Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 44959 (2)
COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § City Secretary Contract No. 41t1/q ycq WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements. Developer and Project Information: Developer Company Name: Serene Development, LLC Address, State, Zip Code: 548 Silicon Dr., Ste. 100 I Southlake, TX 76092 Phone, E-Mail: (817) 251-8488 lieff.peterson@a2a.asia Authorized Signatory/Title: Jeff Peterson, Manager Project Name and Brief Description: Water, Sewer, Paving, Storm Drain, Street Light Improvements to serve The Hills of Windridge Project Location: South of White Settlement Rd., West of Chapel Creek Plat Case No.: FP-012-047 Plat Name: The Hills of Windridge Council District: 3 City Project No: 02119 CFA: 2013-049 DOE: 7055 To be completed by staff Received by: K. \ � .LJ� Date: q 17' CP I :3 1 ( ;y f l ©UAL RECORD f n`ii'V SECRETARY lyithi WORTH, Tx CEVEU 'go NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X , Sewer (A-1) X, Paving (B) X, Storm Drain (B-1) X , Street Lights & Signs (C) X E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequahfied to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and perfonnance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers. servants. or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. If applicable, the City's obligation to participate (exclusive of front foot charges) in the cost of the Improvements shall terminate if the Improvements are not completed within two (2) years provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: The Hills of Windridge CFA No.: 2013 049 DOE No.: 7055 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 340,848.60 2. Sewer Construction $ 461,090.80 Water and Sewer Construction Total $ 801,939.40 B. TPW Construction 1. Street $ 1,204,870.00 2. Storm Drain $ 673,305.00 3. Street Lights Installed by Developer $ 87,147.00 TPW Construction Cost Total $ 1,965,322.00 Total Construction Cost (excluding the fees): $ 2,767,261.40 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 16,038.79 D. Water/Sewer Material Testing Fee (2%) $ 16,038.79 Sub -Total for Water Construction Fees $ 32,077.58 E. TPW Inspection Fee (4%) $ 75,127.00 F. TPW Material Testing (2%) $ 37,563.50 G. Street Light Inspsection Cost $ 3,485.88 H. Street Signs Installation Cost $ 2,450.00 Sub -Total for TPW Construction Fees $ 118,626.38 Total Construction Fees: $ 150,703.96 Choice Financial Guarantee Options, choose one Amount (ck one) 'Bond = 100% $ 2,767,261.40 V 'Completion Agreement = 100% / Holds