HomeMy WebLinkAboutContract 45091-A2 (2)RECEIVED
OCT 222tB,
011? OF TORT WORT1
CITY SEQRET I
Cirri =J
CONTRACT N`
�4
e
SECOND AMENDMENT TO CITY SECRETARY
CONTRACT NO. 45091
WHEREAS, on October 31, 2013, the City of Fort Worth ("City") and G.A. Miller
Enterprise Inc. d/b/a Glenn's Air Conditioning and Heating, a sole proprietorship authorized to
do business in the State of Texas ("Contractor) made and entered into City Secretary Contract
No. 45091 (the "Contract) for construction services for the City's Priority Repair Program.
WHEREAS, the Priority Repair Program provides up to $5,000.00 for home repairs for
eligible City homeowners for Priority 1 emergency repairs and Priority 2 repairs of failed
household mechanical systems to address health and safety issues as more particularly defined
by the program.
WHEREAS, the Contract was for a 1 year term beginning on the Effective Date and
provided for 4 additional 1 year terms;
WHEREAS, the Parties have agreed to extend the Contract for an additional 1 year term
beginning November 1, 2015 through October 31, 2016; and,
WHEREAS, it is the mutual desire of City and Contractor to amend the Contract to meet
Contract objectives.
NOW, THEREFORE, City and Contractor hereby agree to amend the Contract as
follows:
I.
ARTICLE 1. DEFINITIONS is amended by adding the following definitions:
"Effective Date" means November 1, 2015.
"Priority Repair Program" or "program" means the City's home repair program for
eligible low to moderate income homeowners adopted by the City Council in M&C 17589.
ARTICLE 2. SCOPE OF SERVICES Section A. is amended to be and read as follows
by adding the following as the first sentence.
"A. The purpose of this Contract is to provide home repair services for the Priority
Repair Program. The services provided shall be either Priority 1 emergency
repairs or Priority 2 repairs of failed household mechanical systems to address
health and safety issues as determined by City in accordance with program
guidelines.
SECOND CONTRACT AMENDMENT CSC NO. 45091
Priority Repair Program
G.A. Miller Enterprise Inc. d/b/a Glenn's Air Conditioning and Heating
OFFICI . >EGORD
CITY 5 ETARY
PC W(�TH, TX
Rev. 10/2015
Page 1
The first sentence of ARTICLE 5. TERM OF CONTRACT is amended to be and
read as follows:
"This Contract shall commence as of the Effective Date and shall automatically expire
upon the earlier of the expenditure of $300,000.00 or October 31, 2016 (the "Expiration
Date"), if not teuuinated sooner or extended as described below."
II.
Attachment C attached to the Contract is deleted and replaced with the attached
Attachment C Revised 10/2014.
All other terms and conditions of City Secretary Contract No. 45091 not amended herein
remain unaffected and in full force and effect, are binding upon the Parties, and are hereby
ratified by the Parties. Capitalized terms not defined herein shall have meanings assigned to
them in the Contract.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
SECOND CONTRACT AMENDMENT CSC NO. 45091
Priority Repair Program
G.A. Miller Enterprise Inc. d/b/a Glenn's Air Conditioning and Heating
Rev. 10/2015
Page 2
ACCEPTED AND AG
ATTEST:
it Sec
M&C C-
508 10/15/2
APPROVED AS TO FO
ITY OF FORT WORTH
By: as.1.44.frio Lul
Fernando Costa, Assistant City Manager
AND LEGALITY"
Vicki S. Ganske, Senior Assistant City Attorney
By:.
G.A. 1 iller , Owner
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
SECOND CONTRACT AMENDMENT CSC NO. 45091
Priority Repair Program
G.A. Miller Enterprise Inc. d/b/a Glenn's Air Conditioning and Heating
Rev. 10/2015
Page 3
ATTACHMENT C
Revised 10/2014
ITEMIZED MATERIALS & LABOR BID
G.A. Miller Enterprises
PLUMBING SERVICES
VUAt' RS RVIGEr1° XL`U
SHUT OFF VALVE
ROD AND CLEAN DRAINS
DRAIN WASTE - VENT PVC
SEWER SERVICE - 4" PVC
GAS LINE
GAS LINE - PRESSURE TEST
WATER HEATERS
VVATER HEATERS GAS
30 GALLON
40 GALLON
50 GALLON
WATER HEATERS ELEC
30 GALLON
40 GALLON
50 GALLON
WATER SUPPLY
WATER SUPPLY PEX-1 BATH HOUSE
WATER SUPPLY PEX-2 BATH HOUSE
WATER SUPPLY PEX-3 BATH HOUSE
HOURLY RATE -LABOR-MASTER. PLUMBER
HOURLY RATE -LABOR-CARPENTRY
Materials Labor
TOTAL
$ 15.00 $ 45,00 $ 60.00
$ 20.00 $ 75.00 $ 95.00
$ 15.00 $ 25.00 $ 40.00
$ 25.00 $ 18.00 $ 43.00
20.00 $ 230.00 $
250.00
$ 500.00 $ 700.00 $ 1,200.00
$ 500.00 $ 700.00 $ 1,200.00
$ 500.00 $ 700.00 $ 1,200.00
$ 545.00 $ 400.00 $ 945.00
$ 560.00 $ 400.00 $ 960.00
$ 602.00 $ 400.00 $ 1,002.00
$ 42.31 $ 182.69 $ 225.00
$ 42.31 $ 182.69 $ 225.00
$ 42.31 $ 182.69 $ 225.00
$ - $ 83.00 $ 83.00
$ - $ 40.00 $ 40.00
VENDORS MARKUP % 9%
(
IITEMIZED;,MATERIALS.+.&`LAEtOR BIl), `,t":,'.C,.
