HomeMy WebLinkAboutContract 45721 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
COUNTY OF TARRANT §
City Secretary
Contract No. - 157t 1
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project") within the City
of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the Improvements.
Developer and Project Information:
Developer Company Name: CentrePort Venture, L.P.
Address, State, Zip Code: Two Seaport Lane, Boston MA 02210-2021
Phone, E-Mail: (617)261-9375, dbradley@aew.com
•
Authorized Signatory/Title: Daniel J. Bradley, President
Project Name and Brief Description: Water, Sewer, Paving, Storm Drain, Street Lights, Traffic Signals
to serve Centre Station Drive (Lot 2, Blk 104)
Project Location: Centre Station Drive from Centreport to Trinity
Plat Case No.: FP-13-074 Plat Name: Centreport
Council District: 5 City Project No: 02247 CFA: 2014-003 DOE: 7199
To be completed by staff:
Received by: C Date:
•
(Qin! /L-4
utiyuctlat;:sti-da pi-m
Piii I/ F(.7v(l_,1
RECEIVED JUL 0/.2 014
NOW, THEREFORE, For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to
comply with all provisions of said Policy in the performance of its duties and
obligations hereunder and to cause all contractors hired by Developer to comply with
the Policy in connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section
II, of the Policy and recognizes that there shall be no reduction in the collateral until
the Project has been completed and the City has officially accepted the
Improvements. Developer further acknowledges that said process requires the
contractor to submit an Affidavit of Bills paid signed by its contractor and Consent
of Surety signed by its surety to ensure the contractor has paid the sub -contractor
and suppliers in full. Additionally, the contractor will provide in writing that the
contractor has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by
this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X , Sewer (A-1)
Paving (B) X , Storm Drain (B-1) X_, Street Lights & Signs (C) X ,
Traffic Signals (C-1) X
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section II, of the Policy.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being insured licensed and bonded to do
work in public streets and/or prequahfied to perform water/waste water
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the Improvements, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the Improvements for
a period of two (2) years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be furnished
before work is commenced and to meet the requirements of Chapter 2253, Texas
Government Code.
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer -awarded
infrastructure construction contracts. The City shall be named as additional
insured on all insurance required by said documents and same will be evidenced on
the ACORD Certificate of Insurance supplied by the contractor's insurance
provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction Services
Division of intent to commence construction so that City inspection personnel will
be available; and to require the contractor to allow the construction to be subject to
inspection at any and all times by City inspection forces and not to install or
relocate any sanitary sewer, storm drain or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents submitted to
the City to schedule a Pre -Construction Meeting. The submittal should occur no
Tess than 10 working days prior to the desired date of the meeting. No construction
will commence without a City -issued Notice to Proceed to the Developer's
contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and service
lines have been completed to the satisfaction of the Water Department.
G. Developer agrees to provide, at its expense, all engineering drawings and documents
necessary to construct the improvements required by this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in the
relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current
and future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real or
asserted, brought for or on account of any injuries or damages sustained by any
persons (including death) or to any property, resulting from or in connection
with the construction, design performance or completion of any work to be
performed by said Developer, his contractors subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the work, or
on account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or employees,
whether or not such Miseries, death or damages are caused, in whole or in
part, by the alleged negligence of the City of Fort Worth, its officers, servants,
or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and all
claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused, in whole or in part, by the alleged
negligence of the City of Fort Worth, its officers, servants, or employees. Further,
Developer will require its contractors to indemnify, and hold harmless the City for
any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in
a good and workmanlike manner, free from defects, in conformance with the
Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the infrastructure and
Improvements, Developer will assign to the City a non-exclusive right to enforce the
contracts entered into by the Developer with its contractor along with an assignment of
all warranties given by the contractor, whether express or implied. Further, Developer
agrees that all contracts with any contractor shall include provisions granting to the
City the right to enforce such contracts as an express intended third party beneficiary
of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of the
total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of
the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. If applicable, the City's obligation to participate (exclusive of' front foot charges) in
the cost of the Improvements shall terminate if the Improvements are not
completed within two (2) years' provided, however, if construction of the
Improvements has started within the two year period, the developer may request
that the CFA be extended for one year. If the Improvements are not completed
within such extension period, there will be no further obligation of the City to
participate. City participation in a CFA shall be subject to the availability of City
funds and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years from the date of this Agreement the Improvements have
not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion of
the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name. Center Station Drive
CFA No.: 2014-003 DOE No.:7199
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Traffic Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Traffic Signal Inspection
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
Developer's Cost
$ 67,692.00
$ 68,309.00
$ 136,001.00
$ 408,765.00
$ 439,255.00
$ 32,250.00
$ 44,759.00
$ 925,029.00
$ 1,061,030.00
$ 2,720.02
$ 2,720.02
$ 5,440.04
$ 33,920.80
$ 16,960.40
$ 1,290.00
$ 1,790.36
$ 53,961.56
$ 59,401.60
Choice
Amount (ck one)
$ 1,061,030.00
$ 1,061,030.00
$ 170,001.25 X
$ 1,156,286.25 X
$ 1,326,287.50
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said eveloper has executed this
instrument in at Fort Worth, Texas this alfwan, day of
quadruplicate, _
201.