Plat $ 2,767,261.40 'Cash Escrow Water/Sanitary Sewer= 125% $ 1,002,424.25 'Cash Escrow Paving/Storm Drain = 125% $ 2,456,652.50 'Letter of Credit = 125% w/2yr expiration period $ 3,459,076.75 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said P - veloper has execute this instrument in quadruplicate, at Fort Worth, Texas this day of , 20 • CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-Bhbulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. 4�`� Date: ATTEST: ern. City Secre a ATTEST: Signature (Print) Name: Transportation & Public Works Department (A, Ci Douglas . Wiersig, P.E. iby Director Approved by City Manager's Office Fernando Costa Assistant City Manager DEVELOPER: Serene Development, L 8 Signature Print Name: tie .,?e'Wan Title: 1,1 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included m ►1 Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Dram Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 9 r-o D rn • rn 0G�v • rn -J W-3N ( 0) 2 w N O_ ODW �d Waco N co M a' rn -v - INA881/1 1 AEI 03AVS m 33 0 EIS' 9NIAVd-213IM F 0 o -13 -TAO_ (n D m 11 rn CHAPIN SC'•SL FORT WORTH m cn ( CITY IMIT VERNA TRAIL /PAINd PONY PAINT PONY 8' WATER MAIN PHASE I BOUNDARY ELCCREEK DRIVE CCBURN HILL PASS 12' WATER MAIN 8' WATER MAIN WATER LEGEND 4' BLOW OFF VALVE 12' WATER MAIN 8' WATER MAIN�� T CREEX LN. 8' WATER MAIN WESTSIDE III PRESSURE PLANE PROPOSED 12' OR SMALLER WATER MAIN 04 PROPOSED GATE VALVE T r PROPOSED FIRE HYDRANT PROPOSED AIR RELEASE VALVE OR BLOW -OFF VALVE 8' WATER MAIN PHASE 1 BOUNDARY WESTSIDE IV PRESSURE PLANE 8' WATER MAIN F� PRINTED s 7/29/2013 STB FILE! WIER—PAVING .STB FILE! CFA WATER DWG 400 BOO ZOO LAST SAVED! 6/7/2013 2156 PM SAVED BY ' LARRYM W.A. NO. 12132 % , ,YAwIER & ASSOCIATES, INC.., Bidlist Item No. Bid Item Water Unit Total 8 9 10 11 Quantity Unit Cost Total Cost Sheet No: 2 3311.0141 6" Water Pipe LF 28 19 8 4 59 $ 14.00 $ 826.00 3 3311.0241 8" Water Pipe LF 1148 4368 84 5600 $ 17.40 $ 97,440.00 4 3311.0262 8" PVC Water Pipe, CSS Backfill LF 100 100 $ 27.00 $ 2,700.00 5 3311.0441 12" Water Pipe LF 775 598 1373 $ 31.00 $ 42,563.00 6 3311.0442 12" Water Pipe, CSS Backfill LF 77 27 104 $ 42.00 $ 4,368.00 7 3305.0109 Trench Safety LF 1176 4487 944 629 7236 $ 0.60 $ 4,341.60 8 3312.3002 6" Gate Valve EA 2 6 1 1 10 $ 900.00 $ 9,000.00 9 3312.3003 8" Gate Valve EA 3 12 2 17 $ 1,300.00 $ 22,100.00 10 3312.3005 12" Gate Valve EA 2 2 4 $ 2,000.00 $ 8,000.00 11 3312.6001 6" Blow Off Valve EA 1 1 $ 4,200.00 $ 4,200.00 12 3312.4211 24" x 12" Tapping Sleeve & Valve EA 1 1 $ 5,500.00 $ 5,500.00 13 