Loading...
HomeMy WebLinkAboutContract 44262 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. (1tI7 Li Z WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: Ashton Dallas Residential L.L.C. Address, State, Zip Code: 1221 N. Interstate 351 Carrollton, TX 75006 Phone, E-Mail: (972) 428-5403 Authorized Signatory/Title: Mr. Rob Romo, Vice President — Land Acquisition Project Name. Bluffview Phase I Project Location: North Side of Litsey Rd. at Mallard Creek Dr. Intersection Plat Case No.: FP-012-045 Plat Name: Bluffview Mapsco: 644W Council District: 2 City Project No: 02031 CFA: 2013-003 DOE: 6949 To be completed by staff.• Received by: RECEVEfl WILW 1 Date: g I 7-)ima OFFICIALL RECO:E CITY SECRETARY FT. WORTH, TX NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X. Sewer (A-1) X, Paving (B) X, Stortu Drain (B-1) X , Street Lights & Signs (C) X . E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the teen of the maintenance bond All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPFIR, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall teiniinate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name. Bluffview Phase I CFA No.:2013-003 DOE No.: 6949 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 160,113.31 2. Sewer Construction $ 280,467.21 Water and Sewer Construction Total $ 440,580.52 B. TPW Construction 1. Street $ 456,793.50 2. Storm Drain $ 47,359.47 3. Street Lights Installed by Developer $ 76,157.80 TPW Construction Cost Total $ 580,310.77 Total Construction Cost (excluding the fees): $ 1,020,891.29 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 8,811.61 D. Water/Sewer Material Testing Fee (2%) $ 8,811.61 Sub -Total for Water Construction Fees $ 17,623.22 E TPW Inspection Fee (4%) $ 20,166.12 F. TPW Material Testing (2%) $ 10,083.06 G. Street Light Inspsection Cost $ 3,046.31 H. Street Signs Installation Cost $ 2,205.00 Sub -Total for TPW Construction Fees $ 35,500.49 Total Construction Fees: $ 53,123.71 Choice Financial Guarantee Options, choose one Amount (ck on), `e. (Bond = 100% $ 1,020,891.29 L' !Completion Agreement = 100% / Holds Plat $ 1,020,891.29 (Cash Escrow Water/Sanitary Sewer= 125% $ 550,725.65 'Cash Escrow Paving/Storm Drain = 125% $ 725,388.46 !Letter of Credit = 125% w/2yr expiration period $ 1,276,114.11 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and sa' 9eyeloper ha . - xecuted Zis instru - ent in quadruplicate, at Fort Worth, Texas this _9 day of in /2 20 I). CITY OF FORT WORTH - Recommended by: Water Department R L Wendy Chi-Bbulal, EMBA, P.E. Development Engineering Manager Approved as to Fornn & Legality: w boug as . Black AssistantCity Attorney M&CNo. 4\ Date: - ATTEST: ary'J. Kays City Secretary ATTEST: Signature (Print) Name: etkiAtt Dawn McClintic Transportation & Public Works Department /t %, Ur C-rtoDouglaW. Wiersig, P.E. Director Approved by City Manager's Office 'ildra0,4‘A Fernando Costa AssistantCity Manager eg foe? ort 000!)0 Fi fitin pwitgo: 11.24) o ('r �'��- � �-: 0 2 �' � C,f tt �• /..4: .41 % Wit; etf- Ashton Dallas Residential L.L.C. Signature Print Name: Robert J. Romo Title: Vice President • OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included ix x x m v m /1 x N ix x Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) E \10499\PLANS \EIultview - Phase 3eW Cemetery _ITSEY GOAD OWNED/I13 3VE_1,O1E 1 SHTON D BYo \IOTHI AKE nu.LIMO ■ Raisinn IS swimm ra ty == ata V was oast VICINITY MAP DS N.T.S. PHASE 11 CIIY Q= LINT I LI SEY ROAD PROJECT LOCATION LOCATED