Developer and Project Information Cover Sheet:
Developer Company Name: D.R. Horton — Texas, Ltd.
Address, State, Zip Code: 6751 North Freeway J Fort Worth, TX 76131
Phone, E-Mail: (817) 230-0800, dallen@drhorton.com
Authorized Signatory/Title: Don E. Allen, Assistant Secretary
Project Name and Brief Description: Water & Sewer Improvements to serve The Sanctuary at Bear
Creek Ph. 1
Project Location: NWC of Ray White Rd. & Park Vista Intersection
Plat Case No.: FP-14-001 Plat Name: The Sanctuary at Bear Creek Ph. 1
Council District: 7 City Project No: 02275
CFA: 2014-028 DOE: 7223
To be conzplett'd b y staff:
Received by:K l V\
- -
Date: (C-2._ '
Lo I
liU Ink 1V,6
Combined CFA Agreement — Revised January 2014
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
COUNTY OF TARRANT §
City Secretary
Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
( `Improvements") related to a project generally described as The Sanctuary at Bear Creek
Ph. 1 ("Project") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the
Project.
NOW, THEREFORE, For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section H, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's contractor(s) to submit an
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub -contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof Water (A) X ,
Sewer (A-1) X , Paving (B) N/A , Storm Drain (B-1) N/A , Street
Lights & Signs (C) N/A .
E The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Combined CFA Agreement — Revised January 2014
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state -approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre -Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees, whether or not such injuries. death or damages are caused. in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants. or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries. death or damages are caused, in
whole or in part. by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees. Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
Combined CFA Agreement — Revised January 2014
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
•
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
•
Combined CFA Agreement — Revised January 2014
Cost Summary Sheet
Project Name. The Sanctuary at Bear Creek Ph. 1
CFA No.: 2014-028 DOE No.: 7223
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 155,492.26
2. Sewer Construction $ 241,995.00
Water and Sewer Construction Total $ 397,487.26
B. TPW Construction
1. Street $
2. Storm Drain $
3. Street Lights Installed by Developer $
TPW Construction Cost Total $
Total Construction Cost (excluding the fees):
$ 397,487.26
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 7,949.75
D. Water/Sewer Material Testing Fee (2%) $ 7,949.75
Sub -Total for Water Construction Fees $ 15,899.49
E TPW Inspection Fee (4%) $
F. TPW Material Testing (2%) $ G. Street Light Inspsection Cost $ H. Street Signs Installation Cost $ -
Sub -Total for TPW Construction Fees $ -
Total Construction Fees: $ 15,899.49
Choice
Financial Guarantee Options, choose one Amount (ck one)
(Bond = 100% $ 397,487.26 X
'Completion Agreement = 100% / Holds Plat $ 397,487.26
'Cash Escrow Water/Sanitary Sewer= 125% $ 496,859.08
'Cash Escrow Paving/Storm Drain = 125% $ -
!Letter of Credit = 125% w/2yr expiration period $ 496,859.08
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said D e per has executed this
instrument in quadruplicate, at Fort Worth, Texas this I ; day ofC ,V
,20/'�-. 0
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi-B ulal, EMBA, P.E.
Developmen Engineering Manager
Approved as to Fonn & Legality:
Douglas W, Black
Assistant City Attorney
M&C No. /A
Date:
ATTEST:
Signature
Name: Mark Allen
Title: Project Manager
Combined CFA Agreement — Revised January 2014
• ZY
Transportation & Public Works Department
Douglas W. Wiersig, P.E.
Director
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
DEVELOPER:
D.R. Horton — Texas, Ltd., a Texas Limited Partnership
By D.R. Horton, Inc., a Delaware corporation
Its authorized agent
ame: Don Allen
Title: Assistant Secretary
Signature
\ COATI cc:5'SC .RTin
`J121,7 :101,
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included
121
n
C
n
n
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
-10
O.N
)
E
L 4
OV
Eo
or-
C
O
0
N Q
;9
6. a SHEET
IACV
JOSH
JOB NO. 61017
DATE JUNE 2014
DESIGNER BWC
CHECKED XXX DRAWN XXX
1 of 1
n
O
Bear
THE SANCTUARY AT BEAR CREEK
FORT WORTH, TEXAS
VICINITY MAP
g
OLIVE
PECAN
SS A� 11
SITE
8
Ziliq-
KELLER
•
N.T.S.