3312.0001 Fire Hydrant EA 2 6 1 1 10 $ 2,900.00 $ 29,000.00 14 3311.0001 Ductile Iron Water Fittings w/ Restraint TON 0.40 3.70 3.20 1.90 9.2 $ 3,000.00 $ 27,600.00 15 3312.0117 Connection to Existing 4"-12" Water Main EA 1 1 $ 500.00 $ 500.00 16 3312.0108 Connection to Existing 24" Water Main EA 1 1 $ 700.00 $ 700.00 17 3312.2003 1" Water Service EA 118 $ 695.00 $ 82,010.00 Water Total $ 340,848.60 Page 1 15" S.S. LINE 'M' PHASE I BOUNDARY • S.M.H. EX. 24" S.S. S.S.M EX. COBURN HILL PASS 8' S.S L NE 'B 10" S.S. LINE 'Al 'ELC CREEK DRIVE a, N i 8" S.S LINE 'Al • 8" S.S. LINE A . ��•. oC, EX. 24" S.S. EX. S. 0" S.S. LINE 'A' LA. S.S.M.H. E•. OLD BISON, RAY 8" S.S. LINE 'G' SANITARY SEWER LEGEND PROPOSED SANITARY SEWER • PROPOSED SANITARY SEWER MANHOLE • • PHASE i BOUNDARY EX. S.S.M.H. EX. S.S.M.H. • LINE 'I'#nt PRINTED! 7/29/2013 STB FILE' WIER-PAVING .STB FILE 1 CFA SEWER DWG LAST SAVED! 6/7/2013 3122 PM SAVED BY! LARRYM Q W.A. NO. 12132 VNA WIER & ASSOCIATES, INC.wad S.S. LINE 'K' EX. S.S.M.H. S.S.M.H. S.S. LINE 'K' /=-PHASE I 'BOUNDARY S.S. LINE 'J' S4 F� or. EX. S.S.M.H. c. EX. S.S.M.H. Pie 1 1 400 800 I200 Sewer Bidlist Bid Item Unit Sheet No. Total Unit Cost Total Cost Item No. 17 18 19 _ 20 21 22 23 24 25 26 27 Quantity 1 3331.5301 8" PVC Sewer Pipe, 0' to 6' (Misc Only) LF 56 56 $ 21.00 $ 1,176.00 2 3331.5304 8" PVC Sewer Pipe, 6' to 8' (Misc Only) LF 240 143 68 44 230 34 759 $ 21.60 $ 16,394.40 3 3331.5305 8" PVC Sewer Pipe, 6' to 8' (Misc Only), CSS Backfill LF 40 20 55 115 $ 34.00 $ 3,910.00 4 3331.5307 8" PVC Sewer Pipe, 8' to 10' (Misc Only) LF 318 749 147 223 748 84 220 433 289 3211 $ 23.00 $ 73,853.00 5 3331.5308 8" PVC Sewer Pipe, 8' to 10' (Misc Only), CSS Backfill LF 20 40 20 34 40 26 20 54 254 $ 34.00 $ 8,636.00 6 3331.5310 8" PVC Sewer Pipe, 10' to 12' (Misc Only) LF 72 61 144 85 90 452 $ 23.00 $ 10,396.00 7 3331.5311 8" PVC Sewer Pipe, 10' to 12' (Misc Only), CSS Backfill LF 54 11 65 $ 34.50 $ 2,242.50 8 3331.5313 8" PVC Sewer Pipe, 12' to 14' (Misc Only) LF 15 15 $ 28.00 $ 420.00 9 9999.0018 8" PVC Sewer Pipe, 22' to 24' (Misc Only) LF 60 60 $ 73.00 $ 4,380.00 I 10 3331.5407 10" PVC Sewer Pipe, 8' to 10' (Misc Only) LF 43 43 $ 26.00 $ 1,118.00 11 3331.5408 10" PVC Sewer Pipe, 8' to 10' (Misc Only). CSS Backfill LF 40 40 $ 38.00 $ 1,520.00 12 3331.5410 10" PVC Sewer Pipe, 10' to 12' (Misc Only) LF 92 92 $ 26.00 $ 2,392.00 13 3331.5413 10" PVC Sewer Pipe, 12' to 14' (Misc Only) LF 100 100 $ 29.00 $ 2,900.00 I 14 3331.5416 10" PVC Sewer Pipe, 14' to 16' (Misc Only) LF 70 70 $ 38.00 $ 2,660.00 15 3331.5417 10" PVC Sewer Pipe, 