HomeMy WebLinkAboutContract 44262 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. (1tI7 Li Z
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Ashton Dallas Residential L.L.C.
Address, State, Zip Code: 1221 N. Interstate 351 Carrollton, TX 75006
Phone, E-Mail: (972) 428-5403
Authorized Signatory/Title: Mr. Rob Romo, Vice President — Land Acquisition
Project Name. Bluffview Phase I
Project Location: North Side of Litsey Rd. at Mallard Creek Dr. Intersection
Plat Case No.: FP-012-045 Plat Name: Bluffview
Mapsco: 644W
Council District: 2 City Project No: 02031
CFA: 2013-003 DOE: 6949
To be completed by staff.•
Received by:
RECEVEfl WILW
1
Date:
g I 7-)ima
OFFICIALL RECO:E
CITY SECRETARY
FT. WORTH,
TX
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X.
Sewer (A-1) X, Paving (B) X, Stortu Drain (B-1) X , Street Lights &
Signs (C) X .
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the teen of the
maintenance bond All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPFIR, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused. in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall teiniinate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name. Bluffview Phase I
CFA No.:2013-003 DOE No.: 6949
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 160,113.31
2. Sewer Construction $ 280,467.21
Water and Sewer Construction Total $ 440,580.52
B. TPW Construction
1. Street $ 456,793.50
2. Storm Drain $ 47,359.47
3. Street Lights Installed by Developer $ 76,157.80
TPW Construction Cost Total $ 580,310.77
Total Construction Cost (excluding the fees): $ 1,020,891.29
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 8,811.61
D. Water/Sewer Material Testing Fee (2%) $ 8,811.61
Sub -Total for Water Construction Fees $ 17,623.22
E TPW Inspection Fee (4%) $ 20,166.12
F. TPW Material Testing (2%) $ 10,083.06
G. Street Light Inspsection Cost $ 3,046.31
H. Street Signs Installation Cost $ 2,205.00
Sub -Total for TPW Construction Fees $ 35,500.49
Total Construction Fees: $ 53,123.71
Choice
Financial Guarantee Options, choose one Amount (ck on),
`e.
(Bond = 100% $ 1,020,891.29 L'
!Completion Agreement = 100% / Holds Plat $ 1,020,891.29
(Cash Escrow Water/Sanitary Sewer= 125% $ 550,725.65
'Cash Escrow Paving/Storm Drain = 125% $ 725,388.46
!Letter of Credit = 125% w/2yr expiration period $ 1,276,114.11
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and sa' 9eyeloper ha . - xecuted Zis
instru - ent in quadruplicate, at Fort Worth, Texas this _9 day of in /2
20 I).
CITY OF FORT WORTH - Recommended by:
Water Department
R
L
Wendy Chi-Bbulal, EMBA, P.E.
Development Engineering Manager
Approved as to Fornn & Legality:
w
boug as . Black
AssistantCity Attorney
M&CNo. 4\
Date: -
ATTEST:
ary'J. Kays
City Secretary
ATTEST:
Signature
(Print) Name:
etkiAtt
Dawn McClintic
Transportation & Public Works Department
/t
%, Ur C-rtoDouglaW. Wiersig, P.E.
Director
Approved by City Manager's Office
'ildra0,4‘A
Fernando Costa
AssistantCity Manager
eg foe?
ort
000!)0
Fi
fitin
pwitgo:
11.24)
o ('r �'��- � �-:
0 2 �' � C,f
tt �•
/..4:
.41
% Wit;
etf-
Ashton Dallas Residential L.L.C.
Signature
Print Name: Robert J. Romo
Title:
Vice President
•
OFFICIAL RECORD
CITY SECRETARY
Ft WORTH, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included
ix
x
x
m
v
m
/1
x
N
ix
x
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
E \10499\PLANS \EIultview - Phase
3eW
Cemetery
_ITSEY GOAD
OWNED/I13 3VE_1,O1E 1
SHTON
D BYo
\IOTHI AKE
nu.LIMO
■ Raisinn
IS swimm
ra ty
== ata V was oast
VICINITY MAP
DS
N.T.S.