UY F FORT W O 'AM, TEXAS 1221 N. INTERSTATE 35E 1 SUIJ E 170 CARROLLTON, TX 75006 OFFICE (972) 426 -5403 JANUA ", 20 3 PR INPARED BY: G OODwDN & MARSHAL., g CIVIL ENGINEERS — PLANNERS — SURVEYORS 2405 Mustang Drive, Grapevine, Texas 76051 Metro (817) 329-4373 _ 11,UTFV LASE If 1�+ WATER 1L" Lll °,Aei 2 BLOCK F 56x PRIVATE OPEN SPACE BLOCK 8 PRIVATE OPEN SPACE 56x BLOCK B BLOCK 2 8' W. BLOCK E /0 9x PRIVATE O. EX. 8' STUB EX. B' W.L. EX. 16' W.L. PRIVATE OPEN SPACE 56x BLOCK B 52 BLOCK LT 53 EX. B' STUB — LIMEY GOAD BLOCK/ B 51% 50 l9 BLOCK C E 2 35 \ / BLOCK C 30 3/ 32 33 34 8, W L. EX. I6' W.L — —_ GRAPHIC SCALE 1"=200' 6111 Mk 0 200 400 600 LEGEND PROPOSED WATER LINE EXISTING WATER LINE PROPOSED FIRE HYDRANT ASSEMBLY EXIST NG FIRE HYDRANT ASSF MBLY PROPOSED GATE VALVE EXISTING GATE VALVE PRIEPARED 13 Y: G OODW a _.-_ A lRSE-LA , CIVIL ENGINEERS — PLANNERS — SURVEYORS 2405 Mustang Drive, Grapevine, Texas 76051 Metro (817) 329-4373 E:\'0499\PLANS \3Iuffvew - Pnose .pro 22 Feb 2013 DD J liTAS SANITARY SEWER Ex1HmUr "A-1" PRIVATE OPEN SPACE 56x BLOCK B MAT W�E GRAPHIC SCALE LEGEND PROPOSED SANITARY SEWER LINE 1"=200' 0 HONE- SEE THIS SHEET 8S.S. 200 400 56x PRIVATE OPEN SPACE BLOCK B 55 8 600 2 BLOCK Ir EXISTING SANITARY SEWER LINE • PROPOSED SANITARY SEWER MANHOLE OS EXISTING SANITARY SEWER MANHOLE PRIVATE OPEN SPACE 56x BLOCK B BLOCK E 2 MAT I/ BLOCK E 10 BLOCK D l4 BLOC t' A 4 9x PRIVATE O.S. SEE T HIS SHEET HONE - 23 55 LDFSEY ROAD BLOCK D 4 I 58 27 28 � I 29 BLOCK C 30 35 3 IBL UC� B PRIVATE 0.S. PREPARED BY: 7 G OODWI N MARSIHiALL CIVIL ENGINEERS — PLANNERS — SURVEYORS 2405 Mustang Drive, Grapevine, Texas 76051 Metro (817) 329-4373 E \10499\PLANE \Eluffview — Phase 1.pro 22 Feb 2013 LEGEND 1111111111111 PHASE MEETS EXHJ MT vv3" PROPOSED 29 ' B—B ROADWAY w/50'R.O.W. 6" CONCRETE PAVING 4' SIDEWALK BY HOMEBUlLDER 4 ' SIDEWALK PER THIS CONTRACT PRIVATE OPEN SPACE 56x BLOCK B PRIVATE OPEN SPACE 56x BLOCK B 28 29 BLOCK C 30 31 S GRAPHIC SCALE 1'-200' t t t 0 200 400 600 PREPARED BY: G GODWI N2 MARSHAL °W CIVIL ENGINEERS — PLANNERS — SURVEYORS 2405 Mustang Drive, Grapevine, Texas 76051 Metro (817) 329-4373 E:\10499\PLANS\Bluffview - Phase I.pro 22 Feb 2013 3_- U V °p -AS. STORM JRKN EX JIT LEGEND PROPOSED STORM DRAIN LINE EW IIA�' EXISTING STORM DRAIN LINE PROPOSED STORM DRAIN INLET BLOCK E 1 0 U R.0 10' INLET 21' R.C.P 5' INLET — PRIVATE OPEN SPACE 56x BLOCK B 24" R.C.P —10' INLET BLOCK 2 PRIVATE OPEN SPACE 56x BLOCK B F30" R.C.P —24" R.C.P BLOCK 10 BLOC/ A 9x PRIVATE 0.5 BLOCK.6 53 10 "NLET 21" R.C.P LtREY BLOC 51 50 19 BLOCK C 0' INL c 29 BLOCK C 30 BLOC B 56x PRIV ATE O.S. 7 s GRAPHIC SCALE 1"-200' 0 200 400 600 PREPARED BY: GOODVVIITJ��yn�� 1 MARSIRIALL x CIVIL ENGINEERS — PLANNERS — SURVEYORS 2405 Mustang Drive, Grapevine, Texas 76051 Metro (817) 329-4373 E:\10499\PLANS\Bluffview - Phase !.pro 22 Feb 2013 P 1 AS E STRUG TS EL ET v9C" PRIVATE OPEN SPACE 56x BLOCK B 2 BL OCK F BLOCK L 2 56x PRIVATE OPEN SPACE BLOCK B H.H BLOC /0 H.H. BLOC BLOC A 4 9x PRIVA TF 0.S PRIVA TE OPEN SPACE 56x BLOCK B 52 BLOCK B H.H BLOCK 0 14 ILPTSE K ROAD 53 54 I4:1 BLOgK0 BL OCK/B 5/: 50 /9 BLOCK C 2/ 22 23 24 .H. 25 BLOCK C 30 H. \BLOCl4 B, 58x PRIVATE O.S. ' 5 7 GRAPHIC SCALE 1"=200' 0 200 400 600 LEGEND PVC Condu/'l Transformer on PAD Pole Assembly 1OO w HPS PREPARED BY: G 00a9vDN. 2 tRSHAILL CIVIL ENGINEERS — PLANNERS — SURVEYORS 2405 Mustang Drive, Grapevine, Texas 76051 Metro (817) 329-4373 E \10499\PLANS\Bluffv ew - Phase I.pro 22 Peo 2013 LC V W F AS STREET+ SIGNS L:OCH8Ill