HomeMy WebLinkAboutContract 45131 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT §
Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project") within the City
of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the Improvements.
Developer and Project Information:
Developer Company Name: Pulte Homes of Texas, L.P.
Address, State, Zip Code: 4800 Regent Blvd., Ste. 100 J Irving, TX 75063
Phone, E-Mail: (972) 304-2800, clint.vincent@pultegroup.com
Authorized Signatory/Title: Clint Vincent, Division Vice President of Land Development
Project Name and Brief Description: Paving, Drainage & Street Light Improvements to serve
Basswood Boulevard (Horseman Rd. to Old Santa Fe Trail)
Project Location:.-bassa, "PAvri,•Prnrn ¥'icr9errb..r lecI . -k--b Oki Rn nt.i ke- Tr(
Plat Case No.: N/A Plat Name: N/A
Council District: 2
To be completed by staff•
Received by: c
tCEIVED NOV 182013
City Project No: 02142 CFA: 2013 -0 82 DOE: 7087
Date:
i3
OFFICIAL RECORD
CITY SECRETARY
Ft; Victil
NOW, THEREFORE, For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to
comply with all provisions of said Policy in the performance of its duties and
obligations hereunder and to cause all contractors hired by Developer to comply with
the Policy in connection with the work performed by said contractors.
B. Developer shall provide fmancial security in conformance with paragraph 6, Section
II, of the Policy and recognizes that there shall be no reduction in the collateral until
the Project has been completed and the City has officially accepted the
Improvements. Developer further acknowledges that said process requires the
contractor to submit an Affidavit of Bills paid signed by its contractor and Consent
of Surety signed by its surety to ensure the contractor has paid the sub -contractor
and suppliers in full. Additionally, the contractor will provide in writing that the
contractor has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by
this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) Sewer (A-1)
Paving (B) X, Storni Drain (B-1) X, Street Lights & Signs (C) X .
E The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section II, of the Policy.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being insured, licensed and bonded to do
work in public streets and/or prequahfied to perform water/waste water
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the Improvements, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the Improvements for
a period of two (2) years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be furnished
before work is commenced and to meet the requirements of Chapter 2253, Texas
Government Code.
iii To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer -awarded
infrastructure construction contracts. The City shall be named as additional
insured on all insurance required by said documents and same will be evidenced on
the ACORD Certificate of Insurance supplied by the contractor's insurance
provider and bound in the construction contract book
iv. To require its contractor to give 48 hours notice to the City's Construction Services
Division of intent to commence construction so that City inspection personnel will
be available; and to require the contractor to allow the construction to be subject to
inspection at any and all times by City inspection forces and not to install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City
v. To require its contractor to have fully executed contract documents submitted to
the City to schedule a Pre -Construction Meeting. The submittal should occur no
less than 10 working days prior to the desired date of the meeting. No construction
will commence without a City -issued Notice to Proceed to the Developer's
contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and service
lines have been completed to the satisfaction of the Water Department.
G. Developer agrees to provide, at its expense, all engineering drawings and documents
necessary to construct the improvements required by this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein
I. City shall not be responsible for any costs that may be incurred by Developer in the
relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current
and future improvements provided for by this Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real or
asserted, brought for or on account of any injuries or damages sustained by any
persons (including death) or to any property, resulting from or in connection
with the construction, design, performance or completion of any work to be
performed by said Developer, his contractors subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the work, or
on account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or employees,
whether or not such injuries, death or damages are caused. in whole or in
part, by the alleged negligence of the City of Fort Worth, its officers, servants,
or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and all
claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused, in whole or in part, by the alleged
negligence of the City of Fort Worth. its officers, servants, or employees. Further,
Developer will require its contractors to indemnify, and hold harmless the City for
any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in
a good and workmanlike manner, free from defects, in conformance with the
Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the infrastructure and
Improvements, Developer will assign to the City a non-exclusive right to enforce the
contracts entered into by the Developer with its contractor along with an assignment of
all warranties given by the contractor, whether express or implied. Further, Developer
agrees that all contracts with any contractor shall include provisions granting to the
City the right to enforce such contracts as an express intended third party beneficiary
of such contracts.
O Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of the
total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and stonn drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of
the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. If applicable, the City's obligation to participate (exclusive of front foot charges) in
the cost of the Improvements shall terminate if the Improvements are not
completed within two (2) years; provided, however, if construction of the
Improvements has started within the two year period, the developer may request
that the CFA be extended for one year. If the Improvements are not completed
within such extension period, there will be no further obligation of the City to
participate. City participation in a CFA shall be subject to the availability of City
funds and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years from the date of this Agreement the Improvements have
not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion of
the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Project Name: Basswood Boulevard
CFA No.: 2013-082
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
Cost Summary Sheet
DOE No.: 7087
Developer's Cost
375,460.55
11,766.66
1,964.00
389,191.21
389,191.21
15,489.09
7,744.54
78.56
23,312.19
23,312.19
Amount
389,191.21
389,191.21
486,489.01
486,489.01
Choice
/ck one)
X
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has execute . this
instrument in gadruplicate, at Fort Worth, Texas this "1 day of
CITY OF FORT WORTH - Recommended by:
Water Department
J1 A
Wendy Chi-Babulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
DouglasWfi31ack
Assistant City Attorney
Ali
M&C No. Ali
Date:
ATTEST:
Signature
(Print) Name: Curt Millward
Title: Pulte Group Project Manager
Transportation & Public Works Department
is
Douglas jj1V. Wiersig, P.E.
Director
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
DEVELOPER:
Pulte Homes of Texas, L.P.
By: Pulte Nevada I, LLC
Its General Partner
Signature
(Print) Name: Clint Vincent
Title: Div. Vice President of Development
OFFICIAL RECORD
CITY SECRETARY
Ft WORTh, TX
Check items associated with the project being undertaken; checked items must be included as
Attachments to this Agreement
Included Attachment
® Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Stour Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
•
Ei
rs
r
0
r
El
(Remainder of Page Intentionally Left Blank)
9
\.�/22 / 21
20
Li:
18�_
�� BOV/EVAZ �.
LEGEND
7 6 5 4 3 2 1
Da�TD. 52 _--
1
29' B-B CONCRETE PAVEMENT
ASPHALT PAVEMENT
SIDEWALK BY DEVELOPER
H.C. RAMPS BY DEVELOPER
EXHIBIT B - PAVING
H
7
6
5
5
5
4
03
I �
2
Q
W
2
33
34
1
2 3 4 5
BASSWOOD BLVD
8
29
7 30
31
5
4
3
2
0
NORTH
200'
BASSWOOD BOULEVARD
GRAPHIC SCALE DATE: OCTOBER, 2013
OWNER / DEVELOPER:
PULTE HOMES OF TEXAS, L.P.
4800 REGENT BLVD.
SUITE 100
IRVING, TX 75063
972-304-2800
Hill PELOTON
11111 LAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
20
19
PS
18NI 17 E 16
16 15 14
I I 1 J
OO'�0 R��RCP
LEGEND
4 3 2
PROPOSED STORM DRAIN INLET
EXIST STORM DRAIN INLET
EXHIBIT B1 - STORM DRAINAGE
15 14
I} 1
13 12 5 5
6 I 4
1 3
+GAS
MENT-�
7
11 I10 I 9 I 8 \�
/
7
6
5
2
33
34
8
7
O
21" 23CP 4 5
29
30
31
32
33
BASSWOOD BLVD
20' INLET
5
4
3
2
0 NORTH 200'
BASSWOOD BOULEVARD
GRAPHIC SCALE DATE: OCTOBER, 2013
OWNER / DEVELOPER:
PULTE HOMES OF TEXAS, L.P.
4800 REGENT BLVD.
SUITE 100
IRVING, TX 75063
972-304-2800
1111 PELOTON
11111 LAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
\ /2 21
20
19
FUpjk1RE
18N 17
os. volt
14
13 12 l
19
\_� Rp - - ri
i - e 0`E\P / / O -I- O _ 0 �I--
\ / � n o.SS�OO �� '
H
5
1 1�
6
GAS
MENT
7
17
16
15 14
LEGEND
PROPOSED STREET LIGHTS
EXIST STREET LIGHTS
13
EXHIBIT C - STREET LIGHTS
11
10
7
6
5
rI
2
33
34
1 2 3 4 5
8 29
BASSWOOD BLVD
5
4
3
2
1
0 NORTH 200'
GRAPHIC SCALE
BASSWOOD BOULEVARD
DATE: OCTOBER, 2013
OWNER / DEVELOPER:
PULTE HOMES OF TEXAS, L.P.
