Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 44264 (2)
COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract Na Lfq7 WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: Friends of Children, Inc. Address, State, Zip Code: 1004 7t1' Ave I Fort Worth, TX 76104 Phone, E-Mail: (817) 820-8931 I Jennifer.johns@ftworthrmh.org Authorized Signatory/Title: Jennifer Johns, Executive Director Project Name: Ronald McDonald House Alley "A" Project Location: 1000 Southland Ave. Plat Case No.: FS-012-140 Plat Name: Southland Subdivision Mapsco: 76L CFA: 2013-008 DOE: 6960 To be completed y staff Received by: \Lki • RECEIVED MAR - 6 70j3 Council District: 9 City Project No: 02040 1 Date: 1� OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X Sewer (A-1) _X Paving (B) X, Storm Dram (B-1) X , Street Lights & Signs (C) . E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the teiiu of the maintenance bond All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold hainuless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, ttt whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Ronald McDonald House Alley "A" CFA No.: 2013-008 DOE No.: 6960 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 6,600.00 2. Sewer Construction $ 9,418.00 Water and Sewer Construction Total $ 16,018.00 B. TPW Construction 1. Street $ 109,892.25 2. Storm Drain $ 5,340.00 3. Street Lights Installed by Developer $ - TPW Construction Cost Total $ 115,232.25 Total Construction Cost (excluding the fees): $ 131,250.25 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 320.'36 D. Water/Sewer Material Testing Fee (2%) $ 320.36 Sub -Total for Water Construction Fees $ 640.72 E TPW Inspection Fee (4%) $ 4,609.29 F. TPW Material Testing (2%) $ 2,304.65 G. Street Light Inspsection Cost $ H. Street Signs Installation Cost $ Sub -Total for TPW Construction Fees $ 6,913.94 Total Construction Fees: $ 7,554.66 Choice Financial Guarantee Options, choose one Amount (ck one) 'Bond = 100% $ 131,250.25 (Completion Agreement = 100% / Holds Plat $ 131,250,25 'Cash Escrow Water/Sanitary Sewer= 125% $ 20,022.50 X 'Cash Escrow Paving/Storm Drain = 125% ' $ 144,040.31 X 'Letter of Credit = 125% w/2yr expiration period ' $ 164,062.81 IN' TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has execute, e is P instrument in7dru licate, at Fort. Worth, Texas this y dayof r-17A ` ,20 • CITY OF FORT WORTH - Recommended by: Water Department endy Chi-B bulal, EMBA, P.E. Developmen Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. /I-) l Date: ary J. Kays City Secretary A , EST: C Na9)---Wu Signature (Print) Name: ritk�alltttro I Transportation & Public Works Department Douglas Directo� a �J.cu..) 4...try Wiersig, P.E. Approved by City Manager's Office Fernando Costa Assistant City Manager .4P *08744.44 47 it 00000000 Friends of Children, Inc. Signature Print Name: 3e4Jfi1Jh n� Title: Cxeciiite cANV OFFICIAL RECORD CITY SECRETARY FT. WORTK, TX Check items "associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included ►1 n n Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) PLOTTED BY: LaValley, Ryan 0N: Wednesday, February 06, 2013 AT: 9:39 AM FILEPATH: G:\Production\HealthCare\2009\2009142\Engineering\Drawings\EXHIBITS\CFA\Vicinity map.dwg 7-irn "0rnO 044 4,4 oN Is.)W O 0 RONALD McDONALD HOUSE ALLEY 'A' 37VOS 01 ION dVw ALINIDIA 0 00 < / V 0 -I 0 r � � SOUT 5 m 5T 0 D SON 0 1 0 GTONrTi 0 G00M-ISdC LAND 0 Fri 0 0 0 0 SUfVvIT o ALABAMA z BALL NGER 1-1IAS��1�d