HomeMy WebLinkAboutContract 45720 (2)/� / cmu /< 8EC iAtAr CONTACT pi a /15110 Developer and Project Information Cover Sheet: Developer Company Name: LGI Homes — Texas, LLC Address, State, Zip Code: 1450 Lake Robbins Drive, Suite 430 I The Woodlands, TX 77380 Phone, E-Mail: (281) 210-2584, jlipar@lgihomes.com Authorized Signatory/Title: Jack Lipar, Executive VP of Acquisitions Project Name and Brief Description: Water, Sewer, Paving, Storm Drain and Street Light Improvements to serve The Bridges, Ph. 1 Project Location: SWC of FM 1187 & McCart Ave. Plat Case No.: FP-14-005 Plat Name: The Bridges Council District: 0 - ETJ City Project No: 02279 CFA: 2014-027 DOE: 7224 To be complete by staff: Received by: L r Combined CFA Agreement — Revised January 2014 Date: c o,l _A 1 iy RECEIVED JUL 02 • OFFICIAL RECORD CITY SECRETARY �l o l dORT 9 TX COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ( `Improvements") related to a project generally described as The Bridges Ph. 1 ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub -contractors and suppliers in full Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof Water (A) X , Sewer (A-1) _X� Paving (B) X , Storm Dram (B-1) _X , Street Lights & Signs (C) X . E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Combined CFA Agreement — Revised January 2014 Chapter 2253, Texas Government Code. iii To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state -approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth. its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, Combined CFA Agreement — Revised January 2014 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Combined CFA Agreement — Revised January 2014 Project Name. The Bridges Ph. 1 Cost Summary Sheet CFA No.: 2014-027 DOE No.: 7224 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 504,337.50 2. Sewer Construction $ 645,582.00 Water and Sewer Construction Total $ 1,149,919.50 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% 'Cash Escrow Paving/Storm Drain = 125% 'Letter of Credit = 125% w/2yr expiration period 37,457.50 27,125.00 55,350.00 119,932.50 $ 1,269,852.00 $ 22,998.39 $ 22,998.39 $ 45,996.78 $ 2,583.30 $ 1,291.65 $ 2,214.00 $ 6,125.00 $ 12,213.95 $ 58,210.73 Amount $ 1,269,852.00 $ 1,269,852.00 $ 1,437,399.38 $ 149,915.63 $ 1,587,315.00 Choice (ck o IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this EQ day of ,201\. CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-'Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. AVA-- Date: ATTEST: tStb \315) Mary J. Kayser City Secretary ATTEST: (Print) Name: Shannon I3irt V oo President of Development Combined CFA Agreement - Revised January 2014 Transportation & Public Works Department ,s. c3c, Douglas . Wiersig, P.E. Director Approved by City Manager's Office c27484-844Q Fernando Costa Assistant City Manager DEVELOPER: LGI Hom- : - 'e� LLC • Signature Print Name: get Title: CFD ar,ez OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate r/ rs (Remainder of Page Intentionally Left Blank) unuenl111111 ,l„uuYm,.mn,1r tu.111444,uml„„„maw.low.4,,,,fifintaint,,,,44,46,14,.41.actLlet4N 4u J41141464 cRovarraowER r - —� fi -®— rtil urr • J i s` a t U at cg u. I no JOB NO. 61010-00 THE BRIDGES, PH 1 PAPE-DAWSON �T� DATE MAY 2014 /1/1 ENGINEERS rt al DESIGNER CBS FORT WORTH, TEXAS cal, CHECKED JHY DRAWN