Loading...
HomeMy WebLinkAboutContract 44284-A1 (3)tporMV& NM; { 1 AMENDMENT No.1 TO CITY SECRETARY CONTRACT No. 44284 WHEREAS, the City of Fort Worth (CITY) and Jacobs Engineering Group, Inc., (ENGINEER) made and entered into City Secretary Contract No. 44284, (the CONTRACT) which was authorized by M & C C-26084 on the 5th day of February, 2013 in the amount of $363,718; and WHEREAS, the CONTRACT involves engineering services for the following project: Ray White Road (Kroger Drive to Wyndrook Street) - City Project Number 01806; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated 18th of November, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $32,820. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $396,538. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 3 OFF!CIAI. RECORD rri v SECRETARY [? WORTH, 77( RECEVED AEU 13 EV APPROVED: City of Fort Worth 530.nonies aLan. Assistant City Manager DATE: 24-0¢ APPROVAL RECOMMENDED: 4 cam4,...--)/// Director ENGINEER Jacobs Engineering Group, Inc. Scott Bussell Operations Manager DATE: (1863 APPROVED AS TO FORM AND LEGALITY: M&C: InAik UlAA kat( e i eug4r67 Rlack �.ikc l k W1 • Krc`hms Assistant City Attorney ATTEST: Mary J. Y0 City Secre-ary City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 3 Date: OFFICIAL RECORD on SECRETAKI' twoRThTh JACOBS November 18, 2013 Wilma Smith, P.E. City of Fort Worth Transportation and Public Works Department 1000 Throckmorton Street Fort Worth, Texas 76102 RE Amendment No. 1 Ray White Road (Kroger Drive to Wyndrook Street) City Project #01806 City Secretary Contract #44284 Dear Ms. Smith: 777 Main Street Fort Worth, Texas 76102 U.S.A. 1.817.735.6000 Fax 1.817.735.6148 Jacobs is please to present our scope and fee for Amendment No. 1 for the original contract dated March 20, 2013 for the above referenced project. A summary of the supplemental work is as follows: Roundabout Feasibility Study Jacobs will analyze the potential to incorporate a roundabout at the intersection of Ray White Road and Wall -Price Road. Three concepts will be provided that will consider both single -lane and multi -lane designs, as well as bike paths, sidewalks, and site grading. Cost comparisons will also be included. Compressed Street Section Options Jacobs will submit three options for a compressed street section adjacent to North County Community Church, located on the west side of the existing Ray White right-of- way north of Wall -Price Road. The options will consider divided and undivided sections, as well as driveway access and site grading. Coordination and Meetings The amendment includes time for Jacobs to coordinate with City stakeholders, roundabout specialists, and other resources during the feasibility studies. Jacobs and the City of Fort Worth will meet three times to discuss the options. The final compressed street section selection and the decision to include a roundabout in the final design will be made by the City. If you have any questions regarding this amendment, please contact me at (817) 735-6095. Sincerely, JACOBS ENGINEERING GROUP INC. otawasiurfaster Lauren Gilstrap, P.E. Project Manager TBPE Registration #F-2966 LG/shb WFXM0500 Jacobs Engineering Group Inc. FUNDING BREAKDOWN SHEET City Secretary No. 44284 Amendment No. 1 Department TPW City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 Fund -Account -Center C204-531200-202230180630 Total: Amount $32,820.00 $32,820.00 Task No. Task Description 1.0 Project Mana cment 1.1 Managin9 the Team 1.1.1 Internal Team Meetings 1.1.2 QA/QC 1.2 Communications and Reporting 1.2.1 Pre -Design Coordination Meeting 1.2.2 Design Submittal Review Meetings 1.2.3 Pr9are Revised Schedule 1.2.4 Invoicing Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Ray White Road (Kroger Dr to Wyndrook St) - AMENDMENT 1 City Project No. 01806 Program Manager of Manager Projects Rate $265 $200 10 18 2.0 2.1 2.2 2.3 2.4 Conceptual Design Coordination Roundabout Design (3) Street Section Design 3) Construction Estimate 0 Totals' City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 10 4 8 2 4 0 18 