Loading...
HomeMy WebLinkAboutContract 45721 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § City Secretary Contract No. - 157t 1 WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements. Developer and Project Information: Developer Company Name: CentrePort Venture, L.P. Address, State, Zip Code: Two Seaport Lane, Boston MA 02210-2021 Phone, E-Mail: (617)261-9375, dbradley@aew.com • Authorized Signatory/Title: Daniel J. Bradley, President Project Name and Brief Description: Water, Sewer, Paving, Storm Drain, Street Lights, Traffic Signals to serve Centre Station Drive (Lot 2, Blk 104) Project Location: Centre Station Drive from Centreport to Trinity Plat Case No.: FP-13-074 Plat Name: Centreport Council District: 5 City Project No: 02247 CFA: 2014-003 DOE: 7199 To be completed by staff: Received by: C Date: • (Qin! /L-4 utiyuctlat;:sti-da pi-m Piii I/ F(.7v(l_,1 RECEIVED JUL 0/.2 014 NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X , Sewer (A-1) Paving (B) X , Storm Drain (B-1) X_, Street Lights & Signs (C) X , Traffic Signals (C-1) X E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured licensed and bonded to do work in public streets and/or prequahfied to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces and not to install or relocate any sanitary sewer, storm drain or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no Tess than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design performance or completion of any work to be performed by said Developer, his contractors subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such Miseries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. If applicable, the City's obligation to participate (exclusive of' front foot charges) in the cost of the Improvements shall terminate if the Improvements are not completed within two (2) years' provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name. Center Station Drive CFA No.: 2014-003 DOE No.:7199 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Traffic Signals TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Traffic Signal Inspection Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period Developer's Cost $ 67,692.00 $ 68,309.00 $ 136,001.00 $ 408,765.00 $ 439,255.00 $ 32,250.00 $ 44,759.00 $ 925,029.00 $ 1,061,030.00 $ 2,720.02 $ 2,720.02 $ 5,440.04 $ 33,920.80 $ 16,960.40 $ 1,290.00 $ 1,790.36 $ 53,961.56 $ 59,401.60 Choice Amount (ck one) $ 1,061,030.00 $ 1,061,030.00 $ 170,001.25 X $ 1,156,286.25 X $ 1,326,287.50 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said eveloper has executed this instrument in at Fort Worth, Texas this alfwan, day of quadruplicate, _ 201. CITY OF FORT WORTH -Recommended by: Water Department (A_ . _ Wendy ChibulaI, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. B ack Assistant City Attorney M&C No. dijk- Date: ATTEST: Sin Mary J. Kayser ice City Secretary ATTEST: af Signature (Print) Name: afirierelsx C ea r1 • Title: S5oCt Ctle Transportation & Public Works Department Douglas . Wiersig, P.E. Director Approved by City Manager's Office `7,4-14astzet_a• Fernando Costa Assistant City Manager 0.00 r~SXA 9 DEVELOPER: CentrePort Venture, LP By: AEW #13 CentrePort GP, LLC Its General Partner 8 (Print) Name: Title: mil I Signature Daniel J. Bradley Authorized Signatory OFFICIAL RECORD CITY SECRETARY I Fr WORTHS TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Dram Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate Exhibit C-1: Traffic Signal Improvements Traffic Signal Estimate S S to S \I ra S. IV (Remainder of Page Intentionally Left Blank) 9 SH les 44 M 0 w PROJECT LOCATION SOVEREIGN RD. a TRINITY BOULEVARD SH 183 CENTRE STATIOI\ DRIVE VICINITY MAP Graham Associates,Inc. CONSULTING ENGINEERS & PLANNERS 600 SIX FLAGS DRIVE, SUITE 500 ARLINGTON, TEXAS 76011 (817) 640-8535 TBPE FIRM: F-1191/TBPLS FIRM: 101538-00 DRAWN BY, GAI PROJECT NO.: 9905-1045 DATE: 6/20/2014 SHEET 1 OF 8 NOT TO SCALE MAPSCO NO 56Q COUNCIL DISTRICT #5 183 g DRAWN BY: GAI LOT 1 BLOCK 103 ABINET A, SLIDE 11474 P.R.T.C.T. LOT 1 BLOCK 105 CITY OF FORT WORTH VOLUME 2037, PAGE 567 VOLUME 2008, PAGE 243 D.R.T.C.T. TRINITY BOULEVARD LOT 2 BLOCK 104 CITY OF FORT WORTH VOLUME 2037, PAGE 567 VOLUME 2008, PAGE 243 D.R.T.C.T. EX 12" WATER W-10137 ROPOSED 10" WATER LINE EX 10n WATER W-10185 w CENTRE STATION DRIVE A - WATER IMPROVEMENTS Graham Associates,Inc. GRAPHIC SCALE 1 "=200' CONSULTING ENGINEERS & PLANNERS 600 SIX FLAGS DRIVE, SUITE 500 ARLINGTON TEXAS 76011 (817) 640-8535 200 TBPE FIRM F-1191/TBPLS FIRM: 101538-00 DATE: 6/20/2014 0 200 400 C J PROJECT NO.: 9905-1045 SHEET 2 OF 8 J I/ DRAWN BY: GAI LOT 1 BLOCK 103 ABINET A, SLIDE 11474 P.R.T.C.T. CITY OF FORT WORTH VOLUME 2037, PAGE 567 VOLUME 2008, PAGE 243 D.R.T.C.T. ROPOSED SANITARY SEWER MANHOLE PROPOSED 8" SANITARY SEWER -EXISTING SANITARY SEWER MANHOLE LOT 1 BLOCK 105 CITY OF FORT WORTH VOLUME 2037, PAGE 567 VOLUME 2008, PAGE 243 D.R.T.C.T. PROPOSED SANITARY SEWER MANHOLE PROPOSED 8" SANITARY SEWER EXISTING SANITARY SEWER MANHOLE TRINITY BOULEVARD ft \L ::,ci CENTRE STATION DRIVE Al - WASTEWATER IMPROVEMENTS Graham Associates,Inc. CONSULTING ENGINEERS & PLANNERS 600 SIX FLAGS DRIVE SUITE 500 ARLINGTON TEXAS 76011 (817) 640-8535 TBPE FIRM F-1191/TBPLS FIRM: 101538-00 PROJECT NO.: 9905-1045 GRAPHIC SCALE 200 DATES 6/20/2014 SHEET 3 OF 8 0 =200' 200 400 BAITER S I/ DRAWN BY. GAI • LOT 2 BLOCK 104 CITY OF FORT WORTH VOLUME 2037, PAGE 567 VOLUME 2008, PAGE 243 D.R.T.C.T. LOT 1 BLOCK 103 ABINET A, SLJDE 11474 P.R.T.C.T. PROPOSED CENTRE STATION DRIVE 29' B-B WITH 8' PARKING STALLS LOT 1 BLOCK 105 CITY OF FORT WORTH VOLUME 2037, PAGE 567 VOLUME 2008, PAGE 243 D.R.T.C.T. TRINITY BOULEVARD ROPOSED 10' SIDEWALK CENTRE STATION DRIVE B - PAVING IMPROVEMENTS Graham Associates,Inc. CONSULTING ENGINEERS & PLANNERS GRAPHIC SCALE 1 "=200' 600 SIX