Loading...
HomeMy WebLinkAboutContract 45223 (2)STORM WATER FACILITY MAINTENANCE AGREEMENT or/ su,L14 Y CONTRACI NO. THIS AGREEMENT, made and entered into this dayfl_nt of 18, 7g-0 ( , byand between Pinion Park Office Park, L.L.C. actingbyand through Mearl g McBee, President, hereinafter referred to as "Landowner", the Pinion Park Office Center Condominium Association, Inc., hereinafter referred to as "Association" and the City of Fort Worth, hereinafter referred to as "City". WITNES SETH WHEREAS, the Landowner is the owner of certain real property described as Lot 16, Block 2 Pinion Park, Fort Worth, Tarrant County, Texas according to the plat recorded in Cabinet A, Slide 9986, Plat Records, Tarrant County, Texas, hereinafter called the "Property". WHEREAS, the Landowner is proceeding to build on and develop the Property according to the Site Plan/Subdivision Plan known as Lot 16, Block 2 Pinion Park, hereinafter called the "Plan", which is expressly made a part hereof, as approved or to be approved by the City and the Landowner and Association provides for management of storm water within the confines of the Property; and WHEREAS, the City and the Landowner and Association, and their successors and assigns, agree that the health, safety and welfare of the residents of the City of Fort Worth, Texas require that on -site Storm Water Management Facilities be constructed and maintained on a portion of the Property; and WHEREAS, the City requires that on -site Storm Water Management Facilities ("Facility") as shown on the Plan be constructed and adequately maintained by the Landowner, its successors and assigns, including Association, the location and dimensions of which is shown and more particularly described by metes and bounds in the attached Exhibit "A" ("Facility Property"); and OFFICIAL RECORD fr))171tr SECRETARY STORM WATER FACILITY MAINTENANCE AGREEMENT I fi' (I„ 1VORTNI TX Rev. AA A0//20I2 RECEIVED DEC 20 2013 WHEREAS, Landowner agrees to convey the Facility Property to the Association and the Association agrees to accept the Property where the Storm Water Facility is located. NOW, THEREFORE, in consideration of the foregoing premises, the mutual covenants contained herein, and the following terms and conditions, the parties hereto agree as follows: 1. The Landowner and Association, its successors and assigns, shall adequately construct and maintain the on -site Storm Water Management Facility ("Facility") at no expense to the City of Fort Worth in accordance with the design specifications for the Facility, attached as Exhibit "B", and the current standards then in force and effect in the City of Fort Worth and with the Operations and Maintenance Plan attached to this Agreement as Exhibit "C". The Storm Water Facility includes all pipes, channels or other conveyances built to convey storm water to the facility, as well as all structures, improvements, and vegetation provided to control the quantity and quality of the storm water. Adequate maintenance is herein defined as good working condition so that these facilities are performing their design functions. The Storm Water Structural Control Maintenance Checklists, attached to this Agreement as Exhibit "D", are to be used to establish what good working condition is acceptable to the City. 2. The Landowner and Association, its successors and assigns, shall inspect the Facility and submit an inspection report to the City annually. The purpose of the inspection is to assure safe and proper functioning of the Facility. The inspection shall cover the entire Facilities, berms, outlet structure, pond areas, access roads, etc. Components of the Facility, which need maintenance or replacement to perform their design function, shall be noted in the inspection report along with the corrective actions to be taken. 