STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home -rule
municipality (the "CITY"), and Freese and Nichols, Inc., authorized to do business in
Texas, (the "ENGINEER"), for a PROJECT generally described as: East Rosedale street
Retrofit Project from IH35 to U.S. Highway 287 (City Project No.01894).
Article I
Scope of Services
A. The Scope of Services is set forth in Attachment A.
Compensation
Article II
A. The ENGINEER's compensation shall be in the amount of $49,620.00 as
set forth in Attachment B.
Article III
Terms of Payment
Payments to the ENGINEER will be made as follows:
A. Invoice and Payment
(1) The Engineer shall provide the City sufficient documentation, including but
not limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINEER will issue monthly invoices for all work performed under this
AGREEMENT. Invoices are due and payable within 30 days of receipt.
(3) Upon completion of services enumerated in Article I, the final payment of
any balance will be due within 30 days of receipt of the final invoice.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 1 of 16
RECEIVED MAR292.013
OFFICIAL RECORD
CITY SECRETARY
FT. WORTh, TX
(4) In the event of a disputed or contested billing, only that portion so contested
will be withheld from payment, and the undisputed portion will be paid. The
CITY will exercise reasonableness in contesting any bill or portion thereof.
No interest will accrue on any contested portion of the billing until mutually
resolved.
(5)
If the CITY fails to make payment in full to ENGINEER for billings contested
in good faith within 60 days of the amount due, the ENGINEER may, after
giving 7 days' written notice to CITY, suspend services under this
AGREEMENT until paid in full. In the event of suspension of services, the
ENGINEER shall have no liability to CITY for delays or damages caused the
CITY because of such suspension of services.
Article IV
Obligations of the Engineer
Amendments to Article IV, if any, are included in Attachment C.
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement providing professional engineering
consultation and advice and furnishing customary services incidental
thereto.
B. Standard of Care
The standard of care applicable to the ENGINEER's services will be the
degree of skill and diligence normally employed in the State of Texas by
professional engineers or consultants performing the same or similar
services at the time such services are performed.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise
the CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 2 of 16
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that
could affect the total PROJECT cost and/or execution. These
conditions and cost/execution effects are not the responsibility of the
ENGINEER.
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires• provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on -site representatives or otherwise, do not make the
ENGINEER or its personnel in any way responsible for those duties that
belong to the CITY and/or the CITY's construction contractors or other
entities, and do not relieve the construction contractors or any other entity of
their obligations, duties, and responsibilities, including, but not limited to, all
construction methods, means, techniques, sequences, and procedures
necessary for coordinating and completing all portions of the construction
work in accordance with the Contract Documents and any health or safety
precautions required by such construction work The ENGINEER and its
personnel have no authority to exercise any control over any construction
contractor or other entity or their employees in connection with their work or
any health or safety precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the
progress or quality of the completed work on the PROJECT or to determine,
in general if the work on the PROJECT is being performed in a manner
indicating that the PROJECT, when completed, will be in accordance with
the Contract Documents, nor shall anything in the Contract Documents or
the agreement between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on -site inspections to
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 3 of 16
(3)
discover latent defects in the work or otherwise check the quality or quantity
of the work on the PROJECT. If the ENGINEER makes on -site
observation(s) of a deviation from the Contract Documents, the ENGINEER
shall inform the CITY.
When professional certification of performance or characteristics of
materials, systems or equipment is reasonably required to perform the
services set forth in the Scope of Services, the ENGINEER shall be entitled
to rely upon such certification to establish materials, systems or equipment
and performance criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions time or quality of performance by third parties; quality type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate
PROJECT cost or schedule. Therefore the ENGINEER makes no
warranty that the CITY's actual PROJECT costs, financial aspects,
economic feasibility or schedules will not vary from the ENGINEER's
opinions, analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling
and observation that the work has progressed to the point indicated Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the. construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are not other
matters at issue between the CITY and the construction contractor that
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 4 of 16
affect the amount that should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for
any errors or omissions in the information from others that is incorporated
into the record drawings.
I. Minority Business and Small Business Enterprise (MBE)(SBE)
Participation
In accord with the City of Fort Worth Business Diversity Ordinance No.
20020-12-2011, as amended, the City has goals for the participation of
minority business enterprises and/or small business enterprises in City
contracts. Engineer acknowledges the MBE and SBE goals established for
this contract and its accepted written commitment to MBE and SBE
participation. Any misrepresentation of facts (other than a negligent
misrepresentation) and/or the commission of fraud by the Engineer may
result in the termination of this Agreement and debarment from participating
in City contracts for a period of time of not less than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers
and records of the ENGINEER involving transactions relating to this
contract ENGINEER agrees that the CITY shall have access during normal
working hours to all necessary ENGINEER facilities and shall be provided
adequate and appropriate work space in order to conduct audits in
compliance with the provisions of this section. The CITY shall give
ENGINEER reasonable advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant. agrees that the
CITY shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 5of16
(3)
order to conduct audits in compliance with the provisions of this article
together with subsection (3) hereof. CITY shall give subconsultant
reasonable advance notice of intended audits.
ENGINEER and subconsultant agree to photocopy such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for
the cost of copies at the rate published in the Texas Administrative Code in
effect as of the time copying is performed.
K. INSURANCE
(1) ENGINEER'S INSURANCE
a. Commercial General Liability — the ENGINEER shall maintain
commercial general liability (CGL) and, if necessary, commercial
umbrella insurance with a limit of not less than $1,000,000 00 per each
occurrence with a $2,000,000.00 aggregate. If such Commercial General
Liability insurance contains a general aggregate limit, it shall apply
separately to this PROJECT or location.