vvC- p r;t 56x PRIVATE OPEN SPACE BLOCK B PRIVA TE OPEN SPACE 56x BLOCK B BLOCK 2 3 4 BLOCK E 10 PRIVATE OPEN SPACE 56x BL 0CK B BLOCK D 14 BLOCK B OUNOT,BLUFFS BLOC A 4 5 6 7 9x PRIV4 TE 0.5 1LflSEY ROAD 53 BLOCK D 4 BLOC B SI :/50 (9 BLOCK C 0 29 BLOCK C 30 BLOC( B 56x PRIVATE 0'S 7 GRAPnJC SCALE 1 =200' 0 P00 40D 600 LEGEND STREET NAIAE SIGN PREPARED EY: G GODWIN MSLL CIVIL ENGINEERS — PLANNERS — SURVEYORS 2405 Mustang Drive, Grapevine, Texas 76051 Metro (817) 329-4373 E;\10499\PLANS\Blu(iview - Phase I.oro 22 Feb 20'3 TO: Goodwin & Marshall, Inc. c/o: Ashton Woods Homes 1221 N. Interstate 35E, Suite 170 Carrolllon,Texas 75006 SECTION 00 41 00 BID FORM FOR: BLUFFVIEW- PHASE 1 City Project No.: 02031 Units/Sections: D.O.E. #6949 File No. K-2251 Water P265-6021502031-83 Sewer P275-7021302031-83 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Old is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time Indicated In this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification • 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, Including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid Insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or Indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices In competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to Influence the action of a public official in the bidding process. b. "fraudulent practice" means an Intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices al artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive levels, d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to Influence their participation In the bidding process or affect the execution of the Contract. 3, Prequaligcation The Bidder acknowledges That the following work types must be performed only by prequalified contractors and subcontractors: a. Paving Facilities b. Storm Drain, Water, and Sewer Facilities c. Street Light Facilities CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 0041 00 BID FORM Page 1 of 3 COFW STD BID PROPOSAL - Poring Email: Phone: 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 60 days after the date when the the Contract Ttme commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work (and/or achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid . The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 0041 00 b. Proposal Form, Section 00 42 43 c. Contractor Compliance with Workers Compensation Law, Section 00 45 26 d. Prequalification Statement. Section 00 4512 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bld amount. in the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder In signing this proposal that the total bid amount entered below Is subject to verification and/or modification by multiplying the unit bid prices for each pay Item by the respective estimated quantifies shown In this proposal and then totaling all of the extended amounts. Total Bid 7. Bid Submittal This Harlan Jones January 21, 2013 (Printed Name) Vice President Tllle: Company: Mario Sinacola & Sons Excavating, Inc. Address: 10950 Research, Road, Frisco, Tx 75033 State of Incorporation: Michigan hjonesemariosinacola.corn 219.387.3900 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Rovlsed 20120327 $456,793.50 by the entity named below. Receipt is acknowledged of the following Addenda: Addendum No. 1: Addendum No. 2: Addendum No. 3: Addendum No. 4: Corporate Seal: Initial 00 41 00 BID FORM Pago2or3 COFW STD BID PROPOSAL -Paving 1 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Project