Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 44962 (2)
COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT § City Secretary Contract No. q LMIT C/ WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements. Developer and Project Information: Developer Company Name: Pulte Homes of Texas, L.P. Address, State, Zip Code: 4800 Regent Blvd., Ste. 100 I Irving, TX 75063 Phone, E-Mail: (972) 304-2800, clint.vincent@pultegroup.com Authorized Signatory/Title: Clint Vincent, Division Vice President of Land Development Project Name and Brief Description: Water, Sewer, Paving, Storm Drain & Street Light Improvements to serve West Fork Ranch Ph. 3A Project Location: North of Basswood Blvd., East of Horseman Rd. Plat Case No.: FP-013-021 Plat Name: Parr Trust Council District: 2 City Project No: 02153 CFA: 2013-059 DOE: 7096 To be completed by staff Received by: y h L'. L A Date: n 1 OFFICIAL RECORD CflTY SECRETARY Fre WOR1H, Inc p,5.covran `711i3 NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. The following checked exhibits are made a part hereof: D. Water (A) X_, Sewer (A-1) Paving (B) X� Storm Drain (B-1) X_, Street Lights & Signs (C) X . E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, stoinu drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, itt whole or itt part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused. itt whole or in vart, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs P. COMPLETION WITHIN 2 YEARS i. If applicable, the City's obligation to participate (exclusive of front foot charges) in the cost of the Improvements shall terminate if the Improvements are not completed within two (2) years provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: West Fork Ranch Ph. 3A CFA No.: 2013-059 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period DOE No.: 7096 Developer's Cost 246,219.22 204,182.34 $ 450,401.56 $ 458,936.30 113,070.74 42,840.81 $ $ $ $ $ $ 614,847.85 1,065,249.41 9,008.03 9,008.03 18,016.06 22,880.28 11,440.14 1,713.63 2,205.00 38,239.05 56,255.12 Amount 1,065,249.41 1,065,249.41 563, 001.95 768,559.81 1,331,561.76 Choice (ck one) M&C No. Date: ATTEST: IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said veloper has exec d this r 1 instrument in qua a uplicate, at Fort Worth, Texas this = day o _- ,20I CITY OF FORT WORTH - Recommended by: Water Department '� Wendy Chi- : abulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Doug as W. Black Assistant City Attorney fro ayse City Secretary ATTEST: Signature (Print) Name: Curt Millward Title: Land Project Manager Transportation & Public Works Department 1,--Lse\ y Douglas . Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager DEVELOPER: Pulte Homes of Texas, L.P. By: Pulte Nevada I, LLC Its General Partne Signature (Print) Name: Clint Vincent Title: VP of Land Development ©FF8C8AL CITY SEC v 8 UN, TM Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map Alk ►1 ►1 ►1 ►1 ►1 ►1 ►1 ►1 Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 9 L 111 1 1 110' 1 1 I 11111 11 III Ip11111Jp11111111111111nu11dmd111popntlpwlleIulol llgai11111111 111110/1 Ilou ulq uVo el nqn 1 11 111 11Imp 111111111 I Willi -1 BAILEY - BOS ■_11_11_1■ Q 0 CI Z 3 • • SITE ..1� 11 L. ,w01 ce o WESTERN CENTER BLVD f U U 0 1— x D0 ul J ce m O LL to � r BASSWOQD BLV4I ■1 f2875 NOT TO SCALE WEST FORK RANCH PHASE 3A OWNER / DEVELOPERt PULTE HOMES OF TEXAS, L.P. 4800 REGENT BLVD. SUITE 100 IRVING, TX 75063 972-304-2800 (i�11 PE LOTO N 1'"' LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 DATE: AUGUST, 2013 \N ES-10166 0p0e#w.22 20 15 30 2 - • PROP WATER FACILITY ESMT I28 129 nr 32 1 133 I le Li J J 36 �J 26 25 24 23 22 21 20 I 19 18 17 16 15 A I/n • / 11 _ RED BRA Gtm TRAIL LEGEND PROPOSED GATE VALVE EXIST GATE VALVE PROPOSED FIRE HYDRANT EXIST FIRE HYDRANT NOTE: ALL PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE NOTED EXHIBIT A - WATER 20 23 24 918 WAY mt�1dN 11 n-41 6 5 19 20 0 21 22 ti� RE# 24 25 26 Ma 28 29 30 31 32 33 34 35 36 _I s 0 NORTH 200' GRAPHIC SCALE WEST FORK RANCH PHASE 3A DATE: AUGUST, 2013 OWNER / DEVELOPER: PULTE HOMES OF TEXAS, L.P. 4800 REGENT BLVD. SUITE 100 IRVING, TX 75063 972 304 2800 lil11 PE LOTO N III LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE 817-562-3350 -PROP WATER FACILITY ESMT LEGEND —•— PROPOSED SEWER LINES --c� - EXIST SEWER LINES �c SDR 26 SERVICES NOTE: ALL PROPOSED SANITARY SEWER LINES ARE 8' UNLESS OTHERWISE NOTED EXHIBIT Al - WASTEWATER 5 19 20 0 21 24 25 26 r ,27 �/ 28 29 30 31 32 33 34 © 35 36 AY 0 I 0 0 0 NORTH 200' WEST FORK RANCH PHASE 3A i GRAPHIC SCALE DATE: AUGUST, 2013 OWNER / DEVELOPER: PULTE HOMES OF TEXAS, L.P. 4800 REGENT BLVD, SUITE 100 IRVING, TX 75063 972-304-2800 li!II PE LOTO N III LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 .,II11[111 111111111111 11lp 1 1 Ill 111 I ugil I1 III 111 111 11111 111111111111111111111111111111 I 1111NI Ho nu Dill lql [III I I 11111 1'1 WES VAS O. F1�E 20 ♦ 15 W 2 1 3 2 LEGEND K�I®...1 [ I I aL�ola ill 90 I JII SREVfFAIL�TiSYGlill 5 111 Ili 6 II� 7 11I 8I I_ gED BRANGtSp1.,.. TRAM 1 L 2 1 29' B-B / 50' ROW (TYP) S IDEWALK BY DEVELOPER S IDEWALK BY HOMEBUILDER H.C. RAMPS BY DEVELOPER EXHIBIT B - PAVING 5 I 3 I� 10 111 11 ®Ilo �11� ®11 --PROP WATER FACILITY ESMT ___ .; 1I OOP 111 ill 127 Ili 28 Ill 29 IIPANO. 31 III 32 1j1 33 Ili 34 111 35 II1 36 t a o111 all �h� 11� ®111 m11� ®111m ®111 „AI m.1 1 24 23 22 21 20 19 Ill *VI I�LU ■.. .... J.1M' ■.. ■... rtgr 1 J titNtwu v. WAY 111111111 Ell 3 2 1 • • • • • • • • 19 20 29 I 32 34 I 36 1 RA1'1CH 7A 21 V 0 NORTH 200' CThimi GRAPHIC SCALE WEST FORK RANCH PHASE 3A DATE: AUGUST. 2013 II IIII III III IIIII I11111 1 HE II II llllllll IIIIIIII IIII II IIJ111 OWNER / DEVELOPER' PULTE HOMES OF TEXAS, L.P. 4800 REGENT BLVD. SUITE 100 IRVING, TX 75063 972-304-2800 in PELOTON IIII LAND SOLUTION. 