PAPE-DAWSON
ENGINEERS
500 NEST SEVENTH ST. FORT KRIM TEXAS 76102 PHLWE 817.8703668
SATE 827 ' FAX 517.670.3669
TEXAS BOARD OF FROFESWNAL ENGAEERS FRY RET7.S7RARON 1 470
a
LEGEND
P ROPOSED
P ROPOSED
P ROPOSED
PROPOSED
AND BACK
WATER LINE
GATE VALVE
FIRE HYDRANT
1 ' IRRIGATION METER
FLOW
JOB NO. 61017
DATE JUNE 2014
DESIGNER BWC
CHECKED XXX DRAWN XXX
SHEET 1 of 1
•
FUTURE PHASE I1
VIEQUES LANE
II 1
PHASE I
PROPOSED
IL II
TORTOLA LANE PPROVP�OSED
II II h n 1 II
CO
aro
1414
4-
•
ANGUILLA
LANE
0
Lai
CC a
RAY WHITE ROAD
(60' R.O.W.)
THE SANCTUARY AT BEAR CREEK
FORT WORTH, TEXAS
EXHIBIT A - WATER
SCALE: 1 "= 200'
200' 0'
100'
PAPE-DAWSON
ENGINEERS
200'
500 KEST SEVENTH ST.1 FORT WORTH. TEXAS 76102 ' PHOFAX: NE• 817.
817.870870.3668.3668
SUITE 527
7E2446 BOARD OF PROFESS WAL EMbcEMS FPoI REQ5TRAWON / 470
ANA
v
43
LEGEND
o
N
N E
3
1
o "y
0
0
re
PROPOSED SANITARY SEWER LINE
PROPOSED SANITARY MANHOLE
W 1..4I
JOB NO. 61017
DATE JUNE 2014
DESIGNER BWC
CHECKED XXX DRAWNXXX
SHEET
1 of 1
4
1R
•
o'T'
.
CLOD
FUTURE PHASE II
IElUES 11 AN
1 Is I 1
PHASE I
TORTOLA i AN'
I I s
o • �
b td
•
PROPOSED 18"
OFFSITE SS
PROPOSED
8" SS
PROPOSED
8" IgS
i t 1
ii (I r 11
PROPOSED
8" S5
II
•
•
s,
ANGUILLA
LANE
RAY WHITE ROAD
(60' ROW)
THE SANCTUARY AT BEAR CREEK
FORT WORTH, TEXAS
EXHIBIT Al - WASTEWATER
rl
SCALE: 1 "= 200'
200' 0' 100' 200'
PAPE-DAWSON
ENGINEERS
500 NEST SEVENTH ST.. I FORT NORTH. TEXAS 76102 I PNCNE 817.8713668
SUITE 827 FAX: 617.670.5689
TEXAS BOARD OF PROFESSIONAL EHgVEERS, FIRM REGISIRAMW 1470
r
LEGEND
FUTURE 4' SIDEWALK
nJ li1 lu u1u 1 mold Iuu!mli II
JOB NO. 61017
DATE JUNE 2014
DESIGNER BWC
CHECKED XXX DRAWN XXX
SHEET 1 of 1
•
eI I ndoOdJIJ
FUTURE PHASE II
VIEQUES LANE
PHASE I
TORTOLA LANE
ANGUILLA
LANE
RAY WHITE ROAD
(60' R.O.W.)
THE SANCTUARY AT BEAR CREEK
FORT WORTH, TEXAS
EXHIBIT B - PAVING
H
SCALE: 1 "= 200'
200' 0' 100' 200'
PAPE-DAWSON
ENGINEERS
500 NEST SEVENTH ST.' FORT NORTH, TEXAS 76102 I PHQVE 817.870.3668
SURE 827 FAX: 6I7.670.3668
TEXAS 80AR0 OF FRa[S9aWlu EHa vies T161 RE $WRA BCW 1 470
LEGEND
FUTURE STREETLIGHTS
JOB NO. 61017
DATE JUNE 2014
DESIGNER BWC
CHECKED XXX DRAWN XXX
SHEET 1 of 1
•
'TWILL NVIVO'I
FUTURE PHASE II
VIEQUES LANE
PHASE I
TORTOLA LANE
3
ANGUILLA
LANE
4 RAY WHITE ROAD;
(60' R.O.W.)
