CITY OF FORT WORTH, TEXAS CONTRACT NO, y LL
a �
STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES
This AGREEMENT is between the City of Fort Worth, a home -rule municipal
corporation situated in Tarrant, Denton, Parker and Wise Counties, Texas (the "CITY"), and
Halff Associates, Inc., (the "ENGINEER"), for a PROJECT generally described as: Sanitary
Sewer Rehabilitation, Contract 80 (LXXX).
Article I
Scope of Services
A. The Scope of Services is set forth in Attachment A.
Article II
Compensation
A. The ENGINEER's compensation is set forth in Attachment B.
Article III
Terms of Payment
Payments to the ENGINEER will be made as follows:
A. Invoice and Payment
(1) The Engineer shall provide the City sufficient documentation, including but not
limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINEER will issue monthly invoices for all work performed under this
AGREEMENT. Invoices are due and payable within 30 days of receipt.
(3) Upon completion of services enumerated in Article I, the final payment of any
balance will be due within 30 days of receipt of the final invoice.
(4) In the event of a disputed or contested billing, only that portion so contested will
be withheld from payment, and the undisputed portion will be paid. The CITY
will exercise reasonableness in contesting any bill or portion thereof. No
interest will accrue on any contested portion of the billing until mutually
resolved.
(5) If the CITY fails to make payment in full to ENGINEER for billings contested in
good faith within 60 days of the amount due, the ENGINEER may, after giving
7 days' written notice to CITY, suspend services under this AGREEMENT until
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 1 of 15
10-07-11 P02�
pFFICiAL RECORD
�'r. WORTH) TX
paid in full. In the event of suspension of services, the ENGINEER shall have
no liability to CITY for delays or damages caused the CITY because of such
suspension of services.
Article IV
Obligations of the Engineer
Amendments to Article IV, if any, are included in Attachment C.
A. Genera!
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The standard of care applicable to the ENGINEER's services will be the degree
of skill and diligence normally employed in the State of Texas by professional
engineers or consultants performing the same or similar services at the time
such services are performed.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise specified
in Attachment A.
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive test
points and sample intervals and at locations other than where
observations, exploration, and investigations have been made. Because
of the inherent uncertainties in subsurface evaluations, changed or
unanticipated underground conditions may occur that could affect the
total PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of the ENGINEER.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 2 of 15
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in ink
on reproducible mylar sheets and electronic files in .pdf format, or as otherwise
approved by CITY, which shall become the property of the CITY. CITY may
use such drawings in any manner it desires; provided, however, that the
ENGINEER shall not be liable for the use of such drawings for any project other
than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER'0 personnel at a construction site,
whether as on -site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong to the CITY
and/or the CITY's construction contractors or other entities, and do not relieve
the construction contractors or any other entity of their obligations, duties, and
responsibilities, including, but not limited to, all construction methods, means,
techniques, sequences, and procedures necessary for coordinating and
completing all portions of the construction work in accordance with the Contract
Documents and any health or safety precautions required by such construction
work. The ENGINEER and its personnel have no authority to exercise any
control over any construction contractor or other entity or their employees in
connection with their work or any health or safety precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general, if
the work on the PROJECT is being performed in a manner indicating that the
PROJECT, when completed, will be in accordance with the Contract
Documents, nor shall anything in the Contract Documents or the agreement
between CITY and ENGINEER be construed as requiring ENGINEER to make
exhaustive or continuous on -site inspections to discover latent defects in the
work or otherwise check the quality or quantity of the work on the PROJECT. If
the ENGINEER makes on -site observation(s) of a deviation from the Contract
Documents, the ENGINEER shall inform the CITY.
