Loading...
HomeMy WebLinkAboutContract 45131-FP2 (2)Depart t f P onst. Services D# OE gate Project anager Risk Management J. Page D.O.E. Brothe ' on 6 CFA Westerman/Scanne 0 ReZr The Proceeding people have been Contact concerning the request for final payment & have released this project for such payment. clearance Conducted By Shameka Kennedy T WORTHL. 'ATION AND PUBLIC WORKS ►F PROJECT COMPLETION MY SECRETARY ti9/3i. CONTRACT NO. s9coof — co gR)9 D.Q.E. s:7178 a 51+ tici 3 , Regarding contract 117178 for BASSWOOD BLVD- WATER as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation & Public Works Department has accepted the project as complete. Original Contract Prices: Revised Contract A II ount: Total Cost Work Completed: Less Deductions: Liquidated Damages: Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: Less Previous Payments: Final Payment Due Amount of Approved Change Orde UEs taw" 1� fl Ns OV 0 2 21 Recommended for Acceptance Asst. Director, TPW - Infrastructure Design and Construction Accepted Asst. Director, WATER DEPARTMENT t Asst. City Manager Cornments: P265-541200-602150221983 EMA ILyj NOV 4 2015 "WWI � � s 0 SCANNED $36,337.40 $36,337.40 Days @ $210.00/ Day $36,337.40 $0.00 $36,337.40 /AZ -Jr Date 1/Le.tfi Date OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX Pc265--c3i 90111 City Project Numbers 02219 Contract Name BASSWOOD BLVD Contract Limits Project Type WA 1"LR Project Funding By NovECEOVE 0 2 zo,s Ul Project Manager Buckley Inspectors LAYER / ODEN Contractor RKM UTILITY SERVICES, INC. 1604 BLUEBANK ROAD DALLAS , TX 75229-3102 Line Fund Account Center Friday, July 24, 2015 5-mo) - CO 2R/'7 DOE Number 7178 Estimate Number Payment Number For Period Ending City Secretary Contract Number Contract Date Contract Time Days Charged to Date Contract is .000000 CITY OF FORT WORTH SUMMARY OF CHARGES Amount Funded Gross Retainage Total Cost of Work Completed Less % Retained Net Earned Earned This Period Retainage This Period $36,337.40 $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment 117178 1 1 7/24/2015 60 CD 449 CD Complete Net $36,337.40 $0.00 $36,337.40 $0.00 $0.00 $0.00 $0.00 $0.00 $36,337.40 Page 4 of 4 QQJq FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name BASSWOOD BLVD Contract Limits Project Type WATER City Project Numbers 02219 DOE Number 7178 Estimate Number 1 Payment Number 1 City Secretary Contract Number 117178 Contract Date Project Manager Buckley Contractor RKM UTILITY SERVICES, INC. 1604 BLUEBANK ROAD DALLAS , TX 75229-3102 Inspectors LAYER / ODEN For Period Ending 7/24/2015 CD Contract Time 6CD Days Charged to Date 449 Contract is 100.00 Complete Friday, July 24, 2015 Page 1 of 4 City Project Numbers 02219 Contract Name BASSWOOD BLVD Contract Limits Project Type WA1ER Project Funding WATER Item No. 1 8" PVC WATER PIPE Description of Items 2 8" GATE VALVE 3 FIRE HYDRANT 4 DUC 11LE IRON WA PER FITTINGS W/RES'IRAINT 5 CONCRETE BLOCKING TYPE B 6 16" X 8" TAPPING SI}EVE & VALVE 7 MANHOJF ADJUSTMENT MINOR 8 MANHOLE ADJUSTMENT MAJOR W/ COVER 9 TRENCH SAFETY Friday, July 24, 2015 Estimated Unit Unit Cost Quanity 448 LF $40.00 1 EA $1,150.00 1 EA $4,665.00 0.8 TN $1,000.00 2 CY 1 EA 2 EA 1 EA 448 LF Sub -Total of Previous Unit $ 110.00 $5,060.00 $875.00 $4,750.00 $0.05 DOE Number Estimate Number Payment Number For Period Ending Estimated Total $17,920.00 $1,150.00 $4,665.00 $800.00 $220.00 $5,060.00 $1,750.00 $4,750.00 $22.40 $36,337.40 7178 1 1 7/24/2015 Completed Completed Quanity Total 448 $17,920.00 1 $1,150.00 1 $4,665.00 0.8 $800.00 2 $220.00 1 $5,060.00 2 $1,750.00 1 $4,750.00 448 $22.40 $36,337.40 Page 2 of 4 City Project Numbers 02219 DOE Number 7178 Contract Name BASSWOOD