Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 45719 (2)
CITYSECRETArn' CONTRACT No. yC'1 � ti Developer and Project Information Cover Sheet: Developer Company Name: LGI Homes, Inc. Address, State, Zip Code: 1450 Lake Robbins Dr., Suite 430 I The Woodlands, TX 77380 Phone, E-Mail: (281) 632-8998, jliparlgihomes.com Authorized Signatory/Title: Jack Lipar, Executive Vice President Project Name and Brief Description: Water, Sewer, Paving, Drainage & Street Light Improvements to serve Stone Creek Ranch Ph.IV Project Location: Granite Creek Drive, East off of Boat Club Rd., South of Cromwell -Marine Creek Rd. Plat Case No.: FP-013-080 Plat Name: Stone Creek Ranch Council District: 2 City Project No: 02245 CFA: 2014-020 DOE: 7197 To be completed by staff Received by: ( 1 f L �- ��� Date: Combined CFA Agreement — Revised January 2014 sict L1 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX • RECEIVED JUL 02280 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT § § City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ( `Improvements") related to a project generally described as Stone Creek Ranch Ph. IV ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub -contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X_, Sewer (A-1) _X , Paving (B) _X, Storm Drain (B-1) X , Street Lights & Signs (C) X . E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following i. To employ a construction contractor who is approved by the 'director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Combined CFA Agreement — Revised January 2014 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state -approved faun) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, stoinn drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth. its officers. servants, or employees Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, Combined CFA Agreement — Revised January 2014 damages, costs or expenses suffered by the City or caused as a result of saki contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLAND Combined CFA Agreement — Revised January 2014 Cost Summary Sheet Project Name: Stone Creek Ranch Ph IV CFA No.: 2014-020 DOE No.: 7197 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 2. Sewer Construction $ Water and Sewer Construction Total $ B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2vr expiration period 264,023.50 369,817.50 633,841.00 580,877.50 338,764.00 107,800.00 1,027,441.50 1,661,282.50 12,676.82 12,676.82 25,353.64 36,785.66 18,392.83 4,312.00 2,940.00 62,430.49 87,784.13 Amount 1,661,282.50 1,661,282.50 792,301.25 1,284,301.88 2,076,603.13 Choice fck one) IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has execufid this instrument in quadruplicate, at Fort Worth, Texas this Dr= day of ,20 FAA . CITY OF FORT WORTH - Recommended by: Water Department AaX Wendy Chi-Eabulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas Black Assistant City Attorney M&C No. MA Date: ATTEST: inMaryJ. Kayser City Secretary ATTEST: Signature (Print) Name: Shannon Birt Vice President of Development Combined CFA Agreement — Revised January 2014 Transportation & Public Works Department Douglas Director Wiersig, P.E.c"Lis L� Approved by City Manager's Office Sg444&--- Fernando Costa Assistant City Manager DEVELOPE LGI Hom nature Title* Executive Vice President ame: Jack Lipar OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate S AIlk Mr AL Wr (Remainder of Page Intentionally Left Blank) I:\SLD\WFXM5701\700 CADD\728 Exhibits\Phase IV\CFA\CFA.dwg, 3/19/2014 8:17 AM, Beltrand, Blake 0 0 z> 0 cn rn �00 0 V, -0 D 0 corn z� 0 HOD KINS c A Z rn Al:A Z 0 - T S r D r*� EA REST r r TEEHEA 31vOS 01 10N BOAT CLUB BOWMAN - ROBERTS C r -0 o�, 0 Dm on z-1 3 Z ri BOAT CLUI SETH D BARWISE MARVIN BROWN rri GILLIS--AiJOHNSON ti BOB d -ERNM EADO W b z p /5) ,Z-Y rl 01 Z 0 0 0 1 Z I:\SLD\WFXM5701\700 CADD\728 Exhibits\Phase IV\CFA\CFA.dwg, 4/15/2014 2:30 PM, Turner, Nathan t_ j Li Li 1 RB Tt �1429 15 I 11 I J1 IU�� :*1� =27126Q 49 `• 20 19 19 D 6 7 j ' 111111 �y_ 21 TRINlry• EEK �_l-- R DRIVE" PUBLIC PARK SITE BLOCK 23 LOT 128 B.600 ACRES ATB BOAT CLUB PROPERTIES VOL 11437. PC. 1776 D.R.T.C.T LEGEND PROPOSED WATER LINE PROPOSED GATE VALVE PROPOSED FIRE HYDRANT 3D 41 1� PRIVATE OPEN SPACE BLOCK 22 22.774IX 4 ACRE / tO EXISTING WATER LINE - - EXISTING GATE VALVE - D4 EXISTING FIRE HYDRANT - LIMITS OF PROJECT PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE INDICATED • FUTURE STONE CREEK RANCH PHASE \-\ 49 z A7B BOAT CLUB PROPERTIES VOL 11437. PC. 1778 D.RT.C.T 18 15 SCALE:1" = 300' WATER EXHIBIT 'A' STONE CREEK RANCH PHASE IV JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 I:\SLD\WFXM5701\700 CADD\728 Exhibits\Phose IV\CFA\CFA.dwg, 3/19/2014 9:13 AM, Beltrand, Blake E 1 L L__l�__►� _ice L_\ _T-��"� b � 28 ••1 PUBLIC PARK SRE BLOCK 23 LOT 12X 8.800 ACRES ATB BOAT CLUB PROPERTIES VOL 11437. PC. 1776 O.R.T.C.T LEGEND PROPOSED SANITARY SEWER PROPOSED MANHOLE EXISTING SANITARY SEWER EXISTING MANHOLE LIMITS OF PROJECT PROPOSED SEWER LINES ARE 8" UNLESS OTHERWISE INDICATED 39 PRIVATE OPEN SPACE BLOCK 22 LOT 1X ±2.74 ACRE NI 7 CO CO 12 1y 4, FUTURE STONE CREEK RANCH PHASE \-\ ' I —� L 4 SCALE: 1 " = 300' —11 I 1pl , Ills '/- ATB BOAT CLUB PROPERTIES VOL 11437. PG. 1776 O.R.T.C.T 15 o WASTEWATER EXHIBIT 'A-1' STONE CREEK RANCH PHASE IV JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 19 AM, Beltrand, Blake I:\SLD\WFXM5701\700 CADD\728 Exhibits\Phase IV\CFA\CFA.dwg, 3/19/2014 �$o PROPOSED 29'B/B ROADWAY/50'ROW 28 PUBLIC PARK SITE BLOCK 23 LOT 12% 8.800 ACRES ATB BOAT CLUB PROPERTIES VOL 11437, PC. 1776 O.R.T.C.T LEGEND PROPOSED 4'SIDEWALK (BY HOMEBUILDER) PROPOSED ADA RAMPS (BY DEVELOPER) LIMITS OF PROJECT r 1 J 15 14 3 ®' 12 1t _ _ 3 O 1 36 22 latteaRtvear 2T30 312O ® ] 9 5 4A 6 15 13 11 tow1041 0 39 PRIVATE OPEN SPACE BLOCK 22 LOT 16 t2.74 ACRE FUTURE STONE CREEK RANCH PHASE - _ \ - - ATB BOAT CLUB PROPERTIES VOL. 11437, PC. 1776 O.R.T.C.T -J L- SCALE:1" = 300' 15 9 PAVING " EXHIBIT 'B' STONE CREEK RANCH PHASE IV JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 I:\SLD\WFXM5701\700 CARD\728 Exhibits\Phase IV\CFA\CFA.dwg, 3/19/2014 9:13 AM, Beltrand, Blake T 4 28 --1-L/L/L\\ i C) 2 z9 w is a 13 12 i1 m 5 4 ON�JE So � to 9 � No�O\N