The CITY shall be included as an insured under the CGL, using
ISO additional insured endorsement or a substitute providing
equivalent coverage, and under the commercial umbrella, if any
This insurance shall apply as primary insurance with respect to
any other insurance or self-insurance programs afforded to the
CITY. The Commercial General Liability insurance policy shall
have no exclusions by endorsements that would alter or nullify:
premises/operations, products/completed operations contractual,
personal injury, or advertizing injury, which are normally contained
within the policy, unless the CITY approves such exclusions in
writing.
ii ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b Business Auto — the ENGINEER shall maintain business auto liability
and, if necessary, commercial umbrella liability insurance with a limit of
not less than $1 000,000 each accident. Such insurance shall cover
liability arising out of 'any auto', including owned, hired, and non -owned
autos, when said vehicle is used in the course of the PROJECT. If the
engineer owns no vehicles, coverage for hired or non -owned is
acceptable.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 6of16
i ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the business auto liability or
commercial umbrella liability insurance obtained by ENGINEER
pursuant to this agreement or under any applicable auto physical
damage coverage.
c. Workers' Compensation —ENGINEER shall maintain workers
compensation and employers liability insurance and, if necessary,
commercial umbrella liability insurance with a limit of not less than
$100,000.00 each accident for bodily injury by accident or $100,000.00
each employee for bodily injury by disease, with $500,000.00 policy limit.
i ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant to this agreement.
d. Professional Liability — the ENGINEER shall maintain professional
liability, a claims -made policy, with a minimum of $1,000,000.00 per
claim and aggregate The policy shall contain a retroactive date prior to
the date of the contract or the first date of services to be performed,
whichever is earlier. Coverage shall be maintained for a period of 5 years
following the completion of the contract. An annual certificate of
insurance specifically referencing this project shall be submitted to the
CITY for each year following completion of the contract.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be delivered to the CITY prior to ENGINEER
proceeding with the PROJECT.
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, as its interests may appear. The term CITY shall
include its employees, officers, officials, agents, and volunteers as
respects the contracted services.
c. Certificate(s) of insurance shall document that insurance coverage
specified in this agreement are provided under applicable policies
documented thereon
d. Any failure on part of the CITY to request required insurance
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 7 of 16
documentation shall not constitute a waiver of the insurance
requirements.
e. A minimum of thirty (30) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) days notice shall be
acceptable in the event of non-payment of premium. Notice shall be sent
to the respective Department Director (by name), City of Fort Worth,
1000 Throckmorton, Fort Worth, Texas 76102.
f. Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A:V or greater, in the current A.M.
Best Key Rating Guide or have reasonably equivalent financial strength
and solvency to the satisfaction of Risk Management.
g.
Any deductible or self insured retention in excess of $25,000 00 that
would change or alter the requirements herein is subject to approval by
the CITY in writing, if coverage is not provided on a first -dollar basis. The
CITY, at it sole discretion, may consent to alternative coverage
maintained through insurance pools or risk retention groups. Dedicated
financial resources or letters of credit may also be acceptable to the
CITY.
h. Applicable policies shall each be endorsed with a waiver of subrogation
in favor of the CITY as respects the PROJECT.
i. The CITY shall be entitled upon its request and without incurring
expense, to review the ENGINEER's insurance policies including
endorsements thereto and, at the CITY's discretion; the ENGINEER may
be required to provide proof of insurance premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on a
claims -made basis, shall contain a retroactive date coincident with or
prior to the date of the contractual agreement The certificate of
insurance shall state both the retroactive date and that the coverage is
claims -made.
k. Coverages whether written on an occurrence or claims -made basis,
shall be maintained without interruption nor restrictive modification or
changes from date of commencement of the PROJECT until final
payment and termination of any coverage required to be maintained after
final payments.
The CITY shall not be responsible for the direct payment of any
insurance premiums required by this agreement.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 8 of 16
m. Sub consultants and subcontractors to/of the ENGINEER shall be
required by the ENGINEER to maintain the same or reasonably
equivalent insurance coverage as required for the ENGINEER. When
sub consultants/subcontractors maintain insurance coverage,
ENGINEER shall provide CITY with documentation thereof on a
certificate of insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent
consultant and not as a subcontractor, agent, or employee of the CITY.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure
in writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing
of any conflicts of interest that develop subsequent to the signing of this
contract and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with
published design criteria and/or current engineering practice standards
which the ENGINEER should have been aware of at the time this
Agreement was executed, the ENGINEER shall revise plans and
specifications, as required at its own cost and expense. However, if design
changes are required due to the changes in the permitting authorities'
published design criteria and/or practice standards criteria which are
published after the date of this Agreement which the ENGINEER could not
have been reasonably aware of, the ENGINEER shall notify the CITY of
such changes and an adjustment in compensation will be made through an
amendment to this AGREEMENT.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 9 of 16
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City -Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of
the information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of
the CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange and pay for all advertisements for bids; permits and licenses
required by local, state, or federal authorities; and land, easements, rights -
of -way, and access necessary for the ENGINEER's services or PROJECT
construction.
D Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches,
drawings, specifications, proposals, and other documents; obtain advice of
an attorney insurance counselor, accountant, auditor, bond and financial
advisors and other consultants as the CITY deems appropriate and render
in writing decisions required by the CITY in a timely manner in accordance
with the project schedule prepared in accordance with Attachment D
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 10 of 16
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
matenals. In consideration of the associated risks that may give rise to
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of
such materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos
is a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of
Article IV E regarding the ENGINEER's Personnel at Construction Site, and
provisions providing contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third -Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering
services performed. Only the CITY will be the beneficiary
of any undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third -party beneficiaries.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 11 of 16
(3)
The CITY will include in each agreement it enters into with any other entity
or person regarding the PROJECT a provision that such entity or person
shall have no third -party beneficiary rights under this Agreement.
(4) Nothing contained in this section V.H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
I. CITY's Insurance
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will ensure that Builders Risk/Installation insurance is maintained
at the replacement cost value of the PROJECT. The CITY may provide
ENGINEER a copy of the policy or documentation of such on a certificate of
insurance.
(3)
The CITY will specify that the Builders Risk/Installation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
J. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
K. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
Amendments to Article VI, if any, are included in Attachment C.
A. Authorization to Proceed
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 12 of 16
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance
caused by acts of God strikes, lockouts, accidents, or other events beyond
the control of the ENGINEER that prevent ENGINEER's performance of its
obligations hereunder.
D Termination
(1) This AGREEMENT may be terminated only by the City for convenience on
30 days' written notice This AGREEMENT may be terminated by either the
CITY or the ENGINEER for cause if either party fails substantially to perform
through no fault of the other and does not commence correction of such
nonperformance with in 5 days of written notice and diligently complete the
correction thereafter.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or complete studies, plans,
specifications or other forms of ENGINEER'S work product;
b.) Out-of-pocket expenses for purchasing electronic data files and other
data storage supplies or services;
c.)
(3)
The time requirements for the ENGINEER'S personnel to document
the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all termination expenses. The
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 13 of 16
CITY'S approval will be obtained in writing prior to proceeding with
termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER
for the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors,
and ENGINEER's compensation will be made.