PHASE 11
CIIY
Q=
LINT
I
LI SEY
ROAD
PROJECT
LOCATION
LOCATED UY
F FORT W O 'AM, TEXAS
1221 N. INTERSTATE 35E 1 SUIJ E 170
CARROLLTON, TX 75006
OFFICE (972) 426 -5403
JANUA
", 20
3
PR INPARED BY:
G OODwDN &
MARSHAL., g
CIVIL ENGINEERS — PLANNERS — SURVEYORS
2405 Mustang Drive, Grapevine, Texas 76051
Metro (817) 329-4373
_ 11,UTFV
LASE If
1�+ WATER
1L" Lll °,Aei
2
BLOCK F
56x PRIVATE
OPEN SPACE
BLOCK 8
PRIVATE OPEN
SPACE 56x
BLOCK B
BLOCK
2
8' W.
BLOCK E
/0
9x PRIVATE O.
EX. 8' STUB
EX. B' W.L. EX. 16' W.L.
PRIVATE OPEN
SPACE 56x
BLOCK B
52
BLOCK LT
53
EX. B' STUB —
LIMEY GOAD
BLOCK/ B
51% 50
l9
BLOCK C
E
2
35 \ /
BLOCK C
30
3/
32
33
34
8, W L.
EX. I6' W.L — —_
GRAPHIC SCALE 1"=200'
6111 Mk
0 200 400 600
LEGEND
PROPOSED WATER LINE
EXISTING WATER LINE
PROPOSED FIRE HYDRANT ASSEMBLY
EXIST NG FIRE HYDRANT ASSF MBLY
PROPOSED GATE VALVE
EXISTING GATE VALVE
PRIEPARED 13 Y:
G OODW a
_.-_ A lRSE-LA ,
CIVIL ENGINEERS — PLANNERS — SURVEYORS
2405 Mustang Drive, Grapevine, Texas 76051
Metro (817) 329-4373
E:\'0499\PLANS \3Iuffvew - Pnose .pro 22 Feb 2013
DD J
liTAS
SANITARY SEWER
Ex1HmUr "A-1"
PRIVATE OPEN
SPACE 56x
BLOCK B
MAT
W�E
GRAPHIC SCALE
LEGEND
PROPOSED SANITARY SEWER LINE
1"=200'
0
HONE- SEE THIS SHEET
8S.S.
200
400
56x PRIVATE
OPEN SPACE
BLOCK B
55
8
600
2
BLOCK Ir
EXISTING SANITARY SEWER LINE
• PROPOSED SANITARY SEWER MANHOLE
OS EXISTING SANITARY SEWER MANHOLE
PRIVATE OPEN
SPACE 56x
BLOCK B
BLOCK E
2
MAT
I/
BLOCK E
10
BLOCK D
l4
BLOC t' A
4
9x PRIVATE O.S.
SEE T HIS SHEET
HONE - 23
55
LDFSEY ROAD
BLOCK D
4
I
58
27
28
� I
29
BLOCK C
30
35
3
IBL UC� B
PRIVATE 0.S.
PREPARED BY:
7
G OODWI N
MARSIHiALL
CIVIL ENGINEERS — PLANNERS — SURVEYORS
2405 Mustang Drive, Grapevine, Texas 76051
Metro (817) 329-4373
E \10499\PLANE \Eluffview — Phase 1.pro 22 Feb 2013
LEGEND
1111111111111
PHASE
MEETS
EXHJ MT vv3"
PROPOSED 29 ' B—B ROADWAY
w/50'R.O.W.
6" CONCRETE PAVING
4' SIDEWALK BY HOMEBUlLDER
4 ' SIDEWALK PER THIS CONTRACT
PRIVATE OPEN
SPACE 56x
BLOCK B
PRIVATE OPEN
SPACE 56x
BLOCK B
28
29
BLOCK C
30
31
S
GRAPHIC SCALE 1'-200'
t t t
0 200 400 600
PREPARED BY:
G GODWI N2
MARSHAL °W
CIVIL ENGINEERS — PLANNERS — SURVEYORS
2405 Mustang Drive, Grapevine, Texas 76051
Metro (817) 329-4373
E:\10499\PLANS\Bluffview - Phase I.pro 22 Feb 2013
3_- U V
°p -AS.
