Loading...
HomeMy WebLinkAboutContract 45167 (2)Received by: COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract Na L)CJ) LV1 WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements. Developer and Project Information: Developer Company Name: Cook Children's Medical Center Address, State, Zip Code: 801 7t11 Ave. I Fort Worth, TX 76104 Phone, E-Mail: (682) 885-4000, stan.davis@cookchildrens.org Authorized Signatory/Title: Stanley E. Davis, Vice President Project Name and Brief Description: Water, Sewer, Paving & Drainage Improvements to serve 7t11 Avenue & West Terrell Avenue Project Location: From Cooper Street to Pulaski Street & From 7th Avenue to 6th Avenue Plat Case No.: N/A Plat Name: N/A Council District: 9 To be completed by staffs Lift City Project No: 02170 CFA: 2013-080 DOE: 7112 1 Date: i OFFICIAL RECORD CITY SECRETARY c�v�YORTH,LX iterN • NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) _X_, Sewer (A-1) _X, Paving (B) X. Storm Drain (B-1) X ,Street Lights & Signs (C)__. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. 11. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth. its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries, death or damages are caused. in whole or in part. by the alleged negligence of the City of Fort Worth. its officers. servants, or enwlovees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. If applicable, the City's obligation to participate (exclusive of front foot charges) in the cost of the Improvements shall terminate if the Improvements are not completed within two (2) years provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: 7t1i Avenue & West Terrell Avenue CFA No.: 2013-080 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period DOENo.: 7112 Developer's Cost $ 105,664.00 176,788.00 $ 282,452.00 $ 97,714.00 5,000.00 $ $ $ $ 102,714.00 385,166.00 5,649.04 5,649.04 11,298.08 4,108.56 2,054.28 ORM MEI 6,162.84 17,460.92 Choice Amount (ck one) 385,166.00 385,166.00 353,065.00 128,392.50 481,457.50 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and sa. Developer has execut- • this instrument in quad uplicate, at Fort Worth, Texas this F CA day of _ ,20 CITY OF FORT WORTH - Recommended by: Water Department 2 1 Wendy Chi-B'abulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Doug as W. Black Assistant City Attorney M&C No. dits- Date: ATTEST: Miry I. Kays City Secretary ATTEST: Signature (Print) Name: 3,,,, /V5It/tmrte Title:Cosf tvuct»r ;led %g' "a it Transportation & Public Works Department W. 1,3 DouglasWiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager DEVELOPER: Signature (Print) Name: s--7,0 a U( Title: Vee Pr953enl OFFICIAL. YIECORDI CITY SECRETARY Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate S. A. S. /4 rs • (Remainder of Page Intentionally Left Blank) 9 0 rn m ;C s 49 u_ Nf o 0 rn dS 0 c a N O O c m QJ O N - 0 ca O 0 O In c 0 B 0 a 0 M co N .N-, .0 0 0 0 a Z 0 c n N O a ,exe= Science ter I 1 VICINITY MAP NOT TO SCALE 7TH AVENUE AND WEST TERRELL AVENUE WATER, SEWER, PAVING, AND DRAINAGE IMPROVEMENTS DOE # 7112 FILE # X-22457 CITY PROJECT # 02170 DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) en • .0 x LU s x u 0 M 0' 0 n .0 L i Chu c IV 0 N O 0 C m w 0 0 N 0 0 0 0 0 0 0 Ln 0 B D 0 a gal rn 1 m 0 ^/ vi N E a z 0 0 z z 0 t. a �o c� w ro Li 0 Ex_c_ARP F EX T EX -GAS FX-W EXISTING 12" WATER LINE (REF DOE# 6533) EXISTING FIRE HYDRANT COOK CHILDREN'S MEDICAL CENTER GRANDVIEW ADDITION / CAB. B, SLIDE 720 \ P.R.T.C.T. \ LOT 7R1R, BLOCK 4R LEGEND 600 - — — - 602 - — — - EX -CABLE EX-W EX-S,, EX -GAS EX-FO EX-T =v-U E PROPERTY BOUNDARY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING CABLE EXISTING WATER LINE EXISTING SANITARY SEWER EXISTING GAS LINE EXISTING FIBER-OPTIC CABLE EXISTING TELEPHONE LINE EXISTING UNDERGROUND ELECTRIC EXISTING STORM DRAIN EXISTING SANITARY SEWER MANHOLE PROPOSED WATER LINE PROPOSED SANITARY SEWER LINE PROPOSED SANITARY SEWER MANHOLE PROPOSED SANITARY SEWER CLEANOUT PROPOSED GATE VALVE PROPOSED REDUCER PROPOSED STORM DRAIN DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fat 817.335.7437 ITX REG F-1114) �uj _� LOT 38 (j BLOCK 9 PROPOSED 8" WATER LINE , I .. , o AI LVt 1/f\ ��� �9 `J / I Iv\\\ A tf r n i 11 _PROPOSED 6"_WA-TE'R- 1 -- AIIX 6" WATER METER TO BE REMOVE II\�� I~-PROPOSEDTcWA7ER LINT 1 II PROPOSED 12 / `TWA R �NS PROPS /WATER,METEEAR "PROPOSED 12" WATER LIIE�" m IIW/77-1 20" STEEL ENCASEMth '`V II ). 0 r (_ -,. CA-i v . — 1_ T1d EXHIBIT 'A' WATER LINE EXHIBIT 1 OF 2 7TH AVENUE AND WEST TERRELL AVENUE 1 L SCALE: 1"= 60 ft. 0 OI = v co .0 x rJ x w LL V O 0, O L N o N 0 co 0 tri 0 13. a 1 w LL L vi w c cu ro V) 0 d COOK CHILDREN'S MEDICAL CENTER ITION EXISTING FIRE HYDRANT GRANDVIEW CAB. B, CAB. B, SLIDE 72020 P.R.T.C.T. LOT 7R1R, BLOCK 4R \PROPOSED 8" WATER LINE KITH )6" STEEL ENCASEMENT rV UC EXIS77NG 8" 11WATER LINE (REF DCJE# 4003) LEGEND 1111•111M110111 600 - - - - 602 - - — EX CABLE EX-W EX -SC EX -GAS EX-FO EX-U: PROPERTY BOUNDARY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING CABLE EXISTING WATER LINE EXISTING SANITARY SEWER EXISTING GAS LINE EXISTING FIBER-OPTIC CABLE EXISTING TELEPHONE LINE EXISTING