BLVD Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER For Period Ending 7/24/2015 Project Funding lnsp Project Man 6Asst Contract Information Summary Original Contract Amount Chanize Orders z,, _ . Date S -- d � �tCgni� Ai DateA127f( Altat Date/ )3 $36,337.40 Total Contract Price $36,337.40 D:atP //r2-- / Cr- PW frastructure Design and Cotructjon Director / Contracting Departmen i s Total Cost of Work Completed $36,337.40 Less % Retained $0.00 Net Earned $36,337.40 Earned This Period $36,337.40 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $36,337.40 Friday, July 24, 2015 Page 3 of 4 FORT WORTH TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Water And Drainage To Serve Basswood Blvd PROJECT NO.: 2219 PERIOD FROM:04/14/14 TO: 07/06/15 WORK ORDER EFFECTIVE:4/14/2014 DAY OF MONTH 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PERIOD PREVIOUS PERIOD TOTALS TO DATE *REMARKS: A I I I ra iirr. r TtOR ir ian DAYS CHARGED DURING CONTRACTOR: RKM Utilities DOE NO.: 7178 FINAL INSPECTION DATE: 6-Jul-15 CONTRACT TIME: 60 0 W rev 03/05/07 REASON FOR DAYS CREDITED 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. DAY OF MONTH SAT, SUN, RAIN, TOO WET, UTILITIES & HOLIDAYS & TOO COLD RELOCATIONS 0 0 0 0 0 0 0 DAYS CHARGED DURING OTHERS * 0 0 0 0 REASON FOR DAYS CREDITED 0 , Or ,c)ount. EN- Sor DATE INSPECTOR ENGINEERING DEPARTMENT DAYS CHARGED 449 TOTAL DAYS 449 449 449 The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 7601ZL6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 ?/ o, 1 I DATE OFFICIAL RECORD CITY SECRETARY FT, WORTH TX a CD FORT WORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Water And Drainage to Serve Basswood Blvd PROJECT NUMBER: P265-6021502211983 DOE NUMBER: 7178 WATER PIPE LAID SIZE TYPE OF PIPE Water Bin PVC SDR-14 LF FIRE HYDRANTS: 1 VALVES (16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: yes NEW SERVICES: No SEWER PIPE LAID SIZE TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, '1'X 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 July 7, 2015 City of Fort Worth Weyman Oden CFW Inspector 8851 Camp Bowie West Fort Worth, TX 76116 RE: Basswood Boulevard (Cloudcroft Lane to Sierra Pelada Drive), DOE 7178 Mr. Oden: This letter is to serve notice that D.R. Horton, Inc will not charge any liquidated damages to Gilco Contracting, Inc. or RKM Utility Services, Inc. on the above referenced project. Sincerely, Mark P. Allen, P.E. Land Development Manager D.R. Horton, Inc. — DEW West Division 6751 North f reewat- • Fort urorth. FX 76131 (817) 230-0800 FORT WORTH T TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR & PROJECT DATA Name of Contractor RKM Utilities DOE Inspector Weyran Oden DOE Inspector Water n Waste Water Storm Drainage Initial Contract Amount $36,337.40 Final Contract Amount $36,337.40 II) PERFORMANCE EVALUATION 0 - Inadequate 1 - Deficient 2 - Standard 3 - Good 4 - Excellent ELEMENT REV: 02/20/07 Project Name Water and Drainage To Serve Baswood Blvd DOE Number 7178 Project Manager Pavement Pat Buckley Project Difficulty 0 Simple 0 Routine 0 Complex Date 7/21/2015 WEIGHT (x ) 1 Submission of Documents 2 2 Public Notifications 5 3 Plans on Site 5 4 Field Supervision 15 5 Work Performed 15 6 Finished Product 15 7 Job Site Safety 15 8 Traffic Control Maintenance 1 15 9 Daily Clean Up 1 5 10 Citizen's Complaint Resolution 1 5 11 Property Restoration 1 5 12 After Hours Response 1 5 13 Project Completion 1 5 APPLICABLE (Y / N) RATING (0 - 4) MAX SCORE SCORE Y 4 8 8 Y 4 20 20 Y 4 20 20 Y 3 60 45 Y 3 60 45 Y 4 60 60 Y 4 60 1 60 Y 1 4 1 60 1 60 Y 3 1 20 15 Y 4 1 20 20 Y 1 3 J 20 1 15 Y 1 2 1 20 10 Y 1 3 1 20 15 TOTAL ELEMENT SCORE (A) 393 BONUS POINTS (25 Maximum) (B) TOTAL SCORE (TS) 393 III) CONTRACTOR'S