HomeMy WebLinkAboutContract 45150COM1VIUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
4
City Secretary
Contract No. I'M 50
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project") within the City
of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the Improvements.
Developer and Project Information:
Developer Company Name: Hayes & Stolz Industrial Manufacturing Company, Inc.
Address, State, Zip Code: 3521 Hemphill Street I Fort Worth, TX 76110
Phone, E-Mail: (817) 926-3391 I bjmast@hayes-stolz.com
Authorized Signatory/Title: B.J. Masters, Vice President
Project Name and Brief Description: Water Improvements to serve Ripy Street & Alley
Project Location: 3521 Hemphill Street
Plat Case No.: N/A Plat Name: N/A
Council District: 9
To be completed by staff*
Received by: l 11
City Project No: 01826 CFA: 2013-072 DOE: 6765
1
Date: (k I I �-I I
oPgligfl L RECORD
r- ` fV SECRETARY
i�,RIM, TX N0V2621J13
NOW, THEREFORE, For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to
comply with all provisions of said Policy in the performance of its duties and
obligations hereunder and to cause all contractors hired by Developer to comply with
the Policy in connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section
II, of the Policy and recognizes that there shall be no reduction in the collateral until
the Project has been completed and the City has officially accepted the
Improvements. Developer further acknowledges that said process requires the
contractor to submit an Affidavit of Bills paid signed by its contractor and Consent
of Surety signed by its surety to ensure the contractor has paid the sub -contractor
and suppliers in full. Additionally, the contractor will provide in writing that the
contractor has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by
this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water (A) _X ,Sewer (A-1)
Paving (B) � Storm Drain (B-1) _, Street Lights & Signs (C)..
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section II, of the Policy.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being insured, licensed and bonded to do
work in public streets and/or prequalified to perform water/waste water
construction as the case may be.
li. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the Improvements, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the Improvements for
a period of two (2) years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be furnished
before work is commenced and to meet the requirements of Chapter 2253, Texas
Government Code.
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer -awarded
infrastructure construction contracts. The City shall be named as additional
insured on all insurance required by said documents and same will be evidenced on
the ACORD Certificate of Insurance supplied by the contractor's insurance
provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction Services
Division of intent to commence construction so that City inspection personnel will
be available, and to require the contractor to allow the construction to be subject to
inspection at any and all times by City inspection forces and not to install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City
v. To require its contractor to have fully executed contract documents submitted to
the City to schedule a Pre -Construction Meeting. The submittal should occur no
less than 10 working days prior to the desired date of the meeting. No construction
will commence without a City -issued Notice to Proceed to the Developer's
contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and service
lines have been completed to the satisfaction of the Water Department.
G. Developer agrees to provide, at its expense all engineering drawings and documents
necessary to construct the improvements required by this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City shall not be responsible for any costs that may be incurred by Developer in the
relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current
and future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real or
asserted, brought for or on account of any injuries or damages sustained by any
persons (including death) or to any property, resulting from or in connection
with the construction, design, performance or completion of any work to be
performed by said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the work, or
on account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or employees,
whether or not such injuries, death or damages are caused, in whole or in
part, by the alleged negligence of the Citv of Fort Worth, its officers, servants.
or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and all
claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries. death or damages are caused, in whole or in part, by the alleged
negligence of the City of Fort Worth, its officers, servants. or employees. Further,
Developer will require its contractors to indemnify, and hold harmless the City for
any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in
a good and workmanlike manner, free from defects, in conformance with the
Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the infrastructure and
Improvements, Developer will assign to the City a non-exclusive right to enforce the
contracts entered into by the Developer with its contractor along with an assignment of
all warranties given by the contractor, whether express or implied. Further, Developer
agrees that all contracts with any contractor shall include provisions granting to the
City the right to enforce such contracts as an express intended third party beneficiary
of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of the
total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of
the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. If applicable, the City's obligation to participate (exclusive of front foot charges) in
the cost of the Improvements shall terminate if the Improvements are not
completed within two (2) years* provided, however, if construction of the
Improvements has started within the two year period, the developer may request
that the CFA be extended for one year If the Improvements are not completed
within such extension period, there will be no further obligation of the City to
participate. City participation in a CFA shall be subject to the availability of City
funds and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years from the date of this Agreement the Improvements have
not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion of
the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Water Improvements to serve Ripy Street & Alley
CFA No.: 2013-072 DOE No.: 6765
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total $ 129,630.50
$
128, 348.50
1,282.00
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
$ 129, 630.50
$
$
$
$
$
$
2,592.61
2,592.61
5,185.22
gimp
MEI
ONO
$ 5,185.22
$
Choice
Amount (clr one)
129,630.50
129,630.50
162,038.13
162,038.13 X
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this
Z CC
instrument in quadruplicate, at Fort Worth, Texas this
.20 I22 .