3. The Landowner and Association, its successors and assigns, hereby grant permission to the City, its authorized agents and employees, to enter upon the STORM WATER FACILITY MAINTENANCE AGREEMENT Rev. 09/10//2012 Property and to inspect the Facility Property whenever the City deems necessary. The purpose of inspection is to follow-up on reported deficiencies and/or to respond to citizen complaints. The City shall provide the Landowner, its. successors and assigns, copies of the inspection findings and a directive to commence with the repairs if necessary. 4. In the event the Landowner and the Association, its successors and assigns, fails to maintain the Facility in good working condition as specified herein, the City, its authorized agents and employees, may enter upon the Facility Property and take whatever stens necessary to correct deficiencies identified in the inspection report and to charge the costs of such repairs to the Landowner, its successors and assigns. It is expressly understood and agreed that the City is under no obligation to routinely maintain or repair said Facility, and in no event shall this Agreement be construed to impose any such obligation on the City, such obligation is Landowner's. 5. The Landowner and the Association, its successors and assigns, will perform the work necessary to keep the Facility in good working order as appropriate. In the event the City pursuant to this Agreement, performs work of any nature, or expends any funds in performance of said work for labor, use of equipment, supplies, materials, and the like, the Landowner, its successors and assigns, shall reimburse the City upon demand, within thirty (30) days of receipt thereof for all actual costs incurred by the City hereunder. In the event that Landowner or its successors or assigns fail to pay the City for the costs incurred under this section, the City shall impress a lien for the costs of such work upon other lots owned by the Landowner or the Association. Such lien shall be perfected by filing in the office of the County Clerk of Tarrant County, Texas an affidavit identifying the property to be charged with such lien, stating the amount thereof, and making reference to this Agreement. 6. This Agreement imposes no liability of any kind whatsoever on the City. THE LANDOWNER AND ASSOCIATION AGREES TO HOLD THE CITY HARMLESS FROM ANY LIABILITY IN THE EVENT THE FACILITY FAILS TO OPERATE PROPERLY. LANDOWNER AND STORM WATER FACILITY MAINTENANCE AGREEMENT Rev. 09/10//2012 3 ASSOCIATION COVENANT AND AGREE AND DOES HEREBY INDEMNIFY HOLD HARMLESS AND DEFEND THE CITY OF FORT WORTH, ITS AGENTS, SERVANTS AND EMPLOYEES FROM AND AGAINST ALL COSTS, EXPENSES, LOSSES, DAMAGES, CLAIMS OR CAUSES OF ACTION WHATSOEVER ARISING, OR WHICH MIGHT ARISE, FROM THE FAILURE OF LANDOWNER OR ANY FUTURE OWNERS OF THE FACILITITY PROPERTY TO MAINTAIN THE FACILITY, INCLUDING, BUT NOT LIMITED TO THE BED AND BANKS OF THE DETENTION POND; ANY DAMAGES CAUSED TO PERSON OR PROPERTY DUE TO (1) FLOODING OF THE POND AND ITS BANKS, (2) SLOPE FAILURE OF THE BANKS OF THE POND, OR (3) FAILURE OF THE POND OR ITS BANKS TO OPERATE IN A MANNER CONSISTENT WITH CITY OF FORT WORTH CRITERIA; OR FAILURE TO PERFORM ANY OTHER DUTIES OR OBLIGATIONS HEREUNDER. 7. Landowner and Association covenants and agrees that no habitable building shall be erected within the drainage easement outlined on Exhibit "A" but this paragraph shall not preclude construction of other improvements within the drainage easement, which do not impede drainage. Landowner and Association covenants and agrees that no habitable building shall be erected on the above property abutting such easement which shall have a finished floor at an elevation less than two feet above the maximum depth of water in the detention pond which would occur during a 100 year frequency flood. 8. This Agreement shall be recorded among the land records of Tarrant County, Texas, shall constitute a covenant running with the land, and shall be binding on the Landowner, its administrators, executors, assigns, heirs and any other successors in interests, including any property owners association. 