14' to 16' (Mise Only), CSS Backfil LF 20 20 $ 49.00 $ 980.00 16 3331.5419 10" PVC Sewer Pipe, 16' to 18' (Misc Only) LF 75 75 $ 43.00 $ 3,225.00 17 9999.0019 10" PVC Sewer Pipe, 18' to 20' (Misc Only) LF 78 78 $ 77.00 $ 6,006.00 18 9999.0020 10" PVC Sewer Pipe, 20' to 22' (Misc Only) LF 54 54 $ 79.00 $ 4,266.00 19 9999.0021 10" PVC Sewer Pipe, 20' to 22' (Misc Only), CSS Backfil LF 20 20 $ 95.00 $ 1,900.00 20 9999.0022 10" PVC Sewer Pipe, 22' to 24' (Misc Only) LF 20 20 $ 85.00 $ 1,700.00 21 3331.5510 12" PVC Sewer Pipe, 10' to 12' (Misc Only) LF 10 10 $ 30.00 $ 300.00 22 9999.0023 12" PVC Sewer Pipe, 12' to 14' (Misc Only) LF 87 87 $ 32.00 $ 2,784.00 23 9999.0024 12" PVC Sewer Pipe, 12' to 14' (Misc Only), CSS Backfil LF 20 20 $ 54.00 $ 1,080.00 24 9999.0025 12" PVC Sewer Pipe, 14' to 16' (Misc Only) LF 80 80 $ 42.00 $ 3,360.00 25 9999.0026 12" PVC Sewer Pipe, 16' to 18' (Misc Only) LF 75 75 $ 46.00 $ 3,450.00 26 9999.0027 12" PVC Sewer Pipe, 18' to 20' (Misc Only) LF 118 118 $ 79.00 $ 9,322.00 27 9999.0028 12" PVC Sewer Pipe, 20' to 22' (Misc Only) LF 60 60 $ 80.00 $ 4,800.00 28 9999.0029 12" PVC Sewer Pipe, 22' to 24' (Misc Only) LF 278 278 $ 80.00 $ 22,240.00 29 9999.0030 12" PVC Sewer Pipe, 22' to 24' (Misc Only), CSS Backfil LF 40 40 $ 93.00 $ 3,720.00 30 3331.5604 15" PVC Sewer Pipe, 6' to 8' (Misc Only) LF 126 126 $ 36.00 $ 4,536.00 31 3331.5605 15" PVC Sewer Pipe, 6' to 8' (Misc Only), CSS Backfill LF 20 20 $ 48.00 $ 960.00 32 3331.5607 15" PVC Sewer Pipe, 8' to 10' (Misc Only) LF 114 114 $ 39.00 $ 4,446.00 33 3331.5610 15" PVC Sewer Pipe, 10' to 12' (Misc Only) LF 146 146 $ 41.00 $ 5,986.00 34 3305.0202 Imported EmbedmenUBackfill, CSS CY 15 15 $ 45.00 $ 675.00 35 3305.3004 12" Sewer Carrier Pipe LF 60 60 $ 37.00 $ 2,220.00 36 3305.1003 20" Casing By Open Cut LF 60 60 $ 93.00 $ 5,580.00 37 3305.0109 Trench Safety LF 928 910 861 463 530 896 265 389 772 413 426 6853 $ 1.00 $ 6,853.00 38 3339.1001 4' Manhole EA 4 5 2 2 4 2 2 2 3 2 28 $ 2,300.00 $ 64,400.00 39 3339.1101 5' Manhole EA 2 2 $ 7,400.00 $ 14,800.00 40 3339.1003 4' Extra Depth Manhole VF 2 2 $ 100.00 $ 200.00 41 3339.1102 5' Drop Manhole EA 3 3 $ 8,800.00 $ 26,400.00 42 3339.1103 5' Extra Depth Manhole VF 41 41 $ 155.00 $ 6,355.00 43 9999.0002 5' Manhole Constructed Over Existing 24" Sewer Pipe EA 1 1 $ 7,150.00 $ 7,150.00 44 3301.0101 Manhole Vacuum Testing EA 5 4 5 2 2 4 2 2 2 3 3 34 $ 100.00 $ 3,400.00 45 3305.0107 Manhole Adjustment, Minor EA 1 1 $ 500.00 $ 500.00 46 3339.0001 Epoxy Manhole Liner VF 65 40 19 26 12 10 9 9 10 200 $ 180.00 $ 36,000.00 47 9999.0032 Remove Plug Connect to Exist. 