RATING Maximum Score (MS) = 448 or sum of applicable element score maximums which = 448 Rating ( [TS / MS] * 100%) 393 / 448 = 88% Performance Category Excellent <20% = Inadequate 20% to <40% = Deficient 40% to <60% = Standard 60% to <80% = Good >80% = Excellent Inspector's Comments (INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector _.4,/-\,: - 00 cr--) Signature DOE Inspector's Supervisor c,t- .a CONTRACTOR'S COMMENTS Signature Contractor TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 de:* AFFIDAVIT STATE OF Texas COUNTY OF Dallas Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Bryan Piper, Vice President Of RKM Utility Services, Inc , known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Basswood Blvd BY Bryan Piper - Vice Presdient Subscribed and sworn before me on this date 31 of July, 2015. Notary Public Dallas, TX • • • • �%/_ce.73 G': A�'`'TExPS CONSENT OF SURETY TO FINAL PAYMENT NA Document G707 Bond No. PB00317400083 TO OWNER: (Name turd address) D.R. Horton -Texas, Ltd., City of Fort Worth, TX PROJECT: (Mont and a&bt t ) OWNER ARCHITECT CONTRACTOR SURETY OTHER ARCHITECTS PROJECT NO.: CONTRACT FOR: Utility Improvements CONTRACT DATED: Water and Storm Drain Improvements to Serve Basswood Blvd. In Accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (Insert nantpand adds af,4rrrets9 Philadelphia Indemnity Insurance Company One Bala Plaza, Suite 100 Bala Cynwyd, PA 19004 1403 on bond of (Insert mane and adchecc. gfConarrsiot) RKM Utility Services Inc. 1805 Royal Lane Suite 107 Dallas, TX 75229 i , SURETY, C4NTR C ORT hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations ro (Assert Haire and address of Owner) D.R. Horton -Texas, Ltd., City of Fort Worth, TX as set forth in said Surety's bond. OWNER IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date; July 29, 2015 avert (ttietiiAgthe month fod(owedb,Vthe mrtrerH:dareand)year,) Att (s i Jf -Veer Notes, Witness Philadelphia I {Surest) Insurance Company // (S4gdatureofauthorizedttpr-e- tative) 1abitha Reedy Attorn- - -- act (Fiona:1 scone and itik) G707-1994 1247 PHILADELPHIA INDEMNITY INSURANCE COMPANY One Bala Plaza, Suite 100 Bala Cynwyd, PA 19004 Power of Attorney KNOW ALL PERSONS BY THESE PRESENTS: that PHILADELPHIA INDEMNITY INSURANCE COMPANY (the Company), a corporation organized and existing under the laws of the Commonwealth of Pennsylvania, does hereby constitute and appoint: Edward G. Britt, Jr., David G. Miclette, David T. Miclette, Barry K. McCord, Robert C. Davis, Kristi Lovett, Ashley Britt Russell, Joni Bowen, Heather Noles, Brett A. Tisdale, Tabitha Reedy and Rita G. Gulizo of Bowen, Miclette & Britt Insurance Agency, LLC of Houston, Texas. Its true and lawful Attomey(s) in fact with full authority to execute on its behalf bonds, undertakings, recognizances and other contracts of indemnity and writings obligatory in the nature thereof, issued in the course of its business and to bind the Company thereby, in an amount not to exceed S25,000,000 This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELPHIA INDEMNITY INSURANCE COMPANY at a meeting duly called the 1n day of July, 2011. RESOLVED • That the Board of Directors hereby authorizes the President or any Vice President of the Company to: (1) Appoint Attomey(s) in Fact and authorize the Attomey(s) in Fact to execute on behalf of the Company bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof and to attach the seal of the Company thereto; and (2) to remove, at any time, any such Attorney -in -Fact and revoke the authority given And, be it FUR1HLtR RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any such Power of Attorney or certificate relating thereto by