- / .J' \)\_ /// /�i / 1 tea, � // -L-- EX VARIABLE DRAINAGE EASEMENT 25' DRAINAGE EASEMENT LOT34X BLOCK55 PELADA 20 19 18 LOTS% PRIVATE OPEN SPACE AY 7 16 1— EX 20' GAS EASEMENT --\\ P-IIROS \ �d G� NFR2�OA \\\ \\\ / SPTP\_Og \\/ II • EXHIBIT Cl - STREET NAME SIGNS / 7 ---- NN NN NN �\ CNN 49/0 F \ \ bSS2 \ 25 LOT 1% PRIVATE OPEN SPACE // zz / / NN NN N NN NN \\ •N \\ \ N \ N. II II NN \N III ` N.N \N 1 II 20' DRAINAGE EASEMENT \ N ., EASEMENT 25' DRAINAGE `� 1 EASEMENT 20' SANITARY \ I SEWER EASEMENT -+ Ir, I I II1 III I I, W A PGe0041 cSy ER EXIST 20' SANITARY SEWER EASEMENT LEGEND ® PROPOSED STREET NAME SIGNS A EXIST STREET NAME SIGNS 0 NORTH 300' 1..11111.11111 OWNER / DEVELOPER: SANTA FE TRAILS DR HORTON-TEXAS, LTD PHASE 6 GRAPHIC SCALE DATE: JANUARY, 2014 6751 NORTH FREEWAY FORT WORTH, TEXAS 76131 PHONE: 817-230-0800 I PELOTON 11111 LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 PELOTON LAND SOLUTIONS, LLC 5751 KROGER DR, SUITE 185, KELLER, TX 76244(817) 562-3350 SANTA FE PH. 6 Unit Pricing is Actual Bid Prices 12/11/2013 WATER IMPROVEMENTS ITEM # 3311.0261 3312.2203 3312.2103 3312.2003 9999.0000 3312.3003 3312.4103 3311.0001 3312.0001 3312.0117 3305.0109 DESCRIPTION 8' PVC Water Pipe 2' Water Service 1 1/2" Water Service 1" Water Service 3/4" Water Service 8" Gate Valve 10" x 8" Tapping Sleeve & Valve Ductile Iron Water Fittings w/ Restraint Fire Hydrant Connection to Existing 4"-12" Water Main Trench Safety TOTAL WATER SANITARY SEWER IMPROVEMENTS ITEM # 3331.4115 331.4116 3339.1001 3339.1003 3331.3101 3301.0101 3305.0112 3339.0001 3301.0002 3305.0109 DESCRIPTION 8" Sewer Pipe 8" Sewer Pipe w/ cement stabilized sand 4' Manhole 4' Extra Depth Manhole 4" Sewer Service Manhole Vacuum Testing Concrete Collar Epoxy Manhole Liner Post - CCTV Inspection Trench Safety TOTAL SANITARY SEWER STORM DRAIN IMPROVEMENTS ITEM # DESCRIPTION 3341.0309 36" RCP, Class III 3341.0302 30" RCP, Class III 3341.0205 24" RCP, Class III 3341.0201 21" RCP, Class III 9999.0000 136" Sloping Headwall 9999.0000 130" Sloping Headwall 9999.0000 124" Sloping Headwall 3137.0110 !Special Riprap 3349.0001 14' Storm Junction Box 3349.5001 110' Curb Inlet 3349.5002 115' Curb Inlet 3305.0109 (Trench Safety 9999.0000 'Engineered Channel TOTAL STORM DRAIN UNIT LF EA EA EA EA EA EA TON EA EA LF UNIT LF LF EA VF EA EA EA VF LF LF UNIT LF LF LF QTY 4,892 1 1 89 1 17 2 3.1 6 1 4,892 QTY 4,372 280 23 71 89 23 1 58 4,652 4,652 QTY 40 184 542 LF EA EA EA SY EA EA EA LF LF 65 1 1 2 101 2 7 2 831 141 UNIT