Loading...
HomeMy WebLinkAboutContract 45434 (2)CITY SECRETARY/J czji (_JCONTRACT Developer and Project Information Cover Sheet: Developer Company Name: First Texas Homes, Inc. Address, State, Zip Code: 500 Crescent Ct., Suite 350 Dallas, TX 75201 Phone, E-Mail: (214) 613-3400, khardesty@firsttexashomes.com Authorized Signatory/Title: Keith Hardesty, President Project Name and Brief Description: Water, Sewer, Paving, Drainage and Street Light Improvements to serve Presidio West Phase IV Project Location: Amaranth Dr. & Senita Cactus Dr. Plat Case No.: FP-013-060 Plat Name: Presidio West Mapsco: 20V CFA: 2013-091 DOE: 7162 To be complete by staff.• Received by: Council District: 7 City Project No: 02209 Combined CFA Agreement — Revised January 2014 Date: RECEIVED UAI? 1 9 AN COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ( `Improvements") related to a project generally described as Presidio West Phase IV ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Proj ect. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub -contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X , Sewer (A-1) X , Paving (B) X , Storm Drain (B-1) X , Street Lights & Signs (C) X_. E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond All bonds to be furnished before work is commenced and to meet the requirements of Combined CFA Agreement — Revised January 2014 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state -approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's. Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, Combined CFA Agreement — Revised January 2014 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Combined CFA Agreement — Revised January 2014 Cost Summary Sheet Project Name: Presidio West Phase IV CFA No.: 2013-091 DOE No.:7162 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2°70) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period 140,204.20 129,510.40 269,714.60 328,900.95 300,280.60 34,119.40 663,300.95 933,015.55 5,394.29 5,394.29 10,788.58 25,167.26 12,583.63 1,364.78 1,225.00 40,340.67 51,129.25 Amount 933,015.55 933,015.55 337,143.25 829,126.19 1,166,269.44 Choice (ck one) X IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to in quadruplicate in its name and on its behalf by its Assistant City Manager, attested Secretary, with the corporate seal of the City affixed, and said Dreloper has execut instrument in quadruplicate, at Fort Worth, Texas this f day of ,20 /. CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. e/x- Date: ATTEST: aty J. Kays City Secretary, ATTEST: Signature (Print) Name: 3ijv) grail& Combined CFA Agreement — Revised January 2014 be executed by its City his Transportation & Public Works Department ti Lpy Douglas ` '. Wiersig, P.E. Director Approved by City Manager's Office ans•••••4 Fernando Costa Assistant City Manager First Texas Homes, Inc. L \s•A, Signature Print Name: itLiJ-' d1-11) Title: 0 cull err ici,t OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ►1 ►/ El El 121 Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) I:\SLD\WFXK3941\700 CADD\728 Exhibits\CFA\PW4CFA.dwg, 2/9/2014 9:46 PM, Turner, Nathan LL 'ROJECT - _OCATION 0 Z HERITAGE TRACE P KWY. =! 