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 11111 1 I llul 1111111 11111 1 1 Ili a;; 110 111 u1111111111 1 1 1E111 d1 Ip1 1111 1 1111 11 11 1111111 1111111111 11 1111111010111111 1 11111111111 Hai 1111111111111 11111111111 1111 101q Iula 1111111111111111 II IIIIulloi1111lialdilldlllgmll111111 1111 1 11 1 1 ouluun11111ali 1111 1111111111111 ill IIe 11ry41111i 111111IIaIQIIIII eg KcF� we PNANOA7061 30 O O.E. W,2269 F\l.E# 20 15 16 3 : •° "® I I��lo(t_ I I®®Im®eat5 iii �V.\ .1 \ ' PR I! 1FIIIIL� 5141PI1 5 111 6 If 7 111 8 11j 9 10 111 11 ‘1!! N. r"-�_F{ _ _ _ _ _ _ _ _ \ ,�\ I ! _ 1 I III (II ®III II .11.., mlll mil ', \\ `\ • ♦ \\ \• • \ RIN 2 1 3 2 c 1 1 19 13 Wm. MEI crrEnr 4 TA PROP WATER FACILITY ESMT I I127 III 28 11 29 j1fo�,p 31 111 321 33 11! 34 III 35 j11 36 1 II II II (�� IIII II 11 II I 1 L .10 .10 JO ®!I� .111 lllo JI 25 mans flown.. • 12 23 22 21 20 I I aro 0_ r Y ---- ", .. .i. .,. 31. 1• 1 I• ! '...1•1.■ I.‘ TRA LEGEND ' I n j n I .I EL 1 P ROPOSED STORM DRAIN INLET EXIST STORM DRAIN INLET P ROPOSED STORM DRAIN MANHOLE P ROPOSED STORM DRAIN HEADWALL EXHIBIT B1- STORM DRAINAGE 0 NORTH 200, GRAPHIC SCALE NI II II II II Ili WEST FORK RANCH PHASE 3A DATE: AUGUST, 2013 I I I A —i ki T� 2 SI &Ill II • NM OIL NI III NJ 101/4 28 24 34 I lEE— ca -3-a a--_ em= �a ;k—= = =_=—x—=-----W —= 03404 6L 2221 OWNER / DEVELOPER' ii!II PELOTON PULTE HOMES OF TEXAS, L.P. i�lli LAND LO LUTION. 4800 REGENT BLVD. SUITE 100 IRVING, TX 75063 972-304-2800 in Hu HI II II II 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 1 111111111111111111111 1 11111111111111111111111 11 II 1111 11111111111111b L 1 I 1 1111111111 11 111111111111111 11111111111111 11 111111111'p011110111 I I 111 11 IIII i 611J1I11111111 HI 11111111 1111 I11111 11111 1101 11111111111i1 Will III IIIu11III1a ilIiII I 11111 I I III 111 III II11 1111111111111111111 I 11111111111111111111111111111111 eke- \'.%a- • • ' 1 I�ale ®I Imm P 1 \•. \ :\ • / �I� II 111 W9II II 111 fll III P WES pNA E 476 61 p O.E•NN:2269 F\uE • 0 20 • Oil. a 15 16 3 2 1 3 2 1 LEGEND 111111101111110 sM ll s ill 6 ql 7 111 8 kW _Ill 111 111® ill OmffIS ■fa ..1.�.a .� m • 1 -��3Iw I :I _ '.4. •11•1111111 El BED I G Spl-......_....�.�. 19 1 la ,__ _ sow al- _ 12 S PROPOSED STREET LIGHTS EXIST STREET LIGHTS 1 7 EXHIBIT C - STREET LIGHTS D NORTH 200, ICI IMS GRAPHIC SCALE WEST FORK RANCH PHASE 3A DATE: AUGUST, 2013 PROP WATER FACILITY ESMT I I1� iilm ii� girt „t# ii1� iil� lil 111 IIII 1 27 III 28 111 29 11 IARE#E 31 III 32 ill 33 ill 34 III 35 Hi 36 r1 L mm11! _Iri ..m111__ =IIL —1..J..,.L.9.d©aol ^� n,® .._r _ _.r_.i_.., I �.. �..w ■...t.■ OWNER / DEVELOPER• PULTE HOMES OF TEXAS, L.P. 4800 REGENT BLVD. SUITE 100 IRVING, TX 75063 972-304-2800 1 24 30 AY 0 li!�I P E LOTO N TorLAND SOLUTION. 