i� .L CHAIKHOLLOW—DR _ 1 �NR,K al� Q 3, , _ HCIIOW pR 3e r � 35 ]2 ;�t 25 �4 � \\ w 2, 28 O 21 28 36 31 2 20 3 s ! i 9 16 15 9 Cii4`� 23 1 13 11 ' 'CO 22 9 \� � • 1 TRINITY CREEK zo 21` DRIVE111 — © 4 42 0 33 35 36 37 PUBLIC PARK SRE BLOCK 23 LOT 12% 8.600 ACRES 16 16 3 36 40 • O 14 Y I 11 qj 10 L ATB BOAT CLUB PROPERTIES VOL 11431, PC, 1776 O.R,T.C.T LEGEND PROPOSED STORM DRAIN LINE PROPOSED INLET PROPOSED MANHOLE EXISTING STORM DRAIN LINE LIMITS OF PROJECT PRIVATE OPEN SPACE BLOCK 22 LOT 1% 22.74 ACRE B 16 1 111M FUTURE STONE CREEK RANCH PHASE 6 39 40 16 1 9 20 • 21 23 24 25 6" l 7 46 49 AT6 BOAT CLUB PROPERTIES VOL. 11437. PC. 1776 O.R.T.C.T % I xL- SCALE:1" = 300' I I I B 17 16 lox $$s 0 STORM DRAIN EXHIBIT 'B-1' STONE CREEK RANCH PHASE IV JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 I:\SLD\WFXM5701\700 CADD\728 Exhibits\Phase IV\CFA\CFA.dwg, 3/19/2014 8:20 AM, Beltrand, Blake L-_l-1__1+i-1__i-1TI_Ti \y\', T T I i I V 1 1 R8 N 2 ! 29 I 16 1S 14 13 4 a i O12 II 10 6 'DO 1 x is ���- -- I zz �N K Ii0ll0 �� ss ae az L'' 1 i �4 111 1 1I2125 T6 2T 38— Qao m Cl' 9 O 5 �� B 6 \ III i IB 9 B i iLF'i 24 5 5 3 %1t Sa'N\� 23 2a •,-- TRINRY - zo 2/ O� CREEK DRIVE 1B 1s ?� �I 'Z � O o f4 to 40 ' 41 1 PUBUC PARK SITE BLOCK 23 LOT 12X 6.600 ACRES PRIVATE 1 OPEN SPACE L BLOCK 22 LOT 1X 32.74 ACRE ATB BOAT CLUB PROPERTIES VOL 11437, P0, 1776 O.R.T.C.T LEGEND PROPOSED SINGLE STREET LIGHT .-. EXISTING SINGLE STREET LIGHT o LIMITS OF PROJECT FUTURE STONE CREEK RANCH PHASE \,\ -� L- SCALE:1" = 300' 1 I 7 46 49 ATB BOAT CLUB PROPERTIES VOL. 11437, PC. 1226 O.R.T.C.T 15 STREET LIGHTS EXHIBIT 'C' STONE CREEK RANCH PHASE IV JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 I:\SLD\WFXM5701\700 CADD\728 Exhibits\Phase IV\CFA\CFA.dwg, 3/19/2014 8:20 AM, Beltrand, Blake I I I 1 II I 1 L 28 29 30 !©31 32 33 0 re W 10 lU z Q 35 1 36 37 I PUBLIC PARK SITE BLOCK 23 LOT 12X 8.800 ACRES ATB BOAC CLUB PROPERTIES VOL 11437, PC. 1776 LEGEND PROPOSED STREET SIGN EXISTING STREET SIGN LIMITS OF PROJECT ____t _ -i—LL i(- Li \>‘. �2 115 14 ] C ' II �e5 \ (''� 37 I sz 6 W ORIVE is 21 25 26 2] 034 ze ©g 30 31 !A. 20 g a 9 6 7 �ja 8 x4� K OR 23 1131 REi 22 ..to 11 \�\.(�( C 21 .SC - 20 9 4=8 • A RIN •- 7 6 CREEK 3 ]9 t3 40 1 DRIVE 1 07 cc PRNATE OPEN SPACE BLOCK 22 LOT IX ±2.74 ACRE at I �] 11 9 6 04, 14 18 0 • • FUTURE STONE CREEK RANCH PHASE �0/♦ I ♦ / • ♦� ♦ %6 i ATB BOAT CLUB PROPERTIES 9 6 40 18 7 JPOE 41 9 42 20 43 —� I- SCALE: *I" = 300' f I I 1 23 24 25 47 48 69 µ11111Z 1 0I a. m 0 x 18 7 18 .0.0° VOL. 11437. PC. 1778 O.R.T,C.T 15 tit STREET SIGNS EXHIBIT 'C-1' STONE CREEK RANCH PHASE IV JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 UNIT PRICE BID Bidlist Item No. WATER 3305.0109 3311.0001 3311.0241 3311.0441 3311.0242 3312.0001 3312.0117 3312.2003 3312.2203 3312.3003 3312.3005 9999.0001 9999.0013 9999.0020 SECTION 00 42 43 STONE CREEK RANCH, PHASE IV PROPOSAL FORM Project Item Information Description Trench Safety for Water Ductile Iron Water Fittings w/ Res 8" Water Pipe 12" Water Pipe 8" Water Pipe, CSS Backfill Fire Hydrant Connection to Existing 4"-12" Wate 1" Water Service 2" Water