F. Indemnification
In accordance with Texas Local Government Code Section 271.904, the
ENGINEER shall indemnify, hold harmless, and defend the CITY
against liability for any damage caused by or resulting from an act of
negligence, intentional tort, intellectual property infringement, or
failure to pay a subcontractor or supplier committed by the ENGINEER
or ENGINEER's agent, consultant under contract, or another entity
over which the ENGINEER exercises control.
G Assignment
Neither party shall assign all or any part of this AGREEMENT without the
prior written consent of the other party
H. Interpretation
Limitations on liability and indemnities in this AGREEMENT are business
u nderstandings between the parties and shall apply to all the different
theories of recovery, including breach of contract or warranty, tort including
n egligence, strict or statutory liability, or any other cause of action, except for
willful misconduct or gross negligence for limitations of liability and sole
n egligence for indemnification. Parties mean the CITY and the ENGINEER,
and their officers, employees, agents, and subcontractors.
I. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 14 of 16
J. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any
reason to be invalid, illegal or unenforceable in any respect, such invalidity,
illegality, or unenforceability will not affect any other provision, and this
AGREEMENT shall be construed as if such invalid, illegal, or unenforceable
provision had never been contained herein Articles V.F., VI B VI D , VI.F.,
VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause.
K. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in
any way affect this AGREEMENT and the work hereunder, and shall
observe and comply with all orders, laws ordinances and regulations which
may exist or may be enacted later by governing bodies having jurisdiction or
authority for such enactment. No plea of misunderstanding or ignorance
thereof shall be considered ENGINEER agrees to defend, indemnify and
hold harmless CITY and all of its officers, agents and employees from and
against all claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
Article VII
Attachments, Schedules, and Signatures
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. The following attachments
and schedules are hereby made a part of this AGREEMENT:
Attachment A - Scope of Services
Attachment B — Compensation
Attachment C - Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 15 of 16
Executed and effective this the.
BY:
CITY OF FORT WORTH
Fernando Costa
Assistant City Manager
Date: S/25//S
APPROVAL RECOMMENDED:
By: SAYticAc-
Doug Wiersig, P.E.
Dire or, Transportation nd Public
Works Department
APPROVED AS TO FORM AND
LEGALITY
By:
Douglas W. Black
Assistant City Attorney
ATTEST:
a J. K.ys
City Secreta
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 16 of 16
Date:
, 20/
BY:
ENGINEER
Freese and Nichols, Inc.,
John Dewar, P.E.
Principal
3/2z7/j
M&C No.: N/A
M&C Date:
/-04 hir
fGF._
61(4g
ia
O Ott L /
a9OOOpo° d' sci'Weigixtc\ec<ct
0
% LC)
"0 ILA
sue' 0 �l
0C1
00r„�
OFFICIAL RECORD
CITY SECRETARY
Ft WORTH, TX
Innovative approaches
Practical results
Outstanding service
4055 international Plaza, Suite 200 4 Fort Worth, Texas 76109 0 817-735-7300 o fax 817-735-7491 www.freese.com
March 20, 2013
Ms. Dena Johnson, P.E.
Program Management Office
City of Fort Worth
1000 Throckmorton St.
Fort Worth, TX 76102
RE: East Rosedale Retrofit I-35 to US 287
Dear Ms. Johnson:
Please find attached our Attachments A through E and the associated Level of Effort spreadsheet for the
initial conceptual design and survey effort to begin the East Rosedale Retrofit I-35 to US 287 project.
Once you have had a chance to review our scope and fee I can meet at your convenience to discuss your
comments.
Sincerely,
Freese and Nichols, Inc.
Chris Bosco, P.E.
Principal
1 ! lat.,lniic11Ls
ATTACHMENT "A-1"
Scope for Enaineerinq Design Related Services for Street Improvements
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
OBJECTIVE
The project objective is the design of streetscape enhancements of East Rosedale Street as
a 4-Lane divided roadway from IH-35 to US 287. The project will include street median and
parkway modifications, streetscape and landscape enhancements, minor drainage
modifications, traffic signal enhancements and street light enhancements.
Task
Task
(Full
Task
Task
Task
Task
WORK TO BE PERFORMED
1. Design Management
2. Conceptual Design — (Initial Concept Design)
Conceptual Design is Not Included) — To be added as separate contract.
3. Preliminary Design — (Not Included) — To be added as separate contract.
4. Final Design — (Not Included) — To be added as separate contract
5. Bid Phase Services — (Not Included) — To be added as separate contract
6. Construction Phase Services — (Not Included) — To be added as separate
contract.
Task 7. ROW/Easement Services — (Not Included) — To be added as separate contract.
Task 8. Survey control (Full topographic survey for the project is Not included) — To
be added as separate contract.
Task 9. Permitting (Not Included) — To be added as separate contract.
TASK 1. DESIGN MANAGEMENT.
ENGINEER will manage the work outlined in this scope to ensure efficient and effective use
of ENGINEER's and CITY's time and resources. ENGINEER will manage change,
communicate effectively, coordinate internally and externally as needed and proactively
address issues with the CITY's Project Manager and others as necessary to make progress
on the work.
1.1. Managing the Team
• Lead, manage and direct design team activities
• Ensure quality control is practiced in performance of the work
• Communicate internally among team members
• Task and allocate team resources
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 1 of 6
1.2. Communications and Reporting
• Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements
• Conduct and document monthly project update meetings (up to 2 meetings) with CITY
Project Manager
• Prepare invoices, in accordance with Attachment B to this Standard Agreement and
submit monthly in the format requested by the CITY
• Prepare and submit monthly progress reports in the format provided by the respective
CITY Department.
• Prepare and submit baseline Project Schedule initially, and Project Schedule updates
with a schedule narrative monthly, as required in Attachment D to this Standard
Agreement and according to the City of Fort Worth s Schedule Guidance Document.
• Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at
the end of the project
• Personnel and Vehicle Identification: When conducting site visits to the project
location the ENGINEER or any of its sub -consultants shall carry readily visible
information identifying the name of the company and the company representative.
ASSUMPTIONS
• 2 project coordination meetings are included in this scope of services.
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices
C. Monthly progress reports
D Baseline design schedule
E. Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly M/WBE Report Form and Final Summary Payment Report Form
TASK 2. CONCEPTUAL DESIGN (30 PERCENT).