CITY OF FORT WORTH -Recommended by:
Water Department
(A_ . _
Wendy ChibulaI, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
Douglas W. B ack
Assistant City Attorney
M&C No. dijk-
Date:
ATTEST:
Sin
Mary J. Kayser
ice City Secretary
ATTEST:
af
Signature
(Print) Name: afirierelsx C ea r1
•
Title:
S5oCt Ctle
Transportation & Public Works Department
Douglas . Wiersig, P.E.
Director
Approved by City Manager's Office
`7,4-14astzet_a•
Fernando Costa
Assistant City Manager
0.00
r~SXA 9
DEVELOPER:
CentrePort Venture, LP
By: AEW #13 CentrePort GP, LLC
Its General Partner
8
(Print) Name:
Title:
mil I
Signature
Daniel J. Bradley
Authorized Signatory
OFFICIAL RECORD
CITY SECRETARY
I Fr WORTHS TX
Check items associated with the project being undertaken; checked items must be included as
Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Dram Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
Exhibit C-1: Traffic Signal Improvements
Traffic Signal Estimate
S
S
to
S
\I
ra
S.
IV
(Remainder of Page Intentionally Left Blank)
9
SH les
44
M
0
w
PROJECT
LOCATION
SOVEREIGN RD.
a
TRINITY BOULEVARD
SH 183
CENTRE STATIOI\ DRIVE
VICINITY MAP
Graham Associates,Inc.
CONSULTING ENGINEERS & PLANNERS
600 SIX FLAGS DRIVE, SUITE 500
ARLINGTON, TEXAS 76011 (817) 640-8535
TBPE FIRM: F-1191/TBPLS FIRM: 101538-00
DRAWN BY, GAI
PROJECT NO.: 9905-1045
DATE: 6/20/2014
SHEET 1 OF 8
NOT TO SCALE
MAPSCO NO 56Q
COUNCIL DISTRICT #5
183
g
DRAWN BY: GAI
LOT 1 BLOCK 103
ABINET A, SLIDE 11474
P.R.T.C.T.
LOT 1 BLOCK 105
CITY OF FORT WORTH
VOLUME 2037, PAGE 567
VOLUME 2008, PAGE 243
D.R.T.C.T.
TRINITY BOULEVARD
LOT 2 BLOCK 104
CITY OF FORT WORTH
VOLUME 2037, PAGE 567
VOLUME 2008, PAGE 243
D.R.T.C.T.
EX 12" WATER W-10137
ROPOSED
10" WATER LINE
EX 10n WATER W-10185
w
CENTRE STATION DRIVE
A - WATER IMPROVEMENTS
Graham Associates,Inc. GRAPHIC SCALE 1 "=200'
CONSULTING ENGINEERS & PLANNERS
600 SIX FLAGS DRIVE, SUITE 500
ARLINGTON TEXAS 76011 (817) 640-8535 200
TBPE FIRM F-1191/TBPLS FIRM: 101538-00
DATE: 6/20/2014
0
200 400
C
J
PROJECT NO.: 9905-1045
SHEET 2 OF 8
J
I/
DRAWN BY: GAI
LOT 1 BLOCK 103
ABINET A, SLIDE 11474
P.R.T.C.T.
CITY OF FORT WORTH
VOLUME 2037, PAGE 567
VOLUME 2008, PAGE 243
D.R.T.C.T.
ROPOSED SANITARY SEWER MANHOLE
PROPOSED 8" SANITARY SEWER
-EXISTING SANITARY SEWER
MANHOLE
LOT 1 BLOCK 105
CITY OF FORT WORTH
VOLUME 2037, PAGE 567
VOLUME 2008, PAGE 243
D.R.T.C.T.
