HomeMy WebLinkAboutContract 45150COM1VIUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT 4 City Secretary Contract No. I'M 50 WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements. Developer and Project Information: Developer Company Name: Hayes & Stolz Industrial Manufacturing Company, Inc. Address, State, Zip Code: 3521 Hemphill Street I Fort Worth, TX 76110 Phone, E-Mail: (817) 926-3391 I bjmast@hayes-stolz.com Authorized Signatory/Title: B.J. Masters, Vice President Project Name and Brief Description: Water Improvements to serve Ripy Street & Alley Project Location: 3521 Hemphill Street Plat Case No.: N/A Plat Name: N/A Council District: 9 To be completed by staff* Received by: l 11 City Project No: 01826 CFA: 2013-072 DOE: 6765 1 Date: (k I I �-I I oPgligfl L RECORD r- ` fV SECRETARY i�,RIM, TX N0V2621J13 NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) _X ,Sewer (A-1) Paving (B) � Storm Drain (B-1) _, Street Lights & Signs (C).. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. li. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available, and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the Citv of Fort Worth, its officers, servants. or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants. or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. If applicable, the City's obligation to participate (exclusive of front foot charges) in the cost of the Improvements shall terminate if the Improvements are not completed within two (2) years* provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one year If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Water Improvements to serve Ripy Street & Alley CFA No.: 2013-072 DOE No.: 6765 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 129,630.50 $ 128, 348.50 1,282.00 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period $ 129, 630.50 $ $ $ $ $ $ 2,592.61 2,592.61 5,185.22 gimp MEI ONO $ 5,185.22 $ Choice Amount (clr one) 129,630.50 129,630.50 162,038.13 162,038.13 X IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this Z CC instrument in quadruplicate, at Fort Worth, Texas this .20 I22 . CITY OF FORT WORTH - Recommended by: Water Department 1 Wendy Chi- bulal, EMBA, P.E. Development ngineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. _(A- Date: AT (/Mtiiy J. Kayser City Secretary ATTEST: Signature (Print) Name: L itiallefinOm'Qc7 Title:@rvu+Pll1( day of A)COA KY1 he Transportation & Public Works Department Nat Douglas W. Wiersig, P.E. Director Approved by City Manager's Office 5744/...4‘4.- Fernando Costa Assistant City Manager DEVELOPER: Hayes & Stolz Industrial Manufacturing Company, Inc. Signature (Print) Name: a Y /44. t6—)41 Title: f i t E.