Loading...
HomeMy WebLinkAboutContract 45237-A2 (2)AMENDMENT No. 2 TO CITY SECRETARY CONTRACT Y WCRFTARY a CONTRACT (k90� 37231 t.d WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 45237, (the CONTRACT) which was authorized by M&C C 25243 on the 9th day of November, 2011 in the amount of $ 61, 13 8 . 0 0 ; and WHEREAS, the CONTRACT involves engineering services for the followinc project: Ridglca Urban Village Streetscape Improvements; and. WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW TIII';REF®RE,, CITY and ENGINEER, acting herein ay and through their duly authorized representatives, enter into the following- agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the ad ditional engineering services specified in a proposal dated August 22, 2013, a copy of which is attached hereto and incorporates_ herein. The cost to City for the additional design services to be performed by Engineer totals $21,000.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be Paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee Paid by the City for all work and services shall be an amount of $ 83, 438. 00. 3. All other provisions of the Contract, which are not ex - amended herein, shall remain in full force and effect. RECEIVED SEP 042093 Page -1 oressly OFFICtitt -RECORD �-` �� 3 SECRETARY CRETARY KM, 'Tr ;J� ti � EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth • 5'etn, —.2 Fernando Costa Assistant City Manager DATE: 9/3 /i 3 APPROVAL RECON MENDED : R ndle Har `•o ENGINEER Kimley-Horn and Associates, Inc. Scott R. Arnold, P.E. Associate DATE: August 27, 2013 Director, Planning and Development Department APPROVED AS TO FORM AND LEGALITY: M&C: TlAA &tut • D�uylas w. Black •vy, bb€fr rY►- ierck Assistant City Attorney ATTEST: Mary J. Ky�r City Secretary Page -2 Date: /0‘ OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX Kimley-Horn and Associates, Inc. August 27, 2013 Noah Heath, AICP City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Amendment No. 2 to City Secretary Contract No. 45237 Ridglea Urban Village Streetscape Improvements Dear Mr. Heath: Kimley-Horn and Associates, Inc. (Engineer) is pleased to submit this Amendment to the City of Fort Worth (Client or City) to provide professional services to prepare water line relocation design plans for the various water distribution lines in conflict with proposed streetscaping at the intersection of Camp Bowie Blvd. and Westridge Ave. and at the intersection of Bryant Irvin Rd. and Milburn St. Our scope of services, schedule and fee are below. Task 1 Water Line Design Services The Consultant will perform the following: Waterline Design Services • Overall nroiect water and/or sanitary sewer layout sheets. The water layout sheet shall identify the proposed water main improvement/ existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves, and fire hydrants. • Overall water and/or sanitary sewer abandonment sheet. • Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc., in the same coordinate system as the Control Points. • Bench marks per 1,000 ft of plan/profile sheet — two or more. • Plan and profile sheets which show the following: proposed water plan/profile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes, existing meter numbers and sizes that are to be replaced, existing sample locations, existing fire line locations, existing utilities and utility easements, and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. Sheets will contain only plan view for 8" water lines. c Fri Kimley-Horn and Associates, Inc. City of Fort Worth, August 27, 2013, Page 2 • The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. • The ENGINEER will prepare standard and special detail sheets for water line installation. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. ASSUMPTIONS • Project Limits: • 12" water line located in the south parkway along Camp Bowie Blvd. across the intersection at Westridge Ave. • 12" water line located to the north of the westbound outside lane of Camp Bowie Blvd. across the intersection at Westridge Ave. • 10" water line located to the eastern side of the northbound lane of Westridge Ave. across the intersection at Camp Bowie Blvd, to be replaced with a 12" water line. • 8" water line located in the center of the inside northbound lane of Bryant Irvin Rd. across the intersection at Milburn St. • No geotechnical investigations will be performed. • Traffic Control Plan will be same as for streetscaping. • 2 sets of 11 "x 17" size drawings and 1 project manual will be delivered to the Water Department for the 90% design package. • 2 sets of 11 "x17" size drawings and 1 project manual will be delivered to the Water Department for the final design package. • Sheet count: one (1) water system map, one (1) proposed overall improvement map, one (1) water line abandonment map, two (2) plan and profile sheets, three (3) water standard detail sheets. DELIVERABLES • 90% construction plans and project manual. • Final construction plans and project manual as part of streetscape plan submittal. C fl Kimley-Horn and Associates, Inc. ADDITIONAL