CITY OF FORT WORTH - Recommended by:
Water Department
1
Wendy Chi- bulal, EMBA, P.E.
Development ngineering Manager
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. _(A-
Date:
AT
(/Mtiiy J. Kayser
City Secretary
ATTEST:
Signature
(Print) Name: L itiallefinOm'Qc7
Title:@rvu+Pll1(
day of A)COA KY1 he
Transportation & Public Works Department
Nat
Douglas W. Wiersig, P.E.
Director
Approved by City Manager's Office
5744/...4‘4.-
Fernando Costa
Assistant City Manager
DEVELOPER:
Hayes & Stolz Industrial Manufacturing Company, Inc.
Signature
(Print) Name: a Y /44. t6—)41
Title: f i t E.- Pliet-V? ,o c6.4✓ r
OFFICIAL RECORD
CITY SECRETARY
n; WORTH, TX
Check items associated with the project being undertaken; checked items must be included as
Attachments to this Agreement
Included
IZ
Ilr
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
9
3
W
W
0
L
OS
LOTS LOTS 1, 2, 4, 5, 6, 7, 8, 9, 10
BLOCK 5
SOUTH FORT WORTH ADDITION
VOL. 204, PAGE 15
P.R.T.C.T.
HAYES AND STOLZ INDUSTRIAL
MANUFACTURING CO., INC. 4"
INST. NO. D205098315 C 41
D.R.T.C.T. �vOy0�
I
INSTALL
1('X10" CUT -IN TEE
1-10" GATE VALVE
27 S.Y. MIT REPAIR
U.V. o
0
1�II }T}
NSTALL
1o5<a" CROSS
1-10' GATE VALVE
2-8" GATE VALVES
103 L.F. e" MAN
PROP. 10" 1\ ATER
EX1_r DIPSIIX-16638), WEST RIPY STREET
60' R.O.W. - ASPHALT PAVEMENT
ONNECT TO 10'
WATER LINE PER
CRY OF FT. WORTH
1-I/2' WATER
SERVICE DEFAIL
5
PROP. 8" SEWER
S
INSTALL
1-8' PLUG
1
D.R.T.C.T. 1
IHAYES AND STOLZ INDUSTRIAL
MANUFACTURING CO., INC.
LOT 1, BLOCK 8 1-e' PLUG I4�..
MATRIX H&S REALTY, LLC G N
INST. NO. D205325585 y y0�
(PROP. 8' FIREUNE!
INSTALL
1
EXISTING
Wu
N
V/
f
LEGEND
WATER LINE
WATER VALVE/ GATE VALVE
FIRE HYDRANT
WATER METER
PLUG
ti0
EN 6"
PROPOSED
cud, Hampton Sc Brown, Inc.
Engineering ac Surveying
4550 SA 360 5 e. 180. Grape,(ne, TX 76051 e (817)25 -8550 Ica (817)251-8810 wax BHRNCc rn
BPE PRO 144 TBPLS BRA #100I1302
CFA EYH180(5) PREPARED BASED ON PLANS PROVOED BY THOVAS HOOVER ENCTIEERT(G. LLC
N
0-
131
V
x-01505)
HAYES AND STOLZ INDUSTRIAL
MANUFACTURING CO., INC.
LOT 11-R
BLOCK 5
SOUTH FORT WORTH ADDITION
VOL. 388-184, PAGE 17
P.R.T.C.T.
MATRIX H&S REALTY, LLC
INST. NO. D205098314
D.R.T.C.T.
HAYES AND STOLZ INDUSTRIAL
MANUFACTURING CO., INC.