THE SANCTUARY AT BEAR CREEK
FORT WORTH, TEXAS
EXHIBIT C - STREETLIGHTS
ar
SCALE: 1 "= 200'
200' 0' 100' 200'
PAPE-DAWSON
ENGINEERS
500 NEST SEVENTH ST. I FORT NORTH, TEXAS 76102 I PHONE 817.870.3668
SUITE 827 g FAX 817.870.3669
1EXAS BOARD OF PROFERYONAL ONXlEERS, FRY REGSTRATJON # 470
1
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Water Improvements
Project Item Intimation Bidders Proposal
Bidlist Item No. Description
Specification Sectim Unit of Bid
No. Measure Quantity
8" PVC Water Pipe, Complete in Place for the Sum of:
3311.0261 $28 Dollars & 33 11 12 L.F. 2357
00 Cents per Linear Foot
Fire Hydrant, Complete in Place for the Sum of:
3312.0001 3 200 Dollars &
00 Cents per Each
Ductile Iron Water Fittings w/ Restraint, Complete in
3311.0001 Place for the Sum of: 4 500
Dollars & 00 Cents per TON
Concrete Blocking, Complete in Place for the Sum of:
$100 Dollars &
00 Cents per Cubic Yard
Connection to Existing 16" Water Main, Complete in
3312.0106 Place for the Sum of: 4 500
Dollars & 00 Cents per Each
1" Water Service, Complete in Place for the Sum of:
3312.2003 450 Dollars &
00 Cents per Each
1 1/2" Water Service, Complete in Place for the Sum of:
3312.2103 1 200 Dollars &
00 Cents per Each
8" Gate Valve w/ Vault, Complete in Place for the Sum
3312.3003 of 1 200 Dollars &
00 Cents per Each
Cut in 16" Gate Valve w/ Vault, Complete in Place for
the Sum of: 12 000 Dollars &
00 Cents per Each
Testing, Complete in Place for the Sum of:
11 Dollars &
00 Cents per Linear Foot
Trench Safety, Complete in Place for the Sum of:
3305.0109 0 Dollars &
25 Cents per Linear Foot
TOTAL WATER IMPROVEMENTS
CITY OF FORT WORTH
STANDARDCONSTRUCn7ON SPECIFICATION Ixx,4IMWES
Fenn Rerixd 20120120
33 12 40
33 11 11
33 12 25
33 12 10
331210
33 12 00
EA 3
TON 1
C.Y. 4
EA 1
EA 58
EA 4
EA 9
EA 2
L.F. 2357
L.F. 2357
Unit Price Bid Value
$28.00 $65,996.00
$3,200.00
$4,500.00
$100.00
$4,500.00
$450.00
$1,200.00
$1,050.00
$12,000.00
$1.00
$0.25
$9,600.00
$4,500.00
$400.00
$4,500.00
$26,100.00
$4,800.00
$9,450.00
$24,000.00
$2,357.00
$589.25
$152,292,25
DO4243
BID PROPOSAL
Pagc 1 of$
14-0619 CFA-Put B-Bid Pmpoxl ds
UNIT PRICE BID
Sewer Improvements
SECTION 00 42 43
PROPOSAL FORM
Bidder's Application
P jecl Item Information Kidders Proposal
Bidlist hem No. Description
Specification Sectior Unit of Sid
No. Measure Quantity
8" PVC Sewer Pipe, 0' to 6' (Misc Only), Complete in
3331.5301 Place for the Sum of: 26 33 31 20 L.F. 220
Dollars & 00 Cents per Linear
Foot
8" PVC Sewer Pipe, 6 to 8' (Misc Only), Complete in
3331.5304 Place for the Sum of: 28
Dollars & 00 Cents per Linear
Foot
8" PVC Sewer Pipe, 8' to 10' (Misc Only), Complete in
3331.5307 Place for the Sum of: 30
Dollars & 00 Cents per Linear
(Foot
8" PVC Sewer Pipe, 10' to 12' (Misc Only), Complete in
Place for the Sum of: 36
Dollars & 00 Cents per Linear
Foot
3331.5310
3331.5316
3331.5313
3331.5302
3331.5305
3331.5308
3331.5311
8" PVC Sewer Pipe, 12' to 14' (Misc Only), Complete in
Place for the Sum of: 44
Dollars & 00 Cents per Linear
Foot
8" PVC Sewer Pipe, 14' to 16' (Misc Only), Complete in
Place for the Sum of: 50
Dollars & 00 Cents per Linear
Foot
8" PVC Sewer Pipe, 0' to 6' (Misc Only), CSS Backfill,
Complete in Place for the Sum of:
30 Dollars &
00 Cents per Linear Foot
8" PVC Sewer Pipe, 6' to 8' (Misc Only), CSS Backfill,
Complete in Place for the Sum of:
32 Dollars &
00 Cents per Linear Foot
8" PVC Sewer Pipe, 8' to 10' (Misc Only), CSS Backfill,
Complete in Place for the Sum of:
34 Dollars &
00 Cents per Linear Foot
8" PVC Sewer Pipe, 10' to 12' (Misc Only), CSS Backfill,
Complete in Place for the Sum of:
42 Dollars &
00 Cents per Linear Foot
3331.5314
3331.4225
8" PVC Sewer Pipe, 12' to 14' (Misc Only), CSS Backfill,
Complete in Place for the Sum of:
50 Dollars &
00 Cents per Linear Foot
18" Sewer Pipe, Complete in Place for the Sum of:
62 Dollars &
00 Cents per Linear Foot
18n Sewer Pipe, CSS Backfill, Complete in Place for the
3331.4226 Sum of: 72 Dollars &
00 Cents per Linear Foot
3339.1001
4' Manhole, Complete in Place for the Sum of.