Item Information Bidlist Item No. 41 6- 3.600 PSI Concrete w/ T Curb 42 6" Lime Stabilized Subarade (33#/SY) 43 Hydrated Lime (33#/SY1 44 4' Barrier Free Ramo Tvae R-1 45 4' Concrete Sidewalk 46 'Concrete Header & End of Road Barricade 47 (Connect to Exislinn Street Stub -Out 48 IPaymenV Performance/ Maintenance Bonds Paving Facilities Subtotal Description CITY OF FORT WORT( I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Reviscd 20120120 Specification Section No. 3213.0101 3211.0501 3211.0400 3213.0535 3213 0301 9999.0004 9999.0005 Unit or Measure SY SY TON EA I SF I LF LF LS Bidder's Application Bid Quantity 12.634 13.455 222 10 4.448 58 58 1 Bidder's Proposal Unit Price $28.80 $2.50 $134.00 $650.00 3.10 35.00 10.00 6,650.00 Total Bid Bid Value S363.859.20 $33,637.50 $29.748.00 $6.500.00 $13.788.80 $2.030.00 $580.00 $6,650.00 $456,793,50 $456,793.50 004243 BID PROPOSAL Page of COFW STD BID PROPOSAL - Paving SECTION 00 41 00 BID FORM Goodwin & Marshall, Inc. c'o Ashton Woods Homes 1221 N interstate 35E, Suite 170 Carroliton.Texas 75066 FOR BLUFFVIEW-PHASE 1 City Protect No 02031 UntsiSecticrs. D OE #6949 File No. K-2251 Water P265-6021502031-83 Sewer P275-7021302031-83 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish al Work as specified or indicated in the Contract Documents for the Bid Pnce and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents_ 2. BIDDER Acknowledgements and Certification 21 in submitting this Bid, Bidder accepts ail of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond 2 2 Bidder is aware of ail costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certfcate meeting ail requirements within 14 days of notification of award, 2.3 Bidder certifies that this Bid is genuine and not made in the interest of or on behaf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization. or corporation. 2.4 Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2 5 Bidder has not solicited or induced any individual or entity to refrain from bidding. 2 6 Bidder has not engaged in corrupt. fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a "corrupt practice" means the offenng. giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process b. "fraudblent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprave City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at arfificiat. non-competitive levels d "coercive practice" means harming or threatening to harm. directly or indirectly, persons or thew property to influence their participation in the bidding process or affect the execution of the Contract 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalifed contractors and subcontractors_ a Paving Facilites b Storrn Ora:n.WWater. and Sewer Facilities c. Street Light Facilities - . .- =- Si: s.d 4. Time of Completion 4 1 The VJrrk ;'r;'.l be complete for Final Acceptance v. tn:n days after the date when the the Contract Time commences to run as provided in Paragraph 2 03 cf the Genera Conditions 4 2 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to ..emplete the 'Work {and' or achievement of Milestonest wit't n !he tines specified :n the Agreeme. it 5. Attached to this Bid The following documents are attached to and made a par: cf this Bid a `his Bid Form Section CO 41 GO b Proposal Form Section CO 42 43 Contractor Compliance with Workers Compensaten Law. Section G^ 45 26 d Prequa' :cation Statement. Section 03 45 12 6. Total Bid Amount 6.1 Bidder mil complete the Y:trk to accordance with the