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the conceptual design is for the ENGINEER to identify, develop,
communicate through the defined deliverables, and recommend the design concept that
successfully addresses the design problem and to obtain the CITY's endorsement of this
concept.
ENGINEER will develop the conceptual design of the infrastructure as follows.
2.1. Data Collection
City of Fort Worth, Texas
Attachment A
MO Release Date: 07.23.2012
Page 2 of 6
• In addition to data obtained from the CITY, ENGINEER will research and make
efforts to obtain pertinent information to aid in coordination of the proposed
improvements with any planned future improvements that may influence the
project. ENGINEER will also identify and seek to obtain data for existing
conditions that may impact the project including; utilities, agencies (TxDOT and
railroads), City Master Plans, and property ownership as available from the Tax
Assessor's office.
• Subsurface Utility Engineering (SUE) provided per Task 8.
2.2. The Roadway Design Conceptual Design Package shall include the following:
• Conduct project site visits to observe existing conditions
• Existing typical sections of the roadway to be constructed along with proposed
typical sections which outline the proposed improvements. Typical sections shall
include existing and proposed ROW, existing and proposed lane widths and
direction arrows, existing and proposed curbs, sidewalks, and retaining walls.
• Develop a project schematic layout to facilitate project communications and for
use as public meeting exhibits
• Estimates of probable construction cost.
• Meet with key stakeholders one on one to discuss future vision and planning
concept for area (up to 2 meetings).
• Prepare a planning level concept and vision based on future land use and input
for key stakeholders and City planning staff.
2.4. Complete Streets and Urban Design Concepts:
• FNI will prepare streetscape section concepts. The section concepts will illustrate
conversion of outside lane to parallel parking with bulb -outs, widening of median
while keeping outside lane as is, adding intersection and intermediate bulb -outs,
enhancement of median/parkway roadway lighting, and inclusion of pedestrian
lighting at signalized intersections
• FNI will prepare streetscape plan concepts. The plan concepts will illustrate plan
views of the alternative configurations presented in the section concepts
described above Upon city selection of preferred concept to be applied for
entire project, FNI will prepare an overall streetscape plan concept to be used
throughout the project for communication and coordination.
• FNi will develop an opinion of probable construction cost for each of the
streetscape options represented in the section concepts described above.
• FNI will conduct a design workshop with our team and city staff to review and
evaluate the concept sections design alternatives for the project streetscape
concept for further development by FNi
2.6. Public Involvement:
• FNI will develop a public involvement plan
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 3 of 6
• FNI will Coordinate the follow task for each Citizen Advisory Committee Meeting
(1 Meeting). This scope of services includes one initial citizen advisory committee
meetings.
a. Work with team to develop key messages
b. Research neighborhood associations for Citizen Advisory Committee
c. Attendance at the three citizen advisory committee meetings
i Coordinate and confirm meeting locations for meetings.
ii. Contact citizen advisory committee members to confirm attendance.
iii Send out meeting reminders to meeting.
iv. Prepare name tags and room directional signage for meetings.
v. Handle meeting logistics and registration/sign-in.
d. Maintain Citizen Advisory Committee stakeholder list/database
ASSUMPTIONS
• 3 plots of the project Schematic Design Layout will be submitted with the
conceptual deliverables
DELIVERABLES
A. Conceptual Schematic Design Package
TASK 3. PRELIMINARY DESIGN (60 PERCENT) — NOT included in this contract.
These services will be added by a separate contract.
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT) — NOT included in this contract. These services will be added a
separate contract.
TASK 5. BID PHASE SERVICES — NOT included in this contract. These services will
be added by a separate contract.
TASK 6. CONSTRUCTION PHASE SERVICES — NOT included in this contract. These
services will be added by a separate contract.
TASK 7. ROW/EASEMENT SERVICES — NOT included in this contract. These
services will be added by a separate contract.
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
ENGINEER will provide survey support as follows.
8.1. Design Survey
et
ENGINEER will perform field surveys to collect horizontal and vertical elevations
and other information needed by ENGINEER in design and preparation of plans
for the project Information gathered during the survey shall include topographic
data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations,
location of buried utilities, structures, trees (measure caliper identify overall
canopy and have qualified arborist identify species of trees), and other features
relevant to the final plan sheets. Existing drainage at intersections will be verified
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.232012
Page4of6
by field surveys. Spot elevations will be shown on intersection layouts with cross
slope to fit intersecting grade lines.
• The design survey will extend the length of Rosedale from IH-35 to US 287 The
survey will extend 10 feet Left and right of existing right-of-way line or building
front.
Full Roadway Topographic survey and SUE for the project from IH-35 to US
287 is NOT included in this contract These services will be added as a
separate contract.
• The minimum survey information to be provided on the plans shall include the
following:
A Project Control Sheet showing ALL Control Points, used or set while
gathering data. Generally on a scale of not less than 1 400
The following information about each Control Point;
a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a
referred bearing base. Z coordinate on CITY Datum only.
c. Descriptive Location (Ex. Set in the centerline of the inlet in the South
curb line of North Side Drive at the East end of radius at the Southeast
corner of North Side Drive and North Main Street).
Coordinates on all P.C.'s, P.T.'s, P.I. s, Manholes, Valves, etc., in the
same coordinate system, as the Control.
No less than two horizontal bench marks, per line or location.
Bearings given on all proposed centerlines, or baselines.
Station equations relating utilities to paving, when appropriate.
8.2. Temporary Right of Entry Preparation and Submittal
• The ENGINEER shall prepare and letter to be distributed in the field that explains
the scope of the project and the reason for the survey activity.
ASSUMPTIONS
• This initial authorization will initiate the topographic survey The complete survey
of the entire project limits will be included as part of separate authorization.
DELIVERABLES
A. Copses of field survey data and notes signed and sealed by a licensed surveyor
for the initial survey limits.
City of Fort Worth, Texas
Attachment A
PMd Release Date: 07.23.2012
Page 5 of 6
TASK 9. PERMITTING — NOT included in this contract. These services will be added
by a separate contract.