STORM JRKN EX JIT
LEGEND
PROPOSED STORM DRAIN LINE
EW
IIA�'
EXISTING STORM DRAIN LINE
PROPOSED STORM DRAIN INLET
BLOCK E
1
0
U
R.0
10' INLET
21' R.C.P
5' INLET —
PRIVATE OPEN
SPACE 56x
BLOCK B
24" R.C.P
—10' INLET
BLOCK
2
PRIVATE OPEN
SPACE 56x
BLOCK B
F30" R.C.P
—24" R.C.P
BLOCK
10
BLOC/ A
9x PRIVATE 0.5
BLOCK.6
53
10 "NLET
21" R.C.P
LtREY
BLOC
51
50
19
BLOCK C
0' INL
c
29
BLOCK C
30
BLOC B
56x PRIV ATE O.S.
7
s
GRAPHIC SCALE 1"-200'
0 200 400 600
PREPARED BY:
GOODVVIITJ��yn�� 1
MARSIRIALL x
CIVIL ENGINEERS — PLANNERS — SURVEYORS
2405 Mustang Drive, Grapevine, Texas 76051
Metro (817) 329-4373
E:\10499\PLANS\Bluffview - Phase !.pro 22 Feb 2013
P 1 AS E
STRUG TS
EL ET v9C"
PRIVATE OPEN
SPACE 56x
BLOCK B
2
BL OCK F
BLOCK L
2
56x PRIVATE
OPEN SPACE
BLOCK B
H.H
BLOC
/0
H.H.
BLOC BLOC A
4
9x PRIVA TF 0.S
PRIVA TE OPEN
SPACE 56x
BLOCK B
52
BLOCK B H.H
BLOCK 0
14
ILPTSE K ROAD
53
54
I4:1
BLOgK0
BL OCK/B
5/:
50
/9
BLOCK C
2/
22
23
24
.H. 25
BLOCK C
30
H.
\BLOCl4 B,
58x PRIVATE O.S.
'
5
7
GRAPHIC SCALE 1"=200'
0 200 400 600
LEGEND
PVC Condu/'l
Transformer on PAD
Pole Assembly
1OO w HPS
PREPARED BY:
G 00a9vDN. 2
tRSHAILL
CIVIL ENGINEERS — PLANNERS — SURVEYORS
2405 Mustang Drive, Grapevine, Texas 76051
Metro (817) 329-4373
E \10499\PLANS\Bluffv ew - Phase I.pro 22 Peo 2013
LC V W
F AS
STREET+ SIGNS
L:OCH8Ill vvC-
p
r;t
56x PRIVATE
OPEN SPACE
BLOCK B
PRIVA TE OPEN
SPACE 56x
BLOCK B
BLOCK
2
3
4
BLOCK E
10
PRIVATE OPEN
SPACE 56x
BL 0CK B
BLOCK D
14
BLOCK B
OUNOT,BLUFFS
BLOC A
4 5 6 7
9x PRIV4 TE 0.5
1LflSEY ROAD
53
BLOCK D
4
BLOC B
SI :/50
(9
BLOCK C
0
29
BLOCK C
30
BLOC( B
56x PRIVATE 0'S
7
GRAPnJC SCALE 1 =200'
0 P00 40D 600
LEGEND
STREET NAIAE SIGN
PREPARED EY:
G GODWIN
MSLL
CIVIL ENGINEERS — PLANNERS — SURVEYORS
2405 Mustang Drive, Grapevine, Texas 76051
Metro (817) 329-4373
E;\10499\PLANS\Blu(iview - Phase I.oro 22 Feb 20'3
TO:
Goodwin & Marshall, Inc.
c/o: Ashton Woods Homes
1221 N. Interstate 35E, Suite 170
Carrolllon,Texas 75006
SECTION 00 41 00
BID FORM
FOR: BLUFFVIEW- PHASE 1
City Project No.: 02031
Units/Sections: D.O.E. #6949
File No. K-2251
Water P265-6021502031-83
Sewer P275-7021302031-83
1. Enter Into Agreement
The undersigned Bidder proposes and agrees, if this Old is accepted, to enter into an Agreement with City in the form included in the
Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the
Contract Time Indicated In this Bid and in accordance with the other terms and conditions of the Contract Documents.