UNDERGROUND ELECTRIC EXISTING STORM DRAIN EXISTING SANITARY SEWER MANHOLE PROPOSED WATER LINE PROPOSED SANITARY SEWER LINE PROPOSED SANITARY SEWER MANHOLE PROPOSED SANITARY SEWER CLEANOUT PROPOSED GATE VALVE PROPOSED REDUCER PROPOSED STORM DRAIN DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel:817.335.1121 • Fat 817.335.7437 VX REG. F-11141 / // GA Thrtm - PROPOSED 8" WATER PROPOSED 6" FIRE WATER PROPOSED 4" PROPOSED 2" WATER LINE WATER METER / // /;%%////////////// -PROPOSED 4" WATER METER C. meµ•{ -X 1 MRB`L[IT 5-Ta-E Er 60' UTILITY EASEMENT -L.,/vs 1� » PROPOSED 2" \ • /RRIGA770N LINE COOK CHILDREN'S MEDICAL CENTER GRANDVIEW ADDITION VOL. 63, PAGE 29 P.R.T.C.T. LOT 9R, BLOCK 5 EXHIBIT 'A' WATER LINE EXHIBIT 20F2 7TH AVENUE AND WEST TERRELL AVENUE 60 SCALE: 1"= 60 ft. 120 lu co 714 X LLl c X W LL 0 0 0 tn ro z w N C1 0 0 0 c m w cn irt co 0 0 0 0 0 0 c c 0 e 8 a w d E 0 vi 0 ro 2 EXISTING 12" SEWER (REF DOE# 6533) CX T OPIS mamma .1-571 LEGEND 600 — — — — 602 — -- EX-CABLE EX-w rX-SS EX -GAS EX-FO EX-T EX-JE v_r�RP:F PROPOSED SS MANHOL'E /SS J E� T EX -GAS Fx-w PROPOSED 12" SANITARY SEWER LINE SS-1 1" C _ ` _1 ci PROPOSED SS DROP MANHOLE COOK CHILDREN'S MEDICAL CENTER GRANDVIEW ADDITION i CAB. B, SLIDE 720 i D.R.T.C.T. LOT 7R1R, BLOCK 4R PROPERTY BOUNDARY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING CABLE EXISTING WATER LINE EXISTING SANITARY SEWER EXISTING GAS LINE EXISTING FIBER-OPTIC CABLE EXISTING TELEPHONE LINE EXISTING UNDERGROUND ELECTRIC EXISTING STORM DRAIN EXISTING SANITARY SEWER MANHOLE PROPOSED WATER LINE PROPOSED SANITARY SEWER LINE PROPOSED SANITARY SEWER MANHOLE PROPOSED SANITARY SEWER CLEANOUT PROPOSED GATE VALVE PROPOSED REDUCER PROPOSED STORM DRAIN DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817 X15.1121 • Fax 817.335.7437 (TX REG F-11141 PROPOSED SS DROP � MANHOLE PROPOSED 6" SANITARY SEWER LINE SS-2A PROPOSED 12" SANITARY SEWER LINE SS-2 PROPOSED SS MANHOLE \\ \\ =E-XIS11 G 12" SS (DOE/ 6157) LC41, 8 LOCK 9 P- RAF ?1S _SS_DROP-MANHOLE_ t-H=AV E-N=14E-- _ = II PROPOSED 8" SANITARY SEWER LINE SS-2 II PROPOSED WASTEWATER II ACCESS CHAMBER \-PROPOSED WASTEWA7E� ACCESS CHAMBER EXHIBIT 'AV WASTEWATER EXHIBIT 1 OF 2 7TH AVENUE AND WEST TERRELL AVENUE •PROPOSED 6" S",NI-TAR- SEWER--' q " LINE Sb-zti PROPOSED 6" CAMtli _Y EWS R LINE SS--2 60 SCALE: 1"= 60 ft. 120 0, 0 J1 a x w a w 0 v 0 0 m .0 r. 0, c 0 0 0 0' 0 0 0\ trt 0 CO 00 Q. 0 0 O O 0 LA z ro 0 0 troo ro 0 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOUR CHTLDRENS LOT 6 CENTER Rot 7TH AVE A 1111.111111 i LEGEND 600 - — — - 602 - — -- EX-CABLE