Loading...
HomeMy WebLinkAboutContract 45389 (2)VE] Fzb28Z04G CITY 8VCRETATV CONTRACT We COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements. Developer and Project Information: • Developer Company Name: Decatur -Angle Ltd. Address, State, Zip Code: 1000 Throckmorton Street, Fort Worth, Texas 76102 Phone, E-Mail: (817) 392-7540, jesus.chapa@fortworthtexas.gov Authorized Signatory/Title: Jesus J. Chapa, Assistant General Manager Project Name and Brief Description: Water, Sewer, Paving and Street Light Improvements to serve Decatur -Angle Apartments Project Location: NE Corner of Old Decatur Road and Angle Avenue, Fort Worth TX 76106 Plat Case No.: FS-13-174 Plat Name: Decatur -Angle Apartments Council District: 2 To be completed by staff Received by: )( City Project No: 02228 CFA: 2014-005 DOE: 7185 ,;_ --r Date: DI \ D i l Li • ,• +: • } •1,:: •.. , •. I OFFICIAL RECORD CITY SECRETARY -� ,, Ft WORTH,rx NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractorhas, paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof:, Water (A) -X , Sewer (A-1) X Paving (B) X , Storm Drain (B-1) _, Street Lights & Signs (C) X . E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the followings i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a paymentand performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements for a period of two (2) years insuring the maintenance and, repair of the constructed infrastructure during the teiiu of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book iv. To require its contractor to give 48 hours notice, to the City's Construction Services it, Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, stoiin drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract ,documents submitted to the City to schedule a Pre -Construction Meeting. The, submittal should occur no less than 10 working days prior to the desired date of the, meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be m conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect ;or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries, death or damages are caused, in whole or, in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and. tt• Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the 4 • City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two perdent4(2%) for a total of 6% of the developer's share of the total construction cost as 'stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. If applicable, the City's obligation to participate (exclusive of front foot charges) in the cost of the Improvements shall terminate if ; the Improvements are not completed within two (2) years; provided, howevet, , if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name. Decatur -Angle Apartments CFA No.: 2014-005 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% 'Completion Agreement = 100% / Holds Plat (Cash Escrow Water/Sanitary Sewer= 125% (Cash Escrow Paving/Storm Drain = 125% 'Letter of Credit = 125% w/2yr expiration period DOE No.:7185 Developer's Cost 319,213.50 37,499.50 356,713.00 38,322.50 5,500.00 43,822.50 400,535.50 7,134.26 7,134.26 14,268.52 1,532.90 766.45 220'.Op 2,519.35 16,787.87 Choke Amount. (ck one) 400,535.50 X 400,535.50 445,891.25 54,778.13 500,669.38 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in q adruplicate, at Fort Worth, Texas this ,i day of 20 . jr CITY OF FORT WORTH - Reconiniended by: Water Department Wendy Cif abulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. b/Q- Date: Afl14ST: ttiMary J. Kayser City Secretary ATTEST: Signature (Print) Name: Title: U e#43140 oF� A)"t 0 °o OA *IL Yo o .0t.‘ o0aoo DO °, 4r,,fibrin ti DEVELOPER: Transportation & Public Works Department Dougla• . Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager 000 at 1300 aig",0 Q�� a Pi • NO MC REQUIRED DECATUR-ANGLE LTD., a Texas limited partnership By: DECATUR-ANGLE GP LLC, a Texas limited liability company, its General Partner By: FORT WORTH HOUSING FINANCE CORPORATION, a Texas housing finance corporation, its Sole Member By: 8 Signature (Print) Name: Jesus J. Chapa Title: Assistant General Manager • OFFICIAI. RECORD CITY SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included p< p< /1 ►1 n n p< Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 9 c THE CITY OF FORT WORTH, TEXAS COST EXHIBITS DECATUR-ANGLE APARTMENTS LOCATION MAP N.T.S. FORT WORTH , i•r 1 1 2 by. stephen.gose E 0 Feb 17, 2014 w LEGEND PROPOSED PUBLIC WATER LINE W EXISTING WATER LINE F.H. FIRE HYDRANT DOM. DOMESTIC IRR. IRRIGATION PROP. 4" DOM. METER PROP. 8" DOM. STUB U PROP. 2" IRR. STUB & METER PROP. F.H. N ` - - - OLD_DECATUR RCO—A-D — 1� --- — • i \— PROP. F.H. 0 a PROP. F.H. 0 CO N CO CO W 0 O j UI Z N E 0 o- 0 PROP. 16" WATER LINE SCALE: 1" = 250' PROP. 4" DOM. METER PROP. 8" STUB PROP. F.H. EX. 54" WATER LINE CONNECT TO EX. EX. 54" WATER LINE 16" WATER LINE EX. 8" WATER LINE EX. 16" WATER LINE EXHIBIT A WATER IMPROVEMENTS DECATUR-ANGLE APARTMENTS ❑fin IGMey-Hom � and Associates, Inc. UNIT PRICE BID Item No. I Bidlist Item No. 3305.0003 2 3305.0109 3 3305.1104 4 3305.2207 5 3311.0001 6 3311.0061 7 3311.0261 8 3311.0551 9 3311.0561 10 3312.0106 11 3312.2802 12 3312.3001 13 3312.3002 14 3312.3003 15 3312.3006 16 3312.3106 17 3312.4112 18 3312.0001 19 3312.0002 20 3312.1002 21 3312.2203 22 3312.6002 23 3471.0001 8" Waterline Lowering (for sanitary sewer work) Trench Safety 24" Casing By Other Than Open Cut 24" Water Carrier Pipe Ductile Iron Water Fittings w/ Restraint 4" PVC Water Pipe 8" PVC Water Pipe 16" DIP Water 16" PVC C905 Water Pipe Connection to Existing 16" Water Main 4" Water Meter and Vault 4" Gate Valve 6" Gate Valve 8" Gate Valve 16" Gate Valve w/ Vault 16" Cut -in Gate Valve w/ Vault 16" x 8" Tapping Sleeve & Valve Fire Hydrant Water Sampling Station 2" Combination Air Valve Assembly for Water 2" Water Service 6" Blow Off Valve Traffic Control CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUNIENTS Form Revised 20120120 SECTION 00 42 43 PROPOSAL FORM (DAP VERSION) Project Item Information Description Specification Section No. UNIT I: WATER IMPROVEMENTS 33 05 12 33 05 10 33 05 22 33 05 24 33 11 11 33 11 12 33 11 12 33 11 10 33 11 12 33 12 25 33 12 11 33 12 20 33 12 20 33 12 20 33 12 20 33 12 20 33 12 25 33 12 40 33 12 50 33 12 30 33 12 10 33 12 60 34 71 13 Unit of Measure EA LF LF LF TON LF LF LF LF EA EA EA EA EA EA EA EA EA EA EA EA EA MO 00 42 43 BID PROPOSAL Page 1 of 4 Bidder's Application Bid Quantity Bidder's Proposal Unit Price $5,000.00. 2055 $1.50 80 $200.00 80 $150.00 3.5 $4,500.00 5 $30.00 80 $60.00 215 $130.00 1755 $81.75 2 $4,000.00 2 $10,000.00 2 $300.00 5 $500.00 3 $800.00 2 $7,000.00 2 $7,500.00 1 $3,000.00 5 $2,000.00 1 $3,250.00 1 $8,500.00 1 $2,500.00 1 $4,500.00 1 $1,500.00 Transfer total to Summary Sheet Bid Value $5,000.00 $3,082.50 $16,000.00 $12,000.00 $15,750.00 $150.00 $4,800.00 $27,950.00 $143,471.25 $8,000.00 $20,000.00 $600.00 $2,500.00 $2,400.00 $14,000.00 $15,000.00 $3,000.00 $10,000.00 $3,250.00 $8,500.00 $2,500.00 $4,500.00 $1,500.00 $323,953.75 00 42 43 Bid Proposal Workbook-20140217.xls by. stephen.gose E 0. 