Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 44325 (2)
COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: TCG Development, LLC Address, State, Zip Code: 1200 Summit Ave., Suite 444 I Fort Worth, TX 76102 Phone, E-Mail: (817) 446-4792 I dedwards@tcglp.com Authorized Signatory/Title: Donny Edwards, Vice President Project Name: Heritage Place Assisted Living Project Location: Old FM 1187 & IH-3 5 W Plat Case No.: FP-012-041 Plat Name: Heritage Place Addition Mapsco: 119L CFA: 2013-012 DOE: 6970 To be completed by staff Received by: ( � \cir\' • Council District: 9 City Project No: 02045 RECE1VED Iv AR z 9 taxi Date: ti� N 1 W, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) ✓ Sewer (A-1) ✓ Paving (B) Storm Drain (B-1) ✓Street Lights & Signs (C)V. E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in confoitnance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perfoini water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the teiui of the maintenance bond All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perfoini the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, stolin drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or tzot such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a foiin to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and stone drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Heritage Place Assisted Living CFA No.: 2013-012 DOE No.: 6970 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An Itemized estimate corresponding to each project specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one 'Bond = 100% 'Completion Agreement = 100% / Holds Plat 'Cash Escrow Water/Sanitary Sewer= 125% (Cash Escrow Paving/Storm Drain = 125% !Letter of Credit = 125% w/2yr expiration period 95,126.00 151,192.00 246,318.00 231,144.89 177,756.00 83,912.00 492,812.89 739,130.89 4,926.36 4,926 36 9,852.72 16,356.04 8,178.02 3,356.48 245.00 28,135.53 37,988,25 Amount Choice (ck ope) 739,130.89 V 739,130.89 307,897.50 616,016.11 923,913.61 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and sa'd Developer has exec d this instrument in q adruplicate, at Fort Worth, Texas this , 1� � day o 20 . CITY OF FORT WORTH - Recommended by: Water Department n Wendy Chi-B Developmenngineering Manager bulal, EMBA, P.E. Approved as to Form & Legality: Do ggla - .: ack Assistant City Attorney M&C No. _Or Date: ATTEST: tryJ.K City Secret ATTEST: CAr\reitsw`---7 Cith ete•drift* atw Qoo a4&°% et 0 0 2oo00ocr r.0e Transportation & Public Works Department ( Li. Li Dougl. Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager Signature (Print) Name: � n G.7V .04*- TCG Development, LLC 9 Print Name: Title: exA,„/„_ ignature 00 A w`• a. v` 7 tb !Aim- co 3 OFFICIAL RECORD 11�, �-1 SE©ki TARY GAT. WORM, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included 11 ►1 v x // x v ►1 N Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) el co ----- -- -------- ------- I iz 0 n < (NI Ir CO HC 0- 8 z 0 LLJZ re :)03M o ----- OLD DECATUR RE( 1 IX 1 ill i MCC / 1 ; ' I i --3 / — , N I c/0 J.SY3i4i 's N OZ8 a 4)01 1SV*,,-- ozg r--- 'AM?:Ld !H180 ye cto Ct .cc 0 ........ --- z m /N Me.,--1 0 ; 1 cxct / < --F,‘----'' ,-z La it Cap r re . .. . . . . , : . .: . . (Di 0 6 (DI , . .s•Zs cc ,... .............. _.,,, ‘a.,..... ,„ ...... . ••••• 1 ts,;- . ,...,..... i z s— co z b"-"apl si 6p. . 0 „ ,.... .... l' III . ),JMIIJ Hinp '0 t cn . c , --- - - 'IS 11P-Ou-IGH / x....„.{.. ,.. ..?!.\v....., 449\ \ • i C:1> \ cv co ------Isi 1 . .. _,. 4- :- :0 0. \ . -13r (9 \ , ;6;7(.9\ . A.,... s cn > w>?.....00 - - . NIA211\ 1NVA88 ..4`).- _Like- #fr: '1/44 . LI 11 CZ I I . ...,.. ,.- l',... .,, 1 • I • IJ i 1 I i 'N: [ \ ;cm§ 0 o Li r- CCI se o 0 > CC ce CO La ;c1I ce a.0 -J ' ..... ›LIJ - ;cirri 0129 z cn CC - IX 0 < Z 1- a?. raj / • o 0 0 co so CO " Ca) a s: CO W m o 0 a) u_ Z 0_ Id ren g 0 0 co o 1111a11111ellit— HERITAGE PLACE ASSISTED LIVING PROJECT LOCATION MAP i 10"X8" TEE; 10 GV; 8' GV 45° BEND NEW 6 8' X6" TEE; /6"GV; /NEW FH / NEW 8" W i /NEW 6"W, 8'X6" TEE 6" GV, NEW FH 8" TAPPING _ SLEEVE & GV t^� -p UM ULA � 1 � E UL 60° BEND; 10"X10" T-EEFOR Pl7TURE EXTENSION; NEW 10" W 8" I-TI-tE-DINE WItH, DETECTOR \ CHECK & VAULT/ NEW+QtW, Baird, Hampton & Brown, Inc. Eng'neering 8c Surveying 6300 Rd ca Piece. Ste. 700 fl Yeah. IX 76116 Tet{817)338-1277 Far(817)338 245 F-Nolmrfitlb'nccom Teas Regstratian F 000044 Bf@ P7OhCt j 2009.103 C00 EXIST 16" W R— / t-T i i / ( csN 7 FUTURE 10" W EXIST 24' W 10' TAPPING S LEEVE & GV N EW 6" W; 10"X6' TEE; 6" GV; N EW FH 2X2" IRRIGATION SERVICES 4' DO VIESTIC SERV CE EXIST 24" W N EW 6' W; 6' TAPPING S LEEVE & GV; N EW FH 200 100 0 200 GRAPHIC SCALE HERITAGE PLACE ASSISTED LIVING EXHIBIT A - WATER DRAWN BY: KBM CHECKED BY: KBM BNB PROJECT: 2012.146.000 DATE: Mar., 2013 • r ULr __yam - �- ) // ---. y \ /1 `/ ) N i OLD FM 1187 Baird, Hampton & Brown, Inc. Eng'neering & Surveying 6300 Rd9'aa Pact, Ste. 700 Ft. Worths 1X 76116 Tet(617)336- 2P Fac(617)338-9245 E-U kmitbhbiccmm ivas RegsUcUc., F 000044 BNB PROJECT j 2009,103000 to - CONNECT 8" SS TO EXIST 21" SS (M-325) NEW 5' SS MH NEW 4' SS MH NEW 8" SS NEW 4' SS MH NEW 4' SS MH; STUB OUT 6" PRIVATE SS • NEW 4'SSMH NEW 4' SS MH; STUB OUT 8 SS 300 150 0 300 GRAPHIC SCALE DRAWN BY: KBM HERITAGE PLACE ASSISTED LIVING CHECKED BY: KBM BHB PROJECT: 2012.146.000 EXHIBIT Al - SANITARY SEWER DATE: Feb., 2013 Us M s- --__4� f \ / i^ i 1 q o R Baird, Hampton & Brown, Inc. Engineering 8e Surveying 6300 Rdg'ea Prot , Ste. 700 R %MR TX 76116 Tet(817)338-12n Fec(8I7)378 245 E-V kmeObtinc.com Terre Regstrotion F 0006" BHB PROJECT 1 2009103000 - x \ 1 / . \/ \ \ /\ \ \ i x-- \ \ / \ N EW 4' S IDEWALK OLD FM 1187 HERITAGE PLACE ASSISTED LIVING EXHIBIT B - PAVING IMPROVEMENTS MAN NEW 50'R - 6" HMAC TEMPORARY TURNAROUND NEW 29 B-B REINFORCED CONCRETE STREET N EW 4' S IDEWALK NEW 25 B-B REINFORCED CONCRETE DWY WITH 30'R N EW 4' S IDEWALK NEW 29 B-B REINFORCED CONCRETE STREET N EW 4' S IDEWALK NEW 25 B-B REINFORCED CONCRETE DWY WITH 25'R NEW 6" HMAC TEMPORARY ACCESS CONNECTION TO OLD FM 1187 200 100 0 200 GRAPHIC SCALE DRAWN BY: KBM CHECKED BY: KBM BHB PROJECT: 2012.146.000 ' DATE: Feb., 2013 • L X X \J 1: I I� OLD FM 1187 Baird, Hampton & Brown, Inc. Eng'neering & Surveying •m P;sce Ste 700 Ft Wod 1X 76116 Te,'017)338- 277 Fae(817)338-9245 E-41-1mx'OShknccom Texas RegitraU>n F 000044 BNB PROJECT / 2009 103 000 *Nam dwm. NEW HW AND STILLING BASIN FOR 48' SD NEW 48" SD NEW 5' JUNCTION BOX NEW 48"SD N EW 5' JUNCTION BOX NEW 21" SD; 2X10' CI N EW 4' JUNCTION BOX N EW 30" SD N EW21'&24" S D; 2X10' CI JUNCTION BOX 300 150 0 300 GRAPHIC SCALE DRAWN BY: KBM HERITAGE PLACE ASSISTED LIVING CHECKED BY: KBM BHB PROJECT: 2012.146.000 EXHIBIT B 1 - STORM DRAINAGE IMPROVEMENTS DATE: Feb., 2013 LIGHT FIXTURE: LUMINAIRE: VOLTAGE POLE: BASE: NMI • / I 1 7 {, diE UE X X X— /-X \ \ \ \ \ \ / - \ \ /\ \ \ \ \ \ \ 77. %\ J S \ \ \ i \n r(\ \\ i \ \ / \ \ 3i \ OLD FM 1187 ' �I N EW STREET LIGHTS; MAX S PACING=200' NEW STREET LIGHTS MAX SPACING=200' COBRA HEAD STYLE STREET LUMINAIRE ASSEMBLY AND GLOBE EQUAL TO AMERICA L =CTRIC LUMINAIRE WITH 4 BOLT MOUNTING AND ADVANCE BALLAST PT # 115 HID, 200 WATT HIGH PRESSURE SODIUM TYPE III LIGHT, DISTRIBUTION, DOUBLE ARM MOUNT. PROVIDE MULTI -TAP 120V/240V BALLAST TYPE 8 WITH TYPE TWO 33A ARM WITH BACK TO BACK HEEL PLATES, REFER TO CITY OF FORT WORTH STREET LUMINAIRE POLE DETAILS, SHEET 30 REFER TO CITY OF FORT WORTH STREET LUMINAIRE POLE FOUNDATION DETAILS, SHEET 30A, FOUNDATION SIMILAR TO TYPE 3 WITH 11' BOLT CIRCLE, 1" x 40' ANCHOR BOLTS, AND DIM. "CC" = 7" 200 100 0 200 Baird, Hampton & Brown, Inc. Engineering Sc Surveying 6300 Rd9ea Pace, Ste 700 Ft. Worth. IX 6116 Tel:017)338-1277 Far.(017U13-9245 E-1/am,_Ot4bictom Tops Regs4pf , F 0100'4 RRR PROJECT 1 2003.103000 GRAPHIC SCALE DRAWN BY: KBM CHECKED BY: KBM BHB PROJECT: 2012.146.000 DATE: Feb., 2013 HERITAGE PLACE ASSISTED LIVING EXHIBIT C - STREET LIGHTS MIN 6 00 Rea Tare Reg*U rr 1 IUM-kiM-X+-i�M • Baird, Hampton & Brown, Inc. Eng'neering 8c Surveying Ste. 700 it Wuth. IX 76116 Td(817)338- 277 Fm_(817)338- 245 F-IIimt®.igrK[Cm F 000044 8R8 PRO.ECT j 2009.103000 � \ / N. N \ \/ N \ \ \ \ // / \ Nt \ \I 1 \ I I 1 1 OLD FM 1187 N EW STREET S IGN & STOP S IGN (SOUTH BOUND) 200 100 0 200 GRAPHIC SCALE DRAWN BY: KBM CHECKED BY: KBM BHB PROJECT: 2012.146.000 DATE: Feb., 2013 HERITAGE PLACE ASSISTED LIVING EXHIBIT C 1 - STREET SIGNS UNIT PRICE BID Bidlist Item No. SECTION 00 42 43 PROPOSAL FORM Project Item Information Description UNIT 1 - WATER IMPROVEMENTS 3311.0161 6" PVC Water Pipe 3311.0261 8" PVC Water Pipe 3311.0361 10" PVC Water Pi; e 3312.0106 Connection to Existing 16" Water Main 3312.0108 Connection to Existin:3 24" Water Main 3312.2203 2" Water Service 3312.2802 4" Water Meter and Vault 3311.0001 Ductile Iron Water Fittings 3312.0001 Fire Hydrant 3312.3002 6" Gate Valve 3312.3003 8" Gate Valve 3312.3004 10" Gate Valve 3312.4101 10" x 4" Tapping_Sleeve& Valve 3312.4111 16" x 6" Tapping Sleeve & Valve 3312.4112 16" x 8" Tapping Sleeve & Valve 3312.4210 24" x 10" Tapping Sleeve & Valve 3305.0108 Miscellaneous Structure Adjustment 3305.0109 Trench Safe 3331.4115 3331.4116 3339.1 po1 3339.1101 3339_1103 3339.0001 330.0001 3305.0113 3305.0109 3301.0002 330122101 3395.911 o Sub -Total Unit 1 UNIT 2 - SANITARY SEWER IMPROVEMENTS 8" Sewer Pipe 8" Sewer Pipe, CSS S Backfill 4' Manhole 5' Manhole 5' Extra Depth Manhole Epy Manhole Liner Concrete Encase Sewer Pipe - Clay Dams - Trench Safety Post -CCTV Inspection Manhole Vacuum Testing Utility Markers Sub -Total Unit 2 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Fonn Revised 20120120 Specification Unit of Section No. Measure 00 42 43 BID PROPOSAL Page I of2 Bidder's Application Bidder's Proposal Bid Quantity Unit Price 33 11 12 LF 52 -_ $17.00 331112 LF 569 siaoo 331112_ LF 795 $27.00 33 12 25 EA 2 $1 000.0 33 12 25 EA 1 $1,000.00 33 12 10 EA 2 $1.600.00 33 12 11 EA 1 $10,000.00 33 11 11 TON 0.75 $7,000.00 33 12 40 EA 4 $2200.00 33 12 20 EA 4 $900.00 33 12 20 EA 1 51 250.00 33 12 20 EA 2 $1,900.00 33 12 25 EA - 1 - $3,600.00 33 12 25 EA 1 $4 850.00 33 12 25 EA 1 $5,500.00 33 12 25 EA 1 - $6200.00 33 05 14 EA 1 $1 500.00 33 05 10 LF 1416 51.00 33 31 20 33 31 20 33 39 10 33 39 10 33 39 10 33 39 60 03 30 00 33.05 15 33 05 10 33 01 31 33 01 30 33 05 26 LF LF EA EA 1 VF 5 VF LF EA LF 2324 LF 2324 EA 13 LF Bid Value _$884.00 $10:811.Oo $21,465.00 0 $2,000.00 $1,000.00 $3 200.00 $i o,000.00 $5.250.00 $ 8.800.00 $3 600.00 $1,250.00 _ $3,800.00 $3,60000 $4 8.0M0 _ $5,500.00 $6,200.00 $1 500.00 . $11416,00 2264 $23.00 60 575.00 12 $3,100.00 $4,200.00 _ $280.00 20 _ $240.00 30 - _ $25.00 2 - $500.00 ...