CBS � SESiHTH ST. I TORT MAIM TEXAS 76T02' RI AX e1787O.3T66a9 s 1 of 9 LOCATION MAP H:XAS BOARD OF PRCIE54dfAL EhY C= FRU REpSTRATIOV # 470 ` SHEET o a i ■ HIS 00CIAENT HAS BEEN PAWUCED FRW MATEMAL THAT VMS STORED AN/OR 1RANWThD BEC1RDHtu1LY AMA MAY HAW BEEN DiALW RTENTLY ALTERED. RELY CRY W ANAL HAHIICOPY MAT EIN S BEARNC THE CCHAATANES CRQN)L MIUAURE MO a w 41 PROPOSED 8" CONNECTION TO EXISTING 36" WL PG 1 ) P 2H .11 TOWER1 l _. LANE- i`- 8" WL 8" WL PONT DU GARD WAY PG 3 LEGEND PROPOSED WATER LINE PROPOSED GATE VALVE PROPOSED FIRE HYDRANT oa PROPOSED 1" IRRIGATION METER • AND BACK FLOW THE BRIDGES, PH 1 E o JOB N0. 61010-00 aDATE JUNE 2014 DESIGNER CLH FORT WORTH, TEXAS CHECKED JHY DRAWN CLH 2 of 10 EXHIBIT A - WATER, PG 1 • SHEET NISI DOCUMENT HIS BEEN PRODUCED FROM MATERIAL TH▪ AT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HMDCDPY MATERIALS wan THE CONSULTANT'S ORIGINAL SIGNATURE AND SEAL 200' )' 1 TOBIN DRIVE BALLARD STREET SCALE: 1 "= 200' o' 100' 200' PAPE-DAWSON ENGINEERS - 500 NEST SEVENTH ST.1 F5RT NORTH. TEXAS 78102 !PHONE, 877.870.3508 _SUITE 827 FAJO 817.870.366E 1EJUS BOARD OF PROFESSIONAL ENGINEERS FIRM REGISTRADON / 470 SYDNEY HARBOUR DRIVE PROPOSED 20' WATER EASEMENT LEGEND 0 ''I 15 t€ JOB NO. 61010-00 THE BRIDGES,PH 1 $o Ea DATE JUNE 2014 .t DESIGNER CLH FORT WORTH, TEXAS n: CHECKED JHY DRAWN CLH 4 3 of 10 EXHIBIT A - WATER, PG 2 u.. SHEET � r 'HIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND NAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON MAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORICNAL SIGNATURE MID SEAL HARTLAND - STREET PROPOSED WATER LINE PROPOSED GATE VALVE PROPOSED FIRE HYDRANT PROPOSED 1" IRRIGATION METER AND BACK FLOW 200' PG 1 PG3I 1 SCALE: 1 "= 200' 100' 200' PAPE-DAWSON ENGINEERS 500 NEST SEVENTH 5T. FpiT WORTH, TEXAS 76102 PHONE 817.870..7668 SUITE 827 I FAX: 817.670.3669 TEXAS BOARD OF PRO1tao0AL ENGINEERS f,RM RELYSIRA150I / 470 tr F)) w PROPOSED 8" CONNECTION TO EXISTING 36" WL LEGEND PROPOSED WATER LINE IV I PROPOSED GATE VALVE o_ PROPOSED FIRE HYDRANT IIg a= E PROPOSED 1" IRRIGATION METER a> AND BACK FLOW EoJOB NO. 61010-00 THE BRIDGES, PH 1 So DATE JUNE 2014 1 DESIGNER CLH FORT WORTH, TEXAS CHECKED JHY DRAWN CLH 1 4 of 10 EXHIBIT A - WATER, PG 3 .. SHEET o° 1 - HIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED ANO/OR IRANSMITIED ELECTRONICALLY AND MAY NAVE BEEN INADVERIENILY ALTERED. RELY ONLY ON FINAL HAADCOPY MAIERIAIS BEARING THE CONSULTANTS ORIGINAL SIGNANRE AND SEAL PROPOSED 20' WATER EASEMENT PAPE-DAWSON ENGINEERS 500 NEST SEVENTH ST.' FORT NORTH, TIXAS 76102 'PHONE 517.870.5666 SUITE 827 FAX 817870.3669 TEXAS BOARD 9F PRQ'S9CWAL ENOt1FERS AON/ REEYSIRATIOV / 470 111 LEGEND PROPOSED SANITARY PROPOSED SANITARY JOB NO. 61010-00 DATE JUNE 2014 DESIGNER CLH CHECKED JHY DRAWN CLH SHEET 5 of 10 o (r HAS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/CR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SRIA1URE AND SEAL PONT DU GARD WAY SEWER LINE MANHOLE • THE BRIDGES, PH 1 FORT WORTH, TEXAS EXHIBIT Al - SEWER, PG 1 200' TOBIN DRIVE BALLARD STREET SCALE: 1 "= 200' 0' 100' 200' PAPE-DAWSON ENGINEERS 500 HEST SEVENTH ST. I FORT NORTH. TEXTS 76102 1 PHONE 917.a70.3eea SUITE 827 FAX S17.870.5669 TEXAS BOARD OF PRQcsa. tMt ENONEER5 Ffl RWSIRATIQV / 470 1t SYDNEY HARBOUR DRIVE i I ; cn 00 1= N O