- Pliet-V? ,o c6.4✓ r OFFICIAL RECORD CITY SECRETARY n; WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included IZ Ilr Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 9 3 W W 0 L OS LOTS LOTS 1, 2, 4, 5, 6, 7, 8, 9, 10 BLOCK 5 SOUTH FORT WORTH ADDITION VOL. 204, PAGE 15 P.R.T.C.T. HAYES AND STOLZ INDUSTRIAL MANUFACTURING CO., INC. 4" INST. NO. D205098315 C 41 D.R.T.C.T. �vOy0� I INSTALL 1('X10" CUT -IN TEE 1-10" GATE VALVE 27 S.Y. MIT REPAIR U.V. o 0 1�II }T} NSTALL 1o5<a" CROSS 1-10' GATE VALVE 2-8" GATE VALVES 103 L.F. e" MAN PROP. 10" 1\ ATER EX1_r DIPSIIX-16638), WEST RIPY STREET 60' R.O.W. - ASPHALT PAVEMENT ONNECT TO 10' WATER LINE PER CRY OF FT. WORTH 1-I/2' WATER SERVICE DEFAIL 5 PROP. 8" SEWER S INSTALL 1-8' PLUG 1 D.R.T.C.T. 1 IHAYES AND STOLZ INDUSTRIAL MANUFACTURING CO., INC. LOT 1, BLOCK 8 1-e' PLUG I4�.. MATRIX H&S REALTY, LLC G N INST. NO. D205325585 y y0� (PROP. 8' FIREUNE! INSTALL 1 EXISTING Wu N V/ f LEGEND WATER LINE WATER VALVE/ GATE VALVE FIRE HYDRANT WATER METER PLUG ti0 EN 6" PROPOSED cud, Hampton Sc Brown, Inc. Engineering ac Surveying 4550 SA 360 5 e. 180. Grape,(ne, TX 76051 e (817)25 -8550 Ica (817)251-8810 wax BHRNCc rn BPE PRO 144 TBPLS BRA #100I1302 CFA EYH180(5) PREPARED BASED ON PLANS PROVOED BY THOVAS HOOVER ENCTIEERT(G. LLC N 0- 131 V x-01505) HAYES AND STOLZ INDUSTRIAL MANUFACTURING CO., INC. LOT 11-R BLOCK 5 SOUTH FORT WORTH ADDITION VOL. 388-184, PAGE 17 P.R.T.C.T. MATRIX H&S REALTY, LLC INST. NO. D205098314 D.R.T.C.T. HAYES AND STOLZ INDUSTRIAL MANUFACTURING CO., INC. "� P E LT: INSTALL: 13483 L.F. 10' MNN RIPY ST. R.O.W. INSTALL: 1-8' 45' BEND i VACATED BY CITY ORD. NO. 93481 a_ RETAINED AS EMERGENCY ACCESS EASMEVT C- AND AS UTILITY EASEMENT INSTALL: 1' WATER METER" INSTALL 60± L.F. 1 1/2' PRIVATE WATER SERVICE FUTURE ASSEMBLY & PAINT BLDG EXHIBIT "A11 WATER EXHIBIT 3500 S. JENNINGS AVENUE FORT WORTH, TX 76110 INSTALL: 1-8' PLUG 0 04 04 O s 10.0' M : SEPTEMBER 3 LOT 1, BLOCK 6-R 3 REMOVE EXIST. 6' CONNECTION TO FIRE HYDRANT INSTALL 1-6'X6' TEE CONNECT TO EXISTING 6' MAN AND EXISTING FIRE HYDRANT LEAD 1 INSTALL:83 L.F. 6' MAIN INSTALL: 10)(10' TEE 1-I01.X6' REDUCER 1-10" GATE VALVE 1-6 GATE VALVE INSTALL 10'X8. TEE 1-Er GATE VALVE INSTALL 253 LF. 10' MAN INSTALL 1-10' PLUG NSTALL 1903 LF. 18' MAIN INSTALL: 1-81X8" TEE 1-8' GATE VALVE 83 LF. 8" AWN INSTALL 1-85(6' TEE 1-6' GATE VALVE 1-STD. FIRE HYDRANT 83 L.F. 6' MAN N 60' 120' SCALE 1"=60' Hayes & Stolz Industrial 3521 Hemphill Street Fort Worth, TX 76110 Contact: Gary Schilling IBHB PROJECT NO: 11l11 2 ^7E14 AA') DRAM 1 1 U.V. I 1 1 Li HAYES AND STOLZ INDUSTRIAL MANUFACTURING CO., INC. LOT'S 1, 2, 4, 5, 6, 7, 8, 9, 10 BLOCK 5 SOUTH FORT WORTH ADDITION VOL. 204, PAGE 15 P.R.T.C.T. HAYES AND STOLZ INDUSTRIAL MANUFACTURING CO., INC. 4. INST. NO. D205098315 C `b D.R.T.C.T. 0 yy0C 1 PROP. 10" V //TER 5 Anx en WEST RIPY STREET 60' R.O.W. - \SPHAALT PAVEMENT El6' 00 LOT I, BLOCK 8 MATRIX H&S REALTY, LLC INST. NO. D205325585 D.R.T.C.T. 'HAYES AND STOLZ INDUSTRIAL MANUFACTURING CO.. INC. EXISTING s s wv N hti U f LEGEND SEWER LINE WATER VALVE/ GATE VALVE FIRE HYDRANT WATER METER SEWER MANHOLE `k oeC v <11 v0 HAYES AND STOLZ INDUSTRIAL MANUFACTURING CO., INC. LOT I I-R BLOCK 5 SOUTH FORT WORTH ADDITION VOL. 388-184, PAGE 17 P.R.T.C.T. MATRIX H&S REALTY, LI.0 INST. NO. D205098314 D.R.T.C.T. HAYES AND STOLZ INDUSTRIAL MANUFACTURING CO., INC. a `X _130$? 