(3) When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance with
Attachment A.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5,19,2010
Page 3 of 15
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation or
maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule. Therefore, the ENGINEER makes no warranty that the
CITY's actual PROJECT costs, financial aspects, economic feasibility, or
schedules will not vary from the ENGINEER's opinions, analyses,
projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose the
construction contractor has used the moneys paid; that title to any of the work,
materials, or equipment has passed to the CITY free and clear of liens, claims,
security interests, or encumbrances; or that there are not other matters at issue
between the CITY and the construction contractor that affect the amount that
should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
I. Minority and Woman Business Enterprise (M/WBE) Participation
In accord with City of Fort Worth Ordinance No. 15530, as amended, the City
has goals for the participation of minority business enterprises and woman
business enterprises in City contracts. Engineer acknowledges the M/WBE
goal established for this contract and its accepted written commitment to
M/WBE participation. Any misrepresentation of facts (other than a negligent
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5,19,2010
Page 4 of 15
misrepresentation) and/or the commission of fraud by the Engineer may result
in the termination of this Agreement and debarment from participating in City
contracts for a period of time of not less than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after
final payment under this contract, have access to and the right to examine and
photocopy any directly pertinent books, documents, papers and records of the
ENGINEER involving transactions relating to this contract. ENGINEER agrees
that the CITY shall have access during normal working hours to all necessary
ENGINEER facilities and shall be provided adequate and appropriate work
space in order to conduct audits in compliance with the provisions of this
section. The CITY shall give ENGINEER reasonable advance notice of
intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such subconsultant,
involving transactions to the subcontract, and further, that the CITY shall have
access during normal working hours to all subconsultant facilities, and shall be
provided adequate and appropriate work space, in order to conduct audits in
compliance with the provisions of this article together with subsection (3)
hereof. CITY shall give subconsultant reasonable advance notice of intended
audits.
(3) ENGINEER and subconsultant agree to photocopy such documents as may be
requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost
of copies at the rate published in the Texas Administrative Code in effect as of
the time copying is performed.
K. INSURANCE
(1) ENGINEER'S INSURANCE
a. Commercial General Liability —the ENGINEER shall maintain commercial
general liability (CGL) and, if necessary, commercial umbrella insurance
with a limit of not less than $1,000,000.00 per each occurrence with a
$2,000,000.00 aggregate. If such Commercial General Liability insurance
contains a general aggregate limit, it shall apply separately to this
PROJECT or location.
i. The CITY shall be included as an insured under the CGL, using ISO
additional insured endorsement or a substitute providing equivalent
coverage, and under the commercial umbrella, if any. This
i
City of Fort Worth, Texas nsurance shall apply as primary insurance with respect to any other
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19,2010
Page 5 of 16
insurance or self-insurance programs afforded to the CITY. The
Commercial General Liability insurance policy shall have no
exclusions by endorsements that would alter or nullify:
premises/operations, products/completed operations, contractual,
personal injury, or advertizing injury, which are normally contained
within the policy, unless the CITY approves such exclusions in
writing.
ii. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b. Business Auto —the ENGINEER shall maintain business auto liability and, if
necessary, commercial umbrella liability insurance with a limit of not less
than $1,000,000 each accident. Such insurance shall cover liability arising
out of "any auto", including owned, hired, and non -owned autos, when said
vehicle is used in the course of the PROJECT. If the engineer owns no
vehicles, coverage for hired or non -owned is acceptable.
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the business auto liability or
commercial umbrella liability insurance obtained by ENGINEER
pursuant to this agreement or under any applicable auto physical
damage coverage.
c. Workers' Compensation —ENGINEER shall maintain workers compensation
and employers liability insurance and, if necessary, commercial umbrella
liability insurance with a limit of not less than $100,000.00 each accident for
bodily injury by accident or $100,000.00 each employee for bodily injury by
disease, with $500,000.00 policy limit.
i. ENGINEER waives all rights against the CITY and its agents,
officersI directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant to this agreement.
d. Professional Liability —the ENGINEER shall maintain professional liability, a
claims -made policy, with a minimum of $1,000,000.00 per claim and
aggregate. The policy shall contain a retroactive date prior to the date of the
contract or the first date of services to be performed, whichever is earlier.
Coverage shall be maintained for a period of 5 years following the
completion of the contract. An annual certificate of insurance specifically
referencing this project shall be submitted to the CITY for each year
following completion of the contract.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5,19,2010
Page 6 of 15
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be delivered to the CITY prior to ENGINEER
proceeding with the PROJECT.