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scone of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services
described in the tasks above. However, ENGINEER can provide these services if
needed, upon the CITY's written request. Any additional amounts paid to the
ENGINEER as a result of any material change to the Scope of the Project shall be
agreed upon in writing by both parties before the services are performed. These
additional services include the following:
• All services included in Task 2 — Full Conceptual Design, Task 3 — Preliminary
Design, Task 4 — Final Design, Task 5 — Bid Phase Services, Task 6 —
Construction Phase Services, Task 7 - ROW/Easement Services, Task 9 Permiting of the City of Fort Worth Attachment "A" to Standard Agreement for
Engineering Related Design Services
• Providing GIS mapping services or providing renderings, models or mock-ups
at the request of the CITY
• Subsurface utility engineering services "A" through "D"
• Additional field survey outside the limits defined in Work To Be Performed.
• Negotiation of easements or property acquisition
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests bid rejection
and re -bidding of the contract for construction.
• Construction management and inspection services
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of
God.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services to support, prepare document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project
as requested by the CITY.
• Providing value engineering studies or reviews of cost savings proposed by
construction contractors after bids have been submitted.
• USAGE Section 404 Pre -Construction Notifications or Individual Permit.
• Any additional permit preparation, application and/or coordination not
specifically identified in this contract
City of Fort Worth, Texas
Attachment A
PMO Release Date: 01,23.2012
Page 8 of 5
ATTACHMENT B
COMPENSATION
Design Services for
East Rosedale Retrofit 1-35 to US 287
City Project No. 01894
Lump Sum Project
Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $49,620.00 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies,
and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item III. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B. The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER
111. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
monthly progress reports and schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 1 of 3
B-1
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm I Primary Responsibility I Fee Amount
Prime Consultant
Freese and Nichols, Inc. I Design and Management 1 $40,620.00
Proposed MBEISBE Sub -Consultants
Gorrondona & Associates Topographic Survey $9,000.00
Non-MBE/SBE Consultants
n/a
TOTAL I $49,620.00
Project Number & Name Total Fee
$49.620.00
%
81.9%
18.1%
100%
MBEISBE Fee MBE/SBE
°A
$9.000.00 18.1%
City MBE/SBE Goal = 18.0% Consultant Committed Goal =18.1 %
City of Fort Worth, Texas
Attachment B
MO Official Release Date: 8_09.2012
Page 2 of 3
B-2
Professional Services Payment Request Project Manager: IDena Johnson
Project: East Rosedale Retrofit 1-35 to US 287
City Project #: 01894
City Sec Number:
Company Name:
Consultant's PM:
Vendor Invoice #:
Payment Request #:
From Date:
To Date:
Invoice Date:
Sheet
Work Type 1
Work Type 2
Work Type 3
Work Type 4
Work Type 5
Work Type 6
'Freese and Nichols, Inc.
Chris Bosco
Consultant Instructions:
Summary
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
email: Icbno freese.com
Office Address:I4o55 International Plaza, Ste 200
Telephone: 1817-735-7359
Fax:
Remit Address:l
Agreement Amendment
FAC and Work Type Description Amount Amount
Paving & Streetscape Enhancements $49,620.00
Totals This Payment Request
Agreement
Amount to Completed
Date Amount
$49,620.0C
$49,620.00 $49,620.00
Overall Percentage Complete:
Percent
Completed
LOCK
UNLOCK
($) Invoiced Current
Previously Invoice
Remaining
Balance
$49,620.00
$49,620.00
Professional Services Payment Request Project Manager: Dena Johnson
Project: East Rosedale Retrofit 1-35 to US 287
City Project #: 01894
Work Type Desc: Paving Streetscape Enhancen Consultant Instructions:
FIAIC:
City Sec Number:
Purchase Order:
Company Name:
Consultant's PM:
Vendor Invoice #:
Payment Request #:
From Date:
To Date:
Invoice Date:
Pay Items
30 - Design
51 - Preliminary Survey
Freese and Nichols, Inc.
Chris Bosco
Description
Totals This Unit:
Fill in green cells including Percent Complete and Invoiced Previously Quanities
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
email: cb@freese.com
Office Address:4055 International Plaza, Ste 200
Telephone: 817-735-7359
Fax:
Remit
Agreement
Agreement Amendment Amendment Amount to Completed Percent ($) Invoiced Current Remaining
Amount Number Amount Date Amount Completed Previously Invoice Balance
$40,620.00 $40, 620.00 $40, 620, 00
$9,000.00 $9,000.00 $9,000.00
$49,620.00
•
$49,620.00 $49,620.00
Overall Percentage Complete:
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
East Rosedale Retrofit 1-35 to US 287
City Project No. 01894
<List any changes to the Standard Agreement>
City of Fort Worth, Texas
Attachment C
PMO Release Date: 05.19.2010
Page 1 of i
Consulting Contract Schedule Specifications
City of Fort Worth Capital Improvement Program
Attachment D — Project Schedule
FORT WORTH
This PROTECT requires a Tier « » schedule as defined herein and i11 the Citii's Schedule
Guidance Document.
D1. CONSULTING SERVICES SCHEDULE DEVELOPMENT: The CONSULTANT shall
prepare schedules for consulting services that meet the requirements described in this
specification, showing by Critical Path Method (CPM) the planned sequence and tuning of
the Work associated with the Agreement. All submittals shall be submitted in PDF format,
and schedule files shall also be submitted in native file format (i.e. file formats associated
with the scheduling software). The approved scheduling software systems for creating the
schedule files are:
Inor
Primavera (Version 6.1 or later or approved by CITY)
Primavera Contractor (Version 6.1 or later or approved by CITY)
Microsoft Project (Version 2003/2007 or later or approved by CITY)(PHASING OUT)
D2. BASELINE CONSULTING SERVICES SCHEDULE: Following notice -to -proceed, the
CONSULTANT shall develop, submit and review the draft detailed baseline consulting
services schedule with the CITY to demonstrate the CONSULTANT's understanding of the
Agreement requirements and approach for performing the work. The CONSULTANT will
prepare the final detailed baseline consulting services schedule based on CITY con-unents, if
any, and submit to the CITY no later than the submittal of the first project invoice.
The following guidelines shall be adhered to in preparing the baseline schedule, and as
described in further detail in the CITY's Schedule Guidance Document.
a. The scope shall be subdivided by work breakdown structure (WBS) representing the
tasks, subtasks, and activities associated with delivering the work.
b. The schedule shall accurately describe the major work activities, key milestones, and
dependencies/relationships as appropriate to the work.
c. The schedule should include appropriate meetings, review periods, critical decision
points, including third party utility dependencies and reviewing agencies.