12" Sewer EA 1 1 $ 500.00 $ 500.00 48 9999.0031 Remove Plug Connect to Exist. 8" Sewer EA 1 1 $ 500.00 $ 500.00 49 3331.3101 4" Sewer Service EA 3 6 12 23 29 6 12 6 21 118 $ 410.00 $ 48,380.00 50 3331.3102 4" 2-Way Cleanout EA 3 6 12 23 29 6 12 6 21 118 $ 95.00 $ 11,210.00 51 3301.0002 Post -CCTV Inspection LF _ - _ 6853 $ 1.30 $ 8,908.90 Sewer Total $ 461,090.80 Page 2 PHASE I BOUNDARY 1171 \'ELC[s\CREEX DRIVE • a 4' CONC. SIDEWALK HILL P BARRIER FREE RAMPS 4' CONC SIDEWALK BARRIER FREE RAMPS n BARRIER FREE RAMPS 4' CONC. SIDEWALK • • s larlawr RN 4CONC. SIDEWALK BARRIER FREE RAMPS LD snow''---f,_ ,AY BARRIER FREE RAMPS BARRIER FREE RAMPS • PAVING PLAN LEGEND BARRIER FREE RAMPS 7.5' REINFORCED CONCRETE PAVEMENT 6' REINFORCED CONCRETE PAVEMENT BARRIER FREE RAMPS 4' 3,000 P.S.I. REINFORCED CONCRETE SIDEWALK PRINTED ' 7/29/2013 STB FILE WIER-PAVING .STB FILE ' CFA PAVING .DWG LAST SAVED ' 6/26/2013 II 133 AM SAVED BY ' LARRYM W.A. NO. 12132 YA WIER & ASSOCIATES, INC. -I BARRIER FREE RAMPS * fs PHASE 1 BOUNDARY BARRIER FREE RAMPS BARRIER FREE RAMPS pia gpgg PHASE I BOUNDARY BARRIER FREE RAMPS', iy 8`Sp8 N. 1 I 1 0 400 800 1200 Bidlist Item Bid Item 1 3213.0103 7.5" Conc Pvmt 2 3213.0101 6" Conc Pvmt 3 3211.0400 Hydrated Lime 4 3211.0501 6" Lime Treatment 5 3292.0100 Block Sod Placement 7 3214.0100 Brick Pvmt 8 3213.0301 4" Conc Sidewalk 9 3213.0501 Barrier Free Ramo, Type R-1 .10 9999.0003 Header and End of Road Barricade 11 3441.4003 Furnish/Install Alum Sion Ground Mount City F. 12 3217.0009 4" SLD Pvmt Marking Paint (W1 13 3217.1002 Lane Legend Arrow 14 3217.1004 Lane Legend Only, 15 3217.0401 18" SLD Pvmt Marking HAE ON) 16 3217.0301 12" SLD Pvmt Marking HAE (W1 18 9999.0004 Construct Guardrail 19 9999.0005 Construct Guardrail End Terminal 20 0241.0550 Remove Guradrail Paving Total Unit 40 1 SY 4014 SY TON SY 4245 SY 1682 SY SY 587 EA 2 EA 1 EA LF EA EA LF LF LF EA LF 41 42 43 1 44 1 2565 3120 2493 49 59 47 2698 3263 2616 1050 1285 997 2085 40 2214 1236 Paving Sheet No. 45 46 47 48 49 50 1 51 52 52.1 52.2 2137 1524 1140 1173 2902 2644 22 22 41 29 56 51 1204 1239 2275 1638 3087 2826 659 683 1235 757 1923 1915 336 354 1 318 4 2 I 2 2 2 2 1 1 1 L 41 2 1067 21 1140 772 57 4 1 9 85 238 2 2 100 330 Total 53 _ Quantity 15853 11011 513.00 28445 14194 57 1595 22 5 9 323 2 2 100 330 536 536 4 4 41 Unit Cost Total Cost $ 35.40 $ 561.196.20. $ 30.40 $ 334.734.40 _ $ 135.00 $ 69.255.00 $ 2.30 $ 65,423.50 _ $ 3.25 $ 46.130.50 $ 85.00 $ 4.845.00 _ $ 32.50 $ 51.837.50 _ $ 1.250.00 $ 27.500.00 $ 1.750.00 $ 8.750.00 $ 400.00 $ 