Loading...
HomeMy WebLinkAboutContract 43893-A1 (2)1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc., (ENGINEER) made and entered into City Secretary Contract No. 43893, (the CONTRACT) which was authorized by the City Council on the 23rd day of October, 2012 in the amount of $563,730.92; and WHEREAS, the CONTRACT involves engineering services for the following project: Chapel Creek Bridge over Interstate Highway 30 WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated June 24, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $226,205.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $789,935,92, 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. � ra ego, R�7C`�9 it Page -1- DECEIVED �;�u Q � ZOi3 EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: / / APP$QVAL RECOMMENDED: DouglasU Director, ENGINEER Teague Nall and Perkins, Inc. JoSep Atwood, P.E: Director DATE : Wiersig, P.E Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: oug ; �� e �� wl . Y-(, Assistant City Attorney � III I !•- ,'• - rrw�w.. I � Slott � FL IF Page -2- M&C: C-26486 Date: October 7, 2013 June 24, 2013 Mr. Michael Weiss, P.E. City of Fort Worth Transportation &Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 RE: IH 30 at Chapel Creek Boulevard Bridge replacement Fee Proposal for Contract Amendment No. 1 DOE Number 901 CSJ: 0918-48-722 Dear Mr. Weiss: Teague Nall and Perkins, Inc. is submitting this contract based on additional services requested following is a brief description and cost for the project: Mtn p League Hall R Perkins www.mpinc.com fee Amendment for the above referenced by TxDOT for the bridge replacement. The additional services to be provided on this I. Feasibility study, Operations Analysis and Geometric Design for additional U-Turn Bridge: Teague, Nall and Perkins (TNP) performed due diligence during contract scoping phase to identify the need to include a U-Turn bridge. Records from TxDOT and City of Fort Worth staff discussions indicated that a U-Turn was not to be included. Upon notice to proceed, a Design Concept Conference was held and TxDOT requested that a U-Turn feasibility analysis be conducted and contingent upon results, U-Turn be added to the project. Feasibility was determined and Preliminary design was performed. A travel demand forecast study was performed to determine validity of a dated TxDOT-TPP travel demand forecast by comparison to NCTCOG node map volumes at the request of TXDOT. Results were used to prepare a detailed traffic operation analysis. This work is excluded in the scope of services. TNP requested that TxDOT perform this service by TPP staff and were instructed to perform the analysis. Fee: $38,575 II. U-Turn Structure Final Design: The additional U-Turn bridge will require bridge layout, foundation design, and framing detail design services for construction bidding according to TxDOT/FHWA requirements. Turning radius analysis for interstate truck vehicles indicate that special construction methods be employed to provide for turning radii at the bridge ends, thus requiring the use of curved steel beam framing and many other details to provide an aesthetically pleasing and functional structure. Fee: $104,990 engineers surveyors landscape architects III. Extend Construction Limits: The original scope of service and fee assumptions state that the construction limits at the approaches would stay within 200 feet of the bridge due to no significant changes to the bridge Fort Worth � 1 100 Macon Street Fort Worth, Texas 76102 � 817.336.5773 � Dallas � 17304 Preston Road, Suite 1340 � Dallas, Texas 75252 � 214.461.9667 Denfon � 1517 Centre Place Drive, Suite 320 � Demon, Texas 76205 � 940.383.4177 `� Sherman � 200 North Travis Street, Suite 500 � Sherman, Texas 75090 � 903.870.1089 Registered by the Texas Board of Professional Engineers, Finn No. F-230 � Registered by the Texas Board of Professional Surveyors, Firm No. 1001 16-00 Mr. Michael Weiss, PE October 24, 2013 Page 2 of 3 elevation or U-Turn bridge. It has since been established that the bridge needs to be elevated to provide additional IH 30 main lane clearance. Additional frontage road approach lane improvements are necessary to accommodate