EX-W EX -SS EX -GAS EX-FO LX-T EX-UE EX -SS LOT 20 & 1J210 21 r X-GAS rvrt,_W te 9 >C'abx, ) ENS EDICAL TER --$01-7-tH ,T`WORT76104- ' 12 LOT 21, PHI'LLIPS, DT 22 & 23 " \35 W Pt Tin V61 I LOT 24 ILOT 25 EX-T PROPERTY BOUNDARY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING CABLE EXISTING WATER LINE EXISTING SANITARY SEWER EXISTING GAS LINE EXISTING FIBER-OPTIC CABLE EXISTING TELEPHONE LINE EXISTING UNDERGROUND ELECTRIC EXISTING STORM DRAIN EXISTING SANITARY SEWER MANHOLE PROPOSED WATER LINE PROPOSED SANITARY SEWER LINE PROPOSED SANITARY SEWER MANHOLE PROPOSED SANITARY SEWER CLEANOUT PROPOSED GATE VALVE PROPOSED REDUCER PROPOSED STORM DRAIN ^''DUNAWAj/ 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817 33-5.1121 • Fwc 817.335.7437 (TXREG F-11141 ASL T KIST C;: T 7/ .may r.. 4'", EXISTING 8" SEWER (REF DOE# 2711) PROPOSED SS MANHOL ' EDICAL CEt"TI. R AVE PROPOSED 8" TX76.04 _ SANITARY SEWER LINE SS-3 f;. L_e_ 1 i EXHIBIT 'Al' WASTEWATER EXHIBIT 20F2 7TH AVENUE AND WEST TERRELL AVENUE l\/ S EX -GAS I •Fx-W COOK CHILDREN'S MEDICAL CENTER GR'\NDVIEW ADDITION CAB. B, SLIDE 720 P.R.T.C.T. LOT 7R1R, BLOCK 4R SCALE: 1"= 60 ft. ■ 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-11 14) /.� r LOT 24 LOT 25 -s LOT 26 LOT 27 LOT 28 r,r, 1111111111111111. ci9=- a ,r 7T AK#L\itig IjA D' I ..1 PROPOSED 5' SIDEWALK OOK CHILDREN'S MEDICA CENTER GRANDVIEW ADDITION CAB. B, SLIDE 720 P.R.T.C.T. LOT 7R1R, BLOCK 4R LOT 29 I \ COOK CHILDREN'S J MEDICAL CENTER 1 GRANDVIEW ADDITION I - VOL. 63, PAGE 29 fl P.R.T.C.T. LOT 9R, BLOCK 5 I PROPOSED 4' SIDEWALK \ i \\\\\\\\\\\\\\\\\\\\\\\\\ EXHIBIT 'B' PAVING EXHIBIT 1 OF 1 7TH NUE AND WEST TERRELL DUNAWAy AVENUE EWATER S WER PAVING, & DRAINAGE IMPROVEMENTS PROP4ED 5' 115i AMINO IMMIIID PROPOSED -'S LEGEND WA40 PROPERTY BOUNDARY PROPOSED CURB PROPOSED PERMANENT TRENCH REPAIR 4" THICK CONCRETE SIDEWALK 0 100 200 SCALE: 1"= 100 ft. 1 ss -7 w \ T� AS COOK CHILDREN'S MEDICAL CENTER GRANDVIEW ADDITION CAB. B, SLIDE 720 P.R.T.C.T. LOT 7R1R, BLOCK 4R MOM MID I - LEGEND - 600 - - - - - - - 602 - - - - - !.4 PROPERTY BOUNDARY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED WATER LINE PROPOSED SANITARY SEWER LINE PROPOSED SANITARY SEWER MANHOLE PROPOSED SANITARY SEWER CLEANOUT PROPOSED GATE VALVE PROPOSED REDUCER PROPOSED STORM DRAIN DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) Ky. A ry 1 r:r 3 I .ate,® / s'-: :w 11- / f ��- ./ ''( ( (_-\:\ ri II APROPOS D \\ ) \ ORt�I R IL ' \ I \ 1 .