3 RIPY ST. P.O.W. VACATED BY CITY ORD. NO. 9348 RETAINED AS EMERGENCY ACCESS EASfJENT AND AS UTILITY EASEMENT I fl POf? 4"SS PROPOSED 0 u 3aird, arnpton & Brown, Inc. a e Engineering Rr Surveying 45505R 350 S e. ISO. Cccr1z. IX 4051 c(81/PS-8550 Fm(812)251-$810mew %Pt cur, 1E6E nau #44 IBPLS i1W /100t1.102 CFA UH91(S) RRFP m PASFI 0D RARS WESCEED Pr ThC4'AS HOMR ENSet ;, uC NG FiLE- E:\2013.000000\2013706000\Coca\CFA - Weter2.d.g I Sewer N 0— PROP. 10" WATER INSTALL: 20* L.F. 4' PRNAIE SEWER SER`ACE 0 2.00X MN. CONNECT PROPOSED 4 PRIVATE SEWER SERVICE 1D EXISTING 1e SANITARY SEWER FIELD VERIFY EWA11NE FUTURE ASSEMBL & PAINT BLDG EXHIBIT 'Al" SEWER EXHIBIT 3500 S. JENNINGS AVENUE FORT WORTH, TX 76110, 1 1 1 1 1 LOT I, BLOCK 6-R u 60' 12 SCALE V=60' DATE: SEPTEMIEER 2013 Hayes & Stolz Industrial 3521 Hernphill Street Fort Worth, TX 76110 Contact: Gary Schilling F3HB PROJECT NO: 2013.706.002 1Project Name: Ripy Street & Alley Water Improvements 'Water Improvements Description Unit of Specification Estimated CFA Unit CFA Unit Measure Section No. Quantity Price Extension 0241.0100 Remove Sidewalk SF 02 41 13 1085 $4.80 $5,208.00 0241.1000 Remove Conc Pvmt SY 02 41 15 215 $7.80 $1,677.00 0241.1100 Remove Asphalt Pvmt SY 02 41 15 58 $6.31 $365.98 10241.1400 Remove Conc Valley Gutter SY 02 4115 8 $7.80 $62.40 3125.0101 SWPPP ..1 acre LS 3125 00 1 $3,950.00 $3,950.00 3201.0124 7' Wide Asphalt Pvmt Repair, Arterial LF 32 01 17 20 $145.00 $2,900.00 3201.0400 Temporary Asphalt Paving Repair LF 32 01 18 205 $25.57 $5,241.85 3201.0616 Conc Pvmt Repair, Arterial/Industrial SY 32 0129 305 $47.95 $14,624.75 3213.0301 4" Conc Sidewalk SF 32 13 20 98 $46.54 $4,560.92 3213.0501 Barrier Free Ramp, Type R-1 EA 32 13 20 1 $1,154.00 $1,154.00 3216.0302 11" Conc Valley Gutter, Arterial/Industrial SY 32 16 13 8 $70.75 $566.00 3292.0101 Utility Service Surface Restoration Sodding SY 32 92 13 5 $5.00 $25.00 13305.0109 Trench Safety LF 33 05 10 647 $1.98 $1,281.06 13311.0001 Ductile Iron Water Fittings w/ Restraint TON 33 11 11 1 $7,385.00 $7,385.00 13311.0161 6" PVC Water Pipe LF 33 1112 16 $42.90 $686.40 13311.0261 8" PVC Water Pipe LF 33 11 12 258 $55.71 $14,373.18 3311.0361 10" PVC Water Pipe LF 33 1112 373 $68.52 $25,557.96 3312.0001 Fire Hydrant EA 33 1240 1 $4,798.00 $4,798.00 3312.0117 Connection to Existing 4"-12" Water Main:. EA 33 12 25 2 $1,854.00 $3,708.00 3312.0117 Connection to Existing 4"-12" Water Main --10"x10" Cut in tee EA ' 32`12 25 1 $1,565.00 $1,565.00'.` 3312.2103 1 1/2" Water Service EA 33 12 10 1 $1,250.00 $1,250.00 13312.3002 6" Gate Valve EA 33 12 20 2 $1,178.00 $2,356.00 3312.3003 8" Gate Valve EA 33 12 20 4 $1,502.00 $6,008.00 3312.3004 10" Gate Valve EA 33 12 20 3 $2,058.00 $6,174.00 3471.0001 Traffic Control MO 34 71 13 1 $12,870.00 $12,870.00 TOTAL $128,348.50 Ripy Street & Alley Improvements Sanitary Sewer Improvements Description Unit of Specification Section Measure No. 3331.3101 4" Sewer EA 3331.3102 4" 2-Way EA TOTAL 33 3150 33 3150 Estimated CFA Unit CFA Unit Quantity Price Extension 1 $852.00 $852.00 1 $430.00 $430.00 $1,282.00