FLAGS DRIVE, SUITE 500 ARLINGTON, TEXAS 76011 (817) 640-8535 200 TBPE FIRM: F-1191/TBPLS FIRM: 101538-00 DATE: 6/20/2014 0 200 400 PROJECT NO.: 9905-1045 SHEET 4 OF 8 CE DRAWN BY. GAI A 1% LOT 1 BLOCK 103 ABINET A, SLIDE 11474 P.R.T.C.T. IST INLET EXISTING CHANNEL LOT 2 BLOCK 104 CITY OF FORT WORTH VOLUME 2037, PAGE 567 VOLUME 2008, PAGE 243 D.R.T.C.T. ROP 21" SD ROP 27" SD CONNECT TO EXIST SD INLET LOT 1 BLOCK 105 CITY OF FORT WORTH VOLUME 2037, PAGE 567 VOLUME 2008, PAGE 243 D.R.T.C.T. PROPOSED 21" STORM DRAIN CONNECT TO EXISTING 66" SD TRINITY BOULEVARD EXIST 39" STORM K-854 ROCK R7AP PROP 66" , ADWALL ND APRON PROPOSED 6611 STORM DRAIN i -j, ry Ayr JIVI{M fY-IGVY" ) CENTRE STATION DRIVE B 1 - STORM DRAIN IMPROVEMENTS Graham Associates,Inc. CONSULTING ENGINEERS & PLANNERS GRAPHIC SCALE 1 "=200' 600 SIX FLAGS DRIVE, SUITE 500 ARLINGTON, TEXAS 76011 (817) 640-8535 200 TBPE FIRM: F-1191/TBPLS FIRM: 101538-00 DATE: 6/20/2014 PROJECT NO.: 9905-1045 SHEET 5 OF 8 0 200 400 LOT 1 BLOCK 103 CABINET A SLIDE 11474 P.R.T.C.T. PROPOSED DETENTION POND- • / SOVEREIGN ROAD LOT 1 BLOCK 104 CENTREPORT INST. NO. D211144558 P.R.T.C.T. /ci EXISTING CHANNEL • 11' AREA 1, BLOCK 38 CENTREPORT VOLUME 388-207 PAGE 59 P.R.T.C.T. CENTRE STATION DRIVE B 1 - STORM DRAIN IMPROVEMENTS I Graham Associates,Inc. CONSULTING ENGINEERS & PLANNERS 600 SIX FLAGS DRIVE, SUITE 500 ARLINGTON, TEXAS 76011 (817) 640-8535 TBPE FIRM: F-1191/TBPLS FIRM: 101538-00 DRAWN BY. GAI PROJECT NO.: 9905-1045 GRAPHIC SCALE 200 DATE: 6/20/2014 SHEET 6 OF 8 0 200 1 "=200' 400 1 DRAWN BY. GAI PROJECT NO.: 9905-1045 TER STATION LOT 1 BLOCK 103 ABINET A, SLIDE 11474 P.R.T.C.T. LOT 2 BLOCK 104 CITY OF FORT WORTH VOLUME 2037, PAGE 567 VOLUME 2008, PAGE 243 D.R.T.C.T. LECTRIC SERVICE COMPLETE 100 W HPS COBRA HEAD LAMP TYPE 8 POLE W/33B ARM TYPE 2 FOUNDATION 5 TOTAL LOT 1 BLOCK 105 CITY Of FORT WORTH VOLUME 2037, PAGE 567 VOLUME 2008, PAGE 243 D.R.T.C.T. TRINITY BOULEVARD i CENTRE STATION DRIVE C - STREET LIGHT IMPROVEMHNTS Graham Associates,Inc. CONSULTING ENGINEERS & PLANNERS GRAPHIC SCALE 1 "=200' 600 SIX FLAGS DRIVE, SUITE 500 ARLINGTON, TEXAS 76011 (817) 640-8535 200 TBPE FIRM: F-1191/TBPLS FIRM:101538-00 DATE: 6/20/2014 SHEET 7 OF 8 0 200 400 CE TE DRAWN BY: GAI PROJECT NO.: 9905-1045 A LOT 2 BLOCK 104 CITY OF FORT WORTH VOLUME 2037, PAGE 567 VOLUME 2008, PAGE 243 D.R.T.C.T. LOT 1 BLOCK 103 ABINET A, SLIDE 11474 P.R.T.C.T. LOT 1 BLOCK 105 CITY OF FORT WORTH VOLUME 2037, PAGE 567 VOLUME 2008, PAGE 243 D.R.T.C.T. EXISTING SIGNALS TO BE RECONFIGURED AS FOUR WAY INTERSECTION NEW MAST ARM ON EXISTING POLE WITH NEW SIGNAL HEAD TRINITY BOULEVARD 71 CENTRE STATION DRIVE C2 - SIGNAL IMPROVEMENTS Graham Associates,Inc. CONSULTING ENGINEERS & PLANNERS GRAPHIC SCALE 1 "=200' 600 SIX FLAGS DRIVE, SUITE 500 ARLINGTON, TEXAS 76011 (817) 640-8535 200 TBPE FIRM: F-1191/TBPLS FIRM. 101538-00 DATE: 6/20/2014 SHEET 8 OF 8 0 N 200 400 • J Prepared for: City of Fort Worth CFA Application Centre Station Drive - Centreport Boulevard to Trinity Boulevard June 26 ,2014 Item I. Description L A unn A- water Improvements 1-1 3311.036110-inch PVC DR-14 Water Pipe 1-2 3311.02618-inch PVC DR-14 Water Pipe 1-3 3311.0161 6-inch PVC DR-14 Water Pipe 1-4 3312.3004 10" Gate Valve with Box 1-5 3312.3003 8" Gate Valve with Box 1-6 3312.2002 6" Gate Valve with Box 1-7 3311.0001 Ductile Iron Fittings Less than 16" Diameter for PVC Pipe 1-8 3312.001 Fire Hydrant Assembly 1-9 3312.2203 2" Irrigation Service with Meter in Box 1-10 3312.28048" Water Service with Combination Turbine Meter and Bypass in Vault 1-11 3312.0117 Connect to Existing 10" Water Une 1-12 3305.0109 Trench Safety CFA Unit A1-Sanitary Sewer Improvements 1-1 3331.4115 8-inch Sanitary Sewer (PVC) Open Cut, All Depths 1-2 3331.4119 8-inch Sanitary Sewer (DIP) Open Cut, All Depths 1-3 3339.1001 Standard Sewer MH, 48" I.D to 6' Depth with 32-inch Ring and Cover and 30" Opening 1-4 3339.1003 Extra Depth 1-5 9999.0003 Connect to Existing Sanitary Sewer Line 1-6 9999.0004 Connect to Existing Sanitary Sewer Manhole 1-7 3301.0101 Vacuum Test New Sanitary Sewer Manhole 1-8 3301.0002 Post CCTV -Inspection of Sewer Lines 1-9 3305.0202 Cement Stabilized Backfill of Sewer Pipe 1-10 3305.0109 Trench Safety CFA Unit B - Paving Improvements 1-1 3110.0101 Site Preparation - Clearing and Grubbing 1-2 0241.1300 Remove Existing Curb and Gutter 1-3 3123.0101 Unclassified Street Excavation 1-4 3213.0102 7" Reinforced Concrete Pavement 1-5 3211.05016" Thick Lime Stabilized Subgrade 1-6 3211.0400 Lime for Subgrade Stabilization (27# per SY) 1-7 3217.0009 4" SLD Pvmt Marking Paint (W) for Parking Stalls and Turn Lane 1-8 1-9 -10 -11 -12 13 14 15 16 17 18 19 3217.0010 4" SLD Pvmt Marking Paint (V) for Centerline 3217.0503 24" SLD Pvmt Marking Paint (W) for Stop Line at Centre Port Drive 3213.0301 4" Concrete Hike and Bike Path, 10' Wide 3213.0501 Barrier Free Sidewalk Ramp, Type R-1 3213.0501 Barrier Free Sidewalk Ramp, Type P-1 9999.0005 Patterned Concrete Crosswalk 3291.0100 Topsoil 3292.0400 Hydromulch Seeding 3441.4006 R6-2 One Way Sign, 36"x12" 3441.4006 R5-1 Do Not Enter Sign 3441.4006 R1-1 Stop Sign 3471.0001 Traffic Control Plan npecmcauon Section Number 33 11 12 33 11 12 33 11 12 3312 20 33 12 20 3312 20 33 11 11 33 12 40 33 1210 33 12 11 33 12 25 33 0510 333121 33 11 10 33 39 20 33 3910,20 333121 33 39 20 33 0130 33 01 31 33 05 10 33 05 10 31 10 00 02 41 15 3123 16 32 13 13 32 11 29 32 11 29 3217 23 3217 23 3217 23 3213 20 3213 20 3213 20 34 7113 32 91 19 32 9113 344130 34 4130 34 4130 34 71 13 Project Quantity Matrix Unit I 10 I 13 ( 29 LF 0 50 LF 0 20 LF 0 10 EA 0 1 EA 0 4 EA 0 1 Ton 0 1 EA 0 1 EA 0 2 EA 0 1 EA 0 1 LF 0 80 LF 290 0 LF 72 0 EA 3 0 VF 10 0 EA 1 0 EA 1 0 EA 3 0 LF 362 0 LF 72 0 LF 362 0 AC 0 0 LF 0 0 CY 0 0 SY 0 0 SY 0 0 TON 0 0 LF 0 0 LF 0 0 LF 0 0 SF 0 0 EA 0 0 EA 0 0 SF 0 