\\\ EXHIBIT 'Br STORM DRAIN EXHIBIT 1 OF 1 7TH AVENUE AND WEST TERRELL 0 60 120 AVENUE WATER SEWER PAVING, & DRAINAGE IMPROVEMENTS SCALE: 1"= 60 ft. • 7TH AVENUE AND WEST TERRELL AVENUE WATER, SEWER, PAVING, & DRAINAGE IMPROVEMENTS - CITY PROJECT NO. 02170, DOE 7112 CFA QUANTITY MATRIX ITEM NO. WATER 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 BID ITEM 0241.1012 Remove 6" Water Line 0241.1013 Remove 8" Water Line 0241.1015 Remove 12" Water Line 0241.1202 6" Water Abandonment Plug 0241,1203 8" Water Abandonment Plug 0241.1305 Remove 12" Water Valve 0241.1514 Salvage 2" Water Meter I � 0241.1517 Salvage 6" Water Meter 0241.1602 Remove Concrete Water Vault 3305.0109 Trench Safety 3305.1002 16" Casing By Open Cut 3305.1003 20" Casing By Open Cut 3311.0001 Ductile Iron Water 'fittings w/ Restraint 3311.0041 4" Water Pipe 3311.0141 6" Water Pipe 3311.0241 8" Water Pipe 3311.0251 8" DIP Water 3311.0441 12" Water Pipe 3311.0451 12" DIP Water 3312.2203 2" Water Service 3312.2802 4" Water Meter and Vault 3312.2803 6" Water Meter and Vault 3312,3001 4" Gate Valve SHEET NO. UNIT 4 6 7 8 12 13 14 19 26 30 L.F. 201 L.F. 20 L.F. 20 EA. 1 EA. 2 EA. 3 EA. 1 EA. 1 EA L.F. 243 40 110 L.F. 20 L.F. 20 TON 0.7 0.1 0.2 L.E. 30 L.F. 27 39 L.F. 74 30 L.F. 20 L.F. 142 L.F. 20 L.F. 11 EA. 1 EA. 1 EA. 1 ITEM TOTAL UNIT PRICE ITEM TOTAL COST 201 $22.00 $4,422.00 20 $24.00 $480.00 20 $26.00 $520.00 1 $800.00 $800.00 2 $1,000.00 $2,000.00 3 $800.00 $2,400.00 1 $300.00 $300.00 1 $1,000.00 $1,000.00 1 $1,500.00 $1,500.00 393 $4.00 $1,572.00 20 $120.00 $2,400.00 20 $150.00 $3,000.00 1 $5,000.00 $5,000.00 30 $45.00 $1,350.00 66 $50.00 $3,300.00 104 $60.00 $6,240.00 20 $85.00 $1,700.00 142 $70.00 $9,940.00 20 $100.00 $2,000.00 11 $30.00 $330.00 1 $15,500.00 $15,500.00 1 $17,500.00 $17,500.00 1 $850.00 $850.00 7TH AVENUE AND WEST TERRELL AVENUE WATER, SEWER, PAVING, & DRAINAGE IMPROVEMENTS - CITY PROJECT NO. 02170, DOE 7112 CFA QUANTITY MATRIX ITEM NO. 1 24 3312.3002 6' Gate Valve I 25 3312.3003 8" Gate Valve I 26 3312.3005 12" Gate Valve 27 9999.0001 Remove 2" Water Line BID ITEM SHEET NO ITEM TOTAL UNIT PRICE ITEM TOTAL COST UNIT 4 6 7 8 12 13 14 19 26 30 EA. 1 1 2 $950.00 $1,900.00 EA. 2 2 3 7 $1,050.00 $7,350.00 EA. 4 2 6 $2,000.00 $12,000.00 L.F. 31 31 $10.00 $310.00 WATER TOTAL $105,664.00 7TH AVENUE AND WEST TERRELL AVENUE WATER, SEWER, PAVING, & DRAINAGE IMPROVEMENTS - CITY PROJECT NO. 02170, DOE 7112 CFA QUANTITY MATRIX ITEM NO. SEWER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 BID ITEM 0241.2013 Remove 8" Sewer Line 0241.2102 6" Sewer Abandonment Plug 0241.2103 8" Sewer Abandonment Plug 0241.2201 Remove 4' Sewer Manhole 3301.0002 Post -CCTV Inspection 3301.0101 Manhole Vacuum