9. Notwithstanding anything to the contrary contained or implied elsewhere herein, it is expressly agreed and understood that the liabilities, indemnities and obligations of Pinion Park Office Park as Landowner hereunder shall expire and be of no further force or effect upon the transfer ("Transfer") by Pinion STORM WATER FACILITY MAINTENANCE AGREEMENT Rev. 09/10//2012 Park Office Park to the Association of legal title to the Facility Property, save and except for any liabilities, indemnities and obligations of Pinion Park Office Park as Landowner hereunder which have accrued and are due, payable and/or performable as of the date of the Transfer and which shall expressly survive the Transfer. Executed this q day of 201/ Landowner R„„v„ Ptw�. �w� LLC Name: � en/C Q Title: press /d tar- Homeowners Association PitsJo4 Ark afeiCe Ce'der Name:CAN661.0011h,1 6)111. Title: nt CsitC.k A; 5Sa G/G, /ta4KTTEST SiJ c. e {r' Gf / 6ee pity Secr, STORM WATER FACILITY MAINTENANCE AGREEMENT Rev. 09/10//2012 City of Fort Worth c ./r/AnGNtikID ,OOL- Fernando Costa Assistant City Manager Approved as to Form and Legality Assistant City Attorney PktiC C - C f2.1a7(3 OFFICIAL RECORD CEITY SECRETARY `117( ,yr .IYa.L L 1 M. ; STATE OF TEXAS COUNTY OF TARRANT ze /3 This instrument was acknowledged before me oaziziL/atrbY Fernando Costa, Assistant City Manager of the City of Fort Worth, on behalf of the City of Fort Worth. �•.% RV P+�1.. .C'ct.•. • Ps% • _ . .• -\ . ,,,r • • • ce+wen OF I to` �. EVONIA DANIELS Notary Public. State of Texas My Commission Expires July 10, 2017 STATE OF TEXAS COUNTY OF TARRANT c Notary Public, State of Texas Before me, the undersigned authority on this �" day of , 20&-, personally appeared Mearl McBee of Pinion Park Office Center, known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that t e same is tlid act of Pinion Park Office Park, d that he executed the same as its mssA-R,,,`, and as the act of such c t& and for the and consideration expressed in the foregoing purposes p g g instrument. J! se"-, JANETULLINS % -�� f MY COMMISSION EXPIRES ]\.. 1 'at,•lam •AM 7. vL?.V WAS llap mow November 20, 2016 evg .1 _ . .:, . y . STATE OF TEXAS COUNTY OF TARRANT . . 1.• 11 . Nota N Public, State of Texas This instrument was acknowledged before me on ��, \ c, Rs\Th Mearl gby, McBee, President, authorized representative, acting on behalf of the Pinion Park Office Center Condominium Association, Inc. �.. aalmits+s„E e' • ]jai Y JANET MULLINS ,: MY COMMISSION EXPIRES November 20, 2016 4 STORM WATER FACILITY MAINTENANCE AGREEMENT Rev. 09/10//2012 Notary ' ublic, State of Texas EXHIBIT "A" INSERT LEGAL DESCRIPTION Lots 16, Block 2 Pinion Park STORM WATER FACILITY MAINTENANCE AGREEMENT Rev. 09/10//2012 US CAI • rm.k, .- 44. : ti '1 at Y. „rk.)sy I icnn'vw -.\•' *NI 'Ile:.:-�'i-..,,,..,_.� ow)rntt m$3? n n! %- rT, t. a... rnluv,,. .. * r • h' V � — • t .9 • • L _J: • J---.- .. - aru " Lxr v`) cn.f. n r;tt•* a , -1• YA1rr,a'I . , r ^ t1l r1 _ rrtaiteln tr. "I; .4. r i - �;ri- - , -. 00 444. ,11%.1.?yVI, ,, ..-., ,s. v-.. talk C. IS 'Lip • • .. CLtrY—+` ,.. r• tM„ 1 Rr•; TJ'2 r ,%Lii'' (NTS) • `-rrC f JG � P N ��-+iint 1. UT. 1 - Ct L•,'a"Il U- L I - U PINION- PARK AN AG DIT717N -rn T ICI'. f' ITV UP FORT 1Vv 1. !'11 TARRA T r'O1.:1TY. TES.�r: oral • .UI.i 2004 7-2,\GO DON ^QNSULTINC o:C.rank xr. i uy4,, S_ SW1FT ENGINEER. INC. rat KRUL T T -4-4147 scH l l 1/2" IRON PIN FOUND L12 L11 FM 1220 (BOAT CLUB ROAD) POINT OF COMMENCING POINT OF BEGINNING L1 L2 1 L9 L8 0.308 ACRES (13,399 SF) LOT 16, BLOCK 2 PINION PARK CAB. A, SLIDE 9986 P.R.T.C.T. 10' UTILITY ESMT 1/2" IRON PIN FOUND PINIONPARK WAY TEXAS ELECTRIC SERVICE COMPANY VOL. 2103, PG. 290 D R.T.C.T. 1/2" IRON PIN FOUND L4l 7vif+` l 9 L5� ti 7 L6 1 7.5' UTILITY ESMT 1/2" IRON PIN FOUND 1 1 8 7 6 a 5 BLOCK 2 PINION PARK CAB. A, SLIDE 9986 P.R.T.C.T. 4 3 2 1 EXHIBIT A-2 STORM WATER MAINTENANCE FACILITY LOT 16, BLOCK 2 PINION PARK 1"=100' LINE TABLE L1 N89'23'17"E L2 N8923'17"E L3 S00'36'43"E L4 S4414'58"E L5 S16'11'57"W L6 S7812'32"W L7 S57'10'16"W L8 S85628'22"W L9 S88'10'08"W L10 N5712'26"W L11 N10'49'34"W L12 N00'36'43'W 28.87' 212.78' 21.31' 16.63' 11.74' 24.52' 23.12' 49.20' 