Service 8" Gate Valve 12" Gate Valve MJ Solid Sleeve City Bonds for all Water/Sewer Imp Meter Box "Type A" SANIfFARY°SEWER 3301.0002 3301.0101 3305.0107 3305.0109 3305.0113 3331.3101 3331.4115 3331.4116 3331.4119 3331.4205 3339.0001 3339.1001 3339.1002 3339.1003 9999.0004 9999.0005 9999.0006 9999.0018 Post -CCTV Inspection Manhole Vacuum Testing Manhole Adjustment, Minor Trench Safety Trench Water Stops 4" Sewer Service 8" Sewer Pipe 8" Sewer Pipe, CSS Backfill 8" DIP Sewer Pipe 10" DIP Sewer Epoxy Manhole Liner 4' Manhole 4' Drop Manhole 4' Extra Depth Manhole Abandon Sanitary Sewer in Place Connect to Existing Sanitary Sewer Manhole Connect to Existing Sanitary Sewer 14" Chimney Sewer Service CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised20120120 0042 43 BID PROPOSAL Page 1 of 3 Bidder's Application Unit of I Specification Section I Bid Measure No. Quantity LF 33 05 10 TON 3311 11 LF 3311 10, 3311 12 LF 3311 101 33 11 12 LF 33 11 10,33 II 12 EA 3312 40 EA 3312 25 EA 3312 10 EA 331210 EA 3312 20 IEA 3312 20 IEA 00 00 00 ILS 00 00 00 IEA 00 00 00 LF EA EA LF EA EA LF LF LF LF VF EA EA VF EA EA EA EA 33 01 31 33 01 30 33 0514 33 05 10 33 05 15 33 31 50 33 11 10, 33 31 12, 33 11 10, 33 31 12, 3311 10 33 11 10 33 39 60 33 39 10, 33 39 20 33 39 101 33 39 20 33 39 10, 33 39 20 00 00 00 00 00 00 00 00 00 00 00 00 4583 2.4 4304 279 14 4 5 123 1 Bidder's Proposal Unit Price $0.50 $4,000.00 $32.00 $46.00 $30.00 $3,200.00 $800.00 $450.00 $1,200.00 12 $1,050.00 1 I $2,000.00 5 I $500.00 1 I $4,500.00 124 1 $50.00 Total Street Water Bid 4285 22 9 4285 22 122 3360 170 847 78 55.3 21 1 140 6 4 1 1 $2.00 $100.00 $500.00 $1.00 $200.00 $475.00 $38.00 $30.00 $55.00 $65.00 $175.00 $2,800.00 $4,000.00 $150.00 $400.00 $1,500.00 $1,000.00 $600.00 Total Sanitary Sewer Bld Bid Value $2,291.50 $9,600.00 $137,728.00 $12,834.00 $420.00 $12,800.00 $4,000.00 $55,350.00 $1,200.00 $12,600.00 $2,000.00 $2,500.00 $4,500.00 $6,200.00 $264,023.50 $8,570.00 $2,200.00 $4,500.00 $4,285.00 $4,400.00 $57,950.00 $127,680.00 $5,100.00 $46,585.00 $5,070.00 $9,677.50 $58,800.00 $4,000.00 $21,000.00 $2,400.00 $6,000.00 $1,000.00 $600.00 $369,817.50 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12 00 35 13 816 Proposal Workbook (2) UNIT PRICE BID Bidlist Item No. I PAVING 3137.0101 3211.0400 3211.0501 3212.0201 3213.0101 3213.0301 3213.0501 3441.4003 3441.4004 3441.4006 3441.4007 9999.0007 9999.0008 9999.0015 9999.0017 9999.0019 SECTION 00 42 43 STONE CREEK RANCH, PHASE IV PROPOSAL FORM Project Item Information Description Concrete Riprap Hydrated Lime 32#/SY 6" Lime Treatment 2" Asphalt Pvmt Type C 6" Conc Pvmt, 3 600 psi ell 28 days 4" Conc Sidewalk Barrier Free Ramp, Type R-1 Fumish/Install Alum Sign Ground M Furnish/Install Alum Sign Ex. Pole (Install Alum Sign Ground Mount (Install Alum Sign Ex Pole Mount (Remove EOR Barricade install Standard EOR Barricade (City Bonds for ail Paving Improvemt (Pavement Header (Silt Fence (Behind Curb in Lieu of Curiex) STORM DRAIlY .. 