Testing 3305.0109 Trench Safety 3305.0202 Imported Embedment/Backfill, CSS 3331.3202 6" Sewer Service, 2 way Cleanout 3331.4108 6" Sewer Pipe ( 3331.4115 8" Sewer Pipe 3331.4116 8" Sewer Pipe, CSS Backfill I I 3331.4209 12" Sewer Pipe, CSS Back-E11l 3339.0001 Epoxy Manhole Liner I � 3339,0003 Wastewater Access Chamber 3339.1001 4' Manhole 3339.1002 4' Drop Manhole 3339.1003 4' Extra Depth Manhole SHEET NO UNIT 4 6 7 8. 12 13. 14. 19 26 30 L.F. EA. EA. EA. L.F. EA. L.F. C.Y. EA. L.F. L.F. L.F. L.F. V.F. EA. EA. EA. EA. 550 3 ITEM TOTAL UNIT PRICE ITEM TOTAL COST 550 $12.00 $6,600.00 3 1 4 $1,000.00 $4,000.00 1 1 $1,000.00 $1,000.00 3 $1,200.00 $3,600.00 573 312 9 894 $3.00 $2,682.00 3 3 1 7 $100.00 $700.00 573 312 9 894 $4.00 $3,576.00 20 10 30 $20.00 $600.00 2 2 $750.00 $1,500.00 78 78 $55.00 $4,290.00 9 9 $80.00 $720.00 24 24 $85.00 $2,040.00 549 234 783 $105.00 $82,215.00 57 16 73 $205.00 $14,965.00 1 1 2 $2,400.00 $4,800.00 1 2 1 4 $4,000.00 $16,000.00 2 1 3 $5,500.00 $16,500.00 39 16 55 $200.00 $11,000.00 SEWER TOTAL $176,788.00 7TH AVENUE AND WEST TERRELL AVENUE WATER, SEWER, PAVING, & DRAINAGE IMPROVEMENTS - CITY PROJECT NO. 02170, DOE 7112 CFA QUANTITY MATRIX ITEM NO. PAVING 1 2 3 4 5 6 7 8 9 10 11 12 13 SHEET NO BID ITEM UNIT 4 6 7 8 12 13 14 19 26 30 0241.0100 Remove Sidewalk 0241.0401 Remove Concrete Drive 0241.1000 Remove Conc Pvmt 0241.1300 Remove Conc Curb & Gutter 3201.0117 10' Wide Asphalt Pvmt Repair, Residential 3201.0201 Asphalt Pvmt Repai Beyond Defined Width, Residential 3213.0301 4" Conc Sidewalk 3216.0102 7" Conc Curb and Gutter 3217.0001 4" SLD Pvmt Marking HAS (W) 3292.0100 Block Sod Placement 3471.0001 Traffic Control 9999.0002 Remove Parking Meter & Pole 9999.0002 Install Parking Meter & Pole S.F. 2330 S.F. 585 S.Y. 16 L.F. 357 L.F. S.Y. S.F. L.F. S.Y. MO. EA. 1 EA. 163 40 84 580 102 9 ITEM TOTAL UNIT PRICE ITEM TOTAL COST 2330 $2.00 $4,660.00 585 $2.00 $1,170.00 16 $2.00 $32.00 357 $1.00 $357.00 978 $40.00 $39,120.00 384 384 $40.00 $15,360.00 2255 2255 $5.00 $11,275.00 340 340 $28.00 $9,520.00 14 14 $10.00 $140.00 116 116 $5.00 $580.00 2 2 $7,500.00 $15,000.00 1 $250.00 $250.00 1 1 $250.00 $250.00 PAVING TOTAL $97,714.00 7TH AVENUE AND WEST TERRELL AVENUE WATER, SEWER, PAVING, & DRAINAGE IMPROVEMENTS - CITY PROJECT NO. 02170, DOE 7112 CFA QUANTITY MATRIX SHEET NO ITEM NO. BID ITEM UNIT 4 6 7 8 12 13 14 19 26 30 STORM 1 0241.4001 Remove 10' Curb Inlet EA. 1 2 3349,5001 10' Curb Inlet I EA. 1 ITEM TOTAL UNIT PRICE ITEM TOTAL COST 1 $1,500.00 $1,500.00 1 $3,500.00 $3,500.00 S-ORM TOTAL $5,000.00 PROJECT TOTAL $385,166.00