"�
P
E
LT: INSTALL:
13483 L.F. 10' MNN
RIPY ST. R.O.W.
INSTALL:
1-8' 45' BEND
i VACATED BY CITY ORD. NO. 93481
a_ RETAINED AS EMERGENCY ACCESS EASMEVT
C- AND AS UTILITY EASEMENT
INSTALL:
1' WATER METER"
INSTALL
60± L.F. 1 1/2'
PRIVATE WATER SERVICE
FUTURE ASSEMBLY & PAINT BLDG
EXHIBIT "A11
WATER EXHIBIT
3500 S. JENNINGS AVENUE
FORT WORTH, TX 76110
INSTALL:
1-8' PLUG
0
04
04
O
s
10.0'
M
: SEPTEMBER
3
LOT 1, BLOCK 6-R
3
REMOVE EXIST. 6'
CONNECTION TO FIRE
HYDRANT
INSTALL
1-6'X6' TEE
CONNECT TO EXISTING 6'
MAN AND EXISTING FIRE
HYDRANT LEAD
1
INSTALL:83 L.F. 6' MAIN
INSTALL:
10)(10' TEE
1-I01.X6' REDUCER
1-10" GATE VALVE
1-6 GATE VALVE
INSTALL
10'X8. TEE
1-Er GATE VALVE
INSTALL
253 LF. 10' MAN
INSTALL
1-10' PLUG
NSTALL
1903 LF. 18' MAIN
INSTALL:
1-81X8" TEE
1-8' GATE VALVE
83 LF. 8" AWN
INSTALL
1-85(6' TEE
1-6' GATE VALVE
1-STD. FIRE HYDRANT
83 L.F. 6' MAN
N
60' 120'
SCALE 1"=60'
Hayes & Stolz Industrial
3521 Hemphill Street
Fort Worth, TX 76110
Contact: Gary Schilling
IBHB PROJECT NO:
11l11 2 ^7E14 AA')
DRAM
1
1
U.V.
I
1
1
Li
HAYES AND STOLZ INDUSTRIAL
MANUFACTURING CO., INC.
LOT'S 1, 2, 4, 5, 6, 7, 8, 9, 10
BLOCK 5
SOUTH FORT WORTH ADDITION
VOL. 204, PAGE 15
P.R.T.C.T.
HAYES AND STOLZ INDUSTRIAL
MANUFACTURING CO., INC. 4.
INST. NO. D205098315 C `b
D.R.T.C.T. 0 yy0C
1
PROP. 10" V //TER
5
Anx
en
WEST RIPY STREET
60' R.O.W. - \SPHAALT PAVEMENT
El6'
00
LOT I, BLOCK 8
MATRIX H&S REALTY, LLC
INST. NO. D205325585
D.R.T.C.T.
'HAYES AND STOLZ INDUSTRIAL
MANUFACTURING CO.. INC.
EXISTING
s s
wv
N
hti
U
f
LEGEND
SEWER LINE
WATER VALVE/ GATE VALVE
FIRE HYDRANT
WATER METER
SEWER MANHOLE
`k
oeC
v
<11
v0
HAYES AND STOLZ INDUSTRIAL
MANUFACTURING CO., INC.
LOT I I-R
BLOCK 5
SOUTH FORT WORTH ADDITION
VOL. 388-184, PAGE 17
P.R.T.C.T.
MATRIX H&S REALTY, LI.0
INST. NO. D205098314
D.R.T.C.T.
HAYES AND STOLZ INDUSTRIAL
MANUFACTURING CO., INC.
a
`X _130$? 3 RIPY ST. P.O.W.
VACATED BY CITY ORD. NO. 9348
RETAINED AS EMERGENCY ACCESS EASfJENT
AND AS UTILITY EASEMENT I
fl
POf? 4"SS
PROPOSED
0 u 3aird, arnpton & Brown, Inc.
a e
Engineering Rr Surveying
45505R 350 S e. ISO. Cccr1z. IX 4051 c(81/PS-8550 Fm(812)251-$810mew %Pt cur,
1E6E nau #44 IBPLS i1W /100t1.102
CFA UH91(S) RRFP
m PASFI 0D RARS WESCEED Pr ThC4'AS HOMR ENSet ;, uC
NG FiLE- E:\2013.000000\2013706000\Coca\CFA - Weter2.d.g I Sewer
N
0—
PROP. 10" WATER
INSTALL:
20* L.F. 4' PRNAIE
SEWER SER`ACE 0
2.00X MN.