PROPOSED SANITARY SEWER MANHOLE
PROPOSED 8" SANITARY SEWER
EXISTING SANITARY SEWER MANHOLE
TRINITY BOULEVARD
ft
\L
::,ci
CENTRE STATION DRIVE
Al - WASTEWATER IMPROVEMENTS
Graham Associates,Inc.
CONSULTING ENGINEERS & PLANNERS
600 SIX FLAGS DRIVE SUITE 500
ARLINGTON TEXAS 76011 (817) 640-8535
TBPE FIRM F-1191/TBPLS FIRM: 101538-00
PROJECT NO.: 9905-1045
GRAPHIC SCALE
200
DATES 6/20/2014
SHEET 3 OF 8
0
=200'
200 400
BAITER S
I/
DRAWN BY. GAI
•
LOT 2 BLOCK 104
CITY OF FORT WORTH
VOLUME 2037, PAGE 567
VOLUME 2008, PAGE 243
D.R.T.C.T.
LOT 1 BLOCK 103
ABINET A, SLJDE 11474
P.R.T.C.T.
PROPOSED CENTRE STATION DRIVE
29' B-B WITH 8' PARKING STALLS
LOT 1 BLOCK 105
CITY OF FORT WORTH
VOLUME 2037, PAGE 567
VOLUME 2008, PAGE 243
D.R.T.C.T.
TRINITY BOULEVARD
ROPOSED 10'
SIDEWALK
CENTRE STATION DRIVE
B - PAVING IMPROVEMENTS
Graham Associates,Inc.
CONSULTING ENGINEERS & PLANNERS
GRAPHIC SCALE 1 "=200'
600 SIX FLAGS DRIVE, SUITE 500
ARLINGTON, TEXAS 76011 (817) 640-8535 200
TBPE FIRM: F-1191/TBPLS FIRM: 101538-00
DATE: 6/20/2014
0
200 400
PROJECT NO.: 9905-1045 SHEET 4 OF 8
CE
DRAWN BY. GAI
A
1%
LOT 1 BLOCK 103
ABINET A, SLIDE 11474
P.R.T.C.T.
IST
INLET
EXISTING CHANNEL
LOT 2 BLOCK 104
CITY OF FORT WORTH
VOLUME 2037, PAGE 567
VOLUME 2008, PAGE 243
D.R.T.C.T.
ROP 21" SD
ROP 27" SD
CONNECT TO EXIST
SD INLET
LOT 1 BLOCK 105
CITY OF FORT WORTH
VOLUME 2037, PAGE 567
VOLUME 2008, PAGE 243
D.R.T.C.T.
PROPOSED 21" STORM DRAIN
CONNECT TO EXISTING 66" SD
TRINITY BOULEVARD
EXIST 39" STORM K-854
ROCK R7AP
PROP 66" , ADWALL
ND APRON
PROPOSED 6611
STORM DRAIN
i
-j,
ry Ayr
JIVI{M fY-IGVY"
)
CENTRE STATION DRIVE
B 1 - STORM DRAIN IMPROVEMENTS
Graham Associates,Inc.
CONSULTING ENGINEERS & PLANNERS
GRAPHIC SCALE 1 "=200'
600 SIX FLAGS DRIVE, SUITE 500
ARLINGTON, TEXAS 76011 (817) 640-8535 200
TBPE FIRM: F-1191/TBPLS FIRM: 101538-00
DATE: 6/20/2014
PROJECT NO.: 9905-1045 SHEET 5 OF 8
0
200 400
LOT 1 BLOCK 103
CABINET A
SLIDE 11474
P.R.T.C.T.
PROPOSED DETENTION POND-
•
/
SOVEREIGN ROAD
LOT 1 BLOCK 104
CENTREPORT
INST. NO. D211144558
P.R.T.C.T.
/ci
EXISTING CHANNEL
•
11'
AREA 1, BLOCK
38
CENTREPORT
VOLUME 388-207 PAGE 59
P.R.T.C.T.
CENTRE STATION DRIVE
B 1 - STORM DRAIN IMPROVEMENTS
I
Graham Associates,Inc.