3137.0101 3213.0301 3305.0109 3341.0201 3341.0205 3341.0208 3341.0302 3341.0309 3341.0402 3341.0602 3349.0001 3349.0006 3349.5001 3349.5002 3349.5003 9999.0002 9999.0003 9999.0009 9999.0010 9999.0014 Concrete Riprap 4" Conc Sidewalk Trench Safety 21" RCP, Class 111 24" RCP, Class III 27" RCP, Class III 30" RCP, Class ill 36" RCP, Class III 42" RCP, Class III 60" RCP, Class III 4' Storm Junction Box Storm Junction Structure 10' Curb Inlet 15' Curb Inlet 20' Curb Inlet Tree Protection Irrigation Repair 42" Sloped End Headwall Connect to Existing Storm Sewer City Bonds for all Storm Drain Imp CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised20120120 00 42 43 BID PROPOSAL Paget of 3 Bidder's Application Unit of I Specification Section I Bid Measure No. Quantity SY 31 37 00 TN 32 11 29 SY 3211 29 SY 32 12 16 SY 32 13 13 SF 32 13 20 EA 32 13 20 EA 34 41 30 EA 34 41 30 EA 34 41 30 EA 34 41 30 EA 00 00 00 EA 100 00 00 LS 100 00 00 LF (000000 LF 100 00 00 SY SF LF LF LF LF LF LF LF LF EA LS (EA I EA JEA (LS (LS (EA (EA (LS 31 37 00 32 13 20 33 05 10 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 4910 33 49 10 33 49 20 33 49 20 33 49 20 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 32 260 16256 35 15245 2467 12 2 2 2 4 5 6 1 Biddefs Proposal Unit Price $75.00 $160.00 $2.75 $30.00 $29.50 $3.00 $1,000.00 $500.00 $500.00 $500.00 $500.00 $300.00 $500.00 $4,500.00 145 1 $20.00 4730 ( $1.50 Total Paving Bid 46 60 3412 229 586 529 224 1233 520 91 8 1 12 2 2 1 1 1 4 1 $75.00 $20.00 $1.00 $48.00 $50.00 $55.00 $65.00 $80.00 $95.00 $165.00 $3,000.00 $5,500.00 $2,200.00 $2,800.00 $3,200.00 $5,000.00 $3,500.00 $4,000.00 $500.00 $2,500.00 Total Storm Sewer Bid Bid Value $2,400.00 $41,600.00 $44,704.00 $1,050.00 $449,727.50 $7,401.00 $12,000.00 $1,000.00 $1,000.00 $1,000.00 $2,000.00 $1,500.00 $3,000.00 $4,500.00 $2,900.00 $7,095.00 $5821877.50 $3,450.00 $1,200.00 $3,412.00 $10,992.00 $29,300.00 $29,095.00 $14,560.00 $98,640.00 $49,400.00 $15,015.00 $24,000.00 $5,500.00 $26,400.00 $5,600.00 $6,400.00 $5,000.00 $3,500.00 $4,000.00 $2,000.00 $2,500.00 $339,964.00 00 41 00_00 43 13_004243_004337„004512_003513 Bid Proposal Workbook (2) 1 SECTION 00 42 43 STONE CREEK RANCH, PHASE IV PROPOSAL FORM UNIT PRICE BID Bidlist Item No. STREETSIGHTS 2805.3001 3441.1502 3441.3002 3441.3101 3441.3301 9999.0011 9999.0012 9999.0016 Project Item Information Description 1 1/4" CONDT PVC SCH 80 (T) Ground Box Type B, w/Apron Rdwy Ilium Assmbly TY 8 11,D-25, a 100W HPS PC Lighting Fixture Rdwy Ilium Foundation TY 1,2, and 4 #8 Aluminum Conductor I#10CU Aluminum Conductor IC1ty Bonds for all Street Light Imp CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 00 42 43 BID PROPOSAL Page of Bidder's Application IUnit of I Specification Section I Bid Measure No. Quantity LF 26 05 33 EA 34 41 10 EA 34 41 20 EA 34 41 20 EA 35 41 20 LF 00 00 00 LF 00 00 00 LS 100 00 00 END OF SECTION Bidder's Proposal Unit Price I 1940 $12.00 4 $800.00 20 $2,500.00 20 $200.00 20 $1,000.00 3880 $1.00 1940 $1.00 1 1,500.00 Total Street Lights Bid Total! Bid Value $23,280.00 $3,200.00 $50,000.00 $4,000.00 $20,000.00 $3,880.00 $1,940.00 $1,500.00 $107,800.00 S1,664,482.501 00 4100_00 43 13_00 42 43_00 43 37_0045 12_00 35 13_Bid Proposal Workbook (2)