HomeMy WebLinkAboutContract 44303 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
City Secretary
Contract No. Lam 303
•
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Moriah Real Estate Company, LLC
Address, State, Zip Code: 303 W. Wall, Suite 1500 I Midland, TX 79704
Phone, E-Mail: (432) 682-0292
Authorized Signatory/Title: Alfred C. Branch, President
Project Name: Moriah at Timberland
Project Location: NEC IH-35W & Golden Triangle Blvd.
•
Plat Case No.: FP-012-011 Plat Name: Moriah at Timberland Addition
Mapsco: 21L
CFA: 2012-057 DOE: 6826
To be completed by staff
Received by: c _)
Council District: 2 City Project No: 01890
Date: 9110- � � 3
OFFICIAL REGURD\
CITY si'cflTh
nIW�KT$v TX
RECEIVED MAR 252013
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X ,
Sewer (A-1) X , Paving (B) X , Storm Drain (B-1) X , Street Lights &
Signs (C)_.
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii To require its contractor to furnish to the City a payment and perfounance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
m the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the teini of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, stonnn
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused, in whole or in part, by the
alleged negligence of the Citv of Fort Worth, its officers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a font to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express Intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and stoun drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 1 YEAR
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within one (1) year; provided, however, if construction of the
community facilities has started within the one year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of one (1) year from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of one (1)
year if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer s contractors and/or suppliers are not paid for the costs of
supplies and/or construction the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name. Moriah at Timberland
CFA No.: 2012-057 DOE No.: 6826
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 209,978.00
2 Sewer Construction $ 57,518.00
Water and Seiner Construction Total $ 267,496.00
B. TPW Construction
1. Street $ 78,674.00
2. Storm Drain $ 241,600.00
3. Street Lights Installed by Developer $
TPW Construction Cost Total $ 320,274.00
Total Construction Cost (excluding the fees):
$ 587,770.00
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 5,349.92
D. Water/Sewer Material Testing Fee (2%) $ 5,349.92
Sub -Total for Water Construction Fees $ 10, 699.84
E. TPW Inspection Fee (4%) $ 12,810.96
F. TPW Material Testing (2%) $ 6,405.48
G. Street Light Inspsection CostH. Street Signs Installation Cost $
Sub -Total for TPW Construction Fees $ 19,216.44
Total Construction Fees:
$ 29,916.28
Choice
Financial Guarantee Options, choose one Amount (ck one)
I Bond = 100% $ 587,770.00
(Completion Agreement = 100% / Holds Plat $ 587,770.00
'Cash Escrow Water/Sanitary Sewer= 125% $ 334,370.00
'Cash Escrow Paving/Storm Drain = 125% $ 400,342 50
'Letter of Credit = 125% w/1 yr expiration period $ 734,712.50
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this
instrument in quadruplicate, at Fort Worth, Texas this Z day of 17-cauft(t1
,20 .
CITY OF FORT WORTH - Recommended by:
Water Department
1(3 —la_
Wendy Chi
Developm
;bulal, EMBA, P.E.
nt Engineering Manager
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. Ai /A -
Date:
ATTEST:
$4aryJ.K
City Secretary
ATTEST:
•
Signature
(Print) Name:
Transportation & Public Works Department
Dougla
Director
/,‘)
Wiersig, P.E.
emi
Approved by City Manager's Office
tifati4
Fernando Costa
Assistant City Manager
y0i S. ;
t
LcriAlc‘cb\:‘;‘•:<1.`
Moriah Real Estate Company, LLC
•
,4/rC•z_
Signature
Print Name: IaEC/'tot �. • Qf'A.Nt.�+.
Title: ?rcscttnt
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included
rs
rs
ra
n
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
A.
B.
C.
D.
E.
F.
G.
H.
1
J.
K
L
M.
N .
O .
P .