UTILITY LEGEND EXISTING SANITARY SEWER EXISTING WATERILNE zi--7L// / // EXISTING WATERILNE TO BE REMOVED Qs EXISTING SEWER MANHOLE ) LOT 13 EXISTING FIRE HYDRANT PROPOSED WATER PLUG SALVAGE & RETURN EXISTING WATER METER TO WATER DEPAR TMEN T REMOVE & DISPOSE OF EXISTING WATER SERVICE PULASKI STREET (45' R.O.W./ASPHALT PAVING FILE NO. W-2197) DUNAWA 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (1X REG. F-1114) EX. 10" W SCALE: 1' 20 ft. 7L / EXISTING / 77N- - FIRE 'HYDRANT TO WA-iTER DEPARTMENT EXISTING 8" WATER (DOE# 3149) 8" PLU °° --T�f REMOVE & DISPOSE LOB 8 WATER LINE 1 L/ b/ __ ///_ — SALVAGE & RETURN77/ SALVAGE &III RRNi�— �� EXISTING WATER DEPARTMENT T \ > \ EX. 10" W EX. 10' EXHIBIT "A" WATER EXHIBIT RONALD McDONALD HOUSE ALLEY 'A' 3 8 it 8 0 0 a d UTILITY LEGEND • NOTES: EXISTING SANITARY SEWER PROPOSED SANITARY SEWER PROPOSED STORM DRAIN PROPOSED SEWER MANHOLE 1. PER CITY RECORDS, THERE IS AN EXISTING SANITARY SEWER MAIN BREAK ±239 FEET UPSTREAM (NORTH) OF THE MANHOLE WITHIN PULASKI (DESIGNATED WITH A *). THE CONTRACTOR SHALL BID 20 LF OF SDR-35 PVC PIPE, TWO RUBBER SLEEVE COUPLINGS, AND EXCAVATION NEEDED TO REPAIR THIS LINE. THE CITY WILL PARTICIPATE AT THE CURRENT CITY UNIT PRICE LIST. IF ADDITIONAL REPAIR /S DETERMINED NECESSARY BY THE CITY INSPECTOR, THIS ADDITIONAL COST WILL BE PAID BY THE CITY UP TO THE CITY UNIT PRICES AMOUNT DUNAWA�/ 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) SCALE: 1 "= 20 ft. 7--I--T--I--T_ 7 1 1 1 I I 11 1 _ PA T OFI II 11 L T 8 1 REFER TO NOTE 1 EXISTING 6" SS REF. CITY FILE X-448 uli PROPOSEEF7T 4' DIA. SQL/ PART LOT 9 �� I I I II I I I II PRO)'OSEIJ 6" SS LINE A L_J__1__ji PROPOSED 6" WASTERWA TER ACCESSS CHAMBER /E EXHIBIT "Al" WASTE WATER EXHIBIT RONALD McDONALD HOUSE ALLEY 'A' 40 0 i UE WI J <> G:\Production\HealthCare\2009\2009142\Engineering\Drawings\EXHIBITS\CFA\B- PAVING.dwg PLOTTED BY: LaValley, Ryan ON: Thursday, February 14, 2013 AT: 9:28 AM FIL LOT 44 LOT 43 LOT 42 \ PART OF \ LOT 11 �- \\\ IIIIIIIIIII I(I) I(r W.I. COOK FOUNDATION, INC. VOLUME 12620, PAGE 1462 & COUNTY CLERK'S DOCUMENT NO. D206108525 D.R.T.C.T. 7 1 `-° \ II'‘\ PAVING LEGEND PROPOSED 6" PORTLAND CEMENT CONCRETE, MIN. 28 DAY COMPRESSIVE STRENGTH OF 3600 PSI WITH #3 BARS AT 18" O.C.E.W. ON 6" LIME STABLIZED SUBGRADE @ 30 LBS/S.Y. (REFERENCE GEOTECH REPORT NO. 274-12-03) DUNAWAj/ 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) 0 ro' 40 SCALE: 1 "= 20 ft. PART OF LOT 10 EXHIBIT "B" PAVING EXHIBIT SHEET 1 OF 2 RONALD McDONALD HOUSE ALLEY 'A' \ II \\ I y �\ y \ I PAID` koo \\ ALLEY A II7. \\ \ \\ \\ / T OF T 8 I I GAS EX -GAS r �I / IIIIIl[IIIL W.I. COOK FOUNDATION, INC. VOLUME 12620, PAGE 1462 & COUNTY CLERK'S DOCUMENT NO. D206108525 D.R.T.C.T. r'\ g ' PAVING LEGEND tn-u h t EX GA3 1I{-GAS 7j- PROPOSED 6" PORTLAND CEMENT CONCRETE, MIN. 28 DAY COMPRESSIVE STRENGTH OF 3600 PSI WITH #3 BARS AT 18" O.C.E.W. ON 6" LIME STABLIZED SUBGRADE @ 30 LBS/S.Y. (REFERENCE GEOTECH REPORT NO. 274-12-03) DUNAWAj/ 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) 0 40 1..r6171.1 SCALE: 1 "= 20 ft. PART OF LOT 7 LOT 18 EX - GAi EXHIBIT "B" PAVING EXHIBIT SHEET 2 OF 2 RONALD McDONALD HOUSE ALLEY 'A' EXISTING 10 " WATER (DOE# 3149) EXISTING 5' DRAINAGE EASEMENT (BY SEP. INST.) S.D. LINE 'F-1 ' (TO BE CONSTRUCTED UNDER DOE #6748) LOT 43 S.D. LINE 'F' l (TO BE CONSTRUCTED UNDER DOE #6748) , ) EX. 24" RCP i (DOE# 6748) PART OF 1 PA'RT� F PART)-6P LOT ' 11 1 L/0 YO LOT \1-2� _.