__ _ 2.75 $2.25 $250.00 1 $400.00 $95 126.00 $52,072.00 $34 500.00 537 200.00 $4.200.00 $1 400.00 $4 800.0 - $750.0 $1,000.00 $6,391.00 $5,229.00 $3,250.00 $400.00 0 0 $151 192.00 Copy of 00 42 43 Bid Proposal Revisedre UNIT PRICE BID Bidlist Item No. 3110.0101 3123.010 3125.0101 3137.0101 3341.0261 3341.0205 3341.0302 3341.0402 3341.0409 3349,0001 3349,0002 3349.1011 3349.5001 3305.0109 3212,0501 3212.0302 3213.0101 3211.0502 3211.0400 3213.0301 3213.0401 3291.0100 3292_0450 3292.0500 3212.0401 3471.0001 3441.1602 3441.3_102 3441.3302 3441.3312 3441.3404 2605.3011 SECTION 00 42 43 PROPOSAL FORM Project Item Information Description UNIT 3 - STORM DRAIN IMPROVEMENTS Site Clearing Unclassified Excavation SWPPP >_ 1 acre Concrete Riprap (stilling basin) 21" RCP, Class III 24" RCP) Class III 30" RCP, Class III 42" RCP, Class III 48" RCP, Class III 4' Storm Junction Box 5' Storm Junction Box 48" Flared Headwall, 1 pipe 10' Curb Inlet Trench Safety Sub -Total Unit 3 UNIT 4 - PAVING IMPROVEMENTS 4" Asphalt Base Type B 2" Asphalt Pvmt Type D 6" Conc Pvmt (with monolithic curb) 8" Lime Treatment Lime 4" Conc Sidewalk 6" Concrete Driveway Topsoil Seeding, Hydromulch with binding agent Seeding, Soil Retention Blanket HMAC Transition Traffic Control Sub -Total Unit 4 00 42 43 BID PROPOSAL Page 2 of 2 Bidder's Application Specification Unit of Bid Quantity Section No. Measure 31 10 00 31 23 16 31 25 00 31 37 00 3341 10 33 41 10 3341 10 33 41 10 33 41 10 33.49 10 33 49 10 33 49 40 33 49 20 33 05 10 LS CY LS SY 30 LF 82 LF 23 LF 101 LF 218 LF 810 EA EA EA EA LF Bidder's Proposal Unit Price 1 $1,304.00 2000 $12.24 1 $2,850.00 $83.00 $39.00 $43.00 $53.00 $88.00 $104.00 - 1 $2,200.00 4 $3,400.00 1 $3,000.00 4 $34100.00 1234 $2.00 32 12 16 SY 1045 32 12 16 SY 1045 32.13 13 SY 3393 32 11 29 SY 4818 32.1129 TON 110.8 32 13 20 SF 3774 3213 20 SF 1255 32 91 19 CY 261.3333 32 92 13 SY 2352 32 92 13 SY 630 32 12 16 TON 2 34 71 13 Month 6 UNIT 5 - STREET LIGHTING IMPROVEMENTS I Furnish/Install Type 8 Ped Pole Assmbly 34 41 10 EA 200W HPS PC Lighting Fixture 34 41 20 EA Rdwy ilium Foundation TY 3 5 6, and 8 34 41 20 EA Contact Enclosure, Pad Mount _ 34 41 20 EA 2-2-2-4 Quadplex Alum Elec_ Conductor 34 41 20 LF 2" CONDT PVC SCH 40 (T) 26 05 33 LF Sub -Total Unit 5 Grand Total Units 1 - 5 Cecil rods-7-A CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 $24.00 $16.00 $29.34 $5.75 $159.67 $3.49 $3.26 $34.00 $1.17 $4.92 $200.00 $2,000.00 9 $3,612.00 9 $492.00 9 $1,500.00 1 $8,999.96 1557 $3.72 1557 $12.00 Bid Value $1,304.00 $24,480.00 $2,850.00 $2,490.00 $3,198.00 $989,00 $5,353,00 $19,184.00 _ $84,246.00 $2,200.00 $13,600.00 $3,000.00 $12,400. 00 $2,468.00 $1771756.00 $25,080.06 $16,720,00 $99,550.52 $27,703.50 $17,891.44 $13,171.26 $4,091.30 $8,885.33 $2,751.84 $3,099.50 $400.00 $12,000.00 $231044.86 $32,508.00 $4,428.00 $13,500.06 $8,999.96 $5,792.04 $18,684.00 $83,912,00 $739,130.89 Copy of 00 42 43 Bid Proposal Revue-ill-4