2 800 Dollars &
00 Cents per Each
4' Extra Depth Manhole, Complete in Place for the Sum
3339.1003 of: 175 Dollars &
00 Cents per Vertical Foot
3331.3101
4" Sewer Service, Complete in Piace for the Sum of
450 Dollars &
00 Cents per Each
8" 2-Way Cleanout, Complete in Piace for the Sum of:
3331.3302 750 Dollars &
00 Cents per Each
CITI OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCU\IENIS
Fain Rc isd 20120120
33 31 20
33 31 20
33 31 20
33 31 20
33 31 20
33 31 20
33 31 20
33 31 20
33 31 20
33 31 20
33 11 10, 33 31
13, 33 31 20, 33
31 21
33 11 10,33 31
13, 33 31 20, 33
31 21
33 39 10, 33 39
20
33 39 10, 33 39
20
33 31 50
33 31 50
L.F. 1690
L.F. 354
L.F. 122
L.F. 166
L.F. 11
L.F. 40
L.F. 140
L.F. 60
L.F. 20
L.F. 20
L.F. 1026
L.F. 20
EA 15
V.F. 53.2
EA 60
EA 1
Unit Price Bid Value
$26 00 $5,720.00
$28.00
$30.00
$36.00
$44.00
$50.00
$30.00
$32.00
$34.00
$42.00
$50.00
$62.00
$72.00
$2,800.00
$175.00
$450.00
$750.00
$471320.00
$10,620.00
$4,392.00
$7,304.00
$550.00
$1,200.00
$4,480.00
$2,040.00
$840.00
$1,000.00
$63,612.00
$1,440.00
$42,000.00
$9,310.00
$27,000.00
$750.00
00 42 43
13ID PROPOSAL
Page 2 015
140619 CFA•Part LLaid ProposaLis
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Manhole Vacuum Testing, Complete in Place for the
3301.0101 Sum of: 50 Dollars & 33 01 30 EA 15
00 Cents per Each
Post -CCTV Inspection, Complete in Place for the Sum
3301.0002 of: 2 Dollars & 33 01 31 L.F. 3889
00 Cents per Linear Foot
Trench Safety, Complete in Place for the Sum of.
3305.0109 1 Dollars &
00 Cents per Linear Foot
TOTAL SEWER IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Fam Rc,isoi 20120120
L.F. 3889
$50.00 $750.00
$2.00 $7,778.00
$1.00
$3,889.00
$241,995.00
00 42 43
DID PROPOSAL
Pag 3 of5
14-0619 CFA-Part D-Did Pmposal_eis
Kaminska, Wieslawa (Viesha)
From:
Sent:
To:
Cc:
Subject:
We'II do a change order.
Ken Davis
Pape -Dawson Engineers
817-694-3042
Ken Davis @PD [kendavis@pape-dawson.com]
Tuesday, July 08, 2014 8:55 AM
Wong, Soon
Tornero, Victor; Kaminska, Wieslawa (Viesha); Jaafari, Khal
Re. Sanctuary at Bear Creek
Sent from my iPhone - please excuse any typos.
On Jul 8, 2014, at 8:54 AM, "Wong, Soon" <Soon.Wong(Wfortworthtexas.gov> wrote:
Ken,
We were reviewing the CFA yesterday we have couple comment regarding the project.
1) The primary source of water is from Ray White Road via the propose 8" waterline. The 8" line
will need to be upsized to minimum 10" waterline. This system is a one source dead end line. In
the event of fire which required minimum 1500 gpm at 20 PSI. This demand will cause the
velocity in the pipe to exceed 7 ft/sec. Our current criteria is maintain velocity below 7 ft/sec.
2) We still need a waterline stubout towards to Future Park Vista. In the future there may be a
project 5-10 years from now to install waterline along the Future Park Vista. We just don't want
to loose the opportunity to get the second connection point. This stubout could serve a
secondary backup feed to the subdivision.
Ken could we still make this changes on the construction plans or make this changes at pre -con.
Thank you.
Soon M. Wong
Professional Engineer
(0) 817-392-8369
(F) 817-392-8195
How am I doing?