Loading...
HomeMy WebLinkAboutContract 43416-A4 (2)AMENDMENT No . 4 TO CITY SECRETARY CONTRACT WHEREASS, the City of Fort Worth (CITY) and Hamilton Civil Engineering, (ENGINEER) made and entered into City Secretary Contract No. 43416, (the CONTRACT) which was authorized by M&C C-25704 on the 10tr' day of July, 2012 in the amount of $151,464.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $29,200.00 which was authorized administratively on September 17, 2013; and Amendment No.2 in the amount of $44,420.00 which was authorized administratively on December 3, 2013 and Amendment No. 3 in the amount of $12,400.00 which was authorized administratively on June 26, 2014; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2011, WSM-D; and WHEREASS, it has become necessary to execute Amendment No . 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 8, 2014, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $24,000.00 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amend C& o at t total fee paid by the City for all work and servi 00V'fyW an amount of $261, 484 . 00 . � `�' f; ti,cutarPirb 7 Tin WRO T"1 ,'TA R�CrIVp® SPP o'� �0��� Page -1- 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager APPROVAL RECOMN�NDED: Andrew T. Cronb�rg� P.E. Acting Director, W ter Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST: City Sc�retary ENGINEER Hamilton Civil Engineering President DATE : C,6 201 Date: N/A a Met RR7G 19 iTFK Page -2- September 8, 2014 Mr. Robert Sauceda City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Water and Sanitary Sewer Replacement Contract 2011 WSM-D Amendment 4 for Additional Services Dear, Mr. Sauceda: Hamilton Civil Engineering offers additional Professional Engineering Services for this project. These additional services are required due to the need to replace existing waterlines at one additional location and sanitary sewer at one additional location. This Engineering Services Contract Amendment includes a detailed scope of additional services attached to this letter. Hamilton Civil Engineering proposes to provide the attached scope of additional services for the lump sum of $24,000.00. All additional services proposed will be performed in accordance with the original contract dated July 1% 2012. This Amendment, consisting of one page and the attached Additional Scope of Services, consisting of one page, represent the entire amendment to the original agreement between the City of Fort Worth and Hamilton Civil Engineering. If the terms of this Amendment are acceptable, please execute both copies and return one to our office to begin the additional services. If you have any questions or we may be of further service, please contact our office at 817-320- 9679. Sincerely, HAMILTON CNIL ENGINE�E�RI�NG l.,awrence Hamilton, P.E. President Attachment 833 Paint Horse Trail, Saginaw TX 76131 • 817-320-9679 • www.hami(foncivilengineering.com CH September 8, 2014 Mr. Robert SMCC City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Water and Sanitary Sewer Replacement Contract 2011 WSM-D Amendment 4 for Additional Services Dear, Mr. Sauceda: In response to your request on September 8, 2014, Hamilton Civil Engineering proposes to provide Additional Engineering Services for this project. A. SCOPE: Major Event/Task Design & plan preparation for sanitary sewer {8"-200 LF, 12"4200 LF) Design &plan preparation for waterline (8"-1800 LF, 24"4800 LF) B. FEE: Comments 8" & 12" Sanitary sewer (University Dr. near Colonial Pkwy and Log Cabin Village Ln) 8" & 24" waterline replacement (Pearl Ave. from NW 25St to 22nd St) Hamilton Civil Engineering proposes the following Fee for Additional Services (includes overhead costs such as reproduction of drawings, handling and postage, telephone, and faxes). Fee Breakdown Rate Water Design/plan preparation for sanitary sewer $160Ihr Design/plan preparation for waterlines $160/hr Original Contract Amount: $151,464.00 Amendment #1 Amount: $ 29,200.00 Amendment #2 Amount: $ 445420.00 Amendment #3 Amount: $ 129400.00 Amendment #4 Amount: $ 24 000.00 Revised Contract Amount: $261,484.00 Si� erely, i Vim/ lL Emvrence Hamilton, P.E., President HLuSSubtotal ours mp nm x 75 = $ 12,000.00 x 75 — $ 12,000.00 Total Water - $ 24,000.00 833 Paint Horse Trail, Saginaw TX 76131 � 817-320-9679 ^ wv✓w_hamiltoncivilengineering.com