Laborjhours) PM/Project EIT Enaineer $145 $80 34 4 CADD Administrative Total Labor Cost $5 $75 4 $12,0/ 12 2 4 4 4 8 2 4 2 2 28 24 8 144I 0 16 96 24 8 98 148 4 0 4 $1 920 $3.tO $1.220 $2 440 t290 $44Q $20,800 $2,440 $11.160 $5,400 $1.800 $32,820 EX cnse Subconsultant MWBE I Non-MWBE $o $o Travel $a Reproduction $o $0 $0 $o' $0 $0 Total Expense Cost Task Sub Total $0 $12,0201 $0 $1``9201 $0 $3,8'201 $o sd) $0 $0 $0 $0 $0 Project Summary Total Hours Total Labor Total Expense MWBE Subconsultant Non-MWBE Subconsultant 5% Sub Markup MWBE Participation Total Project ost $1,220 $2,440 $290 $440 $20,800' $2,440` $11,160 $5,400 $1,800 $32,820 282 $32,820 $0 $0 $0 $0 0.0% $32,820 1 of 1 ATTACHMENT "A" Scope for Enaineerina Design Related Services for Street Improvements AMENDMENT 1 The scope set forth herein defines the work to be performed by the ENGINEER in completing the Amendment 1 scope provided below. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the supplemental work. OBJECTIVE The following proposal defines the professional design services required for Amendment 1 to the Ray White Road (Kroger Drive to Wyndrook Street) design project — City Secretary Contract No. 44284 — in the City of Fort Worth, Tarrant County. The Amendment includes design and discussion for a roundabout to be located at the intersection of Ray White and Wall -Price Road, as well as street section options adjacent to North County Community Church. This proposal is based on the following assumptions: • Roundabout will be designed in accordance with City of Fort Worth design recommendations, as applied to the specific site constraints. Additional right-of-way acquisition may be required depending upon final roundabout layout and design. WORK TO BE PERFORMED Task A.1 Conceptual Design Task A.2 Coordination and Client Meetings City of Fort Worth, Texas Attachment A — Amendment 1 CFW Pro). No. 01806 October 3, 2013 Page 1 of 3 WORK TO BE PERFORMED TASK A.1 CONCEPTUAL DESIGN. The purpose of the conceptual design is for the ENGINEER to identify, develop, communicate through the defined deliverables, and recommend the design concept that successfully addresses the design problem, and to obtain the CITY's endorsement of this concept. A.1.1. Roundabout Design • ENGINEER will submit to the CITY (3) viable options for a roundabout layout at the Ray White Road and Wall Price Road interchange. The roundabouts will consider both single -lane and multi -lane functions, as well as bicycle lanes, sidewalks, and site grading. Final intersection design will be chosen by the CITY. • Roundabout layout must accommodate a WB-50 trailer. Design speed at all points will be 25 mph. A.1.2. Street Section Design • ENGINEER will submit to the CITY (3) viable options for the street section adjacent to North County Community Church, located on the west side of the existing Ray White right-of-way north of Wall -Price Road. The options will consider divided and undivided sections, as well as driveway access and site grading. Final street section design shall be chosen by the CITY. DELIVERABLES A. Three (3) Roundabout Options - Ray White Road and Wall Price Road Intersection Design B. Three (3) Street Section Options - North County Community Church C. Estimates of Probable Construction Cost TASK A.2 COORDINATION AND CLIENT MEETINGS. ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER s and CITY's time and resources. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues as necessary to make progress on the work. A.2.1. The ENGINEER and CITY will meet (3) times to discuss options related to the roundabout and street section design. Additionally, the ENGINEER will: • Prepare and submit proposed Project Schedule adjustments • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 2 of 3 ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed upon the CITY's written request Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition. • Services related to development of the CITY's project financing and/or budget. • Franchise utility design. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 3 of 3