HomeMy WebLinkAboutContract 44356-A1 (2)CITY SERETARY
C�ITRACTNO. /41/
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 44356
%Q-A I
WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 44356, (the
CONTRACT) which was authorized by M&C C-26130 on the fifth day of March,
2013 in the amount of $ 341,470; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Risinger Road from Crowley Road to IH 35W (City Project no. 01811) ;
and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
e ngineering services specified in a proposal dated May 13, 2013, a copy
o f which is attached hereto and incorporated herein. The cost to City
for the additional design services to be performed by Engineer totals
$22,542.
2.
Article II of the CONTRACT is amended to provide for an increase in
t he fee to be paid to Engineer for all work and services performed under
t he Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $ 3 64, 012
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
City of Fort Worth
Professional Services Agreement Amendment Template
PM0 Official Release 8/1/2012
Page 1 of 3
glitiflf SECRETARY
Erro WORTa9 `�� F4ECEIVED MAY 2 3 2013
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth
Fernando Costa
Assistant City Manager
DATE:
APP'., AL RECOMMENDED:
ENGINEER
Freese and Nichols, Inc.
Chris Bosco, P.E.
Principal
DATE: � �/3�/.3
Douglas ► Wiersig, P.E.
Directo , Transportation Public Works Department
APPROVED AS TO FORM AND LEGALITY:
Douglas W. Black
Assistant City Attorney
ATTEST:
malt- ?
tMar,T J. Kayser
City Secretary
#4.,,Atr s •‘\
•ct Circionoo
eigibe
rips
04%
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 2 of 3
o0
000
M&C:
Date:
OFFICL+' L L EC
CITY SECRET RV
fl GIRTH, TX
9
FUNDING BREAKDOWN SHEET
City Secretary No. 44356
Amendment No. 1
Department
TPW
City of Fort Worth
Professional Services Agreement Amendment Template
PM0 Official Release 8/1/2012
Page 3 of 3
Fund -Account -Center
C204-531200-206230181130
Total:
Amount
$22,542
$22, 542
Innovative approaches
Practical results
Outstanding service
4055 International Plaza, Suite 200 • Fort Worth, Texas 76109 • 817-735-7300 • fax 817-735-7491 www.freese.coni
May 13, 2013
•
Leon Wilson, Jr., P.E., Project Manager
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX76102
Re: Contract Modification Proposal for Risinger Road Improvements Scope
Dear Mr. Wilson:
This letter is written in response to the City's request to add a roundabout at the intersection of
Hemphill Street and Risinger Road. On April 19, 2013, Freese and Nichols (FNI) submitted a schematic
for Risinger Road with three alignment options and typical section options. After the City selects the
alignment and typical section for the overall Risinger Road project, Freese and Nichols will proceed with
a roundabout design at the Hemphill intersection.
Revised Proiect Scope
The roundabout design will require future traffic volumes for AM and PM peak hours to be calculated as
well as the proposed level of service. An operational performance analysis will need to be performed
based on delay and queuing criteria to determine the complete lane configuration diagram. A
conceptual roundabout will be added to the schematic and submitted for approval by the City. With the
revised schematic, FNI will also submit a cost estimate comparison between the roundabout and a
traffic signal at this intersection to aid in discussion.
Once the conceptual design is approved, FNI will proceed with the 30% design plans. Since the
roundabout will be for two lanes in each direction with four legs in the intersection, we anticipate an
additional nine sheets will be necessary to provide adequate plan, profile, and striping at the 30% level.
Compensation
We request a lump sum contract fee modification of $22,542. Please see the attached Level of Effort
spreadsheet for a breakdown of the fee.
If you have any questions concerning this proposal, please do not hesitate to me at 817-735-7296.
Thank you for this op,ortunity,
aM
Jessica Andrews, P.E.
Project Manager
Chris Bosco, P.E.
Principal