Loading...
HomeMy WebLinkAboutContract 43475-CO3 (2)City of Fort Worth Change Order Request CITY SECRRTARY shellS _ r` v CONTRACT NO. Change Order No. Date TPW Project No. Funding (FAC) 3 (Three) 10/8/12 201211106 GG01 536010 0205002 Facility and Project Description City Secretary Contract No. Replace Boiler System at Public Safety Building CSCN 43475 ORIGINAL CONTRACT AMOUNT................................................................ $194,500.00 EXTRAS TO DATE..................................................................... $ 32,700 CREDITS TO DATE, I I h 1 0 1 1 1 1 1 1 1 1 1 1 1 1 K 0 0 1 1 1 1 1 1 1 K I I I I I I I I 1 0 0 * 0 0 0 a a 0 t 9 9 1 1 1 1 1 1 1 1 0 0 0 9 1 a 9 9 1 0 $ 0 CONTRACT COST TO DATE'..... ... ''I pop see see one 00*090000090 she ell "I 'I'm, see "I "I'll losses ''I ''I'll "I ''I 'Ile $ 2271200 AMOUNT OF PROPOSED CHANGE ORDER............................................................................ $ 6,911 REVISED CONTRACT AMOUNT............................................................................................. $ 234,111 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS............................................................ $ 29,140 REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS......................................................... $ 0 ADDITIONAL FUNDING (IF NECESSARY)................................................................................ $ 6,911 IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL; Furnish all labor and material as per the attached Propose Change Requests Replace gas line, regulator and meter to accommodate new boiler as per the proposal dated 9/14/12 ADD $ 6,911 ADD $ 6,911 It is understood and agreed that the acceptance of this Change Order by the contractor constihttes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order Contractor's Name R. L. P. Mechanical Contractors, Inc. Original Contract Time Additional Approved Time To Date Approved Contract Time To Date Additional Time For This Change Order 95 calendar 5 calendar days 100 calendar days 0 calendar days days C n 7ac — R. L. P. Mechanical Contractors, Inc. Date Facilities Maintenance Insp/eAtor Date 11 F cili es Maintsrrgnce u eri ten t Date Di or, Transportation and Public Works Date /D ��- c,J. #0 191, z Proj E r— B rd H pton Brown Date AssistaF9 City Manager / Date As is -' or D to Council Action (If Required) ElApproved ElDisapproved 10 oq- r ❑ OtherVV INC Di 'bati 4� File f� t�,1��.�pI� Attested by: O o°°0000000Q0 0 OFF f�ir.IA "YVEM111f ector ° ° FFrolect Manager p p 0104 CITYRETARY s� g a 0 FT. WORTH, TX Marry J. K , C' Secretary d A, °0000000°� TPW Facilities Management Division Change Order Form (01/31/12) Viechanical (.ontroctors, Inc. phone 972-617-3557 -ax 972-576-0926 October 4, 2012 Ciry of Fort Worth 1000 Throckmorton Fort Worth, Texas 76102 Attn: Mike Pease Ref: Public Safety Building —Boiler Replacement Subj: Gas supply rework Mr. Pease, We have proposed the following changes for your review. Our price includes: 4117 N Hwy 77 TACLA016331 C M8173 HUB Cert # 1752603389300 1. Remove existing gas pipe, regulator and meter in the basement mechanical room areaway 2. Install new gas isolation valve near the location that the gas pipe penetrates the concrete wall 3. After the new boilers are placed in the mechanical room, new pipe will be run along the areaway wall to a new regulator and meter and connected back to existing gas pipe supplying the boilers 4. All work to be performed during normal business hours Our price, $6,911.00 Exclusions: 1. Sales tax If there are any questions or continents please call. Thank you, David Brumley • 1 (Change Order Attachment) PROJECT NAME: Replace Boiler System at Public Safety Building BuySpeed No: Contract No: CS43475 D.O.E. No: NIA Attachment to Change Order No: 3 Today's Date: 1019112 TOTAL Original Contract Amount: $ 194,500.00 Extras to Date: 32,700.00 Credits to Date: $ Contract Amount to Date: $ 227,200.00 Amount of Proposed Change Order: $ 6,911.00 Revised Contract Amount: $ 234,111.00 Contingency Funds Avail. for Admin. Change Orders: $ 29,140.00 Remaining Funds Available for Change Orders: $ - Additional Funding (if necessary): $ 6,911.00 Prepared By: Karen Striker T/PW Business Support