105.38' 20.77' 30.84' 25 47' SD Engineering, Inc. Site Development Engineering PO Box 1357 Aledo, TX 76008-1357 (817) 441-6400 Fax (817) 441-6085 TEXAS REGISTERED ENGINEERING FIRM F-7643 TEXAS REGISTERED SURVEYING FIRM 10095800 BEING A 0.308 ACRE PARCEL OF LAND BEING A PORTION OF LOT 16, BLOCK 2 PINION PARK AN ADDITION TO THE CITY OF FORT WORTH TARRANT COUNTY, TEXAS ACCORDING TO THE PLAT RECORDED IN CABINET A, SLIDE 9986 PLAT RECORDS, TARRANT COUNTY, TEXAS, SAID 0.308 ACRE PARCEL OF LAND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: COMMENCING AT A 1/2' IRON PIN FOUND, SAID 1/2" IRON PIN FOUND BEING THE NORTHWESTERLY CORNER OF SAID LOT 16, BLOCK 2 PINION PARK, SAID 1/2" IRON PIN FOUND ALSO BEING ON THE EASTERLY RIGHT-OF-WAY LINE OF BOAT CLUB ROAD (FM 1220) THENCE NORTH 89 DEGREES 23 MINUTES 17 SECONDS EAST ALONG THE NORTHERLY LINE OF SAID LOT 16, BLOCK 2 PINION PARK 28 87' TO THE POINT OF BEGINNING; THENCE NORTH 89 DEGREES 23 MINUTES 17 SECONDS EAST CONTINUING ALONG THE NORTHERLY LINE OF SAID LOT 16, BLOCK 2 PINION PARK A DISTANCE OF 212.78 FEET; THENCE SOUTH THENCE SOUTH THENCE SOUTH THENCE SOUTH THENCE SOUTH THENCE SOUTH THENCE SOUTH THENCE NORTH THENCE NORTH 00 DEGREES 44 DEGREES 16 DEGREES 78 DEGREES 57 DEGREES 85 DEGREES 88 DEGREES 57 DEGREES 36 MINUTES 43 SECONDS EAST A DISTANCE OF 21.31 FEET; 14 MINUTES 58 SECONDS EAST A DISTANCE OF 16.63 FEET; 11 MINUTES 57 SECONDS WEST A DISTANCE OF 11.74 FEET; 12 MINUTES 32 SECONDS WEST A DISTANCE OF 24.52 FEET; 10 MINUTES 16 SECONDS WEST A DISTANCE OF 2312 FEET; 28 MINUTES 22 SECONDS WEST A DISTANCE OF 49 20 FEET; 10 MINUTES 08 SECONDS WEST A DISTANCE OF 105.38 FEET; 12 MINUTES 26 SECONDS WEST A DISTANCE OF 20.77 FEET; 10 DEGREES 49 MINUTES 34 SECONDS WEST A DISTANCE OF 30.84 FEET; THENCE NORTH 00 DEGREES 36 MINUTES 43 SECONDS WEST A DISTANCE OF 25.47 FEET TO THE POINT OF BEGINNING AND CONTAINING 0.308 ACRES (13,399 SQAURE FEET) OF LAND, MORE OR LESS. EXHIBIT A-3 STORM WATER MAINTENANCE FACILITY LOT 16, BLOCK 2 PINION PARK SD Engineering, Inc. Site Development Engineering PO Box 1357 Aledo, TX 76008-1357 (817) 441-6400 Fax (817) 441-6085 TEXAS REGISTERED ENGINEERING FIRM F-7643 TEXAS REGISTERED SURVEYING FIRM 10095800 ll BLOCK 1 PINION PARK CAB, A. SLIDE 9987 P,R.T.C.T. 3' WIDE CONC, FLUME 0 2% WITH SIDEWALK PLATE, - FLUME TO HAVE 7" CURB WITHIN STREET RIGHT-OF-WAY' TRANSITION CURB HEIGHT FROM 7" TO 8" FROM PROPERTY UNE TO PARKING LOT. 4 llb / Rm2 6., agEFIG & ORMNAGF NOTES I. EXISUNG UTUTES AND UNDERGROUND FAGIUTES INDICATED ON THESE PLANS HAVE BEEN LOCATED FROM REFERENCE INFORMATION SUPPLIED BY VARIOUS OWNERS OF THE FACILITES. THE ENGINEER DOES NOT ACCEPT RESPONSIBILITY FOR THE UIIUTY LOCATORS SHOWN, IT SHALL BE NC RESPONSIBILITY OF THE CONTRACTOR TO VERIFY BOTH HORIZONTALLY AND VERTICALLY THE LOCATION OF ALL EXISTING UTILITIES AND UNDERGROUND FACILITES PRIOR TO CONSTRUCTION, TD TAKE NECESSARY PRECAUTIONS IN ORDER TO PROTECT AU. FACILITIES ENCOUNTERED, AND TO NOTIFY THE ENGINEER PROMPTLY OF AU. CONFUCIS OF THE WORK WIN EXISTING FACILITIES INC CONTRACTOR SHALL PRESERVE AND PROTECT AU. EXISTING UTUTIES FROM DAMAGE DURING CONSIRUCION, ANY DAMAGES BY THE CONTRACTOR TO DCS1INC UTUTES SHALL BE REPMRED BY NE CONTRACTOR AT HIS EXPENSE EXISTING TOPOGRAPHIC &FORMATION SHOWN IS BASED ON FIELD SURVEY PREPARED JUNE 2010. (MR UDES BELOW GRADE PUBLIC UTILITY LOCATIONS PROVIDED BY UTILITY COMPANY AS DESCRIBED ABOVE) 2. NEW RMSHED CONTOURS SHOWN ARE TOP OF PAVING IN AREAS TO RECEIVE PAVEMENT AND TOP OF TOPSOIL IN AREAS TO BE SEWED. 