the U-Turn. TNP has mitigated the effects of clearance requirement by use of low profile beams, but there still remains a need to increase the Chapel Creek Blvd profile over IH 30 that results in extended construction limits. Additional need to extend the construction limits is presented by traffic operations need to store queuing traffic at signal approaches. The proposed fee is to provide for additional design sheets, cross section design, and driveway profiles. Fee: $13,200 IV. Additional Retaining Walls: During the course Geometric Design development, the need for two (2) additional retaining walls has been identified. One located along the proposed Chapel Creek Boulevard ROW at the Exxon Station that reduces encroachment on a storm water detention basin. The other wall is required along Leonard Golf Links property. Both walls will limit encroachment into vital business improvements; therefore the use of retaining wall translates into lowered damages to the businesses. Additional geotechnical investigations are included in the proposed fee. Design Fee: $12,000 Ge )technical Fee (DBE): $6,000 V. Additional ROW Fee Take Parcels and Easements: During the course of Geometric Design development and ROW surveying, it was noted that a parcel was sub -divided into many smaller lots. Therefore, the anticipated numbers of ROW fee take parcels will increase by twelve (12) parcels from four (4) to sixteen (16) ROW fee take exhibits. The project will also require four (4) temporary construction easements for driveways that TxDOT will require exhibits. Survey Fee (DBE): $45,440+$6,000= $51,440 Summary of Contract Amendment Fee: I. Study, Analysis, and Geometric Design for U-Turn Bridge: Fee: $38,575 II. U-Turn Structure Final Design: Fee: $104,990 III. Extend Construction Limits: Fee: $13,200 IV. Additional Retaining Wall Designs: Fee: $12,000 DBE Fee: $6,000 V. Additional ROW Exhibits: DBE Fee: $51,440 Total Contract Amendment Amount: Schedule: $226,205 TNP proposes a revised project schedule that accounts for public involvement delay associated with U-Turn services and associated TxDOT approvals. The changes are not anticipated to affect letting schedule. Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Mr. Michael Weiss, PE October 24, 2013 Page 3 of 3 Sincerely, tnp feague nail & perkins Joseph W. Atwood, P.E. CC File: FTW12583 Teague Nall and Perkins, Inc. Corporate Resolution Authorization to Execute Contracts The UNDERSIGNED hereby certifies that he is Secrefiary of TEAGUE HALL AND PERKINS, INC. (the "Corporation"), a corporation organized and existing under the laws of the State of Texas, and that the following resolution was adopted at the meeting of the Board of Directors of the Corporation, which was duly called and held on the 27"' day of December 20120 that this is a true and correct copy of the resolution; and that it has not been revoked, amended, or altered; and is still in full force and effect. Upon motion duly made, seconded and unanimously passed it was RESOLVED that each of the following individuals, acting in their capacity as an Officer of the Corporation, Principal, Office Manager and/or Director of Surveying has full power and authority to extend employment offers, enter into contracts, or to execute and deliver related instruments and other documents to various agencies, entities, individuals and corporations, etc., on behalf of TEAGUE NALL AND PERKINS, INC., and that no counter -signature is required on such contracts and documents in order to make said contracts and documents legally binding upon the Corporation. Mark R. Berry, Principal —CEO/Treasurer Michael A. Jones, Principal — President C. Ty Hilton, Principal — Vice President/Secretary Tom Rutledge, Principal Greg D. Saunders, Principal Scott C. Wilhelm, Principal Gary L. Vickery, Principal Chris L. Schmitt, Principal / Sherman Office Manager Stephen H. Roberson, Principal / Director of Surveying Timothy W. May, Director of Planning and Landscape Architecture W. L. (Bill) Wimberley, Land Acquisition and Utility Coordination Manager Robert Jenkins, Traffic Engineering Manager Michael Wellbaum, Director of Energy Services Joe Atwood, Director of Transportation IN WITNESS