HomeMy WebLinkAboutContract 44261 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT §
City Secretary
Contract No. - I l'(Z1
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: D.R. Horton -Texas, Ltd
Address, State, Zip Code: 6751 North Freeway, Fort Worth, Texas, 76131
Phone, E-Mail: (817)230-0800, dallen@drhorton.com
drhorton.com
Authorized Signatory/Title: Don E. Allen/Assistant Secretary
Project Name: Villages of Woodland Springs West Phase 8
Project Location: NEC of Timberland Blvd. & North Riverside Dr.
Plat Case No.: FP-012-043 Plat Name: The Villages of Woodland Springs
Mapsco: 21H
CFA: 2013-001
To be completed
Received by:
E: 6944
RECEtVED MR 7 2llTh
Council District: 2
1
ate:
City Project No: 02019
(IQ /
•
OFFICIAL RECORD
��'ftl SECRETARY
Et MOR7H, TX
•
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) _X,
Sewer (A-1) X, Paving (B) X, Storm Drain (B-1) X, Street Lights &
Signs (C) X.
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The submittal
should occur no Iess than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such iniuriess death or
damages are caused. in whole or in part, by the alleged negligence of
the City of Fort Worth. its officers. servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused, in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers. sen'ants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name. Villages of Woodland Springs West Ph. 8
CFA No.: 2013-001 DOE No.: 6944
An Engineer's Estimate of Probable Cost Is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed byTri-County Electric
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
I Bond = 100%
(Completion Agreement = 100% / Holds Plat
(Cash Escrow Water/Sanitary Sewer= 125%
(Cash Escrow Paving/Storm Drain = 125%
(Letter of Credit = 125% w/2vr expiration period
102,612,62
118,990.30
221,602.92
249,895.00
19,322.50
29,418.55
298,636.05
520,238.97
4,432.06
4,432.06
8,864.12
10,768.70
5,384.35
1,176.74
1,960.00
19,289.79
28,153.91
Amount
520,238.97
520,238.97
277,003.65
373,295.06
650,298.71
Choice
/ck one
1
1
1
1
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has execute his
instrument in adru licate, at Fort Worth, Texas this day of e/a/1C—
,
p
20
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi-Ba ulal, EMBA, P.E.
Development ' .ngineering Manager
Approved as to Fort & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. 4/4-
Date:
ATTEST:
Mary J. Kayse
City Secretar
ATTEST:
Signature
(Print) Namella r 4ilen
Transportation & Public Works Department
Dougla� W. Wiersig, P.E.
Direct