facsimile, and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and biding upon the Company in the future with the respect to any bond or undertaking to which it is attached. IN 1"I STIMONY WHEREOF, PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AU 1'HORIZED OFFICE THIS 7111 DAY OF FEBRUARY 2013. (Seal) Robert D. O'Leary Jr., President & CEO Philadelphia Indemnity Insurance Company On this 7'11 day of February 2013, before me came the individual who executed the preceding instrument, to me personally known, and being by me duly sworn said that he is the therein described and authorized officer of the PHILADELPHIA INDEMINITY INSURANCE COMPANY; that the seal aft ized to said instrument is the Corporate seal of said Company; that the said Corporate Seal and his signature were duly affixed. cohrMONWEAL7110FPQjtSYLVAN A tl<JFARfAi:6EAttf OANIFILE PORAiH, Notary Pubic • lomatMetloaTwp MontgomeryCounty My Co mission Ems Mich 12.201 (Notary Seal) Notary Public: residing at: My commission expires. Bala Cynwyd. PA March 22. 2016 I, Craig P. Keller, Executive Vice President, Chief Financial Officer and Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY, do herby certify that the foregoing resolution ofthe Board of Directors and this Power of Attorney issued pursuant thereto are true and correct and are still in full force and effect. I do further certify that Robert D. O'Leary Jr., who executed the Power of Attorney as President, was on the date of execution of the attached Power of Attorney the duly elected President of PUJLADF.T PHIA INDEMNITY INSURANCE COMPANY, + , ' In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this g. day of r1 V W , 20 I� ,lQ .._,,,, 'Pr c tat' t* 1927 4 m- Craig P. Keller, Executive Vice President, Chief Financial Officer & Secretary TRH ADELPHIA INDEMNITY INSURANCE COMPANY July 7, 2015 City of Fort Worth Weyman Oden CFW Inspector 8851 Camp Bowie West Fort Worth, TX 76116 RE: Basswood Boulevard (Cloudcroft Lane to Serra Pelada Drive), DOE 7178 Mr. Oden: This letter is to serve notice that D.R. Horton, Inc will not charge any liquidated damages to Gilco Contracting, Inc. or RKM Utility Services, Inc. on the above referenced project. Mark P. Allen, P.E. Land Development Manager D.R. Horton, Inc. — DFW West Division 6751 North Freeway • Forr Worth. TX 76131 (817) 230-0800 12 13 14 1 i I) PROJECT INFORMATION Name of Contractor RKM Utilities DOE Inspector Weyman Oden DOE Number 7178 Initial Contract Amount $36,337.40 II) PERFORMANCE EVALUATION 0 - Inadequate 1 - Deficient 2 - Standard ELEMENT FORT WORTH TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY Date: J7/21/2015 I Project Difficulty Simple Q Routine INSPECTION EVALUATION 1 Availability of Inspector Knowledge of Inspector Accuracy of Measured Quantities Display Of Professionalism 5 Citizen Complaint Resolution 6 Performance - Setting up Valve Crews, Labs ADMINISTRATION 1 Change Order Processing Time 2 Timliness of Contractor Payments 3 Bid Opening to Pre -Con Meeting Timefi°ame III) COMMENTS & SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS Complex Project Name Water And Drainage To Serve Basswood Blvd Project Manager Pat Buckley Type of Contract Water [] Waste Water Storm DrainagPavement Final Contract A111o11nt $36,337.40 J REV: 02/22/07 3 - Good 4 - Excellent RATING ELEMENT (0 - 4) PLANS & SPECIFICATIONS 1 Accuracy of Plans to Existing Conditions 2 Clarity & Sufficiency of Details 3 Applicability of Specifications 4 Accuracy of Plan Quantities 'PROJECT MANAGER EVALUATION 11 Knowledge And/Or Problem Resolution 2 Availability of Project Manager 3 Communication 4 Resolution of Utility Conflicts y AldirreAr 0'r� 0 `?;A TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 RATING (0 -4) •