m o u � E 8 i JOB NO. 61010-00 O 0. to o 0,1 r1 DATE JUNE 2014 DESIGNER CLH CHECKED JHY DRAWN CLH - SHEET .HIS DOCUMENT HAS BEN PRODUCE FROM MATERIAL Y T WAS STORED AND/Of TRANSMUTE ELECTRONICALLY MD MAY HAVE BEEN INADVERTENTLY ALTERED. HELP ONLY ON FINAL HARDCOPY MATERIALS BEARING 1HE CONSULTANTS ORIGINAL SIGNATURE MD SEAL. 18" STUB OUT 8" STUB OUT I'0 18" SS HARTLAND STREET LEGEND PROPOSED SANITARY PROPOSED SANITARY PROPOSED 50' SEWER EASEMENT SEWER LINE MANHOLE - PROPOSED 50'X100' SANITARY SEWER METERING STATION EASEMENT 6of10 THE BRIDGES, PH 1 FORT WORTH, TEXAS EXHIBIT Al - SEWER, PG 2 • 200' IPG 1 ) Wuliw1Wui��iiiiii SCALE: 1 "= 200' 0' 100' 200' PAPE-DAWSON ENGINEERS -500 HEST SEVENTH Sr. I FORT $CWPI, TEXAS 76102 PHONE 017.870.3868 = =SU/7E 827 I FAX 817.1170.3889 TOGS BOARD OF PRO ES9DVAL ENGINE= PRY RECIS1RA7IOH # 1704. k44,0 a a. tal 0 eNo S�pEWALK PROPOSED 4 IMPRpVEMENTS PROPOSED PA�IN� JOB HO. DATE DESDSER JH DR AO C- CHECKED 7 oi Sk-IEET ooto, flj l'asS 6 WS BE OS iKAS SjOU Pl0/OR likt40.11 44 • ,s • 1 • • • ;, r i . 44. • w { s� •i 4• 1 z r .4- •: a BFN9--ES, 'PH r `��7 foR7 \f �, PG •Texp,s E.X9‘VT B at 13�tL�11I��n IVA Ft CiR,GA1L� NO Uhl KAVE 40s 401 SC ALA. 1" r 401 PAPE-DAWSS014 02 ptiA''tAX, 8�j 887 �fi8 T ATM,TEXAS 761 ATt4 g 474 500 r 5o o FORT AL 5s f REpSTR SUITE 827 TEXAS oo MID yAi= • • A- • BALLARD STREET r k v rn LEGEND N J a U d N 0 0 too o NB U E OL PROPOSED 4' SIDEWALK PROPOSED PAVING IMPROVEMENTS JOB NO. 61010-00 DATE MAY 2014 DESIGNER CBS CHECKED JHY DRAWN CBS SHEET 8 of 1 o HIS DOCUMENT HAS BEEN PRODUCED FROII MA THAT WAS STORED AND/OR TRANWIIIW ELECTRON CALLY AND MAY HAW BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOP'Y IIATIF5ALS BEAKNC THE CC*tS1RTANT'S ORIGINAL SIGNATURE AND SEAL r, • $ 4- • z U 4 SCALE: 1 "= 40' 40' 0' 20' 40' PAPE-DAWSON ENGINEERS THE BRIDGES, PH 1 FORT WORTH, TEXAS EXHIBIT B -PAVING, PG 2 500 WEST SEVENTH ST. I FART WORTH, TEXAS 76102 I PHONE: 817.870.3668 SUITE 827 FAX 817.870.3669 7EXAS BOARD OF PROFESSIONAL ENGINEERS, fRY REGISTRATION 1 470 a s a P S a. ot to TO o o- of Ea° to &o N 5 '• HARTLAND STREET LEGEND PROPOSED STORM DRAIN JOB NO. 61010-00 DATE MAY 2014 DESIGNER CBS CHECKED JHY DRAWN CBS SHEET 9 of 10 IN LIA 1H5 DOEHT HAS KEN PRCWCFD MOHMATO6AL THAT WAS STEM AND/OR TRANSMITTED ELECTROECAILY AND MAY HAW SDI HADWRIDIRY ALTERED. RELY ONLY ON MAL HAFHCOPY MANAUS BEAM THE CONSULTANTS DRH9NAL 901A1LRE AND SEAL 4.1 1- Cr 0 u SCALE: 1 "= 300' 300' 0' 150' 300' PAPE-DAWSON ENGINEERS THE BRIDGES, PH 1 FORT WORTH, TEXAS EXHIBIT B1 - STORM DRAIN 500 HEST SEVENTH ST.' FORT NORTH. TEXAS 76102 'Ma 817.6703668 SUITE 827 FAX 617.670.3669 7ENAS 60A'W OF PROFESSIONAL IXwZIEERS, FIRM REG:S➢TARM! 1470 LEGEND PROPOSED STREETLIGHTS JOB NO. 61010-00 DATE MAY 2014 DESIGNER CLH CHECKED JHY DRAWN CLH SHEET 10of10 a .. HIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON ANAL HAROCOPY MATERIALS BEARING 1NE CONSULTANTS ORIGINAL SIGNATURE AND SEAL THE BRIDGES, PH 1 FORT WORTH, TEXAS EXHIBIT C - STREET LIGHTS SCALE: 1 "= 200' 200' 0' 100' 200' PAPE-DAWSON ENGINEERS 500 NEST SEVENTH ST I FORT NORTH. TEXAS 76102 ' PHONE 817.070.3660 SUITE 827 FAX 017.670.3669 7EXAS BOAST OF PROFESSIOMAL ENONEflRX FIRM REIOSIRA7NIN / 470 VI SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application 1Waler Improvenents Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Unit