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 I 11111111111 I 11111111111 I I II I I I 111 1 11111 1111111111111 1111111 11111111111 111111111 1111111 11111 l 1111 111111 1111111 1111111111111111 111111.1111110 01111u011111 .1, 11 I 11 [I 11 I I 111111111 I Il uu 11111 11111 11 11111 11111111 11111 II HI III II 11111111 11111 HI 111 11 II III 11 1111111111111111111 1111 1111 11111111 1111111111111111111111111110q III 11 I 1111 11111 .d mom`\ 1 I® I�®i�J _ �mlma{� S ,s P - \ .\\. ;II'PTI{ E R §III Ili III Ili P�Ji�° it \ 21 \ ••\\ SR F IL�W SFnTif 5 Ili 6 Ili 7 Ili eo l s III 10 Ili 11 \,.vn \ i r \ \' \ p ` •\\ ,m • >\ 0 KRp3.1Ct� vie PNP E0A-1061 30 0 O.E• Nw.2269 p11.E# 20 19 15 • i 19 18 • -4CTP -nr 14 E 13 12 11 10 6 PROP WATER FACILITY ESMT 27 I28 ill 29 I II pAAQIIPgtE.31 III 32II1j133 ill 34 it II ili 35III 36 ill I it i: II 1 ®Ili =III „AI ®il� _ ll� mil __ ilio 111 __ II� s.I NOM WO OIM la Of WAY .11 NS! NMI MI= ISM a 1(1444 o 10 616 O u.t• W: wE - 2 I _MMI 3 2 1 • ; j I .'1 _ F i --I� YO.- 01 I R.E■I.��.■ elmg ®im... ! '' SS 3 TRAM s 2 1 .-- - ii' L I I NO In mossy sumo 3 I °ma14 ') 2 LEGEND A PROPOSED STREET NAME SIGNS a EXIST SIGNS 1 mo 2 SF $ NO- 7 s EXHIBIT C1- STREET NAME SIGNS 0 NORTH 200' GRAPHIC SCALE WEST FORK RANCH PHASE 3A DATE: AUGUST 2013 II 111111111 II MM 26 29 32 Ai: iiiA® OsSe" za 221 OWNER / DEVELOPER• Hill PELOTON PULTE HOMES OF TEXAS, L.P. Itl ii LAND OLUTION* 4800 REGENT BLVD. SUITE 100 IRVING, TX 75063 972-304-2800 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 111 1 111 111111I 111111111111,1111 111111F 11H,1111111 1111111111111111 1 1111111111111 1111 11111111111111 i1111111111111 III III 11 I 11111 1111111111111 III 111111111111111111111111II 11111 II I III 111111111111111 111111111111111 111111111 II III I 111111111111 I 11111111 I I111111110 inair PELOTON LAND SOLUTIONS 5751 KROGER DR. STE. 185 1 KELLER, TX 76244 1817.562.3350 EXHIBIT A - WATER IMPROVEMENTS ITEM # DESCRIPTION 3311.0263 8" PVC Water Line 3311.0461 12" PVC Water Line 3312.3003 8" Gate Valve & Box 3312.3005 12" Gate Valve & Box 3312.0001 Fire Hydrant Assembly (includes 6" GV) 3311.0001 Cast Iron Fittings 3311.0001 (Concrete Blocking - Type B 3312.2001 l Water Service, 1" Tap to Main 3312.0103 IConnect to Existing Water Line 3305.0109 !Trench Safety TOTAL WATER CFA ESTIMATE FOR: PARR TRUST ADDITION WEST FORK RANCH PHASE 3A 9/17/2013 EXHIBIT Al - SANITARY SEWER IMPROVEMENTS ITEM # DESCRIPTION 3331.4115 8" Sanitary Sewer Main (SDR-35 PVC) 3331.4115 8" Sanitary Sewer Main (SDR-26 PVC) w/Cement Stabilized Sand 3331.4115 10" Sanitary Sewer Main (SDR-26 PVC) 3339.1001 Manhole - Std 4' Dia 3339.1003 Manhole - Extra Depth over 6' 3301.0101 Manhole - Vacuum Test 3331.3101 Sewer Service - 4" Tap (SDR - 35) 3331.3101 Sewer Service - 4" Tap (SDR - 26) 3331.3101 Sewer Service - 4" Line (SDR - 35) 3331.3101 Sewer Service - 4" Line (SDR - 26) 3331.3313 Connect to Ex SS Line 3305.0109 