11 111111111111 1111111111 -- 1 111111111111111111ry��/ �j. IIIu111111 111111111/� U11111111111 IllliiIVP ///� 4 0 W'\'/ 0 O000HH1111�W�''M'MMM''�''�\�''''�'�,,�/'�����''',HHHH,yyyy,, Ct 19 f �I 11111111111""" H 1u uII -o MAPSCO PAGE 20V COUNCIL DISTRICT NO. 7 NOT TO SCALE VICINITY MAP PRESIDIO WEST PHASE IV JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 a tb0A3Mns/1133N SN3 a O 4.7 • " ;alm 5�� bi� AO (n 10 N 0 0 ICE NO, 100930 t cc cc ". Tr 0�I�Y�YYA(((yyy((("vvrrrv�S.Y4 fjo''ppppppll!�bryyY��Y.• rr11tYY}•i -y 10/F�Ny. /ei ^\ e / 11381Nf1N iN3YVfiN1SNI 1 n z YIN/ M4). Cp/ li- /` • 1 1Ot 8 �i�' 1 - .r . 1$.1em as..�wses i• 2It IaN � S*0 43 31 M suit' tt`)- c1aRel�Is SPI3:R 5 n t L.- b r \ � \F al la _Gs Y Cr !) \ \ rt _,;� \ E ;; \ \,\- \ yj . a va, w"\w y i;. gF SIN 41,11. peg' g of 0 1' 2 PRESIDIO WEST - PHASE IV 46 PM, Turner, Nathan I:\SLD\WFXK3941\700 CADD\728 Exhibits\CFA\PW4CFA.dwg, 2/9/2014 LEGEND PROPOSED WATER LINE PROPOSED GATE VALVE PROPOSED FIRE HYDRANT EXISTING WATER LINE EXISTING GATE VALVE EXISTING FIRE HYDRANT LIMITS OF PROJECT PROPOSED WATER LINES ARE OTHERWISE INDICATED 8" UNLESS / FIRST TEXAS HOMES CC# D210260522 0.P.R.T.C.T 28 \ 36 35 w 23 � o U IQ I('- 25 1¢ ;i 26 I< aJ I 27 24 28 6 7\ 9 GARY C. MORCHOWER MD PLAN CC# D207051253 0.P.R.T.C.T. SCALE:1" = 200' EITAN OVED CC# D209035930 0.P.R.T.C.T. WATER EXHIBIT 'A' PRESIDIO WEST RPCE PHASE IV JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 I:\SLD\WFXK3941\700 CADD\728 Exhibits\CFA\PW4CFA.dwg, 2/9/2014 9:46 PM, Turner, Nathan 5\1Z:CC LEGEND PROPOSED SANITARY SEWER PROPOSED MANHOLE EXISTING SANITARY SEWER EXISTING MANHOLE LIMITS OF PROJECT 0 PROPOSED SEWER LINES ARE 8" SDR-26 DI 4AS GARY C. 25 MORCHOWER MD PLAN FIRST TEXAS HOMES CC# D210260522 0.P.R.T.C.T 2 8 \ 0 v 24 37 �Ni N 36 16 Q I�I 26 CC# D207051253 35 I m27 0.P.R.T.C.T. 6 7` 9, 10 `,' ♦ ♦ �RP�E N�R\P PR1,10 SCALE: 1" = 200' EITAN OVED CC# D209035930 0.P.R.T.C.T. WASTEWATER EXHIBIT 'A-1' PRESIDIO WEST PHASE IV JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 I:\SLD\WFXK3941\700 CADD\728 Exhibits\CFA\PW4CFA.dwg, 2/9/2014 9:46 PM, Turner, Nathan Go'!;s LEGEND PROPOSED 29'B/B ROADWAY/50'ROW PROPOSED 4'SIDEWALK (BY HOMEBUILDER) PROPOSED ADA RAMPS (BY DEVELOPER) LIMITS OF PROJECT 0 FIRST TEXAS HOMES CC# D210260522 0.P.R.T.C.T 28 9` 0\ 23 24 GARY C. 25 MORCHOWER MD PLAN 26 CC# D207051253 0.P.R.T.C.T. 27 6 SCALE:1" = 200' EITAN OVED CC# D209035930 0.P.R.T.C.T. PAVING EXHIBIT 'B' PRESIDIO WEST PHASE IV JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 I:\SLD\WFXK3941\700 CADD\728 Exhibits\CFA\PW4CFA.dwg, 2/9/2014 9:46 PM, Turner, Nathan o\`'\'ck LEGEND PROPOSED STORM DRAIN LINE PROPOSED INLET PROPOSED MANHOLE EXISTING STORM DRAIN LINE LIMITS OF PROJECT 1 W HASE FIRST TEXAS HOMES CC# D210260522 0.P.R.T.C.T 28 \\ 23 24 37 iif) I 25 36 26 'Q :- 35 ' co 27 9 ' 10\ 20�v�� 1/ GARY C. MORCHOWER MD PLAN CC# D207051253 O.P.R.T.C.T. SCALE: 1" = 200' EITAN OVED CC# D209035930 0.P.R.T.C.T. STORM DRAIN EXHIBIT'B-1' PRESIDIO WEST PHASE IV JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 I:\SLD\WFXK3941\700 CADD\728 Exhibits\CFA\PW4CFA.dwg, 2/9/2014 9:46 PM, Turner, Nathan LEGEND PROPOSED SINGLE STREET LIGHT •—. EXISTING SINGLE STREET LIGHT o i LIMITS OF PROJECT FIRST TEXAS HOMES CC# D210260522 0.P.R.T.C.T 