D3. PROGRESS CONSULTING SERVICES SCHEDULE: The CONSULTANT shall prepare
and submit monthly to the CITY for approval the updated schedule in accordance with D1
and D2 and the CITY's Schedule Guidance Document inclusive. As the Work progresses,
the CONSULTANT shall enter into the schedule and record actual progress as described in
the CITY's Schedule Guidance Document.
The updated schedule submittal shall also include a concise schedule narrative that
highlights the following, if appropriate and applicable:
• Changes in the critical path,
• Expected schedule changes,
• Potential delays,
• Opportunities to expedite the schedule,
• Coordination issues the CITY should be aware of or can assist with,
City of Fort Worth, Texas
Attachment D
PMO Release Date: 02.15.2011
Page 1 of 2
• Other schedule -related issues that the CONSULTANT wishes to communicate to the
CITY.
D4. PERFORMANCE AND CONSULTING SERVICES SCHEDULE: If the work
accomplished falls behind that scheduled due to factors within the CONSULTANT's
control, the CONSULTANT shall take such action as necessary to improve the progress of
the Work In addition, the CITY may require the CONSULTANT to submit a revised
schedule demonstrating the proposed plan to make up the delay in schedule progress and
to ensure completion of the Work within the allotted Agreement time.
D5. SCHEDULE Tit -IRS SPECIAL INSTRUCTIONS:
The requirements for the schedule are determined based on the nature and needs of the
project. The schedule tier for this project is stated at the top of this document.
CONSULTANT shall submit each schedule relying on the CITY's current Schedule
Guidance Document.
D6. SCHEDULE SUBMITTAL AND PAYMENT:
As stated in III.A.(1). of the Agreement, CONSULTANT shall provide the information
required by Attachment D CONSULTANT's monthly invoices will not be accepted and
processed for payment without monthly schedule updates that are submitted in the time
and manner required by Attachment D and the CITY's current Schedule Guidance
Document.
City of Fort Worth, Texas
Attachment D
PMO Release Date: 02.15.2011
Page 2 of 2
7 1.30.31 Concept Schematic Design
s 1095 - Issue Design Notice to Proceed
a 1100 - Prepare Design Schmatles
i0 1105 - Schematic Submittal
11 1110 - Schematic Design Rotiow
12 1.30.32 60% Preliminary Design
13 1120 - 60% Preliminary Plans and Specification
14 1125 -60% Preliminary Plans and Specification Submittal
is 1130 - Review Preliminary Plans and Specifications (CFW)
16 1135 - Submit Plans to tlhlitic•s
M&C to Request to remove Rosedale from TxDOT System
18 City Council Approval
TxDOT Request to remove Rosed.* for TxDOT System
1.30.33 90% Final Design
21 1150.90% Final Plans and Specifications
22 1155 . 90% Final Plans and Specification Submittal
1160- Review Final Plans and Specifications (CFW)
24 1176 - Prepare and Sutvnit 95% Final Plans and Specifications
25 1180 - Incorporate Commons and Submit Final Plans and Specifications
1190 - Design Complete
Design Project Schedule
ID Task Nano
1 _
1 1.20 Project Agreement
2
4
6
Initial Contract Authorization
1015 - Negoit'ate Scope and Fee
1020 - Md,C and Council Approval
1030 - Council Award A3rcerncnt
1.30 Design
17
19
20
-zs
21
2a
Duration
Sian
Fresh
1_ll L_ 1_ rJa/8___- c/3_ 1.. 1 L 7.6vsh1 1Ynl 1 1 l wu..t_cMy ftl Ary 1 6
i I � / 4 i 129�'_11ifa-1--1ie�1_ .i�_2/.i_ t 2'17 I._361S__ Y1L..-:+fit 1.4r14 [ 428 1 ia7Z 1 .TO i �-�' 1�31_31I ]I1 __tip:-8/18
Mon 3118113 Tue 4/30111 1 ! 1.20 Project Agreement
1 !
32 days
10 days
16 days
16 days
0 days
154 days
25 days
0 days
15 days
0 days
10 days
84 days
40 days
0 days
10 days
0 days
24 days
0 days
3 mons
69 days
40 days
0 clays
10 days
10 days
9 days
0 days
Mon 3/18/13
Mon 3/18/13
Tue 4/9/13
Tue 4/30/13
Fri 3029/13
Frl 3/29/13
Fri 3/29/13
Mon 4/1/13
Fri 4/19/13
Mon 4122/13
Wed 5/1/13
Mon 5/20/13
Frl 7/12113
Mon 7/15013
Fri 7/12/13
Wed 5/1/13
,ton 6'3/13
Tue 6/4/13
Mon 7/29/13
Mon 7/29/13
Fri 9/20/13
Mon 9/23/13
Mon 10/7/13
Mon 10/21/13
Thu 10131/13
1
Fri 3/29/13 1 1 1
I .
Mon 4/8/13
Tue 4/30/13
Tuc 4/30/1
Thu 10/311131
Fri 5/3/13
Fri 3120112
Fri4/19/13
Fri 4/t0112
Fri 5J'3112
Mon 8/26112
Fri 7/12/1'3
Fri 7/12/1Z
Frl 7/26113
Fri 7/12/13
Mona/3/12
Mon 6.'3/1:
Mon 812611?
Thu 10/31/13
Fri 9/20/13
Fri 9/20113
Fri 10/4/13
Fri 10/18113
Thu 10/31/13
Thu 10/31013
1.50 Survey
481 days Mon 4/1/13
Mori 2/2115'
1.50.51 Preliminary Survey
1360 - inaiai Field Srnrey
30 1.50.52 Construction Slaking
31
12 -
33
34
35
36
35 days
35 days
12 mons
Mon 4/1/13
Mon 4/1/13
Tuc 314/14
Fri 5/17/13
Fri 5117/12
Mon 2/2115
1.60 Public Involvement
227 days
Mon 516i13
Tue 3/18/161
1.60.60 Public Meetings
Citizen AdvisoryCommittee No. 1
1380 • Pubbc Meeting No. 1 (Concoptual)
Citizen Advisory Committee No. 2
1390 - Public Meeting No. 2 (Etna! Design)
1400 - Pubic Meeting No. 3 (Conslrucllan)
227 days
5 days
10 days
5days
10 days
10 days
Mon 5/6/13
Mon 5'6/13
Mon 5/13/13
Mon 919113
Mon DW16/13
Wed 3/5/14
The 3/18111
Fri 5110113
Fri 5124/131
Fri 9/13/13
Fri 9127/13,
Tua 3118/14
1.80 Construction
288 days Thu 10.'31/13
Inc 12/9/14
1.80.81.10 Bid Preparation and Advertisement
ern 2010 -Start Adveilisernent
41 2015 - Adverhsemenl Period
ez 2020 -Hold Prc-Bid Meeting
43 2025 - Issue Addenda
35 days
0 days
25 days
0 days
4 days
Thu 10/31/13
Thu 10r31/13
Fri 11/1/13
The 11/26/12
Tue 11t26/12
Thu 12/19112
Thu 10/31/13
Thu 12/5113
Tue 11126/1:
Fri 11/29113.