0 g name: K: \SNA_Civil\068682806\CAD\Exhibits\CFA\E—CFA.dwg 0 0 LEGEND PROPOSED SEWER LINE SS EXISTING SEWER LINE — d w . — — W _ — — OLD_DECQTUR RO PROP. MANHOLE PROP. MANHOLE CONNECT TO EX. MANHOLE EX. 15" SAN. SEW. SCALE: 1" = 250' • PROP. 8" SAN. SEW. LINE EX. 15" SAN. SEW. EXHIBIT Al WASTEWATER IMPROVEMENTS DECATUR-ANGLE APARTMENTS i ❑�1 Moley-Ham and Associates, Inc. UNIT PRICE BID Item No. I Bidlist Item No. I 2 3 4 5 6 7 8 9 I0 II 0330.0001 3301.0002 3301.0101 3305.0109 3305.0112 3311.0261 3331.4115 3339.1001 3339.1003 3471.0001 9999.9999 SECTION 00 42 43 PROPOSAL FORM (DAP VERSION) Project Item Information Description Specification ( Unit of Section No. Measure UNIT II: SANITARY SEWER IMPROVEMENTS Concrete Encase Sewer Pipe Post -CCTV Inspection Manhole Vacuum Testing Trench Safety Concrete Collar 8" PVC Water Pipe 8" Sewer Pipe 4' Manhole 4' Extra Depth Manhole Traffic Control Connection to Existing 4' Dia. SSMH CITY OF FORT WORTII STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 03 30 00 33 01 31 33 01 30 33 05 10 33 05 17 33 11 12 33 31 50 33 39 10, 33 33 39 10, 33 : 34 71 13 9999.9999 CY LF EA LF EA LF LF EA VF MO EA 00 42 43 BID PROPOSAL Page 2 of4 Bidder's Application Bid Quantity Bidder's Proposal Unit Price 3 $110.00. 405 $1.00 3 $150.00 405 $1.50 3 $2,000.00 151 $20.00 254 $22.80 3 $3,500.00 8 $250.00 1 $1,500.00 1 2,250.00 Transfer total to Summary Sheet Bid Value $330.00 $405.00 $450.00 $607.50 $6,000.00 $3,020.00 $5,791.20 $10, 500.00 $2,000.00 $1,500.00 $2,250.00 $32,853.70 00 42 43 Bid Proposal Workbook-20140217.xls Drowing name: K: \SNA_Civi1\068682806\CAD\Exhibits\CFA\E—CFA.dwg EXHIBIT B Feb 17, 2014 12:36pm by stephen.gose 1 11 a3 3 09Z = 6 31V3S J UNIT PRICE BID Item No. Bidlist Item No. I 2 4 5 6 7 8 9 0241.1000 0241.1300 3213.0401 3213.0303 3213.0506 3216.0101 3292.0400 3471.0001 Remove Conc Pvmt Remove Conc Curb&Gutter 6" Concrete Driveway 6" Conc Sidewalk Barrier Free Ramp, Type P-1 6" Conc Curb and Gutter Seeding, Hydromulch Traffic Control CIT1 OF FORT NORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Fonn Revised 20120120 SECTION 00 42 43 PROPOSAL FORM (DAP VERSION) Project Item Information Description Specification Section No. UNIT III• PAVING IMPROVEMENTS 02 41 15 02 41 15 32 13 20 32 13 20 32 13 20 32 16 13 32 92 13 34 71 13 Unit of Measure SY LF SF SF EA LF SY MO 00 42 43 BID PROPOSAL Page 3 or4 Bidder's Application Bid Quantity 232 60 1790 3570 Bidder's Proposal Unit Price $1.00 $10.00 $9.00 $3.50 1 $1,000.00 135 $5.50 5550 $1.00 1 $1,500.00 Transfer total to Summary Sheet Bid Value $232.00 $600.00 $16 110.00 $12 495.00 $1 000.00 $742.50 $5,550.00 $1,500.00 $38,229.50 00 42 43 Bid Proposal Workbook-20140217.xls Drawing name: K:\SNA_Civil\068682806\CAD\Exhibits\CFA\E—CFA.dwg EXHIBIT C Feb 17, 2014 12:36pm by stephen.gose m -H n 70 • m H m c-a • r m Z=x o m�cc • 0 n mm zz H-I wco \ \ 0 r m tit 0 Item No. UNIT PRICE BID Bidlist Item No. SECTION 00 42 43 PROPOSAL FORM (DAP VERSION) Project Item Information Description Specification I Unit of Section No. Measure UNIT IV: SITE LIGHTING 3441.3301 Rdwy Ilium Foundation TY 1,2, and 4 2 3441.3321 Furnish/Install 40' Wood Light Pole 3 3441.3501 Salvage Street Light Pole 4 3441.3502 Relocate Street Light Pole 5 9999.9999 #6 Duplex Overhead Electric Conductor WATER IMPROVEMENTS SANITARY SEWER IMPROVEMENTS DRAINAGE IMPROVEMENTS PAVING IMPROVEMENTS STREET LIGHTING IMPROVEMENTS TRAFFIC SIGNAL IMPROVEMENTS Time of Completion IMPROVEMENTS 34 41 20 34 41 20 34 41 20 34 41 20 EA EA EA EA LF 00 42 43 BID PROPOSAL Page 4 of 4 Bidder's Application Bidder's Proposal Bid Quantity Unit Price 1 1,750.00 1 750.00 1 400.00 1 2,500.00 10 10.00 Transfer total to Summary Sheet TOTAL CONSTRUCTION BID Bidder agrees that the Work will be substantially complete within **** calendar days after the date when the Contract Time commences to run as set forth by the Developer. CITY OF FORT \VORTII STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20i20120 Bid Value $1,750.00 $750.00 $400.00 $2,500.00 $100.00 $5,500.00 $323,953.75 $32,853.70 $38,229.50 $5,500.00 $400,536.95 00 42 43 Bid Proposal Workbook-20140217.xls