3. AREAS OUTSIDE OF THE PARKING LOT PERIMETERS SHOWN TO BE SEWED AND/OR LANDSCAPING SHALL RECDVE 4 INCHES OF TOPSOIL THIS TOPSIL TO BE PLACED AND LEVELED BY INC GRADING CONTRACTOR. REFER TO LANDSCAPE PLAN. 4. ROUGH GRADING ELEVATORS SHALL BE A5 FOLLOWS: 4" BELOW FINISHED CONTOURS IN SEEDED AREAS C BELOW FINISHED CONTOURS IN CONCRE1E PAVED AREAS (TRUCK AREAS) 5" BELOW FINISHED CONTOURS IN CONCRETE PAVED AREAS (PARKING AREAS) UNLESS OTHERWISE NOTED. REFERENCE PAWING PLAN 5, DIMENSIONS ON BUILDINGS ARE FOR GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO LAY -OUT FOOTINGS (REFERENCE SITE PLAN AND ARCHITECTS BUILDING PUNS) **AM D 2012 3O D1Mwtt Im. r iD 411.02A 0' UTILITY ESMT 1—— — i an* 1220 (BOAT CLUB ROAD) 11¶-- "— RIGHT-OF-WAY VARIES 4 COST, HMAC PAVEMENT NTH {t II CONC, CURB & GUTTER II 70 9n11* •d,SY� {: 1 II / \ FFE 802.40/ 10,050 SF/ SINGLE STORY MEDICAL /OFFICE / 0230 0130 20' BLOC. UN 060N •F11e yl II i ..OLIE j xoF..1Ol Ott 2 3 DRADING A ORAINAff NOTES 6. GRADING CONTRACTOR SHALL NOTIFY AND COOPERATE WEN ALL UTILITY COMPANIES OR FIRMS HAVING FACILITIES ON OR ADJACENT TO THE STE BEFORE DISTURBING ALTERING, REMOVING. RELOCATING, ADJUSTING CR CONNECTING TO SAID FACIUTES CONTRACTOR SHALL PAY ALL COSTS IN CONNECTION NTH THE ALTERATION OF OR RELOCATION OF THE FACILITES, CONTRACTOR SHALL RAISE OR LOWER TOPS or EXISTING MANHOLES AS REQUIRED TO MATCH FINISHED GRADES IN CONFORMANCE NTH OTY STANDARDS 7, GRADING CONTRACTOR SHALL COOPERATE AND WORK WITH ALL OTHER CONTRACTORS PERFORMING WORK ON THIS PROJECT TO INSURE PROPER AND TIMELY COMPLETION OF THIS PROXCT. It THE GRADING CONTRACTOR SMALL INSTALL AND MAINTAIN THE EROSION CONTROL FAOUTES AND STRUCTURES AS SHOWN ON THE EROSION CONTROL PLAN AND IN THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) DOCUMENTS. INC CONTRACTOR SHALL SUBMIT A NOTICE OF INTENT (NO) TO THE TEXAS COMMISSION ON ENVIRONMENTAL QUAUTY (TCEO) AS REQUIRED AND MAINTAIN THE PROPER INSPECTIONS AND DOCUMENTS REQUIRED IN INC 5YPPP. THE CONTRACTOR SHALL PROVIDE COPES OF ALL INSPECTOR REPORTS AND ADJUSTMENTS TO THE ER0S0N CONTROL PLAN TO THE OWNER FOR THE OWNER'S RECORDS. 9. FOR THE WORK ON THE STATE OR Ott RICHT-OF-WAY, THE GRADING CONTRACTOR SIALIJ A. NOT STORE MATERIAL EXCESS DIRT OR EQUIPMENT ON THE SHOULDERS OF PAVEMENT: IN CASE OF MULTI -LANE HIGHWAYS. IN THE MEDIAN STRIPS. THE PAVEMENT SHALL BE KEPT FREE FROM ANY MUD OR EXCAVATION WASTE FROM TRUCKS OR OTHER EQUIPMENT. ON COMPLETION OF THE WORK AL EXCESS MATERIAL SHALL BE REMOVED FROM THE RIGHT-OF-WAY. e SHAU. PROVIDE ALL NECESSARY AND ADEQUATE SAFETY PRECAUTIONS SUCH AS SKINS, RAGS LIGHTS BARRICADES AND FLAG MEN AS REQUIRED BY INC LOCAL AUTHORITIES AND IN ACCORDANCE WIN THE TEXAS DEPT. OF TRANSPORTATION MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, THE GRADING CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR AND HOLD HARMLESS THE TEXAS STATE DEPARTMENT OF TRANSPORTATION, THE OTY OF FORT WORTH, INC ENGINEER AND INC OWNER FROM ANY CLAIMS FOR DAMAGE DONE TO EXISTING PRIVATE PROPERTY, PUBUC UIIU1ES, OR TO THE TRAVELING PUBUC. TO- — ogwa auau - FFE 802.D0 _arose SF SINGLE STORY OFFICE i/ $ LOI,b_ol,Pe oiPe B 'olm Try Ilry. VL.y l0' III., mils -'I1 51 _ ?ha p ao 10 op47N5 11 20' BLDG. DC. UN. 7.5E UTILITY ESMt, q10 o1bo_ I' 5 GRAZODW & DRAINAGE NITER C, ALL COMPLETE THE 0 THE SATISFACTION OF THE CI OF FORT WORTH AND OBTAIN A TLETTER FROM THE CITY 5 ATINGTY THAT THE WORK UNDER PUBLIC JURISDICTION IS ACCEPTABLE. 0, POST NECESSARY BONDS AS REWIRED BY THE OTY, COUNTY AND/OR STATE 10. REFER TO PAVING DETAILS FOR TYPE OF PAVING AND BASE TO BE USED, 11, GRADING CONTRACTOR IS RESPONSIBLE FOR REMOVING ANY EXISTING STRUCTURES, FENCES, DEBRIS OR hats REFRAINING ON STE COORDINATE MTH GENERAL CONTRACTOR 12, A QUAUFIED SOILS LABORATORY SHALL DETERMINE THE SUITABIUTY OF INC EXISTING SUBGRADE AND EXISTING ON -SIZE MATERIAL PRIOR TO BEGINNING AND FILLING OPERATOR. 13. ALL AREAS NOT COVERED BY BUILDING OR PAVING STALL BE GRASSED OR LANDSCAPED, REFER TO LANDSCAPE PLAN. 14, UNSUITABLE EXCAVATED MATERIALS AND ALL WASTE RESULTING FROM CLEARING AND GRUBBING SHAU. BE DISPOSED OF OFF-STE BY GRADING CONTRACTOR, 15. ALL EXCAVATION IS UNCLASSIFIED AND SHALL INCLUDE ALL MATERIALS ENCOUNTERED. IS. BEFORE ANY MACHINE WORK IS DONE. CONTRACTOR SHALL STAKE OUT AND MARK THE ITEMS ESTABLISHED BY THE SITE PUN, CONTROL POINTS SHALL BE PRESERVED AT ALL TIMES DURING THE COURSE OF THE PROJECT. LACK OF PROPER WORKING POINTS AND GRADE STAKES MAY REQUIRE CESSATION OF OPERATIONS UNTIL SUCH PINTS AND GRADES HAVE BEEN PLACED TO THE OWNER' SATISFACTION. 