CONNECT PROPOSED
4 PRIVATE SEWER
SERVICE 1D EXISTING
1e SANITARY SEWER
FIELD VERIFY EWA11NE
FUTURE ASSEMBL
& PAINT BLDG
EXHIBIT 'Al"
SEWER EXHIBIT
3500 S. JENNINGS AVENUE
FORT WORTH, TX 76110,
1
1
1
1
1
LOT I, BLOCK 6-R
u 60' 12
SCALE V=60'
DATE: SEPTEMIEER 2013
Hayes & Stolz Industrial
3521 Hernphill Street
Fort Worth, TX 76110
Contact: Gary Schilling
F3HB PROJECT NO:
2013.706.002
1Project Name: Ripy Street & Alley Water Improvements
'Water Improvements
Description Unit of Specification Estimated CFA Unit CFA Unit
Measure Section No. Quantity Price Extension
0241.0100 Remove Sidewalk SF 02 41 13 1085 $4.80 $5,208.00
0241.1000 Remove Conc Pvmt SY 02 41 15 215 $7.80 $1,677.00
0241.1100 Remove Asphalt Pvmt SY 02 41 15 58 $6.31 $365.98
10241.1400 Remove Conc Valley Gutter SY 02 4115 8 $7.80 $62.40
3125.0101 SWPPP ..1 acre LS 3125 00 1 $3,950.00 $3,950.00
3201.0124 7' Wide Asphalt Pvmt Repair, Arterial LF 32 01 17 20 $145.00 $2,900.00
3201.0400 Temporary Asphalt Paving Repair LF 32 01 18 205 $25.57 $5,241.85
3201.0616 Conc Pvmt Repair, Arterial/Industrial SY 32 0129 305 $47.95 $14,624.75
3213.0301 4" Conc Sidewalk SF 32 13 20 98 $46.54 $4,560.92
3213.0501 Barrier Free Ramp, Type R-1 EA 32 13 20 1 $1,154.00 $1,154.00
3216.0302 11" Conc Valley Gutter, Arterial/Industrial SY 32 16 13 8 $70.75 $566.00
3292.0101 Utility Service Surface Restoration Sodding SY 32 92 13 5 $5.00 $25.00
13305.0109 Trench Safety LF 33 05 10 647 $1.98 $1,281.06
13311.0001 Ductile Iron Water Fittings w/ Restraint TON 33 11 11 1 $7,385.00 $7,385.00
13311.0161 6" PVC Water Pipe LF 33 1112 16 $42.90 $686.40
13311.0261 8" PVC Water Pipe LF 33 11 12 258 $55.71 $14,373.18
3311.0361 10" PVC Water Pipe LF 33 1112 373 $68.52 $25,557.96
3312.0001 Fire Hydrant EA 33 1240 1 $4,798.00 $4,798.00
3312.0117 Connection to Existing 4"-12" Water Main:. EA 33 12 25 2 $1,854.00 $3,708.00
3312.0117 Connection to Existing 4"-12" Water Main --10"x10" Cut in tee EA ' 32`12 25 1 $1,565.00 $1,565.00'.`
3312.2103 1 1/2" Water Service EA 33 12 10 1 $1,250.00 $1,250.00
13312.3002 6" Gate Valve EA 33 12 20 2 $1,178.00 $2,356.00
3312.3003 8" Gate Valve EA 33 12 20 4 $1,502.00 $6,008.00
3312.3004 10" Gate Valve EA 33 12 20 3 $2,058.00 $6,174.00
3471.0001 Traffic Control MO 34 71 13 1 $12,870.00 $12,870.00
TOTAL $128,348.50
Ripy Street & Alley Improvements
Sanitary Sewer Improvements
Description
Unit of Specification Section
Measure No.
3331.3101 4" Sewer EA
3331.3102 4" 2-Way EA
TOTAL
33 3150
33 3150
Estimated CFA Unit CFA Unit
Quantity Price Extension
1 $852.00 $852.00
1 $430.00 $430.00
$1,282.00