// - EX. 10' CURB INLET / J III,\ (TO BE CONSTRUCTED J \ UNDER DOE #6748) \ \ i_-�� \ \ 1 1 1 \ \\ 24" S.D. LINE 'F' I c \ , ' i I- \ - S.D. LINE 'F-1 A ' 1. \� N \\ , (PRIVATE) 12"X12" WYE - r_. 1 LOT PROPOSED 5' FYI j•- 42 DRAINAGE EASEMENT I I (BY PLAT) )1 t, 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (1X REG. F-1114) SCALE: 1 "= 40 ft. .0 ;-\) (/ // e•� 12" HDPE (PRI VA TE SD) PROPOSED 10' CURB INLET 11 1 N ■ 4 8" HDPE (/� (PRI VA TE SD) 1 a STORM DRAIN LEGEND 12XSLi WYE EXISTING STORM DRAIN PROPOSED STORM INLET EXHIBIT "B1" STORM DRAIN EXHIBIT RONALD McDONALD HOUSE ALLEY 'A' • TO: Dunaway Associates, L.P. c/o: Brandon Middleton, P.E. 550 Batley Avenue, Suite 400 City of Fort Worth, Texas 76107 SECTION 00 41 00 BID FORM FOR: Water, Sewer, Paving, and Drainage Improvements to Serve Ronald McDonald House Alley A From W. Pulaski Street to Mid Block 10 City Project No.: 1. Enter Into Agreement City Project No. 02040 DOE No, 6960 Water Project. No. P265-609150204083 Sewer Project No. P275-709130204083 004100 BID FORM Page 1of3 The undersigned Bidder proposes and agrees, if this Bid Is accepted, to enter Into an Agreement with Developer in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and In accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.2. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.3. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.4. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.5. Bidder has not engaged In corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process b. "fraudulent practice" means an Intentional misrepresentation of (acts made (a) to influence the bidding process to the detriment of Developer (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive Developer of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of Developer, a purpose of which is to establish Bid prices at artificial, non-competitive levels. d. 'coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. • CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 00 41 00 Did Form.xls • f 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Public Water Improvements b. Public Sanitary Sewer Improvements c. Public Paving Improvements 4. Time of Completion 0041 CO BID FORM Page 2 of 3 4.1. The Work will be complete for Final Acceptance within I cl ( days after the date when the the Contract Time commences to run as provided in Paragraph 2,03 of the General Conditions. 4.2, Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work (and/or achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Proposal Form, Section 00 42 43 6, Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. 6.2. It is understood and agreed by the Bidder In signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3. Total Bid $239.703.25 • CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 00 41 00 Bid Form.xls 7. Bid Submittal This Bid is submitted on January 30, 2013 Respectfully submitted, By: 9 ature) Brock Huaains (Printed Name) by the entity named below. Receipt is acknowledged of the following Addenda: (Addendum No. 1: 'Addendum No. 2: (Addendum No. 3: !Addendum No. 4: Title: Vice President Company: Conatser Management Group, Inc., G.P. Corporate Seal: Address: P.O. Box 15448 Fort Worth, TX 76119 State of Incorporation: Texas Email: brockg-Dconatserconstruction.com Phone: 817.707.6192 END OF SECTION 004100 BID FORM Page 3 of 3 Initial CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Fonn Revised 20120327 00 41 00 ©id Form.xls SECTION 00 42 43 PROPOSAL