17. ALL 4:1 SINES. IF ANY, SHALL BE HYDROMULC H SEEDED UNLESS OTHERWISE NOTED. it THE CONTRACTOR SHALL PREVENT SCE STABIUZATION TREATMENT FIRM LEAVING THE SITE FROM STORM WATER RUNOFF AND DAMAGING DOWNSTREAM WATER COURSES, LAKES OR PONDS ANY DAMAGE TO MLOUFE OR FISH KILLS SHALL BE CORRECTED BY INC CONTRACTOR AT HIS EXPENSE 1C •C.p0e 10 W,ns W:r- 00.N1 n nm, - CB INLET FFE 800.80 FFE 801.30 _I 6,000 SF 3,850 SF SINGLE STORY -STNGLE_ORE1:0 _ OFFICE 33k-:-r (FUTURE)__ (FUTURE) H s 5 E \ M ,01.2e m. e- _GILL 1100,7_6120 OR: TC 01.15 5 GPAGIVIYG.itJWINfM� , W $gp� YAG[NAP NOAW�E$ 7 8 BLOCK 2 / PINION PARK / CAB, A. SLIDE 9986 P.R,TWGTW 19. FILLS SHALL DE COMPACTED IN MAXIMUM 9" LOOSE LAYERS TO MINIMUM 9510 OF STANDARD PROCTOR DENSITY AT CR SUGHT.Y ABOVE OPTIMUM MOISTURE CONTENTS, REFER TO GEOTHEHNICAL SOILS REPORT, GENERAL NOTES: 1. ACCESSIBLE ROUTE ACCESSIBLE ROUTE SHALL HAVE A RUNNING SLOPE MAXIMUM 5% (1:20) AND A CROSS SLOPE OF MAXIMUM 2% (1:50) 2. CURB RAMP THE MAXIMUM SLOPE OF A CURB RAMP IS 8.33% (1:12) MAXIMUM SLOPE OF ADJOINING CUTTERS, ROAD SURFACES ON ACCESSIBLE ROUTE MUST NOT EXCEED 5% (112D) AND A CROSS SLOPE NOT TO EXCEED 2% (1:50) MINIMUM WIDTH IS 36" THE FULL WITH & DEPTH OF CURB RAMPS MUST HAVE A LICIT REFLECTVE VALE AND TEXTURE MAT GGNIF1CANTLY CONTRASTS M1N ADJOINING PEDESTRIAN ROUTES AND SHALL BE PER TEXAS ACCESSBIUTY STANDARDS 3. DOORS ENTRANCES INTO BUILDINGS SHALL HAVE A SLOPE NOT TO EXCEED 2% (1:50) FOR 5 FEET FROM DOOR. 4, REFERENCE GENERAL NOTES FOR GRADING AND DRAINAGE IMPROVEMENTS THIS SHEET. 380 SF 12" ROCK RIP RAP (GROUTED) ROCK RIP RAP (GROUTED) EXIST. TREES _- TO REMAIN- - 9 TEXAS ELECTRIC SERVICE ,COMPANY VOL 203, PG, 290 PIP- POND DETENTON 01A CY,e OUTFALL, Da SF (10'X10') ROCK'RIQThTRAP, 2T DEP MEDIAN 12" Roc�K AX. 18' ROCK \ Ai}lil:Ji 045E iN unLm wdd"r EXIST, TREES TO REMAIN',, 88ZIEc W YdrTCT RF Gy 4 TBS�i BM p - ELEVATION 785.27 CITY OF FORT WORTH MONUMENT NO. 88160. LOCATED AT INC NORTHEAST CORNER OF BOAT CLUB ROAD AND GREENFIELD ROAD, ON INC EAST CURB UNE OF BOAT CLUB ROAD 32' NORTH OF THE NORTH CURB UNE OF GREENFIELD ROAD IN THE CENTER OF A 20 FEET CURB INLET. BM 12 - ELEVATION 798.71 "0" CUT ON SOUTHWEST CORNER OF BOAT CLUB ROAD & PINIONPARK WAY, SCUM CURB RETURN. GRAPHIC SCALE: 1 IN 42 30 FT L LEGEND 070 - PROPOSED POT DLVAngI -. - ROW MIlotl 00' -m,W, 110 MMIX 1 e• r/L WILE" MO 30N %QNNETE FWNGAION ON CGIPAMED� 0MR/a P ems • lY G-C G01 MAT, } k TYPICAL WALL DETAIL bmilma TO CONTRACT UNDERGROUND SEANCES IN AREA OF CONSTRUCTOR. DOSING UTUTY DATA PROVIDED IS FOR INFCRMATON ONLY. ALTHOUGH THIS DATA I5 SHORN AS ACCURATELY A5 POSSIBLE THE CONTRACTOR IS CAUTIONED THAT THE OWNER AND TIE ENGINEER NETHER ASSUMES NOR IMPUES ANY RESPONStUTY FOR INC ACCURACY OF THIS DATA. IT SHALL BE INC CONTRACTORS RESPONSIBIUTY TO CONTACT THE UTUTY AFFECTED AND VERIFY THESE LOCATIONS AND ELEVATORS. CONTRACTOR SHALL CONTACT THE FOLLOWING UTUTES AT LEAST 46 HOURS PRIOR TO CONSTRUCTION. TEXAS EXCAVATOR SAFETY SYSTEM TEXAS ONE CALL FORT WORTH WATER DEPT. EXHIBIT B-1 GRADING PLAN B00 344-8377 BOO) 245-4546 517) 392-8740 PINION PARK MEDICAL/OFFICE CENTER BEING ALL OF LOT 16, BLOCK 2 PINION PARK FORT WORTH, TARRANT COUNTY, TEXAS AUGUST 2012 REVISED SEPT. 16, 2013 REUSED OCT, 1, 2013 SD Engineering, Inc. Site Development Engineering (817 4414400 Fax (817)4414085 TX FIRM F4643 N C8 E DESIGN EVENT AREA (AC) 1 YR 10 YR 100 YR 234 234 234 DESIGN EVENT 1 YR 10 YR 100 YR DETENTION P fMO nFSI;N - MODIFIED RATIONAL MFTHOQ PRE -DEVELOPMENT POST -DEVELOPMENT C To (min.) 0.30 15 0,30 15 0.30 15 (In/hr) 3.32 5.53 7.98 STORAGE PROVO MAX STORAGE (CF)(ELEV 793.95) REO'D (el) 25371 23371 25371 7 ore WAIL 03,7a w /O PIC (ml o) A 701.6 \ /118c) rA. nco DETAIL OF OUTFALL PIPES DETENTION POND WALL NOT TO SCALE -soFleht 29 2012 S9 bWH..