G.A. Miller Enterprises
HVAC - ELECTRICAL -GENERAL
HEATING VENTILATION AND AIR CONDITIONING IHVAC1
Materials
Labor
TOTAL
22 HOURLY RATE FOR LABOR COST HVAC $ $ 80.00 $ 80.00
23 CENTRAL GAS FURNACE
24 FURNACES - GAS 36,000 BTU
25 FURNACES - GAS 42,000 BTU
26 'FURNACES - GAS 50,000 BTU
27 'FURNACES - GAS 70,000 BTU
28 FURNACES - GAS 75,000 BTU
29 FURNACES - GAS 80,000 BTU
30 'FURNACES - GAS 85,000 BTU
31 I FURNACES - GAS 90,000 BTU
32 1FURNACES -GAS 100,000 BTU
WALL VENTED FURNACE / WALL GAS HEATER -GAS
33 WALL VENTED FURNACE 35,000 GAS
34 WALL VENTED FURNACE 40,000 GAS
35 WALL VENTED FURNACE 50,000 GAS
(HEAT PUMP SYSTEMS
36 ( HEAT PUMP -REPLACE 2 TON UNIT
37 IHEAT PUMP -REPLACE 2.5 TON UNIT
38 I HEAT PUMP -REPLACE 3 TON UNIT
39 1 HEAT PUMP -REPLACE 3.5 TON UNIT
40 HEAT PUMP -REPLACE 4 TON UNIT
ELECTRICAL SERVICES ELECTRIC -GENERAL REQUIREMENTS
41 ELECTRIC SERVICE- 150 AMP
42 ELECTRIC SERVICE- 200 AMP
43
53
58
59
60
61
Carbon Monoxide Alarm
WINDOW SILL -EXTERIOR
$ 491.00 $ 995.00 $ 1,486.00
$ 497.00 $ 995.00 $ 1,492.00
$ 460.00 $ 995.00 $ 1,455.00
$ 492.00 $ 995.00 $ 1,487.00
$ 502.00 $ 995.00 $ 1,497.001
$ 504.00 $ 995.00 $ 1,499.00 1
$ 525.00 $ 995.00 $ 1,520.00
$ 542.00 $ 995.00 $ 1,537.00
$ 605.00 $ 995.00 $ 1,600.00
$ 700.00 $ 600.00 $ 1,300.001
$ 750.00 $ 600.00 $ 1,350.00
$ 795.00 $ 600.00 $ 1,395.00
$ 1,780.00 $ 1,225.00 $ 3,005.00
$ 2,003.00 $ 1,225.00 $ 3,228.00
$ 2,165.00 $1,225.00 $ 3,390.00
$ 2,216.00 $1,225.00 $ 3,441.00 1
$ 2,437.00 $ 1,225.00 $ 3,662,00
$ 650.00 $ 1,650.00 $ 2,300.00
$ 700.00 $ 1,750.00 $ 2,450.00
$ 21.00 $ 12.00 $ 33.00
$ 7.00 $ 3.15 $ 10.15
VANITY BASE WITH SINK -Single Bathroom Cabinet $ 278.00 $ 125.00 $ 403.00
TUB WALL KIT -Fiberglass 3 PIECE $ 264.00 $ 250.00 $ 514.00
FAUCET -BATHROOM $ 79.00 $ 53.00 $ 132.00
FAUCET -KITCHEN $ 95.00 $ 112.50 $ 207.50
52 SHEETROCK/DRYWALL 1/2
53 SHEETROCK/GREEN BOARD-1/2
$ 2.00 $ 1.33 $ 3.33
$ 2.25 $ 1.50 $ 3.75
VANITY BASE WITH SINK —Single Bathroom Cabinet $ 278.00 $ 125.00 $ 403.00
TUB WALL KIT -Fiberglass 3 PIECE $ 264.00 $ 250.00 $ 514.00
FAUCET -BATHROOM $ 79.00 $ 53.00 $ 132.00
FAUCET -KITCHEN $ 95.00 $ 112.50 $ 207.50
SHEETROCK/DRYWALL 1/2
SHEETROCK/GREEN BOARD-1/2
$ 2.00 $ 1.33 $ 3.33
2.25 $ 1.50 $ 3.75
ITEMIZED MATERIALS & LABOR BID
G.A. Miller Enterprises ( Material Labor TOTAL
ROOF REPAIRS AND SERVICES
ROOF REPLACMENT
ROOFING TEAR -OFF
LABOR RATE FOR CARPENTRY
S IDING
S IDING CLAPBOARD REPLACE/105-5"
S IDING CLAPBOARD REPLACE/105-7"
S IDING CLAPBOARD REPLACE/105-9"
S IDING CLAPBOARD REPLACE/117
S IDING-T-1-11 REPLACE
LUMBER-1" X 2"
LUMBER-1" X 4"
LUMBER-1" X 6"
S UMBER-1" X 8"
$ 85.00 $ 90.00 $ 170.00
$ - $ 20.00 $ 20.00
$ 30.00 $ 30.00
1.50
1.50
1.50
1.50
1.50
$ 1.50 $ 3.00
$ 1.50 $ 3.00
$ 1.50 $ 3.00
$ 1.50 $ 3.00
$ 1.50 $ 3.00
1.00 $ 1.00 $ 2.00
1.00 $ 1.00 $ 2.00
1.25 $ 1.25 $ . 2.50
1.50 $ 1.50 $ 3.00