HomeMy WebLinkAboutContract 43534-A2 (2)AMENDMENT No . 2
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and Criado &
Associates, Inc., (ENGINEER) made and entered into City
Secretary Contract No. 43534, (the CONTRACT) which was
authorized by M&C C-25758 on the 24t' day of August, 2012 in the
amount of $184,347.00; and
WHEREAS, the CONTRACT was subsequently revised by:
Amendment Number 1 in the amount of $47,460.00 which was
authorized administratively on October 2, 2013; and
WHEREAS, the CONTRACT involves engineering services for
the following project:
Water and Sanitary Sewer Replacement Contract 2011,
WSM-A.
WHEREAS, it has become necessary to execute Amendment No.
2 to the CONTRACT 'to include an increased scope of work and
revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal dated
March 3, 2014, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer totals $5,000.00.
2.
m Article II of the CONTRACT is amended to provide for an c-s
m increase in the fee to be paid to Engineer for all work and
C
m services performed under the Contract, as amended, so that the
total fee -_
paid by the City for all work and services shall a an
� amount of $236,807.00.
o�
Page -1-
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
K�
All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED:
City of Fort Worth
Fernando Costa
Assistant City Manager
DATE
APPR AL RECO NDED:
7
S. Frank Crumb, P.E.
Director, Water Department
APPROVED AS TO FORM AND LEGALITY:
Assistant City Attorney
ATTEST:
ENGINEER
Criado & Associates, Inc.
Cristina Criado, P.E.
President CEO
DATE :
Date: N/A
®FFICIAL RECORD
CITY SECRETARY
'. WORTH, TX
Page -2-
Transportation •Municipal • Lantl Development
March 3, 2014
Roberto Sauceda, PE
Project Manager
City of Fort Worth Water Department
1000 Throckmorton Street
Fort Worth, Texas 76102
Dear Mr. Sauceda:
CRIADO &Associates, Inc. is pleased to submit this proposal to provide the following supplemental
survey services for Water and Sanitary Sewer Replacement Contract 20011 WSMA-A project:
SCOPE OF WORK
Research Existing Public Records
Obtain all subject and adjoining boundary, subdivision; right-of-way dedications, and current
ownership, etc. from Tarrant County Appraisal District Records, Tarrant County Court House, and
City of Fort Worth Transportation and Public Works Survey Department. Contact Abstract
Company for additional research as needed.
Field Data Collection -Horizontal Control and Property Corners
Locate and verify horizon#al control and property corners previously field tied by the City of Fort
Worth. All GPS data (raw, unadjusted, and adjusted) will be submitted to the Survey Program
Manager. All unadjusted conventional field data, along with a sketch, will be submitted to the
Survey Program Manager for review and approval. All horizontal data will be represented as surface
distances in the CADD files. All horizontal coordinates will be represented as grid coordinates.
Boundary Analysis
Perfann a boundary analysis by comparing existing public records with the field data. Any
discrepancies found when comparing the boundary analysis performed by the City of Fort Worth and
the boundary analysis performed by CRIADO will be documented and submitted to both the Survey
Program Manager and the Project Manager for the Water and Sanitary Sewer Replacement. It is
assumed two (2) parcel acquisitions are required for the Water and Sanitary Sewer Replacement
project. Application fees and coordination with the Department of Property Management for parcel
acquisition is not inchtded in this proposal. Depending on the boundary analysis, the permanent
sewer facility easement requirements may initiate subsequent tasks for additional parcels or
easements. A new proposal will be submitted at that time for those additional services.
Page 1 of 3
CRIA_DO
CIVII GNGINUMING
l LAND SURN IYING
Prepare Permanent Sewer Facility Easement Field Notes, Exhibits, S et Monuments
Exhibits and Field Notes will be prepared for two (2) permanent sewer facility easements. The
checklists and templates available on the City of Fort Worth Buzzsaw site will be used in the
preparation of the exhibits and Field Notes. All permanent sewer facility easement lines will be
monumented with 5/8-inch diameter iron rods and a "CRIADO" plastic cap with a length of 16-
inches or monumentation approved by the Survey Program Manager. The exhibits and field notes
will be submitted to the Survey Program Manager for review and approval and will be signed and
sealed by CRIADO. It is understood at this time that right of entry has been obtained for all owners
affected by this proposal. Documentation of right of entry will be provided in conformance with the
checklists and templates available on the City's Buzzsaw site. Depending on the final boundary
analysis performed by CRIADO, the services required to be performed by CRIADO may change
significantly. New monumentation may be required to be established for the entire alignment as well
as revisions of all locative information on the Field Notes and Exhibits.
All surveying services will be performed according to the "Act &Rules" of the Texas Board of
Professional Land Surveying and the "Field Notes Guidelines" of the Department of Public Works
and Transportation Surveying Services of the City of Fort Worth, The Act & Rules will supersede
the Field Note Guidelines if any discrepancies exist between the two.
We propose a lump sum fee of $5,U00.00 to perform, those services. The budget does not include
sales tax of 8.25w mandated by House Bill 61, second called session of the 70th Texas State
Legislature to perform these services. Proof of tax exempt status shall be provided to CRIADO prior
to preparing final invoice in order to preempt sales tax collection. These services cover all necessary
requirements if the boundary analysis performed by CRIADO agrees with the boundary analysis
previously performed by the City of Fort Worth. If a discrepancy between the two analyses is
identified during the boundary analysis (being performed by CRIADO) then all subsequent work will
be stopped. We will schedule a meeting with the City of Fort Worth to address those discrepancies.
After the meeting, CRIADO will prepare a new proposal covering the additional services that will be
required and a commensurate adjustment to the fee will be made. Weather permitting; we can
deliver the survey services within 3 weeks from the time we receive your written order to proceed,
either by fax or mail.
This fee includes 2 delivery charges. Additional prints and delivery charges will be billed separately
at actual cos# in addi#ion to the lump sum fee.
Due to possible changes in our work load, the delivery date will be adhered to if we receive your written order
to proceed by March 14, 2014. After March 14, Zt} 14, it is possible that eve may Head to change the amount of
time needed to deliver the survey. This quote will be honored for up to 30 days from March 14, 2014. Unless
otherwise stated, fees quoted in this proposal exclude state and federal sales taxes on professional services.
All records research will be provided by CRIADQ. Additional research; surveying services required to
address comments, etc. outside the original scope of this proposal; or changes made to the survey after
completion (if so required), will be considered additional services and can be provided to you on an hourly
basis and a separate budget.
Page 2 of 3
CA CRIADO
CIVIL. INGINU[RING
& LAND SURVIVING
We trust this proposal is satisfactory. We appreciate the opportunity to be of service to the CiLay" art
Worth. If this proposal meets with your approval, please sign and date in the spaces provided below and
return one copy as your order to proceed and approval of the budget. Please call the if you have any
questions.
Yours very truly,
CRIADO & ASSOCIATES, INC.
Cristina Criado, PE
President CEO
APPROVED:
City of Fart Worth
Robert Sauceda, PE
'- Project Manager
sy:
Original Contract $184,347.00
Amendment No. 1 $473460600
Amendment No. 2 $5,000.00
Revised Contract Total $236,807.00
Date:
Page 3 of 3