CONSULTING ENGINEERS & PLANNERS
600 SIX FLAGS DRIVE, SUITE 500
ARLINGTON, TEXAS 76011 (817) 640-8535
TBPE FIRM: F-1191/TBPLS FIRM: 101538-00
DRAWN BY. GAI
PROJECT NO.: 9905-1045
GRAPHIC SCALE
200
DATE: 6/20/2014
SHEET 6 OF 8
0 200
1 "=200'
400
1
DRAWN BY. GAI
PROJECT NO.: 9905-1045
TER STATION
LOT 1 BLOCK 103
ABINET A, SLIDE 11474
P.R.T.C.T.
LOT 2 BLOCK 104
CITY OF FORT WORTH
VOLUME 2037, PAGE 567
VOLUME 2008, PAGE 243
D.R.T.C.T.
LECTRIC SERVICE
COMPLETE
100 W HPS COBRA HEAD LAMP
TYPE 8 POLE W/33B ARM
TYPE 2 FOUNDATION
5 TOTAL
LOT 1 BLOCK 105
CITY Of FORT WORTH
VOLUME 2037, PAGE 567
VOLUME 2008, PAGE 243
D.R.T.C.T.
TRINITY BOULEVARD
i
CENTRE STATION DRIVE
C - STREET LIGHT IMPROVEMHNTS
Graham Associates,Inc.
CONSULTING ENGINEERS & PLANNERS
GRAPHIC SCALE 1 "=200'
600 SIX FLAGS DRIVE, SUITE 500
ARLINGTON, TEXAS 76011 (817) 640-8535 200
TBPE FIRM: F-1191/TBPLS FIRM:101538-00
DATE: 6/20/2014
SHEET 7 OF 8
0
200 400
CE
TE
DRAWN BY: GAI
PROJECT NO.: 9905-1045
A
LOT 2 BLOCK 104
CITY OF FORT WORTH
VOLUME 2037, PAGE 567
VOLUME 2008, PAGE 243
D.R.T.C.T.
LOT 1 BLOCK 103
ABINET A, SLIDE 11474
P.R.T.C.T.
LOT 1 BLOCK 105
CITY OF FORT WORTH
VOLUME 2037, PAGE 567
VOLUME 2008, PAGE 243
D.R.T.C.T.
EXISTING SIGNALS TO
BE RECONFIGURED
AS FOUR WAY INTERSECTION
NEW MAST ARM ON EXISTING
POLE WITH NEW SIGNAL HEAD
TRINITY BOULEVARD
71
CENTRE STATION DRIVE
C2 - SIGNAL IMPROVEMENTS
Graham Associates,Inc.
CONSULTING ENGINEERS & PLANNERS
GRAPHIC SCALE 1 "=200'
600 SIX FLAGS DRIVE, SUITE 500
ARLINGTON, TEXAS 76011 (817) 640-8535 200
TBPE FIRM: F-1191/TBPLS FIRM. 101538-00
DATE: 6/20/2014
SHEET 8 OF 8
0
N
200 400
•
J
Prepared for: City of Fort Worth CFA Application
Centre Station Drive - Centreport Boulevard to Trinity Boulevard
June 26 ,2014
Item I. Description
L A unn A- water Improvements
1-1 3311.036110-inch PVC DR-14 Water Pipe
1-2 3311.02618-inch PVC DR-14 Water Pipe
1-3 3311.0161 6-inch PVC DR-14 Water Pipe
1-4 3312.3004 10" Gate Valve with Box
1-5 3312.3003 8" Gate Valve with Box
1-6 3312.2002 6" Gate Valve with Box
1-7 3311.0001 Ductile Iron Fittings Less than 16" Diameter for PVC Pipe
1-8 3312.001 Fire Hydrant Assembly
1-9 3312.2203 2" Irrigation Service with Meter in Box
1-10 3312.28048" Water Service with Combination Turbine Meter and Bypass in Vault
1-11 3312.0117 Connect to Existing 10" Water Une
1-12 3305.0109 Trench Safety
CFA Unit A1-Sanitary Sewer Improvements
1-1 3331.4115 8-inch Sanitary Sewer (PVC) Open Cut, All Depths
1-2 3331.4119 8-inch Sanitary Sewer (DIP) Open Cut, All Depths
1-3 3339.1001 Standard Sewer MH, 48" I.D to 6' Depth with 32-inch Ring and Cover and 30" Opening
1-4 3339.1003 Extra Depth