Q.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
Community Facilities Agreement
for
MORIAH AT TIMBERLAND
December 12, 2012
Exhibit A * Water
Description
16" Water (PVC)
16" Water (DIP)
12" Water
6" Water (Fireline)
16" Gate Valve wNault
12" Gate Valve
6" Gate Valve (Fireline)
4" Blow -off Valve wNault
Fittings
Conn To Ex. Water
2" Dom. Water Service w/Meter Box (tap)
2" Irr. Service w/Meter Box (tap)
Testing
Trench Safety
30" Steel Casing Pipe
2" Dom./Irr. Service line
Hydromulch Seeding
Exhibit A-1 * Sanitary Sewer
Description
10" PVC
8' PVC
8" DIP
4' Dia. S.S. Manhole
Etre Depth Manhole
Conn. To ex. S.S.
Vacuum test for MH
Concrete collars
18" Steel Casing Pipe
TV inspection
Trench Safety
Hydromulch Seeding
Quantity
1,745
120
20
35
3
1
3
1
3.30
2
4
4
1
1,920
95
120
900
1
Unit I Unit Price
L.F. I $ 53.00 $
LF 1 $ 83.00 $
L.F. I $ 38.00 I $
L F $ 28.00 $
Ea. $ 8,768.00 $
Ea. I $ 1,587.00 $
Ea. $ 835.00 $
Ea. $ 4,100.00 $
Tons $ 6,330.00 $
Ea. $ 2,000.00 $
Ea. $ 866.00 $
Ea. $ 866.00 $
L S $ 10,000.00 $
L.F. $ 1.00 $
L.F. $ 250.00 $
L F $ 28.00 $
S.Y. $ 0.50 $
Subtotal $
Quantity Unit
14 L.F.
337 L.F.
208 L F
4 I Ea.
17 ( VF
1 1 Ea.
4 1 Ea.
4 ( Ea.
95 L F
559 L.F.
559 L F
200 S.Y.
Unit Price
$ 60.00
$ 40.00
$ 40.00
$ 2,340.00
$ 150.00
$ 2,000.00
$ 104.00
$ 39.00
$ 200.00
$ 3.00
$ 1.00
$ 0.50
Subtotal
Total
92,485.00
9,960100
760.00
980.00
26,304.00
1,587.00
2,505.00
4,100.00
20,889.00
4,000.00
3,464.00
3,464.00
10, 000.00
1,920.00
231750.00
3,360.00
450.00
209,978.00
Total
840.00
13,480.00
8,320.00
9,360.00
2,550.00
2,000.00
416.00
156.00
19, 000.00
1,677.00
559.00
100.00
57,518.00
G\260\36\Engineering\CFAt26036 cfa-PH1
Community Facilities Agreement
for
MORIAH AT TIMBERLAND
December 12, 2012
Exhibit B- Paving
Description
IA. 6" 4000 psi Conc. Pavement
IB. 6" Scarified Lime -Stabilized Subgrade
IC. I7" Curb
D. 15' Reiff. Conc. Sidewalk
E. I ButtonsfStriping/Signage
F. ITraffic Control
I
Exhibit B-1 * Storm Drain
Description
IA. 4-10'x5' Reiff. Conc Box
1B. Type "PW" Headwall w/Handrail
Cl Rock Riprap
D. Concrete Apron
TOTALS
Exhibit A * Water
Exhibit A-1 * Sanitary Sewer
12% Testing Fee
2% Inspection Fee
Exhibit B * Paving
Exhibit B-1 * Storm Drain
12% Testing Fee
4% Inspection fee
Quantity
1,900
2,090
882
4,260
1
1
U nit
S .Y.
S.Y.
LF
S .F.
LS
L.S.
Quantity Unit
50 L.F.
2 EA
300 C.Y.
165 S.Y.
Unit Price
$ 24.00 $
$ 3.00 $
$ 2.00 $
I $ 4.00 $
$ 5,000.00 I $
$ 3,000.00 1 $
Subtotal I $
Unit Price
$ 2,000.00 $
I $ 60,000.00 $
$ 50.00I$
$ 40.00 I $
Subtotal I $
$
I Subtotal $
$
I Total I $
I Subtotal
Total
Total
45,600.00
6,270.00
1,764.00
17,040.00
5,000.00
3,000.00
78,674.00
Total
100, 000.00
120,000.00
15, 000.00
6,600.00
241,600.00
209,978.00
57,518.00
267,496.00
5,349.92
5,349.92
278,195.84
I $ 78,674.00
$ 241,600.00
$ 320,274.00
$ 6,405.48
$ 12,810.96
$ 339,490.44
G:1260\361Engineering\CFA126036 cfa-PH1
B''� LUE MOUND RD. E.