Approved by City Manager's office
Fernando Costa
Assistant City Manager
lb, 00
Aeriti 1700400011414
net °Ctb**%
01::4 A 000
4 Niraoppr 13814
441 °
• � %a..
0 A►S .o,�'Q"
�i
u�1V�D.�1O'�~'
D.R. Horton —Texas, Ltd.
By: D.R. Horton, Inc.
its Authorized Agent
Signature
Print Name: Don E. Allen
Title: Assistant Secretary
OFFICIAL RECOV=
CITY SECRETARY
�% WORTH9 TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included
0
x
z
a
rs
Ailk
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
PELOTON LAND SOLUTIONS, LLC
5751 KROGER DR, SUITE 185, KELLER, TX 76244 (817) 562-3350
CFA ESTIMATE FOR: THE VILLAGES OF WOODLAND SPRINGS WEST
1/25/2013
EXHIBIT A - WATER IMPROVEMENTS
ITEM # CITY BID # DESCRIPTION
1
2
3
4
5
6
7
8
9
10
00618 8" PVC Water Line
00749 8" Gate Valve & Box
00546 Fire Hydrant w/6" Gate Valve
00568 Cast Iron Fittings
Concrete Blocking - Type B
00762 (Water Service, 1" Tap to Main
00758 'Water Service, 1" Line
11" Irrigation Service
(Meter Box, Class A (Polyethylene) - Res
00372 (Trench Safety
TOTAL WATER IMPROVEMENTS
UNIT
LF
EA
EA
TON
CY
EA
LF
EA
EA
LF
QTY
1,834
6
3
1.9
9.0
52
1,633
3
52
1,834
UNIT PRICE
19.15
1,150.00
3,541.00
3,789.35
101.00
449.00
6.55
1,026.00
77.00
0.40
TOTAL
35,121.10
6,900.00
10,623.00
7,199.77
909.00
23,348.00
10,696.15
3,078.00
4,004.00
733.60
$102,612.62
G:\JOB\CEN12008_Woodland_Springs_West_Ph_8\Civ\CFA\20130124_QTO_WSW8.xls Page 1 of 6
PELOTON LAND SOLUTIONS, LLC
5751 KROGER DR, SUITE 185, KELLER, TX 76244 (817) 562-3350
CFA ESTIMATE FOR: THE VILLAGES OF WOODLAND SPRINGS WEST
1 /25/2013
EXHIBIT Al - SANITARY SEWER IMPROVEMENTS
ITEM #
1
2
3
4
5
6
7
8
9
10
11
12
CITY BID # DESCRIPTION
00351 8" Sanitary Sewer Main (SDR-35 PVC)
8" Sanitary Sewer Main (SDR-26 PVC) w/Cement Stabilized
Sand
18" Ductile Iron Pipe
00094 12" Rock Rip Rap
00213 Manhole - Std 4' Dia. (All Depths Inc' Collar)
00217 Manhole - Vacuum Test
00211 Manhole - Interior Protective Coating
00355 Sewer Service - 4" Tap
00354 4" Sewer Service with cleanouts (SDR-35 PVC)
4" Sewer Service with cleanouts (SDR-26 PVC)
00372 Trench Safety
00201 Post Construction CCTV
(TOTAL SANITARY SEWER IMPROVEMENTS
UNIT
LF
LF
LF
SY
EA
EA
VF
EA
LF
LF
LF
LF
1
QTY UNIT PRICE TOTAL'
1,783 20.40 36,373.20
120
3161
30
10
10
11
52
609
732
2,219
2,219
22.15
68.25
71.05
2,281.00
130.00
195.45
403.00
4.15
3.75
0.40
1.30
2,658.00
21,567.00
2,131.50 1
22,810.00 1
1,300.00 1
2,149.95 1
20,956.00
2,527.35
2,745.00
887.60
2,884.70
$118,990.30
G:\JOB\CEN12008_Woodland_Springs_West_Ph_8\Civ\CFA\20130124_QTO_WSWB.xIs Page 2 of 6
PELOTON LAND SOLUTIONS, LLC
5751 KROGER DR, SUITE 185, KELLER, TX 76244 (817) 562-3350
