Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 44321-CO1 (2)
City of Fort Worth Change Order Request t°fl1fY SECRETARY commActr tltio HO b.")) .7.1 to 1 . . _ • Change Order No. Date TPW Project No. Funding (FAC) 1(One)7/27/13 0004-539120- 0246000 Facility and Project Description City Secretary Contract No. Renovate Auditorium Theatrical Sound System WRMC 44321 ORIGINAL CONTRACT AMOUNT $ 335,401 EXTRAS TO DATE CREDITS TO DATE CONTRACT COST TO DATE AMOUNT OF PROPOSED CHANGE ORDER REVISED CONTRACT AMOUNT ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ADDITIONAL FUNDING (IF NECESSARY) 0 0 IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Furnish all labor and material as per the attached Propose Change requests: Revise Allen & Heath Control Consol from analog to digital as per attached quote Add $ Total Add $ $ 335,401 $ 10,035 $ 345,436 $ 64,599 $ 54,564 0 10,035 10,035 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) foi all costs arising out of, or incidental to, the above Change Order Contractor's Name Able Communications, Inc Original Contract Time 40 cd �} Contractor- A•M 0 Chief, 1reffitectural Se Project Architect /NA Ass Additional Approved Time To Date 0 tions ices Divisio IVA Distribution: File Construction n Man. rroject Manager Co ptr toy,. I •U lit to &I CORD ©D r17 IECRFT - RY Approved Contract Time To Date 40 cd Date 35t f 3 Date t/7 113 Date Date Additional Time For This Change Order 0 cd Const uctiorj Manager Dir;cbl, Tr nsportation and Public Works Claimmira- Manager agh Council Action (If Required) ❑ Approved ❑ Disapproved n Other Date, Date siva Date 8 f Z !3 Ir' 'JD igc-s (� 41\41^ 7 2B'% �xAs TPW Facilities Management Division Change Order Form (12/19/01) CONNECTING COMPANIES ABLe Communications, Inc. Connecting You/ 1413 East Avenue H Grand Prairie, Texas 75050 Phone 972.660.2253 Fax 972.660.2254 www.ablecomm.net To: City of Fort Worth Architectural Services 401 West 13th Street Fort Worth, Tx 76102 Project: Ft Wth Cony Ctr Sound System CHANGE ORDER REQUEST NUMBER 12725-08 CHANGE ORDER REQUEST DATE 7/10/2013 VI Id APPROVAL REQUIRED BY 7/17/2013 Descriotion of Promised Change: According to bid RFI responses from BAI the current AMX Source code would be provided or the winning bidder would have access to retrieve those files after the award. It was unfortunate that the code that was loaded into the current control processors was 'compiled" or unchangeable. We contacted AMX at that time and was informed that we could possibly damage the functioning "compiled code" that was currently in use and that it was their suggestion that we obtain the current "un compiled code". The previous AMX programmer was contacted for the latest revision of source code. This company can no longer retrieve those files and provide for use with this project. Due to not having access to_the-latest revision of the AMX code current functionality could not be easily confirmed requireing ABLe to add additional time for programming labor resources. The estimated labor hours for this change is 16 programming hours and have been completed at this time as ofiul 3 2013. *Pricing does not include applicable sales and use taxes. Applicable taxes shall be billed at the time of invoicing. This Change Order Request is valid thru 7/17/2013. If acceptance has not been received by that date, ABLe reserves the right to reassess the impact of this Change Order Request. If requested, ABLe will provide another Change Order Request after 7/17/2013 which considers the projects progress, any changes •to ABLe's costs detailed above and the project schedule as of that date. The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated above. By accepting below, the sum of $2,400.00 will be added to the contract price. ABLe Job No: COFW12725 k CONNECTING COMPANIES ABLe Communications, Inc. Connecting Your 1413 East Avenue H Grand Prairie, Texas 75050 Phone 972.660.2253 Fax 972.660.2254 www.ablecomm.net To: City of Fort Worth Architectural Services 401 West 13th Street Fort Worth, Tx 76102 Project: Ft Wth Conv Ctr Sound System CHANGE ORDER REQUEST Authorized Signature. Date: ABLe Communications, Inc. Authorized Signature: Date: City of Fort Worth ABLe Job No: C0FW12725 C O N S U L TANTS IN ACOUSTICS, SOUND R EINEORCEMENT, & A UUIOVISUAI. To: Dalton Murayama Architectural Services Manager City of Fort Worth T 7i=2E: v::ieE. 23d :8i • v Memorandum BAi Project No: 5585 Date: July 25, 2013 Project Name. WRMC Auditorium Sound System Renovation Bulletin #2 From. Robert Lee E-mail: robert@baiaustin.com The following are additions and subtractions to the Sound Reinforcement Construction Documents: 1. See drawing 7 on sheet AV-400 for changes to the `MB' plate detail, clouded under Revision 2. 