3,600.00 $ 1.30 $ 419.90 $ 250.00 $ 500.00 $ 300.00 I $ 600.00 $ 15.00 I $ 1.500.00 $ 8.00 I $ 2.640.00 $ 23.00 $ 12.328.00 $ 3.300.00 $ 13.200.00 $ 10.00 I $ 410.00 _ $ 1,204,870.00 Page 4 PHASE I BOUNDARY LCtNCREEK DRIVE CODURN HILL PASS S.D. LINEI BI S.D. LINE 'D-I' S D LINE '0-2' ■ ■ EGI S.D. LINE 'F S.D. i WE 'F' '- 00 • S.D. LINE 'A' EXIST. BOX CULVERT Hl. S.D. LINE 'K' S.D. LINE 'C' - _.. _.MAY S.D. LINE 'G' • S.0. LINE 'H' • : to•• \ �'?' DRAINAGE PLAN LEGEND NT ROAD sw . 0 .'m 0 0 � �C #4S.D. LINE '1-1 PHASE I BOUNDARY .0. LINE '1-2' INDICATES PROPOSED STANDARD CURB INLET INDICATES PROPOSED DROP INLET INDICATES PROPOSED JUNCTION BOX INDICATES PROPOSED HEADWALL INDICATES PROPOSED STORM DRAIN PRINTED' 7/29/2013 STB FILE! WIER-PAVING.STB FILE: CFA STORM DRAIN DWG LAST SAVED 16/26/2013 8' 2I AM SAVED BY! LARRYM W.A. NO. 12132 VIIAwIER & ASSOCIATES, INC. -I C '? EXIST. BOX CULVERT S D LINE 'J-I' EXIST. 30' S.D. S D LINE 'J-3' S D LINE 'J-2' S.D. LINE 'J-I K PHASE I 'BOUNDARY Tht • �Ar E 1 I 1 0 400 800 I200 Drainage BidlistI. Sheet No. Total Bid Item Unit Unit Cost Total Cost Item No. 85 95 96 97 98 99 100 101 102 103 104 105 106 106.1 107 108 109 110 111 Quantity 1 3341.0201 21" RCP. Class II LF 3-2 29 47 36 47 47 47 20 45 119 72 54 595 $ 40,50 $ 24.097.50 2 3341.0205 24" RCP, Class II LF 69 169 42 34 225 357 52 212 46 389 57 9 16 1677 $ 45.00 $ 75,465.00 3 3341.0208 27" RCP, Class II LF 90 57 147 $ 52.00 $ 7,644.00 4 3341.0302 30" RCP, Class II LF 62 107 189 $ 57.00 $ 10.773.00 5 3341.0305 33" RCP, Class II LF 96 148 244 $ 67.00 $ 16,348.00 6 3341.0309 36" RCP, Class II LF 259 259 $ 77.00 $ 19,943.00 7 3341.0402 42" RCP, Class II LF 208 208 $ 101.00 $ 21,008.00 8 9999.0010 3- 10' x 8' TXDOT MC-10-10 Concrete Box Culverts LF 100 100 $ 1,560.00 $ 156,000.00 9 3305.0109 Trench Safety LF 291 98 216 174 81 307 655 99 360 93 496 77 111 100 119 72 70 3419 $ 0.50 $ 1,709.50 10 3349.5001 10' Curb Inlet EA 1 2 1 1 2 2 1 2 1 1 14 $ 2.500.00 $ 35,000.00 11 3349.5002 15' Curb Inlet EA 1 1 1 1 1 1 2 8 $ 3,400.00 $ 27,200.00 12 3349,5003 20' Curb Inlet EA 1 1 1 1 1 5 $ 4,500.00 $ 23,000,00 13 3349.7001 4' Drop Inlet EA 1 1 $ 2,950.00 $ 2,950,00 14 3349.0001 4' Storm Junction Box EA 1 1 1 1 2 1 2 2 11 $ 5,900.00 $ 64.900.00 15 3349.0002 5' Storm Junction Box EA 1 1 $ 6..500.00 $ 6.500.00 16 9999.0011 TxDOT FW-S Headwall for 3- 10' x 8' Box Culverts & Pond Outlet LS 1 1 $ 55,000.00 $ 55,000.00 17 9999.0012 TxDOT Headwall for 3- 10' x 8' Box Culverts LS 1 1 $ 68,000.00 $ 68,000.00 18 3349,1111 48" Flared Headwall. 