! I
Initial Cont?act Authorization
ur.?11 1015 - Negoitiate Scope and Fee
: 1 I I1
1020 - M&C and Council Approval
1030 - Council Aw: rd Plreement t 4/30
1 I
1 I
1.30.31 ' o4ept Schematic Design
I !
1095 - Issue Design Notice to Proce td r- 3/29
1.30 Design
I 1
: 11100 - Prepare Design Schmatics
!1105 - Sctiematicsutsiittal 47,4/19
I
/ma 1110 - Schematic Design Review
1.30.32 60% Preliminary Design
>trt 15 1929_L10[131_ 16127 ! 11llt /24-- 12/Jt i IMF tli�/1.9 1 2 u18
1
1120 -60% Prelimlltiary Plans and Specification
1125 - 60% Pre imin Hy Plans anc Spei location Submittal 47N 7/12
i I I
I I I I
1130 - Review Preliminary Pans and Specification (CFW)
I ( i
1135,- 3ubrt it Plans to Utilities p� 7/12 ;
, I !
M&C to Request to rSiiove Rosedale from TxDOT System
1q }
y+•��vx +�+i
City Council Appaoval'.16/3
I 1
! I
i.-
I
I I ! ( !
TxDOT Request to remove Rosedale for TxDOT System
1.30.33 90% Final Design
1150 - 90a/. Final Plans and Specifications
1155 •90% Final Plans and Specification Subn ittal 9120
I
1 I 1 ! I i 1
:;_:;? 1160 - Review Final Plans and Specifications (CFW)
1 1
It 1176 - Prepare and Submit 90% Final Plar{s and Specifications
1
1 t
td 3, 1180 - Incorporate Comments and Submit Final Plans and Specifications
1 50. -1 Prelim! n •ry S rvey
1360 - Initial Field Survey
1
1
1
t
1 1 3iiii 1,31a _irtiT4-r2i
1
1 I I
1
1
1
1 1 1
1
1191 - Design Complete • 10/31
i ! I
1
T3 Citizen Advisory Committee No. 1
Ism 1380 - Public Meeting No. 1 (Conceptua )
2010 = Start Advertisement 4'r10131
1
1
1
1
1.60 Public Involvement
1.60.60 i Public Meet ngs
1
1
1
Citizeh Advisory Co nmittee No. 2
1390 - Public t sleeting No. 2 (Final Design)
1
I '
1.80.81.10 Bid pkeparation and Advertisement
I I
2015 - Advertisement Period
2020 - Hold Pre -Bid Meeting H.111) 6
2
J 2 5 - Issue Addenda
1.50 Survey
•
Ityggn 1400 - Public Meeting No. 3 (Conste fiction
1.80 Construction'
1
City of Fort Worth
Rosedale Improvements (IH-35 to US 287)
ir Srrl 8'tr IiA1 9141i1ty2B 1iN1211 /8 I 11731 I2(1 121211 tN I ir18-! l
I r 1 1 r T
I 1 1 1 1
I 1 1 I I
1 1 1 1 I
1 1 I I 1
1 1 1 1 1
I r 1 1 1 1
1 1 1 1 1 1
1 I I r !
I 1 ! 1 1 t
I 1 1 1 I !
1 1 t 1 1 ! I
1 I 1 1 1 I
1 1 1 1 f I
1 1 1 1 1 t 1
1 1 1 1 r 1
I 1 1 1 1 i 1
I E I ! !
I I I I
1 1 !
I I ! I
1 1 I 1
i i I 1 I
I I ! ! I
1 1 I
t I 1
1 t 1
t 1 1 1 I
1 1 1 1 I
I 1 t I I
1 1 1 ! I !
1 1 1 1 1 1
1 1 1 1 t 1
1 I 1 1 t
1 1 I ! 1 ?
i 1 1 1 1 I
I 1 f 1 I
I 1 I 1 ( I
I 1 I 1 I
I ! I I I
1 1 1 1
_ , _
1.5C
raislha
fleviscd Wc4 32Cw13
SIM
Des gn Project 5cneaule
IU 1a91tNine
44 2036 - Hid Opening
45
2090 - Review Bids and Select Contractor
46 1.80.81.15 MAC Process
47 2065-M&C Process
48 2070 Award Contract (Construction)
49 1.80.81.20 Contract Award
54 2035 - Execute Contract Documents
51 2040 - Issue Construction Notice to Proceed
1.80.83 Construction Contract
53 2100 - Construction
t
Otwation
SIMI Finish
0 days Thu 1215113 Thu i2/5/17
10 days
33 days
33 days
0 days
20 days
20 days
0 days
200 days
10 mons
Fri 12/6/13
RI 12/20/13
Fri 1212E 3
Tue 2/4114
Wed 2/5/14
Wed 2/5/14
Tuc 314/14.
Wed 3/5/14
Wed 3/914
Thu 12/19/13
Tug 2/4/14
Tue 2/4/14
Tue 2/41114
Tue 314/14
Tue 3/4/14.
Tue 314/14
Tue 12/9114
Tue 1219/14
Lkccrt4 t_ 1 .J�r g 1 t Fs 1 kWh 1 i_ —.Unit_ _1_._re 1 one
i1.12491 2,1._1,s_1_1rmL2r31211i MS_atl.L:INILL414114r28_I 5ry2_t_l24_i.4�R
1
t K! _�t� ticr4rnit. OcM�Gar 1.. 1 (J� 1� 1 J_ .JMWfl I F 1
fiR�l Q1 8r4_L6n16 Heft I :v13 929 M 11 _ 14Z1 _ 1.1/10 Hp. 12$112/A_ a_L109 27 2tl6 ; 2_La/te I Q. _4t13 4P27 L 5111
•
•
2030 - old Opening p 12/5 ;
r I
2090 - Review Bids and Setect
i
1.80. 1.15 MSC Process
II
;.. 2065 - MAC Process
:ontractok
2070 Award Contract (Construction), 2/4
1.80.84E20 Contrac : Award,
1
11
2040 - Issue Construction Notice to Proceed w 3/4
•
City of Fort Worth
Rosedale Improvements (IH-35 to US 287).