28 23 24 37 ' i 25 36 mI 26 35 i w 27 6 ` 7` g `\ 10 `) • 20\< GARY C. MORCHOWER MD PLAN CC# D207051253 0.P.R.T.C.T. GE -cRPGE NCR\p 0.01 per( SCALE: 1" = 200' EITAN OVED CC# D209035930 0.P.R.T.C.T. STREET LIGHTS EXHIBIT 'C' PRESIDIO WEST PHASE IV JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 LEGEND PROPOSED STREET SIGN EXISTING STREET SIGN LIMITS OF PROJECT A FIRST TEXAS HOMES CC# D210260522 0.P.R.T.C.T GARY C. MORCHOWER MD PLAN CC# D207051253 0.P.R.T.C.T. I< Izi 25 26 IQ 27 STREET SIGNS EXHIBIT 'C-1' PRESIDIO WEST 1PCE PHASE IV NER�pP K 4P� TM JACOBS SCALE:1" = 200' EITAN OVED CC# D209035930 0.P.R.T.C.T. 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 ITEM# 1 WATER 2 SANITARY SEWER SUBTOTAL FEES TOTAL FEES DESCRIPTION ITEM# DESCRIPTION 1 STREET PAVING 2 STORM DRAINAGE 3 STREET LIGHTS SUBTOTAL FEES TOTAL FEES ITEM# I DESCRIPTION 1 STREET SIGNS (TOTAL FEES ITEM# DESCRIPTION 1 WATER 2 SANITARY SEWER 3 STREET PAVING 4 STORM DRAINAGE 5 STREET LIGHTS IITOTAL CFA CONSTRUCTION IITOTAL WATER CONSTRUCTION FEE IITOTAL TPW CONSTRUCTION FEE JACOBS ENGINEERING GROUP INC. 777 MAIN STREET, FORT WORTH, TEXAS 76102 PHONE NO. (817) 735-6000 PRESIDIO WEST PHASE IV February 10, 2014 FEE CALCULATION WATER AND SANITARY SEWER AMOUNT $140,204.20 $129,510.40 FEE $2,804.08 $2,590.21 $5,394.29 2%TESTING FEE $2,804.08 $2,590.21 $5,394.29 $10,788.58 FEE CALCULATION PAVING AND STORM DRAINAGE AMOUNT FEE 2% TESTING FEE $328,900.95 $300,280.60 $34,119.40 STREET SIGN INSTALLATION COST AMOUNT $1,225.00 CFA SUMMARY $13,156.04 $12,011.22 $1,364.78 $26,532.04 $6,578.02 $6,005.61 $12,583.631 $39,115.6711 $1,225.0011 TOTAL $140,204.20 $129,510.40 $328,900.95 $300,280.60 $34,119.40 $933,015.55 11 $10,788.58 II $40,340.671 I:\SLD\WFXK3941\600 DISCIPLINE\602 Civil\CFA\PW4 CFA Cost Estimate Page 7 00 42 43 PROPOSAL FORM UNIT PRICE Page 1 of 16 This proposal must not be removed from this book of Contract Documents. TO: FIRST TEXAS HOMES, INC. PROPOSAL FOR: PROJECT NAME Presidio West Phase IV SEWER PROJECT NO. P275-707140220983 WATER PROJECT NO.P265-607150220983 X NO. X-22503 FILE NO W-2994 CITY PROJECT NO. 02209 Includes the furnishing of all materials, except materials specified to be furnished by the City equipment and labor for the installation of WATER, SANITARY SEWER STREET, STORM DRAIN AND LIGHTING IMPROVEMENTS and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: IPRESIDIO WEST PHASE IV Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, the General Contract Documents and General Specifications for Water Department Projects, the General Contract Documents and General specifications for Transportation and Public works Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Department of Transportation & Public Works of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: Updated: 08/30/2010 Presidio West Phase IV 02209 00 42 43 PROPOSAL FORM UNIT PRICE UNIT I: WATER Item Bid Item Approx. Unit No. No. Quantity Measurement Item Description "D" Item Reference UNIT — WATER IMPROVEMENTS 1 3311.0241 3,084 L.F. 8" Water Line, Complete in Place for the Sum of Per Linear Foot Sixteen Dollars & Zero Cents 2 3312 3003 12 Ea. 8" Gate Valve & Box, Complete in Place for the Sum of Per Each One thousand one hundred