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, as its interests may appear. The term CITY shall include
its employees, officers, officials, agents, and volunteers as respects the
contracted services.
c. Certificate(s) of insurance shall document that insurance coverage specified
in this agreement are provided under applicable policies documented
thereon.
d. Any failure on part of the CITY to request required insurance documentation
shall not constitute a waiver of the insurance requirements.
e. A minimum of thirty (30) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) days notice shall be
acceptable in the event of non-payment of premium. Such terms shall be
endorsed onto ENGINEER's insurance policies. Notice shall be sent to the
respective Department Director (by name), City of Fort Worth, 1000
Throckmorton, Fort Worth, Texas 76102.
f. Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A:V or greater, in the current A. Mt
Best Key Rating Guide or have reasonably equivalent financial strength and
solvency to the satisfaction of Risk Management.
g. Any deductible or self insured retention in excess of $25,000.00 that would
change or alter the requirements herein is subject to approval by the CITY
in writing, if coverage is not provided on a first -dollar basis. The CITY, at it
sole discretion, may consent to alternative coverage maintained through
insurance pools or risk retention groups. Dedicated financial resources or
letters of credit may also be acceptable to the CITY.
h. Applicable policies shall each be endorsed with a waiver of subrogation in
favor of the CITY as respects the PROJECT.
i. The CITY shall be entitled, upon its request and without incurring expense,
to review the ENGINEER's insurance policies including endorsements
thereto and, at the CITY's discretion; the ENGINEER may be required to
provide proof of insurance premium payments.
j. Lines of coverage, other than
claims -made basis, shall contain
Professional Liability, underwritten on a
to the date of the contractual agreement. The certificate of insurance shall
state both the retroactive date and that the coverage is claims -made.
k. Coverages, whether written on an occurrence or claims -made basis, shall
be maintained without interruption nor restrictive modification or changes
from date of commencement of the PROJECT until final payment and
termination of any coverage required to be maintained after final payments.
The CITY shall not be responsible for the direct payment of any insurance
premiums required by this agreement.
m. Sub consultants and subcontractors to/of the ENGINEER shall be required
by the ENGINEER to maintain the same or reasonably equivalent insurance
coverage as required for the ENGINEER. When sub
consultants/subcontractors maintain insurance coverage, ENGINEER shall
provide CITY with documentation thereof on a certificate of insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions of
the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities -Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required, at
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 8 of 15
its own cost and expense. However, if design changes are required due to the
changes in the permitting authorities' published design criteria and/or practice
standards criteria which are published after the date of this Agreement which
the ENGINEER could not have been reasonably aware of, the ENGINEER
shall notify the CITY of such changes and an adjustment in compensation will
be made through an amendment to this AGREEMENT.
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City -Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection with
the ENGINEER's services. The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights -of -way, and
access necessary for the ENGINEER's services or PROJECT construction.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2070
Pa0e 9 of 75
D. Timely Review
The CITY will examine the ENGINEER'S studies, reports, sketches, drawings,
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior role
in the generation, treatment, storage, or disposition of such materials. In
consideration of the associated risks that may give rise to claims by third
parties or employees of City, City hereby releases ENGINEER from any
damage or liability related to the presence of such materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is a
result of ENGINEER 's negligence or if ENGINEER brings such hazardous
substance, contaminant or asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of Article
IV.E. regarding the ENGINEER'S Personnel at Construction Site, and
provisions providing contractor indemnification of the CITY and the ENGINEER
for contractor's negligence.
H. Contractor Claims and Third -Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain no
direct action against the ENGINEER, its officers, employees,
and subcontractors, for any claim arising out of, in connection
with, or resulting from the engineering services performed.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 6,19,2010
Page 10 of 16
Only the CITY will be the beneficiary of any undertaking by the
ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third -party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third -party beneficiary rights under this Agreement.
(4) Nothing contained in this section V.H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
I. CITY's Insurance
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will ensure that Builders Risk/Installation insurance is maintained at
the replacement cost value of the PROJECT. The CITY may provide
ENGINEER a copy of the policy or documentation of such on a certificate of
insurance.
(3) The CITY will specify that the Builders Risk/Installation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
J. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required or
requested assistance to support, prepare, document, bring, defend, or assist in
litigation undertaken or defended by the CITY. In the event CITY requests such
services of the ENGINEER, this AGREEMENT shall be amended or a separate
agreement will be negotiated between the parties.