CFA ESTIMATE FOR: THE VILLAGES OF WOODLAND SPRINGS WEST
EXHIBIT B- PAVING IMPROVEMENTS
ITEM # CITY BID # DESCRIPTION
1 00450
2 00484
3 00496
4 00527
5 00532
6
7 00457
TOTAL PAVING IMPROVEMENTS
6" Concrete Pavement 29'B-B w/ 7" Curbs
6" Lime Stabilized Subgrade
Hydrated Lime (30#/SY)
4' Wide, 4" Thick Concrete Sidewalk
ADA Wheelchair Ramp
(Remove Existing 4' Concrete Sidewalk
'Remove Existing Concrete Pavement
1/25/2013
UNIT
SY
SY
TON
SF
EA
SY
SY
QTY
6,585
7,010
105.0
636
8
41
28
UNIT PRICE TOTAL
30.00 197,550.00
2.50 17,525.00
185.00 19,425.00
3.75 2,385.00
1,540.00 12,320.00
10.00 410.00
10.00 280.00
$249,895.00
G:\lOB\CEN12008_Woodland_Springs_West_Ph_8\Civ\CFA\20130124_QTO_WSWB.xis Page 3 of 6
PELOTON LAND SOLUTIONS, LLC
5751 KROGER DR, SUITE 185 KELLER, TX 76244 (817) 562-3350
CFA ESTIMATE FOR: THE VILLAGES OF WOODLAND SPRINGS WEST
1/25/2013
EXHIBIT B1- STORM DRAIN IMPROVEMENTS
ITEM # CITY BID # DESCRIPTION
1 00084
2 00083
3 00074
4 00073
5 1 00106
6 1 00094
7 1 00372
33" RCP
30" RCP
33"Sloping Headwall
30" Sloping Headwall
J 10' Std Curb Inlet
118" Thick Rock Rip Rap
Trench Safety
TOTAL STORM DRAIN IMPROVEMENTS
UNIT
LF
LF
EA
EA
EA
SY
LF
QTY
73
57
1
1I
21
34
130
UNIT PRICE
61.65
52.65
1,658.00
1,600.00
3,056.00
67.50
1.20
TOTAL
4,500.45 1
3,001.05
1,658.00
1,600.00
6,112.00
2,295.00
156.00
S19,322.50 I
G:VOB\CEN12008_Woodland_Springs_West_Ph_8\Civ\CFA\ 20130124_QTO_WSW8.xls Page 4 of 6
PELOTON LAND SOLUTIONS, LLC
5751 KROGER DR, SUITE 185, KELLER, TX 76244 (817) 562-3350
CFA ESTIMATE FOR: THE VILLAGES OF WOODLAND SPRINGS WEST
1/25/2013
EXHIBIT C - STREET LIGHTING IMPROVEMENTS
ITEM # CITY BID #
00967
ITOTAL STREET LIGHTING IMPROVEMENTS
1
2
3
4
5
DESCRIPTION
Conduit - 2 Inch - Open Cut - Sched. 40
Light - Concrete Foundation - Type 4
Pole Type D25-6 w/Single Arm with 100W HPS Luminaire
#8 THHW Alluminum
#10 THHW Alluminum
UNIT
LF
EA
EA
LF
LF
QTY
595
UNIT PRICE TOTAL
8.56 5,093.20
9 966.00 8,694.00
9 1,596.00 14,364.00
780 0.71 553.80
1,005 0.71 713.55
$29,418.55
G:\JOB\CEN12008_Woodland_Springs_West_Ph_8\Civ\CFA\20130124_QTO_WSWB.xIs Page 5 of 6
PELOTON LAND SOLUTIONS, LLC
5751 KROGER DR, SUITE 185, KELLER, TX 76244 (817) 562-3350
CFA ESTIMATE FOR: THE VILLAGES OF WOODLAND SPRINGS WEST
1/25/2013
EXHIBIT C1 - STREET SIGNS
IITEM # CITY BID # DESCRIPTION
1 Street Name Blades
(TOTAL STREET SIGNS
UNIT
EA
QTY
8
UNIT PRICE
245.00
TOTAL.
1,960.00
$1,960.00
G:\JOB\CEN12008_Woodland_Springs_West_Ph_8\Civ\CFA\20130124_QTO_WSW8.xls Page 6 of 6
0
NORTH
HARMON RD
HARMON RD
PROJECT
BLUE MOUND RD E
0
z
0
2
cc
x