1-5 9999.0003 Connect to Existing Sanitary Sewer Line
1-6 9999.0004 Connect to Existing Sanitary Sewer Manhole
1-7 3301.0101 Vacuum Test New Sanitary Sewer Manhole
1-8 3301.0002 Post CCTV -Inspection of Sewer Lines
1-9 3305.0202 Cement Stabilized Backfill of Sewer Pipe
1-10 3305.0109 Trench Safety
CFA Unit B - Paving Improvements
1-1 3110.0101 Site Preparation - Clearing and Grubbing
1-2 0241.1300 Remove Existing Curb and Gutter
1-3 3123.0101 Unclassified Street Excavation
1-4 3213.0102 7" Reinforced Concrete Pavement
1-5 3211.05016" Thick Lime Stabilized Subgrade
1-6 3211.0400 Lime for Subgrade Stabilization (27# per SY)
1-7 3217.0009 4" SLD Pvmt Marking Paint (W) for Parking Stalls and Turn Lane
1-8
1-9
-10
-11
-12
13
14
15
16
17
18
19
3217.0010 4" SLD Pvmt Marking Paint (V) for Centerline
3217.0503 24" SLD Pvmt Marking Paint (W) for Stop Line at Centre Port Drive
3213.0301 4" Concrete Hike and Bike Path, 10' Wide
3213.0501 Barrier Free Sidewalk Ramp, Type R-1
3213.0501 Barrier Free Sidewalk Ramp, Type P-1
9999.0005 Patterned Concrete Crosswalk
3291.0100 Topsoil
3292.0400 Hydromulch Seeding
3441.4006 R6-2 One Way Sign, 36"x12"
3441.4006 R5-1 Do Not Enter Sign
3441.4006 R1-1 Stop Sign
3471.0001 Traffic Control Plan
npecmcauon
Section Number
33 11 12
33 11 12
33 11 12
3312 20
33 12 20
3312 20
33 11 11
33 12 40
33 1210
33 12 11
33 12 25
33 0510
333121
33 11 10
33 39 20
33 3910,20
333121
33 39 20
33 0130
33 01 31
33 05 10
33 05 10
31 10 00
02 41 15
3123 16
32 13 13
32 11 29
32 11 29
3217 23
3217 23
3217 23
3213 20
3213 20
3213 20
34 7113
32 91 19
32 9113
344130
34 4130
34 4130
34 71 13
Project Quantity Matrix
Unit I 10 I 13 ( 29
LF 0 50
LF 0 20
LF 0 10
EA 0 1
EA 0 4
EA 0 1
Ton 0 1
EA 0 1
EA 0 2
EA 0 1
EA 0 1
LF 0 80
LF 290 0
LF 72 0
EA 3 0
VF 10 0
EA 1 0
EA 1 0
EA 3 0
LF 362 0
LF 72 0
LF 362 0
AC 0 0
LF 0 0
CY 0 0
SY 0 0
SY 0 0
TON 0 0
LF 0 0
LF 0 0
LF 0 0
SF 0 0
EA 0 0
EA 0 0
SF 0 0
CY 0 0
SY 0 0
EA 0 0
EA 0 0
EA 0 0
MO 0 0
Quantity by Sh et
30 31 32
39 40 53
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
O 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0
0
0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
O 0 0 0 0 1 1 0
0 0 0 0 0 70 0
0 0 0 0 0 941 1146 0
0 0 0 0 0 2481 3008 0
O 0 0 0 0 2613 3182 0
0 0 0 0 0 36 44 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 5390 6770 0
0 0 0 0 0 0 2 0
0 0 0 0 0 0 2 0
0 0 0 0 0 0 87 0
0 0 0 0 0 325 325 0
0 0 0 0 0 1225 1225 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
O 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
60 Total
0 50 $
0 20 $
0 10 $
0 1 $
0 4 $
0 1 $
0 1 $
0 1 $
0 2 $
0 1 $
0 1 $
0 80 $
96.00
84.00
85.00
2,302.00