K. Changes
The CITY may make or approve changes within the general Scope of Services
in this AGREEMENT. If such changes affect the ENGINEER's cost of or time
required for performance of the services, an equitable adjustment will be made
through an amendment to. this AGREEMENT with appropriate CITY approval.
Article VI
General Legal Provisions
Amendments to Article VI, if any, are included in Attachment C.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 11 of 15
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse oll Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments of
service for this PROJECT, whether the PROJECT is completed or not. Reuse,
change, or alteration by the CITY or by others acting through or on behalf of the
CITY of any such instruments of service without the written permission of the
ENGINEER will be at the CITY's sole risk. The CITY shall own the final
designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance
caused by acts of God, strikes, lockouts, accidents, or other events beyond the
control of the ENGINEER that prevent ENGINEER' performance of its
obligations hereunder.
D. Termination
(1) This AGREEMENT may be terminated only by the City for convenience on
30 days' written notice. This AGREEMENT may be terminated by either the
CITY or the ENGINEER for cause if either party fails substantially to perform
through no fault of the other and does not commence correction of such
nonperformance with in 5 days of written notice and diligently complete the
correction thereafter.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or complete studies, plans, specifications
or other forms of ENGINEER'S work product;
b.) Out-of-pock(t expenses for purchasing electronic data files and other
data storage supplies or services;
c.) The time requirements for the ENGINEER'S personnel to document the
work underway at the time of the CITY'S termination for convenience so
that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will submit
to the CITY an itemized statement of all termination expenses. The CITY'S
approval will be obtained in writing prior to proceeding with termination
services.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5,19,2010
Page 12 of 16
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule, commitment
and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's
compensation will be made.
F. Indemnification
In accordance with Texas Local Government Code Section 271.904, the
ENGINEER shall indemnify, hold harmless, and defend the CITY against
liability for any damage caused by or resulting from an act of negligence,
intentional tort, intellectual property infringement, or failure to pay a
subcontractor or supplier committed by the ENGINEER or ENGINEER's agent,
consultant under contract, or another entity over which the ENGINEER
exercises control.
G. Assignment
Neither .party shall assign all or any part of this AGREEMENT without the prior
written consent of the other party.
H. Interpretation
Limitations on liability and indemnities in this AGREEMENT are business
understandings between the parties and shall apply to all the different theories
of recovery, including breach of contract or warranty, tort including negligence,
strict or statutory liability, or any other cause of action, except for willful
misconduct or gross negligence for limitations of liability and sole negligence
for indemnification. Parties mean the CITY and the ENGINEER, and their
officers, employees, agents, and subcontractors.
I. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT, its
interpretation and performance, and any other claims related to it. The venue
for any litigation related to this AGREEMENT shall be Tarrant County, Texas.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release pate: 5.19.2010
Page 13 of 15
J. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
K. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the work hereunder, and shall observe and
comply with all orders, laws ordinances and regulations which may exist or may
be enacted later by governing bodies having jurisdiction or authority for such
enactment. No plea of misunderstanding or ignorance thereof shall be
considered. ENGINEER agrees to defend, indemnify and hold harmless CITY
and all of its officers, agents and employees from and against all claims or
liability arising out of the violation of any such order, law, ordinance, or
regulation, whether it be by itself or its employees.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 14 of 15
Article VII
Attachments, Schedules, and Signatures
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, supersedes all prior written or oral understandings, and may only be changed
by a written amendment executed by both parties. The following attachments and schedules
are hereby made a part of this AGREEMENT:
Attachment A -Scope of Services
Attachment B — Compensation
Attachment C - Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
Executed this theday %J 1 2011.
ATTEST:
Marty Hendrix
City Secretary
(MSG G— 25�01
st_Iz - I(
TO FORM
nt City Attorney
ATTEST:
A1.5
k.l EIAa2
j�p�cT �p„�A6ic.P
p�000p0�
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 15 of 15
By:
CITY OF FORT WORTH
Fernando
Costa
Assistant City Manager
,�,,�d� APPROV�A�L �R,,E/COMMENDED
S. Frank Crumb, P.E.
Director, Water Department
HALFF ASSOCIATES, INC.