KELLER-HICKS RD
0
cc
z
o
x
HARMON RD
rr
1
HICKS Rf•
OLD DENTON RD
KELLER-HICKS RD
GOLDEN TRIANGLE BLVD
ALTA VISTA
ALTA VISTA
ENGINEER:
OWNER/DEVELOPER: gnu pELOTON
2000. THE VILLAGES OF CROWN VALLEY , LAND SOLUTIONS
WOODLAND SPRINGS WEST AQUISITIONS SOUTH, L.P. 5751 KROGERDRIVE
122 N. IH 35-E, SUITE 200 SUITE 185
CARROLLTON, TEXAS 75006 KELLER, TX 76244
PHONE: 469 892 7200 PHONE: 817-562-3350
GRAPHIC SCALE DATE: JAN 2013
1
0
w
X1-vW
1
2
3
4
BLOCK 1
LOT 1X
PR VATE
OPEN SPACE
GRP.Y 7KIN6ElIR9D
20 19 18
17 16 15
21 22 23 24 25 26 27
5
�ANYO1\ WREN LANE
r
9 10 11 12 13
BLOCK 2, LOT 14X
PRIVATE
OPEN SPACE
LEGEND
A; .1) I3011
`4 PROPOSED WATER LINES
EXIST WATER LINES
H PROPOSED GATE VALVE
♦ PROPOSED FIRE HYDRANT
NOTE: ALL PROPOSED WATER LINES ARE 8"
UNLESS OTHERWISE NOTED
EXHIBIT A - WATER
38 37
0 CC
CI0
BLOCK 1
LOT 10X
PRIVATE
OPEN SPACE
•
S aF SCEs Nloecoo
NO
PNP
/ \
4
0
NORTH
200'
THE VILLAGES OF
OWNER / DEVELOPER'
CROWN VALLEY
!�I PE LOTO N
III LAND SOLUTIONS
WOODLAND SPRINGS WEST AQUISITIONS SOUTH, L.P. 5751 KROGER DRIVE
SUITE 185
122 N. IH 35-E, SUITE 200 KELLER, TX 76244
GRAPHIC SCALE DATE: JAN 2013
CARROLLTON, TEXAS 75006 PHONE: 817-562-3350
PHONE: 469-892-7200
1
i
2
3
4
BLOCK 1
LOT 1X
PRIVATE
OPEN SPACE
i
0
NO.S,AGS"-S0N3
6
*
i PROJ # 7 F S,
\ 074005. \
.17. .18n. 9
T *
I3RA KIfJGB RD
20 19 18 6 15
17
10
21 22 23 24 25 26 27 28
5 f * * * * * * * * *
6
CANNON WRETIUNE
8 9 10 11 12 13
BLOCK 2, LOT 14X
PRIVATE
OPEN SPACE
-Fr I l 131_
LEGEND
--�-- PROPOSED SEWER LINES
EXIST SEWER LINES
SDR 26 SERVICES
PROPOSED SEWER MANHOLE
•
NOTE: ALL PROPOSED SANITARY SEWER
LINES ARE 8' UNLESS OTHERWISE NOTED
EXHIBIT Al - WASTEWATER
cc
W
2
Q
N
CO
31
29 30
38 37
36
� OeP•NO SE jSO NO
J\L 9PSE'I.
P\.\P
y
ix
3a
0
NORTH
200'
THE VILLAGES OF
OWNER / DEVELOPER: PELOTON
CROWNVALLEY p� LAND SOLUTIONS
WOODLAND SPRINGS WEST AQUISITIONS SOUTH, L.P. 5751 KROGER DRIVE
122 N. IH 35-E, SUITE 200
CARROLLTON, TEXAS 75006
PHONE: 469-892-7200
SUITE 185
GRAPHIC SCALE DATE: JAN 2013
KELLER, TX 76244
PHONE: 817-562-3350
!1 I
L'I � mLig
,-1
(n (1;3'71
l ZO
i ow
BILL
ANEN\N
T
OON �.Ct 26
J OE02 pG
2
4
5
BLOCK 1
LOT 1X
PRIVATE
OPEN SPACE
20
19
6 7 GRAY KI G P':IRD
18
17 16 15
21 22 23 24
25
26
BAN YON WREN L ANE
w�
2>
Z�rM I
—
I
--BCODK 2LOT TdX--=---- - _.. _,___.___
PRIVATE
OPEN SPACE__ __ ____ .___
9 10 11 12 13
14
1
27 28
29 30
-o le, NT 1RSe'I
�p
BO(.11.E `/A RL)
DOE NO 3792
FILE NO K-1686
LEGEND
29' B-B / 50 ROW (TYP)
6" CONC ON 6" LIME STAB SUBGRADE
S IDEWALK BY DEVELOPER
S IDEWALK BY HOMEBUILDER
ADA RAMPS BY DEVELOPER
EXHIBIT B - PAVING
BLOCK 1
LOT 10X
PR VATE
OPEN SPACE