fiftv Dollars & Zero Cents 3 3312 0001 4 Ea. Fire Hydrant Assembly, Complete in Place for the Sum of Per Each Thiee thousand four hundred Dollars & Zero Cents 4 3312.2003 61 Ea. 1" Water Services, Complete in Place for the Sum of Each Seven hundred three Dollars & Ninety-one Cents 5 3312 0117 2 Ea. Connect to Existing 8" Water Line, Complete in Place for the Sum of Per Each Six hundred Dollars & Zero Cents Page 2 of 16 Unit Total Price Amount $16.00 $49,344.00 $1,150.00 $13,800.00 $3,400.00 $13,600.00 $703.91 $42,938.80 $600.00 $1,200.00 Updated: 08/30/2010 Presidio West Phase IV 02209 Item No. Bid Item No. Approx. Unit Quantity Measurement UNIT — WATER IMPROVEMENTS 6 3305.0016 100 Ea. 7 3305.0109 3,084 8 9 3311.0001 9999.0001 Updated: 08/30/2010 3 1 Item Description "D" Item Reference Concrete Encasement for Utility Pipes, Complete in Place for the Sum of Per Each Forty Zero 00 42 43 PROPOSAL FORM UNIT PRICE Page 3 of 16 Dollars & Cents L.F. Trench Safety, Complete in Place for the Sum of Per Lineal Foot Ton L.S. Zero Ten Dollars & Cents Ductile Iron Fittings, Complete in Place for the Sum of Per Ton Three thousand one hundred Dollars & Zero Cents City Bond for All Water/Sewer Improvements (Performance, Payment & Maintenance), Complete in Place for the Sum of Per Lump Sum Five thousand Dollars & Zero Cents TOTAL AMOUNT BID WATER IMPROVEMENTS Unit Price Total Amount $40.00 $4,000.00 $0.10 $308.40 $3,100.00 $10,013.00 $5,000.00 $140,204.20 $5,000.00 Presidio West Phase IV 02209 Item No. UNIT II•SEWER Bid Item No. Approx. Unit Quantity Measurement Item Description "D" Item Reference UNIT II — SEWER IMPROVEMENTS 1 3331.4115 2669 L.F. 8" SDR-26 PVC Sewer Main, Complete in Place for the Sum of Per Linear Foot 2 3 4 5 3339.1001 3339.1003 3331.3101 3331.3101 11 Twenty-one Twenty 00 42 43 PROPOSAL FORM UNIT PRICE Page 4 of 16 Dollars & Cents Ea. 4' Diameter Manhole, Complete in Place for the Sum of Per Each Two thousand Dollars & Zero Cents 24 V.F. Extra Vertical Depth of Manhole (>6'), Complete in Place for the Sum of Per Vertical Foot One hundred Dollars & Zero Cents 29 Ea. 4" Sanitary Sewer Service (SDR- 35), Complete in Place for• the Sum of Each Five hundred twenty-one Dollars & Seventy-two Cents 35 Ea. 4" Sanitary Sewer Service (SDR- 26), Complete in Place for the Sum of Each Six hundred forty-four Dollars & Ninety-one Cents Unit Price Total Amount $22.28 $59,452.80 $2,000.00 $22,000.00 $100.00 $2,400.00 $521.72 $15,130.00 $644.91 $22,572.00 Updated: 08/30/2010 Presidio West Phase 1V 02209 00 42 43 PROPOSAL FORM UNIT PRICE Item Bid Approx. Unit Item Description "D" Item No. Item Quantity Measurement Reference UNIT II — SEWER IMPROVEMENTS 6 9999.0002 1 Ea. Connect to Existing Sanitary Sewer Manhole Complete in Place for the Sum of Per Each 7 3305.0109 Four hundred fifty Dollars & Zero Cents 2669 L.F. Trench Safety, Complete in Place for the Sum of Per Linear Foot One Dollars & Zero Cents 8 3301.0101 11 Ea. Vacuum Test for Manhole Complete in Place for the Sum of Per Each 9 3301.0002 2669 L.F. One hundred Dollars & Zero Cents TV Inspection of Sanitary Sewer, Complete in Place for the Sum of Per Linear Foot One Dollars & Forty Cents TOTAL AMOUNT BID SEWER IMPROVEMENTS Unit Price Page 5 of 16 Total