W. HICKS RD.
\‘17nIl�.aAogeleflai*a ONSULTIILO VA% ENGINEERS a SURVEYORS
0772) 490-7090 FAX C972) 490-7099
Scale : N.T.S.
Design : TG.Y.
Drawn : W.A.I.
Dwg. Fife : 26036CFA.dwq
Project No. : 26036.01(20)
oats: 12/12/12
GOLDEN TRIANGLE BLVD.
ERITAGE TRACE PKWY.
tn
N. TARRANT PKWY
LOCATION MAP
N.T.S.
TARRANT COUNTY MAPSCO NO. 21--L
COUNCIL DISTRICT 2
onnn
J. JUSTICE SURVEY A
R.R. RAMEY SURVEY A — 1342
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
LOCKARD CONSTRUCTION
4601 PRAIRIE PKWY.
CEDAR FAILS, IOWA 50813
SHRRT
1
OF
FORT WORTH, TARRANT COUNTY, TEXAS S
VICINITY RIP
MORIAH AT TIMBERLAND
E
IEX. 24" WATER
S —7
a4aa� AI 1
---� EX. 16" WATER
CONNECT TO
EXISTING 16"
WATER
H 5959'S5`I W
LOT 8
BLOCK 1
LOT 10
BLOCK 1
LOT 1, BLOCK 1
LAWSON AOOITLON
CAB. A, SL, 5570
PROP. 16" WATER
- -t
— ss — sr--- --sr
J
LOT 11
BLOCK 1
GOLDEN TRIANGLE BLVD.
Wnmkeaunimgamm
Lis A8®Q AWt®me lliu u
cDNSUL1e70 £ML ENOINEERS • SURVEYORS
(972} 00-7090 FAX (972) 440-7094
Scale ; 1 "= 2003
Destgn
Drawn : W.A.I.
Owg. Fite : 26036CFA.dwq
Protect No. ; 26036.01(2M
Date : 12/12/12
W. MCCO'MEN SURVEY. ABSTRACT NO. 949
CRY OF FORT WW1
7ARRANr COUNTY, TEXAS
MOROAN REAL ESTATE COMPANY. LLC
303 W. WALL MEET. SUITE 1600
MWANO, TEXAS 70704
e73,eo'
LOT 7
PLUCK 1
r
b
LOT 9
BLOCK 1
LOT 12
BLOCK 1
0
CONNECT TO
EXISTING 16"
WATER
LOT 3
BLACK 1
IEX, 16" WATER
L
01 100' 200'
SCALE: ft= 200'
WATER EXHIBIT
EXIIIBIT A
MORIAH AT TIMBERLAND
Sasax
2
OF
FORT WORTH, TARRANT COUNTY, TEXAQ 5
1
1
1
V 99'69'61'
LOT 11 BLOCK 1
LAWSON ADDITION
OAR. A, SL 5579
N 6999'85' W L-
Y_
LOT 8
BLOCK 1
\
LOT 10
BLOCK
CONST. 4' DIA.
// SAN. SWR. M.H.
/f itg
If m•
wart—
GOLDEN TRIANGLE BLVD.
Wih mkeilt�meam1ra
Aeozoonittcwo Ikea
CnusULDHa CIVIL 47l01HEEss a SURVEYORS
(972) 490-7090 FAX (072} 490-1099
Scale : 1 = 200'
Design : T.C.Y.
Drawn :
Dwg. File : 26036CFA.dw,q
Protect No.: 26036.01(20)
Date : 12/12/12
Q� a
PROP. 8"
SAN SWR,
W. NCCOWER SURVEY, ASS1RACr NO, 999
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
L10R?A6 REAL ESTATE COMPANY, LLO
303 W WALL STREET, SUITE 1500
LRIOLAND, 1FVAI 79704
673.901
n
LOT 7
BLOCK 1
1
LOT 9
BLOCK 1
LOT 12
BLOCK 1
CONST. 4' DIA.
