Loading...
HomeMy WebLinkAboutContract 45237-A1 (2)AMENDMENT No. 1 TO CITY SECRETARY CONTRACT CITY SECkLioA CONTRACTNP3RYISZ3141 WHEREAS, the City of Fort Worth (CITY) and K mley-Horn and Associates, .Inc., (ENGINEER) made and entered into City Secretary Contract No. 45237, (the CONTRACT) which was authorized by NI&C C-25243 on the 9th day of November, 201.E in the amount of $ 61, 13 8.0 0 ; and WHEREAS, the CONTRACT involves engineering services for the following project: Ridglea Urban Village Streetscape Improvements; and WHEREAS, it has become necessary to execute Amendment No. 1. to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated May 20, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $ 1 , 300. 00 . 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $62, 438. 00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -1- 11-12 P03:20 IN EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Oft4001Ami.104Z1:4—..... Fernando Costa Assistant City Manager DATE: APPRO AL •. COMMENDED: andl e od ENGINEER Kitley-Horn and Associates, .Inc. Scott R. Arnold, P.E. Associate DATE: June 1, 2012 Director, Planning and Development Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST: Mary J. ser City Secretary �I�zllz kiboatts oc=e °0000 1 a pi U 000 es M&C : OA- Date: OFFICIAL REGUr } CITY s:. , f Y1 rat, WORIN9 Page -2- --- May 20, 2012 Kimley-Horn and Associates, Inc. Noah Heath, AICP City of Fort Worth 1000 Throclamrton Street Fort Worth, Texas 76102 Re: Amendment No. 1 to City Secretary Contract No. 45237 Ridglea Urban village Streetscape Improvements Dear Mr. Heath: Kimley-Horn and Associates Inc (Consultant) is pleased to submit this Letter Agreement to the City of Fort Worth (Client or City) to provide professional services to prepare additional topographic survey for. the intersection of Westridge Avenue and Sunset Drive. Our scope of services, schedule and fee are below. Task 1 Additional Topographic Survey The Consultant will perform the following: Design Survey • The ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by the ENGINEER in desifn and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of brnied utilities, structures, trees (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. • The minimum survey information to be provided on the plans shall include the following: A Project Control Sheet, showing ALL Control Points, used or set while gathering data Generally on a scale of not less than 1:400: The following information about each Control Point. a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. City of Fort Worth, Texas, May 20, 2012, Page 2 c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). Coordinates on all P.0 's, P.T.'s, P.l.'s, Manholes, Valves, etc , in the same coordinate system, as the Control. No less than two horizontal bench marks, per line or location. Bearings given on all proposed centerlines, or baselines. Station equations relating utilities to paving, when appropriate. ASSUMPTIONS • No right of entry documents will be required. DELIVERABLES • Copies of field survey data and notes signed and sealed by a licensed surveyor. • Drawing of the project layout with dimensions and coordinate list. Additional Services Any services not specifically provided for in the above scope will be considered additional services and can be performed at our then current hourly rates. Schedule Task 1 will be completed within mutually agreed upon schedule following the ieceipt of Notice to Proceed from the Client, exclusive of Client review time. Additional services, if desired, will be performed in a timely manner upon authorization by the Client. Fee and Billing The Consultant will perform the Services described in Task 1 for a lump sum fee of $1 300. All permitting, application, and sirnilar project fees will be paid directly by the Client City of Fort Worth, Texas, May 20, 2012, Page 3 We appreciate the opportunity to provide these services to you. Please contact me if you have any questions Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. itfrff an.° By: Scott R. Arnold, P.E. Associate, Contract Specialist KAF11V TPTO\0610180931PPP\POST NPA.Amendment 01\Amendmmi 01 Prq+ncai.doc