Amount $450.00 $450.00 $1.00 $2,669.00 $100.00 $1,100.00 $1.40 $3,736.60 $129,510.40 Updated: 08/30/2010 Presidio West Phase IV 02209 00 42 43 PROPOSAL FORM UNIT PRICE Page 6 of 16 UNIT II• Street Improvements (Furnish and install, including all appurtenant work, complete in place, the following items) Item No. UNIT 1 2 3 4 5 6 Bid Item No. Approx. Unit Quantity Measurement I — STREET IMPROVEMENTS 3213.0101 8,647 S Y. 3211.0501 3211.0400 3213.0501 9999.0003 9999.0004 Updated: 08/30/2010 9,197 S.Y. 148 Ton 8 Each 2 Ea. 1 Ea. Item Description "D" Item Reference 6" RC Street Pavement w/ 7" Curb, Complete in Place for the Sum of Per Square Yard Thirty Zero Dollars & Cents 6" Lime Stabilized Subgrade, Complete in Place for the Sum of Per Square Yard Three Dollars & Zero Cents Hydrated Lime (32#/SY), Complete in Place for the Sum of Per Ton One hundred forty-five Dollars & Zero Cents Barrier Free Ramps Type R-1, Complete in Place for the Sum of Per Each Nine hundred Dollars & Zero Cents Relocate Existing FOR Barricade, Complete in Place for the Sum of Per Each Five hundred Zero Dollars & Cents Standard FOR Barricade, Complete in Place for the Sum of Per Each One thousand Dollars & Zero Cents Unit Price Total Amount $30.20 $261,139.40 $2.15 $19,773.55 $136.00 $20,128.00 $1,350.00 $10,800.00 $1,500.00 $3,000.00 $1,500.00 $1,500.00 Presidio West Phase IV 02209 Item No. Bid Item No. Approx. Unit Quantity Measurement Reference 00 42 43 PROPOSAL FORM UNIT PRICE UNIT II — STREET IMPROVEMENTS 7 9999.0005 95 L F. 8 9 3137.0101 9999.0006 Item Description "D" Item Install Header, Complete in Place for the Sum of Per Linear Foot Ten Dollars & Zero Cents 56 S.Y. 12" Rock Rip Rap, Complete in Place for the Sum of Per Square Yard Sixty-five Dollars & Zero Cents 28 S.Y. Relocate 12" Rock Rip Rap, Complete in Place for the Sum of Per Square Yard Twenty Zero Dollars & Cents 10 9999.0007 1 L.S. City Bonds for Paving Improvements (Performance, Payment & Maintenance, Complete in Place for the Sum of Per Lump Sum Five thousand Dollars & Zero Cents TOTAL AMOUNT BID STREET IMPROVEMENTS Page 7 of 16 Unit Price Total Amount $8.00 $760.00 $75.00 $4,200.00 $75.00 $2,100.00 $5,500.00 $328,900.95 $5,500.00 Updated: 08/30/2010 Presidio West Phase IV 02209 00 42 43 PROPOSAL FORM UNIT PRICE Page 8 of 16 UNIT II: STORM DRAIN (Furnish and install, including all appurtenant work, complete in place, the following items) Item No. UNIT 1 Bid Item No. Approx. Unit Item Description "D" Item Quantity Measurement Reference I — STORM DRAIN IMPROVEMENTS 3341.0201 328 L.F. 21" Class III R.C. Pipe, Including Trench Excavation & Backfill, Complete in Place for the Sum of Per Linear Foot Thirty-nine Zero Dollars & Cents 2 3341.0205 406 L.F. 24" Class III R C. Pipe, Including Trench Excavation & Backfill, Complete in Place for the Sum of Per Linear Foot Forty-four Zero Dollars & Cents 3 3341.0208 84 L.F. 27" Class III R C. Pipe, Including Trench Excavation & Backfill, Complete in Place for the Sum of Per Linear Foot Forty-nine Dollars & Zero Cents 4 3341.0302 10 L.F. 30" Class III R C Pipe, Including Trench Excavation & Backfill, Complete in Place for the Sum of Per Linear Foot Fifty-four Zero Dollars & Cents 5 3341.0305 48 L.F. 33" Class III