WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 43789, (the
CONTRACT) which was authorized by M&C C-25819 on the 11 day of September,
2012 in the amount of $749,823.00, and
WHEREAS, the
following project:
Neighborhood
Bicycles; and
CONTRACT involves engineering
Transportation Connections for
services for the
Pedestrians and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated January 11, 2013, a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional design services to be performed by Engineer
totals $29,900.00. (See Attached Funding Breakdown Sheet, Page -3-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $779,723.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Pagel of 3
1
APPROVED:
City of Fort Worth
Assistant City Manager
DATE : I
Halff Associates, Inc.
Le�i,�`iy F](�►.ighes, RLA
V ce President
DATE :
APPROVAL RECOMMENDED:
Rich rd Zavala
Director, Parks and Community Services Department
APPROVED AS TO FORM AND LEGALITY:
Douglas W. Black
Assistant City Attorney
ATTEST:
Mary J. K�
City Secre
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 2 of 3
M&C :
Date:
"a VOO 11 Mf TR
FUNDING BREAKDOWN SHEET
City Secretary No. 43789
Amendment No. 1
Department
Fund -Account -Center
Amount
Parks and
Community
Services
C280 / 531200 / 801589990100
$29,900900
Total:
$29,900.00
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 3 of 3
1201 North Bowser Road
Richardson, Texas 75081
(214) 34M200
Fax (214) 73M095
)NAL SERVICES CONFI
To: Joel McElhany Date:
From: David Buchanan AVO:
Email: dbuchanan@halff.com Project:
VIA: Email
January 11, 2013
29114
Fort Worth Transportation Connections
for Pedestrians and Bicycles
As per your request, Halff Associates is pleased to submit this fee proposal for $29,900 to provide a Survey
Services, Geotechnical Services, H&H Services and Design Services for the trail relocation at Quanah Parker
Park in Ft. Worth Texas. A plan showing the approximate trail alignment is attached. Per our understanding of
your requirements, the specific items are identified as follows:
1. Survey Services ($9,600):
a. Survey Services: On -ground survey services will be relocated from the Randol Mill Rd frontage
and East of the Chesapeake station to the Goodman Property West of the Chesapeake station.
Survey services shall include locating all above ground improvements. Above ground visible
utilities and trees 6" caliper or greater.
b. A legal description of the trail easement and survey exhibit stamped and signed by a licensed
surveyor depicting the metes and bounds of the proposed easement will be provided to the City
for inclusion in the Recreation Trail Easement Agreement.
2. Geotechnical Services ($6,600):
a. Geotechnical Investigation: Geotechnical services will be relocated from the creek crossing off of
Randol Mill Rd to the heavily wooded area east of the West Fork Trinity behind the existing
Chesapeake Station. The report shall include recommendations for the proposed improvements
and include testing for the proposed bridge (2 total borings) on each creek embankment. Tree
clearing (10 feet) will be provided to allow proper access for drilling equipment.
Services ($5,200)
a. Hydraulic Impact: Due to increased impacts in the adjacent wooded area, Halff will quantify the
hydraulic impacts of the updated trail alignment and provide recommendations to the design
team to lessen or mitigate impacts. Impact studies will include the proposed bridge at the creek
crossing, the culvert crossing at the drainage outfall from the Chesapeak station and the
proposed trail along the West Fork Trinity River
4. Design Services ($6,000)
a. Tree Survey/Mitigation Plan: Halff Associates will prepare a tree survey/protection plan that
shows the location, caliper and name of all existing trees within the area of the proposed
development. The quantity, species and size of all existing trees over 6" caliper will be shown and
an indication of which protected trees will be removed and preserved during construction will be
noted.
1201 North Bowser Road
Richardson, Texas 75081
(214) 34M200
Fax (214) 73M095
b. Culvert Plan and Profile: A culvert plan and profile will be provided for the proposed culvert
crossing at the drainage outfall from the Chesapeake station. The culvert plan and profile will
include the determination of the culvert size and location based on the calculation of on and off -
site runoff. Coordinate geometry and layout dimensions will be shown to allow for proper
construction.