J. Rt�sell Killen, P.E. CFM
Vice President
By:
OFFICIAL RECORD
CITY S1ErCRETARY
ATTACNMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 80
CITY PROJECT NO.: 01499
ATTACHMENT A
Scone for Engineering Design Related Services for Water andlor Sanitary Sewer
Improvements
r I
RX01111111fMANU 1 ill
CITY PROJECT NO.: 01499
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
CL
N
N
Street
;a, ?
ao
a ro N
�o
3
a to
0
an
w
oc
J
Ally between Wiseman Ave and Stalcup Rd
5
2078-384
L-3005
6
8
358
Ally between Andrew Ave and Wiseman Ave
5
2078-384
L-3006
6
8
699
Ally between Birdell St and Andrew Ave
5
2078-384
L-3007
6
8
1604
Dillard St
5
2078-384
L-3010
6
8
517
Ally from Dunbar track to Dillard St
5
2078-384
L-3013
6
8
164
From Dunbar HS to Dunbar track
5
2078-384
L-3014
6
8
700
Stop Six Park
5
2078-384
L-3292
6
8
329
Ally between Alexander Dr and Truman Dr
5
2078-384
L-3926
6
8
261
Ally between Truman Dr and Bong Dr
5
2078-384
L-3927
6
8
453
2078-384
Stalcup Rd
5
L4129
6
8
497
2078-380
Ally between Capers Ave
5
2078-384
L-4674
6
8
638
and Rickenbacker PI
Ally between Rickenbacker PI and Lester
5
2078-380
L4675
6
8
578
Granger Dr
Ally between Bong Dr and Rickenbacker PI
5
2078-384
L-4676
6
8
611
5
2078-384
L-4676
6
8
313
Ally between Lester Granger Dr
5
2078-380
L-4846
6
8
335
and Ramey Ave
Ally between Rickenbacker PI
5
2078-380
L-4849
6
8
315
and Lester Granger Dr
_
Ally to Calumet
5
2078-384
L-4992
6
8
23$
city of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 1 of 16
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 80
CITY PROJECT NO.t 01499
Fitzhugh Ave
1 5
2078.3,90
L-5164
6
8 747
Willis Point Ct to
Ramey Ave and Stalcup Rd Intersection
5
2078-380
L-5487
6
8 1103
Fitzhugh Ave from Lena St to Walker St
5
2078-380
L-5487
6
8 447
Draper St
5
2078-380
L-5489
6
8 655
Sunshine Dr 5 2078-380
L-5490
6
8 433
WORK TO BE PERFORMED
Task 1. Design Management
Task 2. Conceptual Design
Task 3. Preliminary Design
Task 4. Final Design
Task 5. Bid Phase Services
Task 6. Construction Phase Services
Task 7. ROW/Easement Services
Task 8. Survey and Subsurface Utility Engineering Services
TASK 1. DESIGN MANAGEMENT.
ENGINEER shall ensure efficient and effective use of ENGINEER'S and CITY's time and
resources.
ENGINEER shall manage change,
• communicate effectively,
■ coordinate internally and externally as needed, and
■ proactively address issues with the CITY's Project Manager and others as
necessary to make progress on the work.
1.1. Managing the Team
• Lead, manage and direct design team activities
• Ensure quality control is practiced in performance of the work
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting
• Attend apre-design project kickoff/chartering meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements
• Conduct review meetings with the CITY at the end of each design phase
• Prepare invoices and submit monthly in the format requested by the CITY.
Clty of Fort Worth, Texas
Attachment A
PMO Release Oate: 08.27.2010
Page 2 of 16
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 8D
CITY PROJECT NO.: 01499
• Prepare Cl"d submit monthly progress reports in the format provided by the Water
Department.
• Prepare and submit baseline Project Schedule initially, and Project Schedule updates
with a schedule narrative monthly, as required in Attachment D to this Standard
Agreement and according to the City of Fort Worth's Schedule Guidance Document.
• Complete Monthly MWWBE Report Form and Final Summary Payment Report Form at
the end of the project
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs. ENGINEER shall work with regulatory
authorities to obtain approval of the designs, and make changes necessary to meet
their requirements, as part of the design scope.
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub -consultants shall carry readily visible
information identifying the name of the company and the company representative.