PRICE $26.15 $1,200.00 $1,000.00 $490.35 $475.00 $1, 050.00 $3,000.00 $3,500.00 $3,200.00 $800.00 $0.25 UNIT PRICE $32.23 $32.23 $2,750.00 $80.00 $455.06 $50.00 $70.00 $175.00 $1.25 $1.00 UNIT PRICE $80.00 $70.00 $50.00 $45.00 $2,500.00 $2,000.00 $1,500.00 $65.00 $3,500.00 $2,000.00 $3,000.00 $1.00 $20.00 TOTALS 127,925.80 1,200.00 1,000.00 1 43,641.15 475.00 17,850.00 6,000.00 10,850.00 19,200.00 800.00 1,223.00 $230,164.95 TOTAL 140,909.56 9;024.40 63,250.00 5,680.00 40,500.34 1,150.00 70.00 10,150.00 5,815.00 4,652.00 $281,201.30 TOTAL' 3,200.00 12,880.00 27,100.00 1 2,925.00 2,500.00 2,000.00 3,000.00 6,565.00 7,000.00 14,000.00 6,000.00 831.00 2,820.00 $90,821.00 SF Ph6_CFA_QTO_20140116.xisx, Ph 6 1 of 2 1/16/2014 PAVING ITEM # 3213.0105 3213.0101 3211.0502 3211.0501 3211.0400 3213.0301 3213.0501 3217.0503 3217.2002 3217.2103 9999.0000 9999.0000 9999.0000 9999.0000 PELOTON LAND SOLUTIONS, LLC 5751 KROGER DR, SUITE 185, KELLER, TX 76244(817) 562-3350 SANTA FE PH. 6 Unit Pricing is Actual Bid Prices 12/11/2013 IMPROVEMENTS DESCRIPTION 10" Conc Pvmt 6" Conc Pvmt 8" Lime Treatment 6" Lime Treatment Hydrated Lime 4" Conc Sidewalk Barrier Free Ramp, Type R-1 24" SLD Pvmnt Marking Paint (W) Raised Marker TY Y Refl Raised Marker TY II -A -A Street Header Type III Street Barricade Remove Street Barricade Move Sign TOTAL PAVING STREET LIGHTING IMPROVEMENTS DESCRIPTION 3441.3002 Rdwy Ilium Assmbly TY 8,11,D-25, and D-30 3441.3301 Rdwy ilium Foundation TY 1,2, and 4 9999.0000 2" Sch 80 PVC (includes Trenching & Backfill) 3441.1408 NO 6 Insulated Elec Conductor 3441.3101 100W HPS PC Lighting Fixture 3441.3102 200W HPS PC Lighting Fixture 3441.1501 Ground Box, Small, w/ Lid 3441.1503 Ground Box, Large, w/ Lid Apron TOTAL STREET LIGHTS STREET SIGNS DESCRIPTION 9999.9999 Street Name Blades (TOTAL STREET SIGNS UNIT QTY SY 614 SY 16,067 SY 664 SY 17,228 TON 273 SF 5,302 EA 14 LF 25 EA 47 EA 12 LF 104 LF 116 EA 1 LS 1 UNIT EA EA LF LF EA EA EA EA UNIT EA QTY 20 20 1,725 5,175 19 11 1j 21 QTY 9 UNIT PRICE $42.50 $27.50 $3.00 $2.65 $155.00 $2.96 $155.00 $12.00 $5.00 $5.00 $15.00 $40.00 $200.00 $500.00 UNIT PRICE $1,400.00 $917.00 $6.26 $0.47 $145.00 $145.00 $700.00 $800.00 UNIT PRICE 245.00 TOTAL 26,095.00 441, 842.50 1,992.00 45,654.20 42,315.00 15,693.92 2,170.00 300.00 235.00 60.00 1,560.00 4,640.00 200.00 500.00 $583,257.62 TOTAIJ 28, 000.00 18,340.00 10,798.50 2,432.25 2,755.00 145.00 700.00 1,600.00 $64,770.75 TOTAL 2,205.00 $2,205.00 SF Ph6_CFA_QTO_20140116.xlsx, Ph 6 2 of 2 1/16/2014