1,514.00
1,350.00
2,474.00
3,250.00
4,628.00
24,823.00
7,491.00
42.00
CFA Unit A - Water Improvements TOTAL
0
0
0
0
0
0
0
290
72
3
10
1
1
3
362
72
362
$ 81.00
$ 120.00
$ 4,319.00
$ 184.00
$ 2,463.00
$ 8,100.00
$ 115.00
$ 1.00
$ 60.00
$ 16.00
CFA Unit A1- Sanitary Sewer Improvements TOTAL
TOTAL ESTIMATED COST - WATER
0 0 2 $ 5,239.00
0 0 70 $ 9.00
O 0 2087 $ 12.00
0 0 5489 $ 43.00
O 0 5795 $ 3.00
O 0 80 $ 180.00
734 0 734 $ 1.00
2380 0 2380 $ 1.20
15 0 15 $ 20.00
0 0 12160 $ 5.00
0 0 2 $ 1,542.00
0 0 2 $ 783.00
0 0 87 $ 50.00
0 0 650 $ 15.00
0 0 2450 $ 0.10
4 0 4 $ 350.00
1 0 1 $ 350.00
1 0 1 $ 350.00
4 0 4 $ 4,456,00
CFA Unit B - Paving Improvements TOTAL
Item Cost
4,800.00
1,680.00
850.00
2,302.00
6,056.00
1,350.00
2,474.00
3,250.00
9,256.00
24,823.00
7,491.00
3,360.00
b/,b9Z.UU
23,490.00
8,640.00
12,957.00
1,840.00
2,463.00
8,100.00
345.00
362.00
4,320.00
5,792.00
68,309.00
136,001.00
11,673.69
630.00
25,044.00
236,023.28
17,385.26
14,400.00
734.00
2,856.00
300.00
60,800.00
3,084.00
1,566.00
4,350.00
9,750.00
245.00
1,400.00
350.00
350.00
17,824.00
408,765.23
GAI 9905-1045 Page 1 of 2
Project Quantity Matrix
Prepared for: City of Fort Worth CFA Application
Centre Station Drive - Centreport Boulevard to Trinity Boulevard
June 26 ,2014
Qu ntity by Sh et
on
DesMpNon Seaton Nurmber I Unit I 10 I 13 I 29 I 3o I 31 32 33 I 39 I 40 S3 I 58 I 60 I Total I Unit Price L Item Cost
CFA Unit 81- Storm Drain Improvements
11-1 3341.0605 66" Class III RCP Complete in Place
11-2 3341.0201 21" Class III RCP Complete in Place
11-3 3341.0208 27" Class III RCP Complete in Place
11-4 3349.5003 20' Standard Curb Inlet
11-5 3349.0005 8' Storm Junction Box
11-6 3349.101466" Flared Headwall, 1 Pipe
11-7 3137.0104 Rock Riprap
11-8 3305.0109 Trench Safety
11-9 3123.0101 Unclassified Drainage Excavation by Plans
11-10 3125.0101 SWPPP -Preparation, Implementation and Maintenance
11-11 9999.0006 Remove Existing 66" RCP Backfill and Compact
CFA Unit C- Street Light Improvements
11-1 3441.3001 Install Roadway Illumination Assembly
11-2 3441.3301 Install Roadway Illumination Foundation Type 2
11-3 3441.3404 Quadplex Alum Elec Conductor
11-4 9999,0001 2" PVC Sch 80 PVC Conduit
I1-5 9999.0002 Electric Service with Relay
CFA Unit C1- Street Name Signs
I1-1 Street Name Signs
CFA Unit C2 - Signal Improvements
11-1 3217.0305 12 SLD Pvmt Marking Paint (W) 32 17 23 LF 0 0 0 0 0 0 0 0 0 0 0 92 92 $ 8.00 $ 736.00
11-2 3217,0503 24" SLD Pvmt Marking Paint (W) 3217 23 LF 0 0 0 0 0 0 0 0 0 0 0 24 24 $ 16.00 $ 384.00
11-3 3217.1002 Lane Legend Arrow 32 17 23 EA 0 0 0 0 0 0 0 0 0 0 0 3 3 $ 247.00 $ 741.00