2. BIDDER Acknowledgements and Certification
•
2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and
INSTRUCTIONS TO BIDDERS, Including without limitation those dealing with the disposition of Bid Bond.
2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid
Insurance certificate meeting all requirements within 14 days of notification of award.
2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity
and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or
corporation.
2.4. Bidder has not directly or Indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding.
2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices In competing for the Contract. For the
purposes of this Paragraph:
a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to Influence
the action of a public official in the bidding process.
b. "fraudulent practice" means an Intentional misrepresentation of facts made (a) to influence the bidding
process to the detriment of City (b) to establish Bid prices al artificial non-competitive levels, or (c) to
deprive City of the benefits of free and open competition.
c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the
knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive levels,
d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property
to Influence their participation In the bidding process or affect the execution of the Contract.
3, Prequaligcation
The Bidder acknowledges That the following work types must be performed only by prequalified contractors and subcontractors:
a. Paving Facilities
b. Storm Drain, Water, and Sewer Facilities
c. Street Light Facilities
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120327
0041 00
BID FORM
Page 1 of 3
COFW STD BID PROPOSAL - Poring
Email:
Phone:
4. Time of Completion
4.1. The Work will be complete for Final Acceptance within 60 days after the date when the
the Contract Ttme commences to run as provided in Paragraph 2.03 of the General Conditions.
4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work
(and/or achievement of Milestones) within the times specified in the Agreement.
5. Attached to this Bid .
The following documents are attached to and made a part of this Bid:
a. This Bid Form, Section 0041 00
b. Proposal Form, Section 00 42 43
c. Contractor Compliance with Workers Compensation Law, Section 00 45 26
d. Prequalification Statement. Section 00 4512
6. Total Bid Amount
6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bld amount. in the space
provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the
bid opening.
6.2. It is understood and agreed by the Bidder In signing this proposal that the total bid amount entered below Is subject to
verification and/or modification by multiplying the unit bid prices for each pay Item by the respective estimated quantifies
shown In this proposal and then totaling all of the extended amounts.
Total Bid
7. Bid Submittal
This
Harlan Jones
January 21, 2013
(Printed Name)
Vice President
Tllle:
Company: Mario Sinacola & Sons Excavating, Inc.
Address: 10950 Research, Road, Frisco, Tx 75033
State of Incorporation: Michigan
hjonesemariosinacola.corn
219.387.3900
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Rovlsed 20120327
$456,793.50
by the entity named below.
Receipt is acknowledged of
the following Addenda:
Addendum No. 1:
Addendum No. 2:
Addendum No. 3:
Addendum No. 4:
Corporate Seal:
Initial
00 41 00
BID FORM
Pago2or3
COFW STD BID PROPOSAL -Paving
1
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID
Project Item Information
Bidlist Item
No.
41 6- 3.600 PSI Concrete w/ T Curb
42 6" Lime Stabilized Subarade (33#/SY)
43 Hydrated Lime (33#/SY1
44 4' Barrier Free Ramo Tvae R-1
45 4' Concrete Sidewalk
46 'Concrete Header & End of Road Barricade
47 (Connect to Exislinn Street Stub -Out
48 IPaymenV Performance/ Maintenance Bonds
Paving Facilities Subtotal
Description
CITY OF FORT WORT( I
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Reviscd 20120120
Specification
Section No.
3213.0101
3211.0501
3211.0400
3213.0535
3213 0301
9999.0004
9999.0005
Unit or
Measure
SY
SY
TON
EA
I SF
I LF
LF
LS
Bidder's Application
Bid Quantity
12.634
13.455
222
10
4.448
58
58
1
Bidder's Proposal
Unit Price
$28.80
$2.50
$134.00
$650.00
3.10
35.00
10.00
6,650.00
Total Bid
Bid Value
S363.859.20
$33,637.50
$29.748.00
$6.500.00
$13.788.80
$2.030.00
$580.00
$6,650.00
$456,793,50
$456,793.50
004243
BID PROPOSAL
Page of
COFW STD BID PROPOSAL - Paving
SECTION 00 41 00
BID FORM
Goodwin & Marshall, Inc.