«a Inc 8022 15271 23903 RIPRAP APRON FOR OUTLET PIPE 0-4.09 cfs •9.1 fps 0 Cols) 23 3.9 5.6 AREA C Tc 0 (AC.) (min.) On Ay) (cfs) 2.81 0.71 10 4.05 8,1 251 0.71 10 6.51 13.0 2.81 0.71 10 9,24 18.4 DETENTION POND DESIGN POND ELEVATOR 792.23 793.01 793.81 ALLOW. DISCHARGE (cfs) 23 3,9 5.5 ORIFICE FLOW (OUTLET PIPE) 0 • Cd(A)(29h)•41/2 Cd-0.6 A • 0.196 (6' PIPE) A • 0.349 (8' PIPE) 01 WSEL 792.23 PIPE PIPE 2 h• .98' h- 0.30' O - .33 cfs Q- 0.92 els TOTA 0 - 225 efs 0PII0 WSEL PE 793.01PIPE 2 h• 2.76' h- 1.05' O - .57 cfs 0 - 1475 of* TOTAL 0 - 3.32 cfs 0100 WSEL 793.51 PIPE PIPE 2 h - 3,56' h-1.86' 0 • .75 cls 0 . 2.31 ch TOTA 0 - 4.09 ets FOR MN. TAILWATER CONDITION (TW0.0') USE FIGURE 42, DESIGN OF RIPRAP APRON UNDER MAXIMUM TAILWATER GOND/TONS, NCTCOG 2010 ISWM TECHNICAL MANUAL LENGTH Lo - 5 ft WIDTH - Lo+PIPE DIA-5.5' d50 • 12. dmax- 1.61/4150 - 18' DEPTH OF APRON dmes•1.5 - 27t FOR MAX TAILWATER CONDITION (TW40.8') USE FIGURE 43. DESIGN OF RIPRAP APRON UNDER MAXMUM TAILWATER CONDITIONS NCTCOD 2010 ISWM TECHNICAL MANUAL LENGTH Lo - 3 ft WIOTH - Lo+PIPE DIA-3.5' d50 - 12' dmox- 1a4d50 - 18- DEPTH OF APRON dmox41.5 • 27' OVERFLOW WEIR LENGTH - 7.7' MIN. WIDTH OF RIP RAP - 7.7' USE 10x1D PRELIM STORAGE MAX STORAGE (OF) (CF) 5189 10187 15834 8022 15371 23903 OUTLET PIPES ACTUAL (ORIFICE FLOW) DISCHARGE (cfe) 2-6' PVC 2.3 2-6' PVC 3.3 2-6- PVC 4.1 OVERFLOW WEIR RECTANGULAR WEIR 0 - Cd•L'H•43/2 Cd - 3.0 L • 7.7' H-6.66' 0=15.4 o/e (100-1T) OVENTON FACIUTY STORGE VOLUME CALCULATORS CRITICAL STORM DURATION - Td - (20A6/Qo)•40.5 - b 01 Oc-2.3 ch. C40.71, A-261 oc, 0-95,535, b-13.425 TO - 33.62 min 010 0e03.9 cfs. C-0.71, A-281 so, c-203.83, b421.09 Td • 45.25 min 0100 00-5.6 cfs, C-0.71, A4281 ea 0=322.07. b•24.385 Td • 50.42 min STORAGE REQUIRED - Vp,alims50[CA0-(2CabA0a)•00.5 + (Oo/2)(b-Tc)] O1 C-0.71, A-2.e1 es, Oo-2.3 cfs, o-95.835, b-13.425, Te-10 min Vprelim • 5189 cf 010 C00.71, A-2.81 ac. 0043.9 eta o-203.93, b-21.09. To-10 min Vprellm • 10/87 of 0100 C-0.71, A-281 se, Oo-5.6 oh, 0-322.07. b024.368, To-10 min Vprallm - 151134 cf STORAGE VOLUME MAX - Vpr81m (P160/PTd) 01 ISO 70I 1l, , Td 33,82 min, PTd-1.14 In P 010 P180-3.45 In, Td-45.25 min, Pid-2.29 In Vmox 15371 cf 0100 P180=5.43 In, Td•50.42 min, PTd-3.60 In Vmox n 23903 el STARTING Witt 79000 lIrt1 1 P4571 Inl d PIPE 1 Pin PIPE (dal 1ml1 PIPEIPE Tldvl flol I 791.60 ; r to 0,44 1.70 0 1 23 53 100 169 244 389 549 744 990 1281 1625 2026 3013 3616 4200 5413 5530 7644 .8571 9495 10428 11173 12311 MOO 142112 15776 10202 17300 10331 19375 70411 21473 22581 13475 341783 25902 FwS, ID. nJrt/ PtuNDATION ON i f3 OOAP • ie ApC-C CAW WAY. TTPICAL WALL DETAIL ORAINAGF CRITERIA DESIGN CRITERIA PER CITY OF FORT WORTH ISWM CRITERIA MANUAL FOR SITE DEVELOPMENT AND CONSTRUCTION, AUGUST 2012 RAINFALL INTENSITIES FROM NCTCOG ISWM DESIGN MANUAL FOR SITE DEVELOPMENT FOR TARRANT COUNTY, 2010 RATIONAL METHOD OF DESIGN: 0-CIA EXHIBIT B-2 DETENTION FACIUTY CALCULATIONS LOT 16, BLOCK 2 PINION PARK BEING ALL OF LOT 16, BLOCK 2 PINION PARK FORT WORTH, TARRANT COUNTY, TEXAS PREPARED AUGUST. 2013 REVISED SEPTEMBER 16. 2013 SD Engineering, Inc. Site Development Engineering 0 Box 57 Alodo, TX 70 08.1337 (817) 4414400 Fax I817144141080 TEXAS REGISTERED ENGINEERI G FIRM F-7843 TEXAS REGISTERED SURVEYING FIRM 10008000 2 of 2 Exhibit "C" CITY OF FORT WORTH STORM WATER FACILITY OPERATION AND MAINTENANCE PLAN The only responsibility the City of Fort Worth has in the operation and maintenance of this Facility is inspection. General Maintenance Procedures The structural and functional integrity of the Facility shall be maintained at all times by removing and preventing drainage interference obstructions, blockages or other adverse effects into, through, or out of the system. Periodic silt removal shall occur when standing water conditions occur or the pond's storage volume is reduced by more than 10% Silt shall be removed and the pond/basin returned to original lines and grades shown on the approved engineering plans. In addition, corrective measures are required any time a basin does not drain completely within 72 hours of cessation of inflow NO STANDING WATER IS ALLOWED in basins designed for dry detention purposes. Accumulated litter, sediment, and debris shall be removed every 6 months or as necessary to maintain proper operation of the basin. Disposal shall be in accordance with federal, state and local regulations Detention facilities shall be mowed monthly between the months of April and October or anytime vegetation exceeds 12-inches in height. To prevent debris from entering and clogging the downstream storm sewer system a wire mesh screen or similar screening device shall be installed over the outlet until final acceptance. 