0 CY 0 0 SY 0 0 EA 0 0 EA 0 0 EA 0 0 MO 0 0 Quantity by Sh et 30 31 32 39 40 53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 1 1 0 0 0 0 0 0 70 0 0 0 0 0 0 941 1146 0 0 0 0 0 0 2481 3008 0 O 0 0 0 0 2613 3182 0 0 0 0 0 0 36 44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5390 6770 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 87 0 0 0 0 0 0 325 325 0 0 0 0 0 0 1225 1225 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 Total 0 50 $ 0 20 $ 0 10 $ 0 1 $ 0 4 $ 0 1 $ 0 1 $ 0 1 $ 0 2 $ 0 1 $ 0 1 $ 0 80 $ 96.00 84.00 85.00 2,302.00 1,514.00 1,350.00 2,474.00 3,250.00 4,628.00 24,823.00 7,491.00 42.00 CFA Unit A - Water Improvements TOTAL 0 0 0 0 0 0 0 290 72 3 10 1 1 3 362 72 362 $ 81.00 $ 120.00 $ 4,319.00 $ 184.00 $ 2,463.00 $ 8,100.00 $ 115.00 $ 1.00 $ 60.00 $ 16.00 CFA Unit A1- Sanitary Sewer Improvements TOTAL TOTAL ESTIMATED COST - WATER 0 0 2 $ 5,239.00 0 0 70 $ 9.00 O 0 2087 $ 12.00 0 0 5489 $ 43.00 O 0 5795 $ 3.00 O 0 80 $ 180.00 734 0 734 $ 1.00 2380 0 2380 $ 1.20 15 0 15 $ 20.00 0 0 12160 $ 5.00 0 0 2 $ 1,542.00 0 0 2 $ 783.00 0 0 87 $ 50.00 0 0 650 $ 15.00 0 0 2450 $ 0.10 4 0 4 $ 350.00 1 0 1 $ 350.00 1 0 1 $ 350.00 4 0 4 $ 4,456,00 CFA Unit B - Paving Improvements TOTAL Item Cost 4,800.00 1,680.00 850.00 2,302.00 6,056.00 1,350.00 2,474.00 3,250.00 9,256.00 24,823.00 7,491.00 3,360.00 b/,b9Z.UU 23,490.00 8,640.00 12,957.00 1,840.00 2,463.00 8,100.00 345.00 362.00 4,320.00 5,792.00 68,309.00 136,001.00 11,673.69 630.00 25,044.00 236,023.28 17,385.26 14,400.00 734.00 2,856.00 300.00 60,800.00 3,084.00 1,566.00 4,350.00 9,750.00 245.00 1,400.00 350.00 350.00 17,824.00 408,765.23 GAI 9905-1045 Page 1 of 2 Project Quantity Matrix Prepared for: City of Fort Worth CFA Application Centre Station Drive - Centreport Boulevard to Trinity Boulevard June 26 ,2014 Qu ntity by Sh et on DesMpNon Seaton Nurmber I Unit I 10 I 13 I 29 I 3o I 31 32 33 I 39 I 40 S3 I 58 I 60 I Total I Unit Price L Item Cost CFA Unit 81- Storm Drain Improvements 11-1 3341.0605 66" Class III RCP Complete in Place 11-2 3341.0201 21" Class III RCP Complete in Place 11-3 3341.0208 27" Class III RCP Complete in Place 11-4 3349.5003 20' Standard Curb Inlet 11-5 3349.0005 8' Storm Junction Box 11-6 3349.101466" Flared Headwall, 1 Pipe 11-7 3137.0104 Rock Riprap 11-8 3305.0109 Trench Safety 11-9 3123.0101 Unclassified Drainage Excavation by Plans 11-10 3125.0101 SWPPP -Preparation, Implementation and Maintenance 11-11 9999.0006 Remove Existing 66" RCP Backfill and Compact CFA Unit C- Street Light Improvements 11-1 3441.3001 Install Roadway Illumination Assembly 11-2 3441.3301 Install Roadway Illumination Foundation Type 2 11-3 3441.3404 Quadplex Alum Elec Conductor 11-4 9999,0001 2" PVC Sch 80 PVC Conduit I1-5 9999.0002 Electric Service with Relay CFA Unit C1- Street Name Signs I1-1 Street Name Signs CFA Unit C2 - Signal Improvements 11-1 3217.0305 12 SLD Pvmt Marking Paint (W) 32 17 23 