11-4 3217.1004 Lane Legend Only 3217 23 EA 0 0 0 0 0 0 0 0 0 0 0 3 3 $ 288.00 $ 864.00
11-5 3441.1001 3-Sect Signal Head Assmbly 344110 EA 0 0 0 0 0 0 0 0 0 0 0 4 4 $ 1,351.00 $ 5,404.00
11-6 3441.1003 5-Sect Signal Head Assembly 344110 EA 0 0 0 0 0 0 0 0 0 0 0 2 2 $ 1,955.00 $ 3,910.00
11-7 3441.1011 Ped Signal Head Assmbly 344110 EA 0 0 0 0 0 0 0 0 0 0 0 8 8 $ 661.00 $ 5,288.00
11-8 3441.1031 Accessible Ped Signal 34 41 11 EA 0 0 0 0 0 0 0 0 0 0 0 8 8 $ 1,357,00 $ 10,856.00
11-9 3441.1203 Install Radar Presence Detect System 34 41 10 EA 0 0 0 0 0 0 0 0 0 0 0 1 1 $ 6,210.00 $ 6,210.00
11-10 3441.1208 Install Emergency Vehicle Preemption System 344110 LS 0 0 0 0 0 0 0 0 0 0 0 1 1 $ 776.00 $ 776.00
11-11 3441.1315 20/C 14 AWG Multi -Conductor Cable 344110 LF 0 0 0 0 0 0 0 0 0 0 0 230 230 $ 6,00 $ 1,380.00
11-12 3441.1626 Install Mast Arm 16' - 36' 34 41 10 EA 0 0 0 0 0 0 0 0 0 0 0 1 1 $ 3,542,00 $ 3,542.00
11-13 3441.4001 Furnish/Install Alum Sign Mast Arm Mount 34 41 30 EA 0 0 0 0 0 0 0 0 0 0 0 2 2 $ 449.00 $ 898.00
11-14 3441.4005 Install Alum Sign Mast Arm Mount 344130 EA 0 0 0 0 0 0 0 0 0 0 0 4 4 $ 495.00 $ 1,980.00
II-15 3441.1234 Furnish and Install Radar Presence Cable 344110 LE 0 0 0 0 0 0 0 0 0 0 0 520 520 $ 3.00 $ 1,560.00
II-16 3441.1224 Furnish and Install Emergency Vehicle Preemption Cable 34 41 10 LF 0 0 0 0 0 0 0 0 0 0 0 230 230 $ 1.00 $ 230.00
33 4110 LF 0 0 0 700 420 0 0 0 0 0 0 0
33 4110 LF 0 0 0 0 0 70 50 0 0 0 0 0
33 4110 LF 0 0 0 0 0 0 150 0 0 0 0 0
33 49 20 EA 0 0 0 0 0 2 2 0 0 0 0 0
33 4910 EA 0 0 0 1 0 0 0 0 0 0 0 0
33 49 40 EA 0 0 0 0 1 0 0 0 0 0 0 0
3137 00 SY 0 0 0 0 750 0 0 0 0 0 0 0
33 0510 LF 0 0 0 700 420 70 200 0 0 0 0 0
31 23 16 CY 0 0 10790 0 10 0 0 0 0 0 0 0
31 25 00 L5 0 0 0 0 0 0 0 1 0 0 0 0
31 10 00 LF 575
1120 $ 200.00 $ 224,000.00
120 $ 74.00 $ 8,880.00
150 $ 79.00 $ 11,850.00
4 $ 7,839.00 $ 31,356.00
1 $ 13,301.00 $ 13,301.00
1 $ 6,689.00 $ 6,689.00
750 $ 100.00 $ 75,000.00
1390 $ 2.00 $ 2,780.00
10800 $ 4.29 $ 46,332.00
1 $ 10,052.00 $ 10,052.00
575 $ 41.00 $ 23,575.00
CFA Unit B1 - Storm Drain Improvements TOTAL $ 430,240.00
34 41 20 EA 0 0 0 0 0 0 0 0 0 5 0 0 5 $ 2,724.00 $ 13,620.00
34 41 20 EA 0 0 0 0 0 0 0 0 0 5 0 0 5 $ 863.00 $ 4,315.00
34 41 20 LF 0 0 0 0 0 0 0 0 0 1200 0 0 1200 $ 3.00 $ 3,600.00
34 41 20 LF 0 0 0 0 0 0 0 0 0 1200 0 0 1200 $ 5.00 $ 6,000.00
34 41 20 LS 0 0 0 0 0 0 0 0 0 1 0 0 1 $ 4,715,00 $ 4,715.00
CFA Unit C- Street Light Improvements TOTAL $ 32,250.00
GAI 9905-1045
34 41 30 EA 0 0 0 0 0 0 0 0 0 0 0 2 2 $ 431.00 $ 862.00
CFA Unit C2 - Street Sign Improvements TOTAL $ 862.00
CFA Unit C2 - Signal Improvements TOTAL $ 44,759.00
TOTAL ESTIMATED COST - TPW $ 916,876.23
Page 2 of 2