AIME
. 525 I rota jjaTemilit-C arum 7- iota
r.P. 1_a1r22: 7B Oat! 9114 t1 1Q12 11Ir26 1 1119 11t73 . 11 1w7 112aJri 1.14 i -'swL2IL_
I I
2035 - Execute Contract Documents
1.80.83 Construction Contrajct
s
-, MN I
•
•
•
2100 -Construction'
RaiirsoctWd320r13
w CS]1=i
1
MM
MOM
MEM
ii
111
tl
11••
z_L_
z
J
1-
H
tIiMarliI11IIIIII
I11111111111 I
111(
1
111 111 11111
11111111 11
J
in I411111 i i-1-1,1-IT-1 -1
H
11111111H
l�iiilnll U(111TIl1ICl tliNczt111TliITil► 11I1111 ills 11 1 11 1 I\
111 1111111 11111111 � j�I I III 11 1111111111 111111'N
•4 i11111O
•
-I-=—■?id•
111111111H
11111111111
111111111 1
1J11 JJJJ 11IIIIIIII IIIIIII IIIII
IIIlllllllll1111IIIIIIIIlIl1111111
H 111111IIII
L111111111
1111111/11
1111/111/1
1
1111
NM
ems
;!
IIII®®
h
MI= Mk
_
_
_1111
— 111111EED
_■
NM WO
NM MN
111 1 1 111 1
OHL'
11111 I
1 III
III
ELIO
-r-
n11: i
1111111 1
1111111111
uIliIN-J-,I
1111111111111111111
(11 If111 ITT TTITTi1
111111111 ! 1111111
_�= II !pi
�
11
11-1
�IIIIII
11
z
III I IIIII
1 11111 1 1
1111111
III
1111
IIIII
111111
1111
uI9 I ,•
!1iii.
Attachment E - East Rosedale Retrofit 1-35 to US 287
Rosedale Street
Cop Qht 2071 G of Fort Worth. UhattthorlieQ lE l Il '1d.�W_9JI 11 1 I it; i I 1 I 1
This product Is for Information purposes and may not have been prepared foo���lle for legal, engineering, or surveying
survey and represents only the approximate relative location of property boundaries. The City of Fort Worth assumes no responsibility tar the accu accuracy of said data. on they ound
Parcels
11111111
111111
1111111111111
1 1 11
J IJJ,JJ� )1
IJ1111111111 I ..■
11111111111
411111
AIM
4111/1111
1=111 EOM
1111
11111111
I I n
\ I - I I 1LJ1I _I'1\\I I► I I l l ll l l//C O l f rl ii
� 11111 11( N 11111111111111 \
�l 1111 11 II(\M11] 11111
1/11111111
111111
1111111
1111111
I1111111
1111111
III
11 1 \ 1 I 111 1
1111111\
f
Ll
11
I111II1
L.
1 111
111
Feet
pool = 0 500 1,000 2,000
CITY PROJE6� ########
•
Task No.
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
East Rosedale Street Retrofit 1-35 to US 287 (Initial Authorization for Pre -Design Services)
Task Description
1.0 Project Management (Initial Phase)
1.1 Managing the Team
1.1.1 _ QA/QC (Concept Submittal)
1.2 _Communications and Reporting
1.2.1 Project Update Meetings (2) (Monthly)
2.0 Conceptual Design (Initial Phase)
2.0 'Conceptual Design Schematic
2.1 :Data
Collection
2.2 Roadway Design
2.2.11 Project Site Investigation (2 Site Visits)
2.2.21 Meet with Key Stakeholders
2.2.31 Develop Planning Concept
2.4 'Complete Streets and Urban Design Concepts
2.4.11 Prepare Streetscape Section Concepts
2.4.21 Prepare Streetscape Plan Concepts
2 4.31 Prepare Cost Comparison Estimates
2.4.4 Design Workshop
2 6 Public Involvement
2.6.1 Prepare for (1) Citizen Advisory Committee Meetings
2 6.21 Citizen Advisory Committee Meeting No. 1
8.0 Survey
8.1 Design Survey
1
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 5.19.2010
Project
Director
Rate $248
•
•
•
I
I
I
I
Tolalsl
2
2
6
4
2
0
1
Project
Manager
$192
8
4
4
30
4
4
4
2
2
2
4
4
4
Project
Engineer
$105
4
4
80
4
4
4
4
40
12
4
4
4
CADD
City Project No. 01894
Labor (hours)
Landscape
Architect V
$53 $140
4
4
20
20
01
81
0
381
84
O
24
4
4
50
4
24
8
2
4
4
4
0
Landscape
Architect III
$89
0
60
41
48
4
4
60
Senior
Planner
$170
0
20
8
8
2
2
01
1
1
201
$420
$0
$2,104
$2,128
401 $6,5881
$0
$8,436
$6,764
$1,924
$3,096
$0
$2,444
$2,584
0i $01
$0!
Planner
Total Labor
Cost
$101
0 $3,224
$0
$1,824
$0
$1,400
$0
40 $36,496
1
1
1
Expense
Subcons altant
MWBE N )n-MWBE
$0
i
so'
1
1
1
1
1
1
1
1
1
$9,000
$9,000I
$0
Total Expense Task Sub Total
Reproduction Cost
$0
$o
$o
$o
$o
$o
so
$0
$0
$0
$0
$0
$0
$0
$0
$0 , $01 $9,000
' $9,000
401 $ 39,720 I $ 9,000 I $ $
$3,224
$1,824
$0
$1,400
$0
$36,496
$420
$0
$2,104
$2,128
$6,588
$0
$8,436
$6,764
$1,924
$3,096
$0
$2,444
$2,584
$9,000
$9,000
- 1 $ 9,000 I $
Project Summary
Total Hours
Total Labor
Total Expense
MWBE Subconsultant
Non-MWBE Subconsultant
10% Sub Markup
MWBE Participation
Total Project Costl
48,720
328
$39,720
$9,000
$9,000
$0
$900
18.1%
$49,620
1 of 1