2. See drawing 1 on sheet AV-501 for changes to the audio schematic online diagram, clouded under Revision 2. -End of SYSTEMSE M S �.m C ONSULTANTS IN A COUSTICS, SOUND REINFORCEMENT, & A UD IOVISUAL SYSTEMS J LUTE 800 To: Dalton Murayama Architectural Services Manager City of Fort Worth Voice: 21 580 Memorandum ww'14' f iau'111t.r0111 BAi Project No: 5585 Date: July 18, 2013 Project Name. WRMC Auditorium Sound System Renovation Bulletin #1 From: Robert Lee E-mail: robert@baiaustin.com The following are additions and subtractions to the Sound Reinforcement Construction Documents: 1. In Specification 27 41 00, under section 2.7.C, delete the following: 1. Audio Mixing Console: Midas VeniceF-32 with 2 dimmable 12V console lights. 2. In Specification 274100, under section 2.7.C, add.the folio_wang: 3. Allen & Heath GLD-80 compact mixing console (Qty. 1) 4. Allen & Heath GLD-AR2412 Audio Rack (Qty 1) 5. Allen & Heath GLD-AR84 Audio Rack (Qty. 1) 6. Allen & Heath LEDIampX (Qty. 1) 7. WiFi Router 802 11 a/ac/b/g/n with dual band (2.4 and 5 GHz), 4 x 10/100/1000 LAN Ports, and lx10/100/1000 WAN Port (Qty. 1) 8. Provide all cabling necessary to connect console to Audio Racks and wireless router. 9. Provide additional rack rails and mounting hardware to mount Audio Racks in the rear of the rolling cart. -End of Memo- CONNECTING COMPANIES ABLe Communications, Inc. Connecting You' 1413 East Avenue H Grand Prairie, Texas 75050 Phone 972.660.2253 Fax 972.660.2254 www.ablecomm.net To: City of Fort Worth Architectural Services 401 West 13th Street Fort Worth, Tx 76102 Project: Will Rogers Memorial Aud Sound CHANGE ORDER REQUEST NUMBER 12726-03 CHANGE ORDER REQUEST DATE 7/25/2013 APPROVAL REQUIRED BY 7/30/2013 Description of Proposed Change: Renovation of the Will Rogers Memorial Auditorium Sound System specification section 27-41-00-8/ 2.7 "Auditorium Mixing Console" calls for an analog Midas VeniceF-32 with 2 dimmable 12V console lights. According to BAI Bulletin #2 dated for July 25, 2013 page AV-501 changes the previously specified console. Bulletin #2 now specifies a digital Allen & Heath Console with accessories. Midas VeniceF32 Credit = $ -4291.62 Alien & Heath GLD-80 w/ Accessories = $ 14327.00 *Pricing does not include applicable sales and use taxes. Applicable taxes shall be billed at the time of invoicing. This Change Order Request is valid thru 7/30/2013. If acceptance has not been received by that date, ABLe reserves the right to reassess the impact of this Change Order Request. If requested, ABLe will provide another Change Order Request after 7/30/2013 which considers the projects progress, any changes to ABLe's costs detailed above and the project schedule as of that date. The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated above. By accepting below, the sum of $10,035.38 will be added to the contract price. Authorized Signature: Date: ABLe Communications, Inc. Authorized Signature: Date: ABLe Job No: COFW12726 s ® (� ® m9 rn Ys th C co 0 0 O m k s m Zmom 000 yuy >o 0 � o iZ i na =x „0< S�Tpa cfluT pflo 00 on as no PM H c A m --1 `r' K mm 21 2-8 O y C 3 O 0 0 0 z 'Ow v nn a m o S C O vS g m o m z m` a z m O n < y S� q{ao<C. r ® O 5 0 4 a L J = WILL ROGERS MEMORIAL AUDITORIUM SOUND SYSTEM REPLACEMENT 2 a m m FORT WORTH, TEXAS r ( 0 AUDIO - SCHEMATIC DIAGRAM : { ) as ƒa } -- —Finn T1 — —§!§!§ DDGyy%y§ ® 2;e;!$m ]& WILL ROGERS MEMORIAL AUDITORUM ( SOUND SYSTEM REPLACEMENT FORT WORTH, TEXAS onvit q TCUINIS LOILM sa ] ;! 923n 220 5215 02 20 4,34 §/ Hs 1 s ƒt / 922 gat 522 asZ