SAN. SWR. M,H,
&10L.E8"
SWR. NORTH
& CAP
PROP. 8"
SAN SWR.
CONST. 4' DIA.
SAN. SWR M.H.
& 101 L.F 8'
SWR. WEST.
CONNECT TO
EXISTING 10"
SEWER
13
S1
k -1
0' Tool 200'
1
SCALE: 1'AM 200'
SANITARY SEWER .EXHIBIT
EiLH1BIT 4 1
MORTAR- AT TIMBERLAND
FORT WORTH, TARRANT COUNTY, TEXAS
1
SHEET
3
OF
5
/
/
/
/
/
/
/
/
•
f
1
r c //
88'b9'65'
N b0ri0$54 W .
LOT
BLOCK 1
LOT ID
BLOCK 1
870.90'
r I1
LOT 1 BLOCK 1
LAWSON AOOMTtON
CAB. A, SL. 557D
0'
100'
SCALE; 11%= 200'
I 111R.vi'
y
LOT 11
BLOCK 1
art
GOLDEN TRIANGLE BLVD.
itigkiDilMagiYa
85 AVM 61,1)amain, haat
CONSULTING CIVIL EROINEERS ■ SURVEYORS
(972) 490-7090 FAX (972) 490-7099
Scats : 1 '= 200'
Design : T.C.Y.
Drawn :
Owg. FEte ; 26036CFAAN
protect No. : 26036.01(20)
Dote : 12/12/12
0nm:
W. UCCOWEN SURVEY, ADSIRAGT ND. DOD
C1lY OF PORT HURTlI
TARRANT 000NTY, TEXAS
AIORIAH REAL ESTATE CNLIPANY. LLC
303 W. WALL STREET. STRTE 'Sao
MIDLAND, TEXAS 70704
LOT 7
BLOCK 1
w
200' 13
6" 4000 PSI CONC.
APAVEMENT, 8 LIME
STAHIL ZED SUBGRADE AND
7' CURB
LOT D
BLOCK 1
1
CONST. 4-260 S.F.
5' REINF. CONC.
SIDEWALK
LOT 12
BLOCK 1
1
b
LOT 15
BLOCK 1
TW"
•
PAYING EXHIBIT
EXHIBIT B
MORIAH AT TIMBERLAND
FORT WORTH, TARRANT COUNTY, TEXAS
•
i
SHERT
4
OR
5
LOT 1, BLOCK 1
LAWSON AUDITION
CAB, A, SL. 5579
N 99'39'85' W 1 If 92959'
LOT B
BLOCK 1
CONSTRUCT
4-10'x5' REINF.
CONCRETE BOX
CULVERT
INSTALL 655 S.F. I .1 N)
CONC RIP —RAP.
Vvcire
LOT 11
BLOW( 1
-3a
GOLDEN TRIANGLE BLVD.
Wfunikoilatlitalimin
Amegewitthel, 1I si
CONSULTING CIVIL ENGINEERS ■ SURVEYORS
(972) 490--7090 FAX (972) 49(1-7099
Scale : 1 = 200'
Design : T.C.Y.
Drawn :
Dwg. Fire : 26036CFA.dwg
Pmiaat No.: 26036.01(20)
Date : 12/12/12
ate:
W. WCCOWcN SURVEY ASSTRAcT ND. 999
CITY OF FORT WORTH
TARRANT COUNTY. TEXAS
NORM ARAL ESTATE COMPANY. TLC
303 W. WALL STREET, SUITE 1400
MOUND. TEXAS 79704
f
L
971.90E
LOT 7
BLACK 1
LOT 5
BLOCK 1
LOT12
BLOCK 1
1
INSTALL 622 S.F.
CONC RIP —RAP.
LOT 13
BLOCK 1
O' 1D0' 200'
1
SCALE: 1"= 200'
STORM SEWER EXHIBIT
EXHIBIT B-1
MORIAH AT TIMBERLAND
FORT WORTH TARRANT COUNTY, TEXAS
•
•
SHUT
4
OF
5