of Measure Bid Quantity Unit Price Bid Value Section No. 3311.0261 3312.0001 3311.0001 3312 0110 3312.2003 3312.2103 3311.0061 3312.3001 3312.3003 3312.4311 3305.0109 " PVC Water Pipe. Complete in Place for the Sum of: 33 Dollars & 00 cnts per Linear Foot Fire Hydrant. Complete in Place for the Sum of: 3,200 Dollars & 00 Cents per Each Ductile Iron Water Fittings w/ Restraint, Complete in Place for tM Sum of: 4,202 Dollars& 93 Cents per TON Connection to Existing 36" Water Main Complete in Place for the Sum of: 1 000 Dollars & 00 Cents per Each 1" Water Service, Complete in Place for the Sum of: 500 Dollars & 00 Cents per Each 1 I2" Water Service. Complete in Place for the Sum of: 1 316 Dollars & 66 Cents per Each 4" PVC Water Pipe, Complete in Place for the Sum of: 1 500 Dollars & 27 Cents per Linear Foot 4" Gate Valve w/ Vault, Complete in Place for the Sum of: Dollars & was per Each " Gate Valve w/ Vault, Complete in Place for the Sum of: Dollars & eats per Each 36" x 8" Tapping Sleeve & Valve, Complete in Place for the Sum of: Dollars & Cents per Each Trench Safety, Complete in Place for the Sum of: Dollars & Cents per Linear Foot SUBTOTAL - WATER IMPROVEMENTS 33 11 12 33 12 40 33 11 11 33 12 25 33 12 10 33 12 10 33 12 00 33 12 00 33 12 25 33 05 10 L.F. EA TON EA EA EA L.F. EA EA EA L.F. 9285 12 4.78 2 164 3 55 1 30 2 9285 $33.00 $3,200.00 $4,202.93 $1,000.00 $500.00 $1.316.67 $27.27 $850.00 $1,050.00 56,500.00 $0.50 $306,405.00 $38,400.00 $20,090.00 52.000.00 $82,000.00 $3,950.01 $1.500.00 $850.00 $31,500.00 $13,000.00 $4.642.50 $504,337.50 D04243 BID PROPOSAL Page l of CHI OFIORTR'ORT11 STANDARD CONSTRUCTION SPECIFICATION DOCUN1LYTS Form Rated 20120120 140625 Parr Reid Proposal xis 004241 BID PROPOStt. Pare2or3 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidders Application Sewer Improvements Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Unit of Measure Bid Quantity Unit Price Bid Value Section No. 3331.4115 3331.4116 3331.4201 3331.4202 3331.4225 3339.1001 3339.1001 3331.3101 8" PVC Sewer Pipe, Complete in Place for the Sum of: 33 Dollars & 58 Cents per Linear Fool 8" PVC Sewer Pipe, CSS Backfill, Complete in Place for the Sum of: 40 Dollars & 33 Cents per Linear Foot 10" PVC Sewer Pipe, Complete in Place for the Sum of 47 Dollars & 75 Cents per Linear Foot 10" PVC Sewer Pipe. CSS Baclfll, Complete in Place for the Sul of: 50 Dollars & 17 Cents par Linear Foot 18" Sewer Pipe. Complete in Place for the Sum of: Dollars & Cents per Linear Foot 4' Manhole, Complete in Place for the Sum of: Dollars & eats per Each 4' Extra Depth Manhole, Complete in Place for the Sum of: Dollars & eats per Vertical Foot " Setter Service, Complete in Place for the Sum of: Dollars & Cents per Each Trench Water Slops, Complete in Place for the Sum of: 3305.0113 Dollars & Cents per Each 33010101 33010002 3305.0109 Manhole Vacuum Testing, Complete in Place for the Sum of: Dollars & Cents per Each Post -CCTV Inspection. Complete in Place for the Sum of: Dollars & Cents per Linear Foot Trench Safety, Complete in Place for the Sum of: Dollars & Cents per Linear Foot 33 11 10,3331 12, 33 31 20 33 11 10, 33 31 12, 33 31 20 33 11 10, 33 31 12, 33 31 20 33 II 10, 33 31 12, 33 31 20 33 1110, 33 31 13, 33 31 20, 33 31 21 33 39 10, 33 39 20 33 39 10, 33 39 20 33 31 50 33 05 15 33 01 30 33 01 31 33 05 10 L.F. L.F. L.F. L.F. L.F. EA V.F. EA EA EA L.F. L.F. 4382 240 2611 240 855 51 230 167 13 51 8328 8328 $33.58 $40.33 $47.75 $50.17 $76.00 $2,800.00 $175.00 $450.00 $100.00 $50.00 $2.00 $1.00 $147,164.00 $9,680.00 $124,684.00 $12,040,00 $64,980.00 $142,800.00 $40,250.00 $75,150.00 $1,300.00 $2,550.00 $16,656.00 $8.328.00 SUBTOTAL - SANITARY SEWER IMPROVEMENTS S615,582.