Contract Documents for the following bid amount in the space provided below please enter the total bid amount for this poled Only this figure will be read pub; cly by the City at the bid open ng 6 2. It is understood and agreed by the Bidder in signing this proposal that the total b d arno inn entered below :s subject to venflcafion and:cr modification by multiplying the unit bid paces for each pay item by the respective estimated quantities shown :n this proposal and then totaling all of the extended arncunts Total Bid T. Bid Submittal This Lt:d is submitted on Respeciiuti tabmilted, By Title Company - actress. Sta:e of Incorporation t +1 Email C-�e C4tesi rat&A. • Cr) fit Phone �i I ` / Wet/ END OF SECTION he entity named below Receipt is acknowledged oti the follow:.: Addenda [Addendum No. 1. !Addendum No 2 ?Addendum No 3 ?Addendum No 4' Corporate Seal: UNIT PRICE BID SE( I TOS 00 42 43 PROPS Al - t i tR\! PVC Water Pare S Gate Va-e3Va'veBox !Si:; Roe 'Loran!. Asse^':.-'.w':"'" Ga!e Va` 4 8 Water L^ePs 1` F •mast': .';ate+ St ^e 31' !rn atzon Se:v:ce—_ -- i . trrioat r Serw::e - - E Da.t:'et Po . ,`Hater F 4.-ttas 9 Crrect t.. Exissno 8' Vi L Trerch Safety - - ----- £ ° PVC S eave PV Sleeve SDR 2S PVC Cen;ent Stao:zed 830,f=1t 1 C- :rete Cae 811 S S Std_ 4 D:a _S S Litt St 5 D.a Cron S S / Dec4t2 ter 4" D.;a Mar^r:B >..a Der,ttr for 51 Dra Mantic:e Eccr, Marrc'e L.:fc- C ay Darn 41 Sewer Set -:ice Sewer Service _re ::h Safetq TV Sar tar" Sewer L;rte Mar4-c;e Vaczer Test r:1 Ccrreztt Ex=s:^3SS;1trt T•af` t. CI rite^_; far Off -site Sewer J '.`b e Asceatt Pav:ni Rear 110 Depressed Curt Met 3`- - Depressed Curt I^te,t a2 21' Class III RC P 13 '_,—,2 IRCP 34 0 Class I€i R C P 35 2411 5 coed End Heaay.a: t2.4811S Iced. End Head:va' r.? "x3'S0hiH 2-3 C rd-tett to Ex:st:na Stcrrr '29£ 'wasted Gat.:n Mattress Sj •Tie ._r Safety Water Facilities Subtotal 1 Sewer Facilities Subtotal Per Par Data:; Per Pia De!a: a n St,.. _.L! Storm Drain Facilities Subtotal Pa, .viert;Pe4cr^+a^:e.!.larterance Soros V:ater(Se;we-:Stcrm Gran Far.:Et es St t`:ctal 3311 026 L.F 24 Lc3 c4 S2a2 2vC:3 33-«4.4 EA 3311 C$0.1 3,42 01(33 33G5 0100 E%5 F ZC' 5 2311 t€ 133"a CQC:1 3'L5 0113 ?331 31 => 33'_132C2 33 S0*09 2291 0801 9399 CO)` 2471 .*ry 1 32v. s... 3349 5901 ftr c.a., 2341 0201 3241-_295 33410232 9; 99082 9999 9902 9999 983 313E C'33259129 11 EA E4 EA LF EA EA cy Bidder's Application al $1 079 ''2 $3 37 $68 64 S5.135 ... SEEP' 75: $1 322 83 $4 282 89 53... _ SO 25 $5 79 S41 2w $30 03 „IRE 08 S2 373 3R Sc4207 St $.3 ".^ $3 6 89 $537 c $3 as $70 >;C"1 $775 571 $539^_ $_0001i $? Ct^ $39 58 S42 75 $52 89 $1.475 $1 cr4 QC $2 25" 09 $ S95 - 30 er2c -fatal Bid S.73 447 68 043 $.35C928 $13726 ,.. t 31 83 S1 113 $3 8C $e 37 `600 DC f $925 50 $1 423 00 S579 GO S160,113.31 $167 35,1 2E1 363880 S-16 it=' c' S` 27 at Sr2.95-; CC $33 58,9 53 S53' S_ Si 01.4 25 $4 46< 73 Si 470 .,.. $775 57 $5_0. -r3 CC) $280,467.21 $ SE _ _01 $' .939 42 S21 350 DO $1 85783 St 47c , $575 CC, $2._ 31 $630 CC $1-1480 $142 25i $47,359.47 512.8351 S487 939 99 $500,774.991 er Into Agreement 2. BIDDER Acknowledgements and Certification -r 2-2 2 2 uatificatiun 4 triE coy0Es oepr rice S-CTIO N 00 41 00 an Cif 431 t^, est;a.Ei sr 3-1$fi.;.a('...2-.. .. coulr !ism an: ;:ncsC UW. a...,... -.a,.. arrangerrien: „e';'.,V at zaa. e 4 Time of Con- ion ached to leis B1e1 5 Tota1 Bid 4niount 7. Sid Submittal t;1:tt;' msv 56Ct D END OF SEC ON ®end.ett1 N: Hat;entitim NG PRI lent Pctr8Thriapre•- eApp(ic c12 is cs •, = S3":.. '02 2. 7.80