FORM UNIT I - WATER IMPROVEMENTS Project Item Information Bidlist Hem No. Description 1 0241.1013 Remove 8" Water line 2 10241.1303 Remove 8" Water Valve 3 10241.1510 Salvage Fire Hydrant 4 10241.1511 Salvage 3/4" Water Meter 5 13312.3003 8" Gate Valve 1 (UNIT I - WATER IMPROVEMENTS Specification Section No. 02 41 14 02 41 14 02 41 14 02 41 14 33 12 20 Unit of Measure Bid Summary - Base Bid IF EA EA EA EA Project Type: Developer Funding, New Development Bidder's Application Bidder's Proposal Bid Quantity Unit Price 100 $22.00 11 $1,200.001 if $1,500.001 11 $500.001 11 $1,200.001 1 Bid Value $2,200.00 $1,200.00 $1,500.00 $500.00 $1,200.00 $6,600.001 SECTION 00 42 43 PROPOSAL FORM UNIT II e SANITARY SEWER IMPROVEMENTS Project Item Information Bidlist Item No. 1 3301.0101 2 3305.0109 3 13331.0102 4 13331.4108 5 13339.0003 6 13339.1001 7 13339.1003 Description Manhole Vacuum Testing Trench Safety 6" Sewer Pipe, Point Repair 6" Sewer Pipe Wastewater Access Chamber 4' Manhole 4' Extra Depth Manhole 1 'UNIT II - SANITARY SEWER IMPROVEMENTS Specification Section No. 33 01 30 33 05 10 33 31 22, 33 33 11 10, 33 33 39 40 33 39 10, 33 33 39 10, 33 1 1 1 1 1 1 Unit of Measure Bid Summary - Base Bid EA iF LF LF EA EA VF Project Type: Developer Funding, New Development Bidder's Application Bid Quantity 1 18 20 18 1 1 1 Bidder's Proposal Unit Price $200.00 $4.00 $80.00 $72.00 $2,500.00 $3,500.00 $250.00 Bid Value $200.00 $72.00 $1,600.00 $1,296.00 $2,500.00 $3,500.00 $250.00 1 $9,418.001 SECTION 00 42 43 PROPOSAL FORM UNIT III - PAVING IMPROVEMENTS Project Item Information Bidlist Item No. ey 5 6 7 8 9 10 11 12 13 14 15 16 17 Description 0241.0100 Remove Sidew 0241.1000 Remove Conc Pvett 241 1100 Remove Asphalt Pvmt 0241.1300 Remove Como Curb&Gutter 3110.0103 12"-18" Tree Removal 3110.0104 18"-24" Tree Removal 3123.0101 Unclassified Excavation 3211.0400 Lime 3211.0501 6" Lime Treatment 3213.0101 6" Conc Pvmt 3213.0301 4" Conc Sidewalk 3213.0507 4' Barrier Free Ramp, Type G 3213.0509 4' Barrier Free Ramp, Type J 3217.0403 18" SLD Pvmt Marking Paint (W) 3292.0100 Block Sod Placement 3441.4006 Install Alum Sign Ground Mount 3471.0001 Traffic Control Ik IUNIT III - PAVING IMPROVEMENTS Specification Section No. 0241 13 02 41 15 02 41 15 02.11 15 31 10 00 31 10 00 31 23 16 32 11 29 32 11 29 321313 32 13 20 32 13 20 32 13 20 32 17 23 32 92 13 34 41 30 34 71 13 Unit of Measure Bid Summary - Base Bid SF SY SY LF EA EA CY TN SY SY SF EA EA LF SY EA MO Project Type: Developer Funding, New Development Bidder's Application Bid Quantity Unit Price 258 6.',I 34 3 2 220 10 682.5 650 480 1 1 12 34 1 2 Bidder's Proposal $ 16.00 S117.00 $ 14.00 $15.00 $800.00 $1,200.00 $30.00 $170.00 $6.50 $52.00 $6.00 $1,500.00 $1,800.00 $40.00 $6.00 $500.00 $2,000.00 Bid Value S6.912.00 S30,186.00 S8,834.00 81,260.00 $2,400.00 $2,400.00 $6,600.00 $1,700.00 $4,436.25 $33,800.00 $2,880.00 $1,500.00 $1,800.00 $480,00 $204,00 $500.00 $4,000.00 $109,892.251 SECTION 00 42 43 Project Type: PROPOSAL FORM Developer Funding, New Development UNIT IV - DRAINAGE IMPROVEMENTS Bidder's Application Bidtist Item No. Project item Information Description 1 3125.0101 SWPPP Z 1 acre 2 3305.0109 Trench Safety 3 3349.5001 10' Curb Inlet 1 IUNIT IV - DRAINAGE IMPROVEMENTS Specification Unit of Section No. Measure Bid Quantity Bidder's Proposal Unit Price Bid Value 31 25 00 LS 1! $1,000.00 $1,000.00 33 0510 1 LP 210 $4.001 $840.00 33 49 20 1 EA 1 $3,500.001 $3,500.00 Bid Summary - Base Bid $5,340.001