c'o Ashton Woods Homes
1221 N interstate 35E, Suite 170
Carroliton.Texas 75066
FOR BLUFFVIEW-PHASE 1
City Protect No 02031
UntsiSecticrs. D OE #6949
File No. K-2251
Water P265-6021502031-83
Sewer P275-7021302031-83
1. Enter Into Agreement
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the
Bidding Documents to perform and furnish al Work as specified or indicated in the Contract Documents for the Bid Pnce and within the
Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents_
2. BIDDER Acknowledgements and Certification
21 in submitting this Bid, Bidder accepts ail of the terms and conditions of the INVITATION TO BIDDERS and
INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond
2 2 Bidder is aware of ail costs to provide the required insurance, will do so pending contract award, and will provide a valid
insurance certfcate meeting ail requirements within 14 days of notification of award,
2.3 Bidder certifies that this Bid is genuine and not made in the interest of or on behaf of any undisclosed individual or entity
and is not submitted in conformity with any collusive agreement or rules of any group, association, organization. or
corporation.
2.4 Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2 5 Bidder has not solicited or induced any individual or entity to refrain from bidding.
2 6 Bidder has not engaged in corrupt. fraudulent, collusive, or coercive practices in competing for the Contract. For the
purposes of this Paragraph:
a "corrupt practice" means the offenng. giving, receiving, or soliciting of any thing of value likely to influence
the action of a public official in the bidding process
b. "fraudblent practice" means an intentional misrepresentation of facts made (a) to influence the bidding
process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to
deprave City of the benefits of free and open competition.
c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the
knowledge of City, a purpose of which is to establish Bid prices at arfificiat. non-competitive levels
d "coercive practice" means harming or threatening to harm. directly or indirectly, persons or thew property
to influence their participation in the bidding process or affect the execution of the Contract
3. Prequalification
The Bidder acknowledges that the following work types must be performed only by prequalifed contractors and subcontractors_
a Paving Facilites
b Storrn Ora:n.WWater. and Sewer Facilities
c. Street Light Facilities
- . .-
=- Si:
s.d
4. Time of Completion
4 1 The VJrrk ;'r;'.l be complete for Final Acceptance v. tn:n days after the date when the
the Contract Time commences to run as provided in Paragraph 2 03 cf the Genera Conditions
4 2 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to ..emplete the 'Work
{and' or achievement of Milestonest wit't n !he tines specified :n the Agreeme. it
5. Attached to this Bid
The following documents are attached to and made a par: cf this Bid
a `his Bid Form Section CO 41 GO
b Proposal Form Section CO 42 43
Contractor Compliance with Workers Compensaten Law. Section G^ 45 26
d Prequa' :cation Statement. Section 03 45 12
6. Total Bid Amount
6.1 Bidder mil complete the Y:trk to accordance with the Contract Documents for the following bid amount in the space
provided below please enter the total bid amount for this poled Only this figure will be read pub; cly by the City at the
bid open ng
6 2. It is understood and agreed by the Bidder in signing this proposal that the total b d arno inn entered below :s subject to
venflcafion and:cr modification by multiplying the unit bid paces for each pay item by the respective estimated quantities
shown :n this proposal and then totaling all of the extended arncunts
Total Bid
T. Bid Submittal
This Lt:d is submitted on
Respeciiuti tabmilted,
By
Title
Company -
actress.
Sta:e of Incorporation
t +1
Email C-�e C4tesi rat&A. • Cr) fit
Phone �i I ` / Wet/
END OF SECTION
he entity named below
Receipt is acknowledged oti
the follow:.: Addenda
[Addendum No. 1.
!Addendum No 2
?Addendum No 3
?Addendum No 4'
Corporate Seal:
UNIT PRICE BID
SE( I TOS 00 42 43
PROPS Al - t i tR\!