4800 REGENT BLVD.
SUITE 100
IRVING, TX 75063
972-304-2800
11111 PELOTON
IIIII LAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
•
PELOTON
11111 LAND SOLUTIONS
5751 KROGER DR. STE. 185 1 KELLER, TX 76244 1 817.562.3350
EXHIBIT
ITEM #
3123.0101
3213.0104
3211.0501
3211.0400
3213.0302
3123.0518
3123.0503
0241.1300
0241.1000
0241.0100
0241.1100
3216.0102
3217.2101
3217.2102
3217.2104
3217.1002
3217.1004
3217.4301
3291.0100
3292.0400
9999.0000
9999.0000
9999.0000
9999.0000
9999.0000
9999.0000
TOTAL PAVI
B- PAVING IMPROVEMENTS
DESCRIPTION
Unclassified Street Excavation
10" Reinf. Conc. Pvmt. w/ 7" Curbs
8 Lime Stabilized Subgrade
Hydrated Lime (30#/SY)
5', 4" Conc. Sidewalk
5' B/F Ramps (Type H)
6" Asphalt Base Type B
Sawcut & Remove Ex. Conc. Curb & Gutter
Remove Ex. Conc. Pavement & Disposal
Remove Ex. Conc. Sidewalk & Disposal
Remove Ex. Asphalt Pavement & Disposal
7" Conc. Curb & Gutter
Raised Marker TY W
REFL Raised marker TY I-C
REFL Raised Marker TY II-C-R
Lane Legend Arrow
Lane Legend Only
Remove 4" Pvmt. Marking
Topsoil
Seeding/Hydromulch for Median & Parkway
Remove Ex. Traffic Signage
Connect to Ex. Pavement Header & Remove Ex. Barricade
Construct Pavement Header
Type III Standard Street Barricade
SWPPP> 1 Acre
Traffic Control Plan
NG
CFA ESTIMATE FOR: PARR TRUST ADDITION
WEST FORK RANCH BASSWOOD BLVD
10/30/2013
UNIT IQTY
CY
SY
SY
TON
SF
EA
SY
LF
SY
SF
SY
LF
EA
EA
EA
EA
EA
LF
CY
SY
EA
LF
LF
LF
LS
LS
3,000
5,026
5,345
80.2
6,426
2
461
331
577
548
423
213
755
88
101
6
3
5,004
1,315
11,836
1
28
28
30
1
1
7.00
43.40
1.95
136.00
3.85
1,350.00
35.00
16.00
10.00
1.50
10.00
20.00
3.50
4.80
4.80
250.00
275.00
0.35
15.00
1.50
250.00
15.00
8.00
50.00
2,050.00
1,500.00
TOTAL
21,000.00
218,128.40
10,422.75
10,907.20
24,740.10
2,700.00
16,135.00
5,296.00
5,770.00
822.00
4,230.00
4,260.00
2,642.50
422.40
484.80
1,500.00
825.00
1,751.40
19,725.00
17,754.00
250.00
420.00
224.00
1,500.00
2,050.00
1,500.00
$375,460.55
WFR_BASSWOOD_QTO_20131030, Ph3B
1 of 3 11/6/2013
PELOTON
LAND SOLUTIONS
5751 KROGER DR. STE. 185 I KELLER, TX 76244 1817.562.3350
EXHIBIT B1- STORM DRAIN IMPROVEMENTS
ITEM # DESCRIPTION
3341.0201 21" RCP
3349.6001 10' Recessed Curb Inlet
3349.6003 20' Recessed Curb Inlet
0241.4201 Remove 4' Drop Inlet
3305.0109 ITrench Safety
TOTAL STORM DRAIN
CFA ESTIMATE FOR: PARR TRUST ADDITION
WEST FORK RANCH BASSWOOD BLVD
10/30/2013
UNIT QTY
LF
EA
EA
EA
LF
89
1
1
1
89
38.57
3,144.96
4,773.60
393.12
0.25
TOTAL
3,432.73
3,144.96
4,773.60
393.12
22.25
$11,766.66
WFR_BASSWOOD_QTO_20131030, Ph3B
2 of 3 11/6/2013
5751 KROGER DR. STE. 185 I KELLER, TX 76244 1 817.562.3350
P E L O T O N CFA ESTIMATE FOR: PARR TRUST ADDITION
IIIII LAND SOLUTIONS WEST FORK RANCH BASSWOOD BLVD
10/30/2013
EXHIBIT C - STREET LIGHTING IMPROVEMENTS
(DESCRIPTION UNIT (QTY
3441.3104 150W MH PC Lighting Fixture EA 4
(TOTAL STREET LIGHTS
491.00
TOTAL
1,964.00
$1,964.00
WFR_BASSWOOD_QTO_20131030, Ph3B
3 of 3 11/6/2013