R C. Pipe, Including Trench Excavation & Backfill, Complete in Place for the Sum of Per Linear Foot Sixty-nine Zero Dollars & Cents 6 3341.0312 407 L.F. 39" Class III R C. Pipe, Including Trench Excavation & Backfill, Complete in Place for the Sum of Per Linear Foot Ninety-two Dollars & Zero Cents Unit Price Total Amount $39.00 $12,792.00 $44.00 $17,864.00 $49.00 $4,116.00 $54.00 $540.00 $69.00 $3,312.00 $92.00 $37,444.00 Updated: 08/30/2010 Presidio West Phase IV 02209 Item No. UNIT 7 8 9 Bid Item No. Approx. Quantity I — STORVI DRAIN 3341.0402 3341.1102 3341.1201 10 3349.5001 11 3349.7001 12 3349.0001 13 3349.0002 Updated: 08/30/2010 270 570 178 10 2 1 1 Unit Measurement IMPROVEMENTS L F. L.F. L.F. Ea. Ea. Ea. Ea. 00 42 43 PROPOSAL FORM UNIT PRICE Item Description "D" Item Reference 42" Class III R.C. Pipe, Including Trench Excavation & Backfill, Complete in Place for the Sum of Per Linear Foot Ninety-six Dollars & Zero Cents 4 x3 R.C. Box, Including Trench Excavation & Backfill Complete in Place for the Sum of Per Linear Foot One hundred sixty-eight Dollars & Zero Cents 5'x3' R.C. Box, Including Trench Excavation & Backfill Complete in Place for the Sum of Per Linear Foot One hundred ninety-eight Dollars & Zero Cents Std. 10' Curb Inlet, Complete in Place for the Sum of Per Each Two thousand five hundred Dollars & Zero Cents Std. 4'x4' Drop Inlet (including Rock Rip -Rap) Complete in Place for the Sum of Per Each Three thousand two hundred Dollars & Zero Cents Std. 4' Square Manhole, Complete in Place for the Sum of Per Each Two thousand nine hundred Dollars & Zero Cents Std 5' Square Manhole, Complete in Place for the Sum of Per Each Thi ee thousand five hundred Dollars & Zero Cents Page 9 of 16 Unit Price Total Amount $96.00 $25,920.00 $168.00 $95,760.00 $198.00 $35,244.00 $2,500.00 $25,000.00 $3,200.00 $6,400.00 $2,900.00 $2,900.00 $3,500.00 $3,500.00 Presidio West Phase IV 02209 Item No. UNIT 14 Bid Item No. Approx. Unit Quantity Measurement I — STORM DRAIN IMPROVEMENTS 1 Ea Std. 6' Square Manhole, Complete in Place for the Sum of Per Each 3349.0003 15 3349.0102 00 42 43 PROPOSAL FORM UNIT PRICE Item Description "D" Item Reference 2 16 3305.0112 4 17 9999.0008 18 3137.0101 19 9999.0009 1 57 1 20 3305.0109 2,301 Updated: 08/30/2010 Ea. Ea. Ea S.Y. Ea. Thi ee thousand nine hundred Dollars & Zero Cents Manhole Riser with Lid, Complete in Place for the Sum of Per Each Two thousand Dollars & Zero Cents Pipe Collar, Complete in Place for the Sum of Per Each Five hundred Dollars & Zero Cents 6'x3 TxDOT FW-0 Headwall, Complete in Place for the Sum of Per Each Seven thousand nine hundred Dollars & Zero Cents 12' Rock Rip Rap, Complete in Place for the Sum of Per Square Yard Forty-four Zero Dollars & Cents Remove Existing Drop Inlet, Apron & RCP, Complete in Place for the Sum of Per Each Eight hundred Dollars & Zero Cents L.F. Trench Safety, Complete in Place for the Sum of Per Linear Foot Zero Sixty Dollars & Cents Page 10 of 16 Unit Price Total Amount $3,900.00 $3,900.00 $2,000.00 $4,000.00 $500.00 $2,000.00 $7,900.00 $7,900.00 $44.00 $2,508.00 $800.00 $800.00 $0.60 $1,380.60 Presidio West Phase IV 02209 00 42 43 PROPOSAL FORM UNIT PRICE Page 11 of 16 Item Bid Approx. Unit Item Description "D" Item Unit Price Total No. Item Quantity Measurement Reference Amount No. UNIT II — STORM DRAIN IMPROVEMENTS 21 9999.0010 1 L.S. City Bonds for Storm Drain Improvements (Performance, Payment & Maintenance), Complete in Place for the Sum of Per Lump Sum Seven thousand Zero $7 000.00 TOTAL AMOUNT BID STORM DRAIN IMPROVEMENTS $300,280 60 Dollars & Cents $7,000.00 Updated: 08/30/2010 Presidio West Phase IV 02209 00 42 43 PROPOSAL FORM UNIT PRICE Page 12 of 16 UNIT II: Lighting Improvements (Furnish and install, including all appurtenant work, complete in place, the following items) Item No. Bid Item No. Approx. Unit Quantity Measurement UNIT I — LIGHTING IMPROVEMENTS 1 2605.3001 1,035 L.F. 2 9999.0011 2,070 3 9999.0012 1,035 4 3441.3001 1 0 5 3441.3101 1 0 6 3441.3301 Updated: 08/30/2010 10 Item Description "D" Item Reference Conduit 1-1/4' Complete in Place for the Sum of Per Linear Foot Six Dollars & Thirty-five Cents L.F. #10G Wire, Complete in Place for the Sum of Per Linear Foot Zero Dollars & Sixty-three Cents L.F. #10 Wire, Complete in Place for the Sum of Per Linear Foot Ea. Ea. Ea Zero Dollars & Sixty-three Cents D25-6 Light Poles, Complete in Place for the Sum of Per Each One thousand two hundred thirty- five Dollars & Zero Cents 100W HPS Cobra Luminaire Type, Complete in Place for the Sum of Per Each Two hundred eighty-seven Dollars & Zero Cents Type 4 Foundation, Complete in Place for the Sum of Per Each Nine hundred seven Zero Dollars & Cents Unit Price Total Amount $6.35 $6,572.25 $0.63 $1,304.10 $0.63 $652.05 $1,235.00 $12,350.00 $287.00 $2,870.00 $907.00 $9,070.00 Presidio West Phase IV 02209 Item No. Bid Item No. Approx. Unit Quantity Measurement UNIT I — LIGHTING IMPROVEMENTS 7 ! 3441 1502 1 Ea 00 42 43 PROPOSAL FORM UNIT PRICE Item Description "D" Item Reference Ground Box, Complete in Place for the Sum of Per Each Six hundred forty-one Dollars & Zero Cents 8 9999.0013 1 L.S. City Bonds for All Street Light Improvements (Performance, Payment & Maintenance), Complete in Place for the Sum of Per Lump Sum Six hundred forty-one Zero Dollars & Cents TOTAL AMOUNT BID LIGHTING IMPROVEMENTS Page 13 of 16 Unit Price Total Amount $641.00 $641.00 $660.00 $660.00 $34,119.40 Updated: 08/30/2010 Presidio West Phase IV 02209 00 42 43 PROPOSAL FORM UNIT PRICE Page 14 of 16 IBID SUMMARY TOTAL AMOUNT BID WATER $140,204.20 TOTAL AMOUNT BID SANITARY SEWER $129,510.40 TOTAL AMOUNT BID STREET $328,900.95 TOTAL AMOUNT BID STORM DRAIN $300,280.60 TOTAL AMOUNT BID LIGHTING $ 34,119.40 GRAND TOTAL AMOUNT BID $933,015.55 Updated: 08/30/2010 Presidio West Phase IV 02209 00 42 43 PROPOSAL FORM UNIT PRICE Page 15 of 16 After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Developer. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within ( ) calendar days after issue of the work order, and to complete the contract within ( ) calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) n A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Updated: 08/30/2010 Presidio West Phase IV 02209 00 42 43 PROPOSAL FORM UNIT PRICE Page 16 of 16 I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) Respectfully submitted, By: Title Address Telephone: Fax: Updated: 08/30/2010 Presidio West Phase IV 02209