PVC Water Pare
S Gate Va-e3Va'veBox
!Si:; Roe 'Loran!. Asse^':.-'.w':"'" Ga!e Va`
4 8 Water L^ePs
1` F •mast': .';ate+ St ^e
31' !rn atzon Se:v:ce—_ --
i . trrioat r Serw::e - -
E Da.t:'et Po . ,`Hater F 4.-ttas
9 Crrect t.. Exissno 8' Vi L
Trerch Safety - - -----
£ ° PVC S eave
PV Sleeve
SDR 2S PVC
Cen;ent Stao:zed 830,f=1t
1 C- :rete Cae 811 S S
Std_ 4 D:a _S S Litt
St 5 D.a Cron S S /
Dec4t2 ter 4" D.;a Mar^r:B
>..a Der,ttr for 51 Dra Mantic:e
Eccr, Marrc'e L.:fc-
C ay Darn
41 Sewer Set -:ice
Sewer Service
_re ::h Safetq
TV Sar tar" Sewer L;rte
Mar4-c;e Vaczer Test r:1
Ccrreztt Ex=s:^3SS;1trt
T•af` t. CI rite^_; far Off -site Sewer
J '.`b e Asceatt Pav:ni Rear
110 Depressed Curt Met
3`- - Depressed Curt I^te,t
a2 21' Class III RC P
13 '_,—,2 IRCP
34 0 Class I€i R C P
35 2411 5 coed End Heaay.a:
t2.4811S Iced. End Head:va'
r.? "x3'S0hiH
2-3 C rd-tett to Ex:st:na Stcrrr
'29£ 'wasted Gat.:n Mattress
Sj •Tie ._r Safety
Water Facilities Subtotal
1
Sewer Facilities Subtotal
Per Par Data:;
Per Pia De!a:
a n St,.. _.L!
Storm Drain Facilities Subtotal
Pa, .viert;Pe4cr^+a^:e.!.larterance Soros
V:ater(Se;we-:Stcrm Gran Far.:Et es St t`:ctal
3311 026 L.F
24 Lc3 c4
S2a2 2vC:3
33-«4.4
EA
3311 C$0.1
3,42 01(33
33G5 0100
E%5 F
ZC' 5 2311 t€
133"a CQC:1
3'L5 0113
?331 31 =>
33'_132C2
33 S0*09
2291 0801
9399 CO)`
2471 .*ry 1
32v. s...
3349 5901
ftr c.a.,
2341 0201
3241-_295
33410232
9; 99082
9999 9902
9999 983
313E C'33259129
11
EA
E4
EA
LF
EA
EA
cy
Bidder's Application
al
$1 079 ''2
$3 37
$68 64
S5.135 ...
SEEP' 75:
$1 322 83
$4 282 89
53... _
SO 25
$5 79
S41 2w
$30 03
„IRE 08
S2 373 3R
Sc4207
St
$.3 ".^
$3 6 89
$537 c
$3
as
$70 >;C"1
$775 571
$539^_
$_0001i
$? Ct^
$39 58
S42 75
$52 89
$1.475
$1 cr4 QC
$2 25" 09
$
S95 -
30
er2c
-fatal Bid
S.73 447 68
043
$.35C928
$13726
,.. t 31 83
S1 113 $3
8C
$e 37 `600 DC
f
$925 50
$1 423 00
S579 GO
S160,113.31
$167 35,1 2E1
363880
S-16 it=' c'
S` 27 at
Sr2.95-; CC
$33 58,9 53
S53' S_
Si 01.4 25
$4 46< 73
Si 470 .,..
$775 57
$5_0.
-r3 CC)
$280,467.21
$
SE _ _01
$' .939 42
S21 350 DO
$1 85783
St 47c
,
$575 CC,
$2._ 31
$630 CC
$1-1480
$142 25i
$47,359.47
512.8351
S487 939 99
$500,774.991
er Into Agreement
2. BIDDER Acknowledgements and Certification
-r
2-2
2
2
uatificatiun
4 triE
coy0Es
oepr
rice
S-CTIO N 00 41 00
an
Cif 431 t^, est;a.Ei sr 3-1$fi.;.a('...2-.. ..
coulr
!ism
an: ;:ncsC
UW. a...,... -.a,..
arrangerrien: „e';'.,V
at zaa.
e
4 Time of Con- ion
ached to leis B1e1
5 Tota1 Bid 4niount
7. Sid Submittal
t;1:tt;'
msv
56Ct D
END OF SEC ON
®end.ett1 N:
Hat;entitim NG
PRI
lent Pctr8Thriapre•-
eApp(ic
c12 is cs •, =
S3":..
'02 2.
7.80