4. PREVENTIVE MAINTENANCE/INSPECTION • Visual inspections of all components will be conducted every 6 months. • A log shall be kept of maintenance actions, and inspections. The log should document the condition of the detention system's primary components, mowing, and silt, litter and debris removal dates Document aeration of the basin bottoms and replanting to prevent the sealing of the basin bottom. • Written maintenance and repair records shall be maintained by the party or parties signing the attached Agreement and shall be provided to the City upon request. STORM WATER FACILITY MAINTENANCE AGREEMENT Rev. 09/10/12012 8 Exhibit "D" Storm Water Structural Maintenance CHECKLIST FREQUENT INSPECTION Mowing Remove Trash and debris Inspect irrigation system operation Remove grass clippings Violations Noted MINOR INSPECTION Condition of Pond Amount of silt in pond Amount of silt in flume Amount of ponded water Amount of wetland vegetation Location of Erosion Percent of vegetation Condition of trash guard Location of Erosion MAJOR INSPECTIONS Condition of Storm Water Quality Structure Type of Storm Water Quality Structure Structure type and Condition Condition of Rip - DATE REPAIRS REQUIRED REPAIRS MADE NOTES STORM WATER FACILITY MAINTENANCE AGREEMENT Rev. 09/10//2012 Rap Condition of filtration system Berm or Embankment Settlement Location of erosion Evidence of Animals Evidence of Aquatic life Condition of Aeration Foundation STORM WATER FACILITY MAINTENANCE AGREEMENT Rev. 09/10//2012 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 12/10/2013 DATE. Tuesday, December 10, 2013 REFERENCE NO.: **C-26588 LOG NAME: 20ROWE 5804 SWFMA PINION PARK SUBJECT: Authorize Execution of a Stormwater Facility Maintenance Agreement with Pinion Park Office Park, LLC, and Pinion Park Office Center Condominium Association, Inc , for Property Located at 6364 Pinionpark Way, East of Boat Club Road, at No Expense to the City (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize the execution of a Stormwater Facility Maintenance Agreement with Pinion Park Office Park, LLC, and the Pinion Park Office Center Condominium Association, Inc. for property located at 6364 Pinionpark Way east of Boat Club Road, at no expense to the City. DISCUSSION: Pinion Park Office Park, LLC, is the owner of a tract of land upon which it will construct a stormwater management facility including a detention pond. The facility is being constructed to limit stormwater runoff from their property to predevelopment levels. The detention pond will be located east of Boat Club Road at the northern end of the Pinion Park Office Park common area. The terms of the Maintenance Agreement will ensure proper maintenance of the facility by Pinion Park Office Park, LLC, and the Pinion Park Office Center Condominium Association, at no cost to the City. The landowner and successors are required to maintain the facility. However, if the landowner fails to properly maintain the Agreement, the City has the right to take all steps necessary to ensure the facility is operating according to City standards and to correct any deficiencies This requirement and right run with the land. The facility is located in COUNCIL DISTRICT 2, Mapsco 46F and 48G. FISCAL INFORMATION: The Financial Management Services Director certifies that this action will have no material effect on City funds. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers CERTIFICATIONS: Submitted for City Manager's Office bv: Originating Denartment Head: Additional Information Contact: ATTACHMENTS Fernando Costa (6122) Douglas W. Wiersig (7801) Deanna Cody (8379) 1. DOE 5804 20ROWE 5804 SWFMA PINION PARK.ndf