LF 0 0 0 0 0 0 0 0 0 0 0 92 92 $ 8.00 $ 736.00 11-2 3217,0503 24" SLD Pvmt Marking Paint (W) 3217 23 LF 0 0 0 0 0 0 0 0 0 0 0 24 24 $ 16.00 $ 384.00 11-3 3217.1002 Lane Legend Arrow 32 17 23 EA 0 0 0 0 0 0 0 0 0 0 0 3 3 $ 247.00 $ 741.00 11-4 3217.1004 Lane Legend Only 3217 23 EA 0 0 0 0 0 0 0 0 0 0 0 3 3 $ 288.00 $ 864.00 11-5 3441.1001 3-Sect Signal Head Assmbly 344110 EA 0 0 0 0 0 0 0 0 0 0 0 4 4 $ 1,351.00 $ 5,404.00 11-6 3441.1003 5-Sect Signal Head Assembly 344110 EA 0 0 0 0 0 0 0 0 0 0 0 2 2 $ 1,955.00 $ 3,910.00 11-7 3441.1011 Ped Signal Head Assmbly 344110 EA 0 0 0 0 0 0 0 0 0 0 0 8 8 $ 661.00 $ 5,288.00 11-8 3441.1031 Accessible Ped Signal 34 41 11 EA 0 0 0 0 0 0 0 0 0 0 0 8 8 $ 1,357,00 $ 10,856.00 11-9 3441.1203 Install Radar Presence Detect System 34 41 10 EA 0 0 0 0 0 0 0 0 0 0 0 1 1 $ 6,210.00 $ 6,210.00 11-10 3441.1208 Install Emergency Vehicle Preemption System 344110 LS 0 0 0 0 0 0 0 0 0 0 0 1 1 $ 776.00 $ 776.00 11-11 3441.1315 20/C 14 AWG Multi -Conductor Cable 344110 LF 0 0 0 0 0 0 0 0 0 0 0 230 230 $ 6,00 $ 1,380.00 11-12 3441.1626 Install Mast Arm 16' - 36' 34 41 10 EA 0 0 0 0 0 0 0 0 0 0 0 1 1 $ 3,542,00 $ 3,542.00 11-13 3441.4001 Furnish/Install Alum Sign Mast Arm Mount 34 41 30 EA 0 0 0 0 0 0 0 0 0 0 0 2 2 $ 449.00 $ 898.00 11-14 3441.4005 Install Alum Sign Mast Arm Mount 344130 EA 0 0 0 0 0 0 0 0 0 0 0 4 4 $ 495.00 $ 1,980.00 II-15 3441.1234 Furnish and Install Radar Presence Cable 344110 LE 0 0 0 0 0 0 0 0 0 0 0 520 520 $ 3.00 $ 1,560.00 II-16 3441.1224 Furnish and Install Emergency Vehicle Preemption Cable 34 41 10 LF 0 0 0 0 0 0 0 0 0 0 0 230 230 $ 1.00 $ 230.00 33 4110 LF 0 0 0 700 420 0 0 0 0 0 0 0 33 4110 LF 0 0 0 0 0 70 50 0 0 0 0 0 33 4110 LF 0 0 0 0 0 0 150 0 0 0 0 0 33 49 20 EA 0 0 0 0 0 2 2 0 0 0 0 0 33 4910 EA 0 0 0 1 0 0 0 0 0 0 0 0 33 49 40 EA 0 0 0 0 1 0 0 0 0 0 0 0 3137 00 SY 0 0 0 0 750 0 0 0 0 0 0 0 33 0510 LF 0 0 0 700 420 70 200 0 0 0 0 0 31 23 16 CY 0 0 10790 0 10 0 0 0 0 0 0 0 31 25 00 L5 0 0 0 0 0 0 0 1 0 0 0 0 31 10 00 LF 575 1120 $ 200.00 $ 224,000.00 120 $ 74.00 $ 8,880.00 150 $ 79.00 $ 11,850.00 4 $ 7,839.00 $ 31,356.00 1 $ 13,301.00 $ 13,301.00 1 $ 6,689.00 $ 6,689.00 750 $ 100.00 $ 75,000.00 1390 $ 2.00 $ 2,780.00 10800 $ 4.29 $ 46,332.00 1 $ 10,052.00 $ 10,052.00 575 $ 41.00 $ 23,575.00 CFA Unit B1 - Storm Drain Improvements TOTAL $ 430,240.00 34 41 20 EA 0 0 0 0 0 0 0 0 0 5 0 0 5 $ 2,724.00 $ 13,620.00 34 41 20 EA 0 0 0 0 0 0 0 0 0 5 0 0 5 $ 863.00 $ 4,315.00 34 41 20 LF 0 0 0 0 0 0 0 0 0 1200 0 0 1200 $ 3.00 $ 3,600.00 34 41 20 LF 0 0 0 0 0 0 0 0 0 1200 0 0 1200 $ 5.00 $ 6,000.00 34 41 20 LS 0 0 0 0 0 0 0 0 0 1 0 0 1 $ 4,715,00 $ 4,715.00 CFA Unit C- Street Light Improvements TOTAL $ 32,250.00 GAI 9905-1045 34 41 30 EA 0 0 0 0 0 0 0 0 0 0 0 2 2 $ 431.00 $ 862.00 CFA Unit C2 - Street Sign Improvements TOTAL $ 862.00 CFA Unit C2 - Signal Improvements TOTAL $ 44,759.00 TOTAL ESTIMATED COST - TPW $ 916,876.23 Page 2 of 2