WHEREOF, the UNDERSIGNED has hereunto set his hand and the seal of the Corporation this the 28'f' day of December 2012. „ SECRET-ARY OF THE CORPORATION C. Ty Hilton p M&C Review Page 1 of 2 Official site of the City of Fort Worth, Texas illi�illill III iiiiiiiiii 1� r P. 1'OftT`VORT11 COUNCIL ACTION: Approved on 10/7/2013 **C-26486 LOG NAME: DATE: 10/7/2013 REFERENCE NO.: 20CHAPEL BRIDGE AMEND 1 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 1 to City Secretary Contract No. 43893, an Engineering Services Agreement with Teague Nall and Perkins, Inc., in the Amount of $226,205.00 for the Design of Chapel Creek Bridge Over Interstate Highway 30, Thereby Establishing a Revised Contract Cost in the Amount of $789,935.92 (COUNCIL DISTRICT 3) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 1 to City Secretary Contract No. 43893, an Engineering Services Agreement with Teague Nall and Perkins, Inc., in the amount of $226,205.00 for the Design of Chapel Creek Bridge over Interstate Highway 30, thereby establishing a revised total contract cost in the amount of $789,935.92. DISCUSSION: This Professional Services Agreement provides for the design of a new six -lane bridge across Interstate Highway 30 (IH-30) to serve Chapel Creek Boulevard. The Texas Department of Transportation has asked that the City expand the scope of the design to include the addition of a second turnaround at the bridge that will serve the eastbound traffic on IH-30. The proposed design amendment will provide the services necessary to accomplish the modification in scope. Funding for this Agreement includes the amount of $309,016.00 of 2008 Capital Improvement Program (CIP) funds (or 19 percent of the total). The balance is being provided by Federal and State Funds. There are sufficient funds remaining from these original amounts to pay for the additional design work. On May 8, 2012, (M&C C-25607) the City Council authorized the execution of a Local Project Advance Funding Agreement with the Texas Department of Transportation (TxDOT) in the amount of $1,650,059.00 for the design of the Chapel Creek Bridge over IH-30. On October 23, 2012, (M&C C-25937) the City Council authorized the execution of Engineering Services Contract No. 43893 with Teague Nall and Perkins, Inc., for the design of Chapel Creek Bridge over IH-30. http: //apps. cfwnet. org/council�acket/mc_review. asp?ID=1903 ... 10/24/2013 M&C Review Page 2 of 2 Amount Description M&C Approved Number Initial Contract $5631730.92 Design of Chapel C-25937 10/23/2012 Creek Bridge over IH- 30 Amendment No. $226,205.00 Design of U-Turn pending pending 1 Bridge over IH-30 and additional retaining walls, extend project limits, and provide additional right-of-way exhibits Contract Total $789,935.92 The proposed amendment will provide for a feasibility study, traffic operations analysis, geometric and final design of the additional U-turn bridge, extend the design limits along the IH-30 frontage roads and Chapel Creek Boulevard due to the higher required elevation of the new bridge, design two additional retaining walls, and to prepare additional right-of-way easements and exhibits. Teague Nall and Perkins, Inc., proposes to complete Amendment No. 1 for a lump sum fee not to exceed $226,205.00, for a revised total contract amount not to exceed $769,935,92, Staff considers this fee to be fair and reasonable for the scope of services to be performed. M/WBE Office - Teague Nall and Perkins, Inc., is in compliance with the City's DBE Ordinance by committing to an additional 25 percent DBE participation on this Amendment No. 1. The City's DBE goal on this Amendment is 22 percent. This project is located in COUNCIL DISTRICT 3, Mapsco 72K. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Grant Capital Projects Fund. TO Fund/Account/Centers Submitted for City Manager's Office bv: Originating Department Head: Additional Information Contact: ATTACHMENTS 20CHAPEL CREEK BRIDGE MAP, FROM Fund/Account/Centers GR74 531200 020302569300 Fernando Costa (6122) Douglas W. Wiersig (7801) Mike Weiss (8485) $226, 205.00 http : //apps. cfwnet. org/council�acket/mc_review. asp?ID=1903 ... 10/24/2013 •]:Ol\►lIIIKSM kINIMKS] ►ylWi1l1►II@f MICL■IJIM 30