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Farm Revised 20120120 144625 Pare B-Rid Propo,aLrts twat 43 BID PROPOSAL Page uf4 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application 'Paving Improvements Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Unit of Measure Bid Quantity Unit Price Bid Value Section No. 3213 0101 3211.0501 3211.0400 3216.0102 3213 0301 3213.0501 6" Concrete Pavement, Complete in Place for the Sum of: Dollars & Cents per Square Yard 6" Lim Stabilized Subgrade, Complete in Place for the Stun of: Dollars & Cents per Square Yard Hydrated Lim (32 Ibs/sy), Complete in Place for the Sumo! Dollars & Cents per Ton 7" Curb and Gutter, Complete in Place for the Sum of: Dollars & Cents per Linear Foot • 4" Sidewalk Complete in Place for the Sum of: Dollars & Cents per Square Yard Barrier Free Ramp. Type R-1, Complete in Place for the Sum of: Dollars & Cents per Each SUBTOTAL -PAVING IMPROVEMENTS 32 13 13 32 11 29 32 1I 29 32 16 13 32 13 20 32 13 20 S.Y. 760 S.Y. 806 TON 12.9 L.F. 293 S.Y. 47 EA 4 $29.50 $2.75 $160.00 $16.00 $27.00 $1.200.00 $221420.00 $2,216.50 $2.064.00 $4,688.00 $1,269.00 $4,800.00 $37,457.50 CITA OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Rntsed20120120 14-0625 P rt wlm Proposilah 004243 DID PROPOSAL Page4or4 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application !Drainage Imumvenenls Bidlist Item No. 3341.1103 3341.1303 3349.0104 3137.0104 Description Project Item Information Bidder's Proposal Specification Unit of Measure Bid Quantity Section No. 4x4 Box Culvert, Complete in Place for the Sum of: Dollars & 33 41 10 Cents per Linear Foot 6x4 Box Culvert, Complete in Place for the Sum of: Dollars & Cents per Linear Foot 4' Slacked Manhole, Complete in Place for the Sum of: Dollars & tints per Each TXDOT (F\V-O) Flared \VingAalls, Complete in Place for the Sum of: Dollars & Cents per Each Medium Stone Riprap, dry, Complete in Place for the Sum of: Dollars & Cetus per Each L.F. 24 33 41 10 L.F. 33 49 10 EA EA 31 37 00 S.Y. 64 1 1 23 Unit Price Bid Value $150.00 53,600.00 5200.00 $2.500.00 $6,500.00 $75.00 $12,800.00 $2.500.00 $6,500.00 $1,725.00 SUBTOTAL -DRAINAGE IMPROVEMENTS $27,125.00 Future Streetlight Improvements Bidlist Item No. Description 1 Project Item Information Bidder's Proposal 100W HPS PC Lighting Fixture, Complete in Place for the 3441.3101 Sum of: Dollars & Cents per Each 3441.3110 3441.3301 Install Lighting Fixture, Complete in Place for the Sum of: Dollars & Cents per Each Rdwy Ilium Foundation TY 1,2, and 4, Complete in Place for the Sum of: Dollars & Cents per Each Specification Section No. Unit of Measure Did Quantity 34 41 20 EA 9 34 41 20 EA 34 41 20 EA 9 9 Unit Price Did Value $3,500.00 $31,500.00 $2.000.00 $650.00 $18,000.00 $5,850.00 TOTAL - FUTURE STREETLIGHT IMPROVEMENTS $55,350.00 CITY OF TORT WORTlI STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Rratud 20120120 14-6625 Part D-Did Propos*Ldr