Trench Safety 3301.0002 Post Construction CCTV TOTAL SANITARY SEWER UNIT LF LF EA EA EA TON CY EA EA LF UNIT LF LF LF EA VF EA EA EA LF LF EA LF LF QTY 3,456 1,001 12 3 6 1.8 5.7 125 4 4,457 IQTY 2,042 140 1,074 13 69 13 48 45 842 1,450 3 3,256 3,256 UNIT PRICE 20.69 34.74 1,089.96 2,057.67 3,385.22 5,111.33 207.40 700.20 461.11 0.14 23.05 44.32 32.61 3,037.57 279.58 112.32 171.34 119.53 15.33 15.65 530.58 0.25 1.24 TOTAL 71,504.64 34,774.74 13,079.52 6,173.01 20,311.32 9,200.39 1,182.18 87,525.00 1,844.44 623.98 1 $246,219.22 TOTAL 47,068.10 6,204.80 35,023.14 39,488.41 19,291.02 1,460.16 8,224.32 5,378.85 12,907.86 22,692.50 1,591.74 814.00 4,037.44 $204,182.34 WFR_PH3A_QTO_20130917.xls, Ph3B-CFA Pricing 1 of 3 9/23/2013 • PELOTON LAND SOLUTIONS 5751 KROGER OR, STE. 185 KELLER EXHIBIT ITEM # 3213.0101 3211.0501 3211.0400 3213.0508 9999.0000 9999.0000 62 3350 B- PAVING IMPROVEMENTS DESCRIPTION 6" Reinf. Conc. Pvmt. w/ 7" Curbs for 29' b-b street 6' Lime Stabilized Subgrade for 29'b-b street Hydrated Lime (30#/SY) B/F Ramps (Type R-1) Street Header Type III Standard Street Barricade 0241.0900 Remove Barricade and Connect to Existing Header 0241.1000 IRemove Existing Temporary Turn -Around Pavement 3471.001 'Traffic Control Plan TOTAL PAVING EXHIBIT ITEM # I 3341.0502 3341.0409 3341.0205 3349.5001 3339.1001 0241.4401 0241.3104 3305.0109 B1- STORM DRAIN IMPROVEMENTS DESCRIPTION 33" RCP 27" RCP 24" RCP 10' Std Curb Inlet 14' Square Manhole 'Remove Existing Headwall and Connect to Ex IRemove Plug and Connect to Ex 'Trench Safety TOTAL STORM DRAIN CFA ESTIMATE FOR: PARR TRUST ADDITION WEST FORK RANCH PHASE 3A 9/17/2013 UNIT SY SY TON EA LF LF I EA I SY I LS I UNIT LF LF LF EA EA EA EA LF QTY 14,176 15,122 227 14 58 60 I 5I 391 QTY. 565 536' 558 7 4 I 2I I 4 1. I - . 1,659, 26.15 1.95 136.00 1,250.00 8.00 I 50.00 500.00 I 10.00 I 500.00 I 58.57 45.49 40.10 2,779.92 2,678.84 1,036.02 558.66 0.25 TOTAL 370,702.40 29,487.90 30,872.00 17,500.00 464.00 3,000.00 2,500.00 3,910.00 500.00 $458,936.30 TOTAL 33,092.05 24,382.64 22,375.80 19,459.44 10,715.36 2,072.04 558.66 414.75 $113,070.74 • WER_PH3A_QT0_20130917.x1s, Ph3B-CFA Pricing 2 of 3 - 9/24/20I3. lipar PELOTON LAND SOLUTIONS 5751 KROGER DR. STE. 185 1 KELLER, TX 76244 1817.562.3350 CFA ESTIMATE FOR: PARR TRUST ADDITION WEST FORK RANCH PHASE 3A 9/17/2013 EXHIBIT C - STREET LIGHTING IMPROVEMENTS DESCRIPTION 9999.0000 Roadway Illum Assembly - D25-6 Pole w/100W MH Cobra Lum 9999.0000 Light Pole Foundation 9999.0000 #10 THHW Aluminum Conductor 2605.3011 2" PVC Conduit, Sch 40 TOTAL STREET LIGHTS EXHIBIT C1 - STREET SIGNS DESCRIPTION 1 Street Name Blades TOTAL STREET SIGNS UNIT QTY EA 13 EA LF LF 13 1,815 605 UNIT IQTY EA 9 1,741.41 1,152.41 0.56 6.95 245.00 TOTAL 22,638.33 14,981.33 1,016.40 4,204.75 $42,840.81 TOTAL 2,205.00 $2,205.00 WFR_PH3A_QTO_20130917.x1s, Ph3B-CFA Pricing 3 of 3 9/23/2013