SERVICES City of Fort Worth, August 27, 2013, Page 3 Any services not specifically provided for in the above scope will be considered additional services and can be performed at our then current hourly rates. SCHEDULE Task 1 will be completed within mutually agreed upon schedule following the receipt of Notice to Proceed from the Client, exclusive of Client review time. Additional services, if desired, will be performed in a timely manner upon authorization by the Client. FEE AND BILLING The Consultant will perform the Services described in Task 1 for a lump sum fee of $21,000. All permitting, application, and similar project fees will be paid directly by the Client. We recommend that the City increase the budget by $21,000 for these additional services. From the additional services listed above, the recommended breakdown for water services is as follows: Description Task 1 — Water Line Design Total Water $21,000 $21,000 Sewer $0 $0 The following table summarizes the fee per Work Phase: Work Phase 31 32 33 51 Water Fee $6,300 $12,600 $2,100 $0 Total $21,000 Sewer Fee $0 $0 $0 $0 $0 i Total $21,000 $21,000 Total Fee $6,300 $12,600 $2,100 $0 $21,000 I c Kimley-Horn and Associates, Inc. City of Fort Worth, August 27, 2013, Page 4 If the City concurs with our requested additional services, the summary of fees for this project is shown in the table below: Contract/Amendment Original Contract Amendment No. 1 Amendment No. 2 Total Fee $61,138 $1,300 $21,000 Revised Contract Amount N/A $62,43 8 $83,438 We appreciate the opportunity to provide these services to you. Please contact me if you have any questions. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. c By: Scott R. Arnold, P.E. Associate, Contract Specialist \\FTWFP01\Data\Project\FTW_TPTO\061018093\PPP\POST_NTP\Amendment_02\Amendment_02 Proposal_rev-waterdpt.doc EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacement Contract City Project No. 01786 Labor (hours) Expense Task No. Task Description Principal Project Project EIT CADD Administrative Total Labor Subconsultant Total Expense Task Sub Total Manager Engineer Cost Travel Reproduction Cost Rate $220 $190 $120 $105 $90 $85 MWBE Non-MWBE 1.0 Project Management 0 8 0 0 0 4 $1,860 $0 $0 $0 $0 $0 $1,860 1.1 Managing the Team $0 1.1.2 QA/QC 8 $1,520 $0 $1,520 1.2 Communications and Reporting 4 $340 1.2.1 Pre -Design Coordination Meeting $0 $0 $0 1.2.2 Design Submittal Review Meetings $0 $0 $0 1.2.3 Prepare Baseline Schedule $0 $0 $0 Prepare Monthly Progress Reports with 1.2.4 Schedule $0 $0 $0 1.2.5 Prepare Monthly MBE/SBE Reports $0 $0 $0 2.0 Conceptual Design (30-Percent) 0 7 11 11 0 0 $3,805 $0 $0 $40 $0 $40 $3,845 2.1 Data Collection 2 3 3 $1,055 $40 $40 $1,095 2.2 Conceptual Design Package 2 3 3 $0 $0 2.2.1 Cover Sheet $0 $0 $0 2.2.2 Exhibits and Summary 2 3 3 $1,055 2.2.3 Phasing $0 $1,055 2.2.4 Construction Estimate 1 2 2 $6$0 $0 40 40 $0 $640 3.0 Preliminary Design (60 Percent) 0 12 20 38 0 3 $8,925 $0 $0 $0 $0 $0 $8,925 3.1 Preliminary Design Package 3.1.1 Cover 1 $120 $0 20 3.1.2 Overall Layout 2 4 8 $1,700 $0 $0 $,$775 00 $0 $1, 3.1.3 Plan and Plan/Profile Sheets 4 7 15 $3,175 10 3.1.4 Specifications 2 4 10 $1,910 91 $0 $ 3.1.5 Construction Estimate 2 2 3 $935 $0 $ 1$9630 5 3.2 Constructability Review 1 1 1 3 $670 3.3 Utility Clearance 1 1 1 $415 $0 $415 $0 $415 4.0 Final Design 0 7 14 28 0 0 $5,950 $0 $0 $0 $420 $420 $6,370 Final Draft (90%) Construction Plans and 4.1 Specifications 2 8 15 $2,915 $210 $210 $3,125 4.2 Final (100%) Plans and Specifications 4 4 10 $2,290 $210 $210 $2,500 4.3 Construction Estimates (90% and 100%) 1 2 3 $745 $0 $745 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 Bid Phase Bid Support Upload Documents to Buzzsaw Sell Contract Documents and Maintain 5.1.2 Plan Holders List 5.1.3 Issue Addenda 5.1.4 Attend Bid Opening 5.1.5 Tabulate Bids and Recommend Award 5.2 Mylar Drawings 6.0 6.1 6.1.1 6.1.2 6.2 Construction Phase Services Construction Support Attend Preconstruction Conference Attend Public Meeting Record Drawings/As Built 7.0 ROW/Easement Services 7.1 Right -of -Entry Documents 8.0 Survey 8.1 Design Survey Description Conceptual Design (30%) Preliminary Design (60%) Final Design (10%) Survey Subtotal Total City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 Totals 0 0 0 0 0 0 0 6 34 I Water Line Footage I Sewer Line Footage (A) Total Fee (B) Survey Fee (C) Total Fee (-) survey Fee I Water Fee (.100% of C) $21,000.00 WP Water 31 $6,300.00 32 $12,600.00 33 $2,100.00 51 $0.00 0 0 0 0 0 45 0 0 0 0 0 77 100% 0% 100% $21,000 $0 $21,000 Sewer Fee (0% of C) $0.00 Sewer $0.00 $0.00 $0.00 $0.00 I $21,000.0o I $0.00 $21,000.00 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 0 $0 $0 $0 $0 0 $0 $0 0 $0 $0 7 $20,540 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $40 $420 $460 Project Summary Total Hours Total Labor Total Expense MBE/SBE Subconsultant Non-MBE/SBE Subconsultant 10% Sub Markup MBE/SBE Participation Total Project Cost) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $21,000.00 163 $20,540 $460 $0 $0 $0 0.0% $21,000.00