Loading...
HomeMy WebLinkAboutContract 44165-A3 (2)AMENDMENT No.3 TO CITY SECRETARY CONTRACT Z?2002A Lto WHEREAS, the City of Fort Worth (CITY) and Bridgefarmer & Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 44165, (the CONTRACT) which was administratively authorized by the City on the 1st day of February, 2013 in the amount of $39,300.00; and WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount of $393,767.65 authorized by the City Council by M&C C- 26422 on September 10, 2013; and subsequently revised by Amendment Number 2 in the amount of $131,637.20 authorized by the City Council by M&C C- 26846 on July 22, 2014; WHEREAS, the CONTRACT involves engineering services for the following project: Parker -Henderson Road from Mansfield Highway to David Strickland Road WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 30, 2014, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $39,740.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $604,444.85. 3. All other provisions of the Contract, whi amended herein, shall remain in full force and effe Page -1- essly EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE : 8 iS (+ APPROVAL RECOMMENDED: J ENGINEER �ridgefarmer & Associates, Inc. n h% M. Mansoor san, P.E. Chief Execut've Officer DATE: D Douglas,(�Wiersig, P.E. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: Douglas V�B'lack Assistant City Attorney Page -2- Weiss, Michael From: Deitemeyer@bridgefarmer.com Sent: Wednesday, July 30, 2014 9:27 AM To. Weiss, Michael Subject: Parker Henderson Amendment for Water Line Attachments: Attachment A - 2014-07-30 Parker -Henderson (PMO_Release_20120723).docx; LOE for Parker Henderson Project Amendment 2014-07-30.xls Mike, The updated LOE and attachment A for the water design amendment are attached. Please let me know if you need any additional information. Thank you, Lisa Lisa Deitemeyer, PE Bridgefarmer &Associates, Inc. 12801 IJorfh Central Expressway, Suite 400 Dallas, TX 75243 main phone 972-231-8800, exfi. 1 102 direct phone 469-916-0338 From: Kasavich, John [mailto:John.KasavichC�fortworthtexas.gov] Sent: Friday, July 25, 2014 1:10 PM To: Weiss, Michael; Lisa Deitemeyer; Sholola, Tony Subject: RE: Message from "RNP0026737D4C17" Mike, after review, the hours can be shifted to other tasks,. and so the revised total is around $40,000. Thanks. John Kasavich. From: Weiss, Michael Sent: Monday, July 07, 2014 5:16 PM To: DeitemeyerCc�bridgefarmer.com Cc: Kasavich, John Subject: FW: Message from "RNP0026737D4C17" Lisa, Attached are the Water Dept.'s comments on the proposed amendment. The M&C foi• Amendment #2 in the amount of $131,637.20 (without the Water Fee) is on the Council Agenda for• 7I15/14. Thanks, Mike Weiss, P.E. Senior Professional Engineer City of Fort Worth Transportation and Public Works Department Infrastructure Design and Construction 1000 Throckmorton Street Fort Worth, TX 76102 (817) 392-8485 Office phone (817) 584-6441 Cell phone Michael.Weiss(a,fortworthtexas. ov 1 City of Fort Wgrth — Working together to build a strong community. ORT 1H; -----Original Message ----- From: Kasavich, John Sent: Monday, July 07, 2014 2:59 PM To: Weiss, Michael Cc: Sholola, Tony Subject: FW: Message from "RNP0026737D4C17" Mike, attached are comments on the Parker Henderson water hourly breakdown. Thanks. John Kasavich. -----Original Message ----- From: printeradmins@fortworthgov.org [mailto:printeradmins@fortworthgov.org] Sent: Monday, July 07, 2014 1:44 PM To: Kasavich, John Subject: Message from "RNP0026737D4C17" This E-mail was sent from "RNP0026737D4C17" (MP C4503). Scan Date: 07.07.2014 14:44:28 (-0400) Queries to: printeradmins@fortworthgov.org z ATTACHMENT "A" Scope for Engineering Design Related Services for Street Improvements The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The objective of this contract is to progress and complete design and construction plans for Parker -Henderson Road. The limits of the project are from BUS 287, Mansfield Highway to Martin Street. This contract amendment includes work for water line design services. TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT) Prepare final water line design from BUS 287 to Pecos Street. Work includes: • Address City comments water line design • Shift horizontal alignment of water line • Re -design water line profile • Provide water line layout sheet • Establish water line construction sequencing to maintain water services and prepare construction sequencing sheets • Update water line plan and profile sheets, specs, and quantities. City of Fort Worth, Texas Attachment A PMO Release Date: 07.23.2012 Page 1 of 1 A o 0 0 0 0 0 0 0 a o 0 o p o 0 0 0 H � n rrn0 m(0o0 T O Il (O N O1 M M Y N N H N U m N O H C N a w 0 u •O O v 41 > 41 � C ~ W cl X W m C _N C j O Z C O u m w to o 0 0 0 0 0 0 0 o r V J O n NO m (0o a ro U Cf O f- VZ (O N A O M M H MEMEME > O O O O O o (6 N w N a W E a W D o 0 0 0 0 0 0 U 0 0 0 0 0 0 0 0 0 0 o O O o 0 0 = T N M N N W 7 N 0 0 L U D O O O O O 0 0 0 O L ro O c 0 V J 'p VO _ t,EL c w u 0 O O 0 00 0 N O N m m m m ' N R C N M M ate' U O 0N u N O N r a` o W N fC 0 cc N N C O N 6 C ro O m d O d c CL o ro 0 O O O O m m o U 2 d N U CO N CO O > IN O U) T N N U N C U E w `" c E c E m U/ ro o r m 0 o UUa a- w aci C c _ _ O) 10N O U m O O U O .� N u N O C Ul w N m p N m 13 N Y i W m ma LL O a` M LL LL &n Q d (n Q( j U m U (n 0 0 0 0 0 0 0 0 0 0 0 0 Z O O O r M V N N V O O O O O M Y N V V V V a ro FMEMENIC O O 0 0 0 0 a m m M M T N E_ N 7 N ro N y 0 O, ro W c N U '� C y 0 0 y O H to- F co O `w 0 `w (n(%7 w `m w w m a m m n U (n U) O w _ w w O In ro 0] CO O O Z