2 pipes EA 1 1 $ 4,600.00 $ 4,600.00 19 0241.3015 Remove 24" Storm Line EA 1 1 $ 900.00 $ 900.00 20 3137.0103 Large Stone Riprap, grouted SY 12 6 6 6 12 6 12 5 65 $ 64.00 $ 4,160.00 22 3136.0104 Twisted Gabion Mattresses SY 48 48 $ 124.00 $ 5,952.00 24 3305.0112 Concrete Collar EA 1 1 2 $ 250,00 $ 500.00 25 9999.0013 Sloped End Headwall 24" RCP EA 1 1 1 1 4 $ 2j100.00 $ 8,400.00 26 9999.0014 Sloped End Headwall 30" RCP EA 1 1 2 $ 2,700.00 $ 5,400.00 27 9999.0015 Sloped End Headwall 33" RCP EA 1 1 2 $ 3,100,00 $ 6,200.00 28 9999,0016 Sloped End Headwall 36" RCP EA 2 2 $ 3,400.00 $ 6.800,00 29 9999.0017 Sloped End Headwall 42" RCP EA 1 1 $ 4,100.00 $ 4,100.00 30 9999,0008 Painted Aluminum Handrail LF 90 90 $ 60,00 $ 5,400.00 31 9999.0006 Stone Fascia SF 365 365 $ 12.00 $ 4,380.00 32 4" Concrete Flume with 6" Curbs SY 15 15 $ 65.00 $ 975.00 Drainage Total $ 673,305.00' Page 7 I STREET LIGHT t COBURN HILL •ASS STREET LIGHTS PHASE I BOUNDARY CREEK DRIVE • STREET LIGHTS STREET LIGHTS 0 STREET LIGHTS STREET LIGHT HIT. At ROA OLp BISON I" MAY STREET LIGHTS PHASE I BOUNDARY STREET LIGHTS - 0";31,vn.4040 ��'► rjents4'# • STREET LIGHTS REET LIGHTS �. PHASE I Ct. Stilt BOUNDARY �lso0 ST STREET LIGHTS o STREET LIGHT LEGEND PROPOSED STREET LIGHT BASE PROPOSED PULLBOX PRINTED' 7/29/2013 STB FILE 1 WIER-PAVING . STB FILE! CFA STREET LIGHTS . DWG LAST SAVED $ 6/26/2013 11 1 13 AM SAVED BY! LARRYM W.A. NO. 12132 s �1'./ v"I `d y. ,4 STREET LIGHTS cbeY/241 ct. 1 F� f 1 1 0 400 800 I200 WA WIER & ASSOCIATES, INC.-1 Bidlist Item No. Bid Item Luminaire 1 3441.3002 Rdwy Ilium Assmbly TY 8,11,D-25, and D-30 2 3441.3301 Rdwy Ilium Foundation TY 1,2, and 4 3 2605.2101 Conduit Box 4 2605.3012 2" CONDT PVC SCH 40 (B) 5 3441.3101 100W HPS PC Lighting Fixture 6 3441.1410 NO 10 Insulated Elec Condr Erosion Total' Unit Sheet No. 65 166 EA 25 EA 25 EA 19 LF 2040 EA 25 LF 6120 Total Quantity 25 25 19 2040 25 6120 Unit Cost $ 1,220.00 $ 1,050.00 $ 600.00 $ 5.15 $ 205.00 $ 0.55 Total Cost $ 30,500.00 $ 26,250.00 $ 11,400.00 $ 10, 506.00 $ 5,125.00 $ 3,366.00 $ 87,147.00 I Page 5 TRAFFIC SIGNS COBURN NILL PASS PHASE I BOUNDARY rml 1 E 3 CREEK DRIVE STREET SIGNS TRAFFIC SIGNS ❑1 STREET SIGN 1 • DENET CREEK LN. EARLY CREEK LN 1' STREET SIGNS o' - ,�P` ‘51.., STREET 8 TRAFFIC SIGN LEGEND -Cr PROPOSED TRAFFIC SIGN (9) PROPOSED STREET SIGN (101 flint aVENr ROAD STREET SIGNS PRINTED ' 7/29/2013 STB FILE ' WIER-PAVING .STB FILE' CFA STREET SIGNS . DWG LAST SAVED' 7/29/2013 11116 AM SAVED BY' LARRYM W.A. NO. 12132 WA WIER & ASSOCIATES, INC.• 0 PHASE I BOUNDARY LVD s n t K', PHASE I ;BOUNDARY s\ j F 1 F� f 1 0 400 800 I200