HomeMy WebLinkAboutContract 43475-CO2 (2)Change Order No.
Date
City of Fort Worth
Change Order Request
TPW Project No.
Funding (FAC)
2 (TWO) 9/20/2012 2012-06 GG01 536010 0205002
Facility and Project Description City Secretary Contract No,
Replace Boiler System at Public Safety Building CSCN 43475
ORIGINAL CONTRACT AMOUNT................................................................ $194,500.00
EXTRAS TO DATE',,'', spossm ",mow 004 "1 I'm odd do, ''I *odes ''I ''loot $ 18,003
CREDITS TO DATE, I I I I 1 0 0 a 9 a a I I I I I I I I I I 1 0 * 0 0 1 1 1 1 1 1 1 0 0 a I I I I I I * 9 1 9 $ 0
CONTRACTCOST TO DATE,., bell'' ''I ''I 14*06M ''I a 0 1 1 1 1 1 1 1 1 1 1 0 a I I I I I 1 0 0 a a & I I I I I I 1 9 a I I I I 1 4 1 1 1 s I I I I I I I I I o 0 0 1 1 1 1 1 1 1 1 1 1 1 $ 2121503
AMOUNT OF PROPOSED CHANGE ORDER.''....,,,,, Mow wpm Ohl'', 'It a I I & I I I 1 0 t 1 0 1 1 1 1 1 1 1 4 0 6 * I I I I I I I I 1 0 a a 9 4 1 $ 14,697
REVISEDCONTRACT AMOUNT............................................................................................. $ 227,200
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS''.... ME, ''I or* *06 'We ''I see MOM ",@Dole, ''I '',lei me, ''I ''I ''I $ 29,140
REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS,''.....'''"', Best,, 41* 01111, 114 4*9 DOE'', $ 11,137
ADDITIONAL FUNDING (IF NECESSARY),,,... Pie ell'', '',moo ''I I'laosell ''1 104 Egg $ 31560
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL;
Furnish all labor and material as per the attached Propose Change Requests
Replace Domestic Cold Water Distribution header as per the proposal dated
9/14/12 ADD $ 141697
ADD $ 14,697
It is understood and agreed that the acceptance of this Change Order by the contractor constihrtes an accord and satisfaction and represents payment in full (both time
and money) for all costs arising out of, or incidental to, the above Change Order
Contractor's Name
R. L. P. Mechanical Contractors, Inc.
Original Contract Time Additional Approved Time To Date Approved Contract Time To Date Additional Time For This Change Order
95 calendar days, 5 calendar days 100 calendar days 0 calendar days
ntracto - R. L. P. echanical Contractors, Inc.
Date
Fads Maintenance Inspector
Date
l ' ' c,
1 Iz
7 gook d -1
/
F lliti s Mainte e bp in ndffit
or, Transportation and Public Works
Date
tw
�J
gi a aird pton Brown
Assistan Cdesit Manager
Date
A sis a ttorn
Date
Council Action (If Required)
❑ Approve 4waro ed
❑ Othe d
Distribution
File
Facilities Maintenance Inspector
Project Manager
Contractor
J.
by:
S OFFICIAL RECUR®
�0 11TY SECRETARY
p°° ,"' F4n �1� [� li Gee TX
7d� 1%
.Cy
TPW Facilities Management Division
Change Order Form (01/31/12)
.-ontractors, Inc.
prone 972-611-3557
�ax 972-576-0926
September 14, 2012
City of Fort Worth
1000 Throckmorton
Fort Worth, Texas 76102
Attn: Mike Pease
Ref: Public Safety Building —Boiler Replacement
Subj: Replace domestic cold water header in the boiler plant
Mr. Pease,
We have proposed the following changes for your review.
Our price includes:
41�1 N Hwy / 1
TACLA016331 C
M8173
HUB Cert # 1752603389300
1. Remove and dispose of existing 4" DCW header including the 4" isolation gate valve
2. Provide and install kl) 4", ( ) 3, k2) 25 kl) 2-1/2" and ( ) l" ball valves to rebuild the header
3. All valves 2" and below to be sweat ball valve and 24/2" and larger to be flanged ball valves
4. All piping to be type "L" copper
5. Dielectric unions to be used at all connection points to the existing galvanized pipe
6. All prefabrication to be performed during normal business hours
7. Domestic cold water shutdown and header installation to be performed on a Saturday
8. Facility personnel to be present for drain and re -fill of system
Our price. . 0 a a * 6.6 0 0 a 4 0 6 0 0 4 0 a a M 0 0 a 0 0 see 0 0 0 4 0 0 6 ot $14,697.00
Exclusions:
1. Piping insulation
2. Sales tax
If there are any questions or comments please call.
Thank you,
David Brumley