5. Site Visits ($2,500)
a. Site Visits: Halff Associates will conduct two (02) site visits, to stake the proposed alignment and
confirm the acquired survey data including tree locations, types and sizes. The staked alignment
shall be coordinated with the project surveyor prior to site clearing.
�y
K D &G CONSOLIDATED L'.
� �� `FART WQI�,i-RIVER6Et�
x,
I Inv,
RT WORTW CITY
RANT�C$3i
1F
I
"t Ina
d
City of Fort Worth, Texas
Mayor and Council Communication
COUNCILA IIUN" Approved on 9/11/2012
DATE: Tuesday, September 11, 2012 REFERENCE NO.: **C-25819
LOG NAME: 80TE PROJECTS HALFF AGREEMENT
SUBJECT:
Authorize Execution of an Engineering Agreement with Halff Associates, Inc., in the Amount of
$749,823.00 for the Design and Engineering of the Neighborhood Transportation Connections for
Pedestrians and Bicycles Project (COUNCIL DISTRICTS 3, 47 8 and 9)
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute an engineering Agreement
with Halff Associates, Inc., in the amount of $749,823.00 for the design and engineering of Neighborhood
Transportation Connections for Pedestrians and Bicycles project.
DISCUSSION:
The purpose of this Mayor and Council Communication is to authorize the City Manager to execute an
engineering Agreement with Halff Associates, Inc., in the amount of $749,823.00 to prepare environmental
reports and design and prepare construction documents for the Neighborhood Transportation Connections
for Pedestrians and Bicycles Project. This project includes five connections that provide Fort Worth
neighborhoods access to the Trinity River Trails. Specific improvements will include paved trails,
pedestrian bridges and on -street bike lane striping. The five connections associated with this project were
identified in the Trinity River Vision Neighborhood Recreation Enhancement Plan which was adopted by
City Council on August 4, 2009 (M&C G-16638) and are listed below:
1. Westcreek Boulevard Trail Linkage (COUNCIL DISTRICT 3)
2. River Park Trailhead Improvements (COUNCIL DISTRICT 3)
3. Quanah Parker Park - Handley THE Station Connection (COUNCIL DISTRICT 4)
4. Oakland Bike Lanes and Sidewalks (COUNCIL DISTRICT 8)
5. Mistletoe Heights Neighborhood - Forest Park Connection (COUNCIL DISTRICT 9)
On May 3, 2011, (M&C G-17267) the City Council authorized the City Manager to execute a Local Project
Advance Funding Agreement with the Texas Department of Transportation (TxDOT) for a Transportation
Enhancement Program - Neighborhood Transportation Connections for Pedestrians and Bicycles Grant in
the amount of $5,520,125.00. The 80 percent federal participation totals $4,416,100.00 while the 20
percent local participation share totals $1,104,025.00 together totaling $5,520,125.00.
The local share will be funded through a donation from Streams &Valleys, Inc., the 2004 Capital
Improvements Program (CIP) and gas well revenue appropriated for River Park on January 4, 2011 (M&C
G-17175).
DBE - Halff Associates, Inc., is in compliance with the City's DBE Program by committing 13 percent DBE
participation on this project. The City's goal on this project is 13 percent.
Logname: 80TE PROJECTS HALFF AGREEMENT Page 1 of 2
These projects are located in COUNCIL DISTRICTS 3, 4, 8 and 9.
FISCAL INFORMATION / CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Grant Capital Projects Fund.
FUND CENTERS:
TO Fund/AccounVCenters FROM Fund/Account/Centers
GR74 531200 080302526300
CERTIFICATIONS:
Submitted for City Manager's Office by_
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
1. 302 526.pdf (CFW Internal)
2. Compliance Memo Halff.pdf (CFW Internal)
3, Project Map 100.pdf (Public)
4. TxDOT trails Halff FAR.pdf (CFW Internal)
Susan Alanis (8180)
Richard Zavala (5711)
David Creek (5744)
Mike Ficke (5746)
$749,823.00
Logname: 80TE PROJECTS HALFF AGREEMENT Page 2 of 2