of V4\ES NNo
JP -\ASPS 1.5�0-\\O
QAp
0
NORTH
OWNER / DEVELOPER:
Hill PELOTON
200, III LAND SOLUTIONS
WOODLAND SPRINGS WEST AQUISITIONS SOUTH, L.P. 5751 KROGER DRIVE
122 N. IH 35-E, SUITE 200 SUITE 185
KELLER, TX 76244
THE VILLAGES OF
CROWN VALLEY
CARROLLTON, TEXAS 75006 PHONE: 817-562-3350
PHONE: 469-892-7200
•
•
•
GRAPHIC SCALE DATE: JAN 2013
EXIST 3-81x4' MB8
D.O.E. 3792
„FILE # W-1175
Ptt-0:S
PoPtoO\-k•OX� 6 O
F SGO �g72
2
3
4
5
8
BLOCK 1
LOT 1X
PRIVATE
OPEN SPACE
•
0
30" SLOPING
/ HEADWALL
16
GIVY KIGEIfD
10' INLET
20 19 18 17 16 15 14
I 21 22 23 24
`�.DANYON WREN LAN
9
25
10 11 12 13
26
27 28
BLOCK 2, LOT 14X -�
PRIVATE
OPEN SPACE
Li D
LEGEND
PROPOSED STORM DRAIN
EXIST STORM DRAIN
EXHIBIT B1 - STORM DRAINAGE
31
29 30
38
37 36
•
•
BLOCK 1
LOT 10X
PRIVATE
OPEN SPACE
•
33" SLOPING N
HEADWALL
V IgNO N
tAC'es °: SEG \O
J\L 5P5�t,
PNP
34
97.00,' /
9 �666 A6 / f
/
I, CY,Szv
\\\/
0
NORTH
200'
MIME
OWNER / DEVELOPER: In PELOTON
THE VILLAGES OF CROWN VALLEY
'fl LAND SOLUTIONS
WOODLAND SPRINGS WEST AQUISITIONS SOUTH, L.P. 5751 KROGER DRIVE
SUITE 185
122 N. IH 35-E, SUITE 200 KELLER, TX 76244
•
GRAPHIC SCALE DATE: JAN 2013
CARROLLTON, TEXAS 75006 PHONE: 817-562-3350
PHONE 469-892-7200
1 N NS Nt.
J� 32p 26
3
4
BLOCK 1
LOT IX
PRIVATE
OPEN SPACE
650G5`NO
-5 N'3
_ J\1 QNP5�1fe cL —
10
GRF'Y KI GE IR9D
20 19 18
17 16 15
I 21 22 23 24 25 26 27
5
IL :AN YON WREN LANE
9 10 11
'BLOCK 2;10T 1"4X-��
PRIVAT
OPEN SP
IP,ERLAN Ii BC)
NIs
S1GPg R5 1R,9P
LEGEND
PROPOSED STREET LIGHTS
EXIST STREET LIGHTS
2 13 2
OCC
0 ❑
Z,
z
EXHIBIT C - STREET LIGHTS
28
BLOCK 1
LOT 10X
PRIVATE
OPEN SPACE
7
OF4'esNNO
POEP\C' g 10.10
J\� SP5E1,
QNP
O NORTH 200'
OWNER / DEVELOPER'
THE VILLAGES OF CROWN VALLEY
01 PE LOTO N
'II LAND SOLUTIONS
WOODLAND SPRINGS WEST AQUISITIONS SOUTH, L.P. 5751 KROGER DRIVE
122 N. IH 35-E, SUITE 200
CARROLLTON, TEXAS 75006
PHONE: 469-892-7200
SUITE 185
GRAPHIC SCALE
DATE: JAN 2013
KELLER, TX 76244
PHONE: 817-562-3350
os•51
O
2
BLOCK 1
LOT 1X
PRIVATE
OPEN SPACE
9
GE' GSN j50N 3
JU"�SPSE'I;SEG
pN
22
10 11 12 13
-BCOCK2; LOT 14X__
PRIVATE
OPEN SPACE
\I
ZRPNENZ V 7
GOVI
32 •
vP Z61
0
j1GP6 PRS �59 P
LEGEND
PROPOSED STREET NAME SIGNS
A EXIST STREET NAME SIGNS
EXHIBIT Cl - STREET NAME SIGNS
BLOCK 1
LOT 10X
PRIVATE
OPEN SPACE
GES GS� Z09
‘140.S NNO
/
0
NORTH
200'
MIME
THE VILLAGES OF
WOODLAND SPRINGS WEST
GRAPHIC SCALE DATE: JAN 2013
OWNER / DEVELOPER: 'NH P E LOTO N
CROWN VALLEY
III ` LAND SOLUTION!
AQUISITIONS SOUTH, L.P. 5751 KROGER DRIVE
122 N. IH 35-E, SUITE 200 SUITE 185
CARROLLTON, TEXAS 75006 KELLER, TX 76244
PHONE: 469-892-7200 PHONE:817-562-3350