ASSUMPTIONS
• 15 MWBE reports will be prepared
• 4 meetings with city staff
• 15 monthly water department progress reports will be prepared
• 15 monthly project schedule updates will be prepared
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices
C. Monthly progress reports
D. Baseline design schedule
E. Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly MWWBE Report Form and Final Summary Payment Report Form
TASK 2. CONCEPTUAL DESIGN 130 PERCENT).
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the conceptual design is for the ENGINEER to
Cilyof Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 3 of 16
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 80
CITY PROJECT NO.: 01499
• Study the project,
■ Identify and develop alternatives that enhance the system,
• Present (through the defined deliverables) these alternatives to the CITY
■ Recommend the alternatives that successfully addresses the design problem, and
■ Obtain the CITY's endorsement of this concept.
ENGINEER will develop the conceptual design of the infrastructure as follows.
2.1. Data Collection
• In addition to data obtained from the CITY, ENGINEER will research proposed
improvements in conjunction with any other planned future improvements that
may influence the project.
• The ENGINEER will also identify and seek to obtain data for existing conditions
that may impact the project including but not limited to; utilities, agencies (TxDOT
and railroads), City Master Plans, and property ownership as available from the
Tax Assessor's office.
• The data collection efforts will also include conducting special coordination
meetings with affected property owners and businesses as necessary to develop
sewer re-routing plans.
• The ENGINEER shall visit the project site and obtain the meter numbers and sizes
on all existing meters to be replaced on the project and shall identify existing
sample stations and fire line locations.
2.2. Geotechnical Investigations
• ENGINEER shall advise the CITY of test borings and other subsurface
investigations that may be needed for the project. If the CITY determines that
such borings or investigations are needed, then the ENGINEER shall work with
the CITY and CITY's geotechnical consultant to draw up specifications for such
testing program. The cost of such testing will be paid for by the CITY.
2.3. The Conceptual Design Package shall include the following:
• Cover Sheet
• Graphic exhibits and written summary of alternative design concepts considered,
strengths and weaknesses of each, and the rationale for selecting the
recommended design concept.
• Proposed phasing of any water and sanitary sewer work that is included in this
project documented in both the project schedule and narrative form.
• Documentation of key design decisions.
• Estimates of probable construction cost.
Clty of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 4 of 10
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 60
CITY PROJECT NO.: 01499
ASSUMPTIONS
• 0 Geotechnical borings are expected for this project.
• 2 copies of the conceptual design package (30% design) will be delivered..
Report shall be letter sized and comb- bound with a clear plastic cover. Drawings
will be 11"X17" size fold outs bound in the report
• DWF files created from design CAD drawings will be uploaded to the designated
project folder in Buzzsaw
• ENGINEER shall prepare the meeting minutes of the Concept Review meeting
and revise the report, if needed.
• ENGINEER shall not proceed with Preliminary Design activities without obtaining
written approval by the CITY of the Conceptual Design Package,
DELIVERABLES
A. Conceptual Design Package
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
Preliminary plans and specifications shall be submitted to CITY per the approved Project
Schedule.
ENGINEER will develop the preliminary design of the infrastructure as follows.
3.1. Development of Preliminary Design Drawings and Specifications shall include the
following:
• Cover Sheet
• A Project Control Sheet, showing all Control Points, used or set while gathering
data. Generally on a scale of not less than 1:400. The following information shall
be indicated for each Control Point: Identified (existing City Monument #8901, PK
Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system,
and a referred bearing base, Z coordinate on City Datum only; descriptive location
(i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the
East end of radius at the Southeast corner of North Side Drive and North Main
Street).
• Overall project easement layout sheets) with property owner information.
• Overall project water and/or sanitary sewer lavout sheets. The water layout sheet
shall identify the proposed water main improvement/ existing water mains in the
vicinity and all water appurtenances along with pressure plane boundaries, water
tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall
identify the proposed sewer main improvement/existing sewer mains and all
sewer appurtenances in the vicinity.
Cily of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 5 of 16
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 80
CITY PROJECT NO.: 01499
• Overall water and/or sanitary sewer abandonment sheet
• Coordinates on all P.C.Is, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc.,
I
n the same coordinate system as the Control Points.
• Bench marks per 1,000 ft of plan/profile sheet — two or more.
• Bearings given on all proposed centerlines, or baselines.
• Station equations relating utilities to paving, when appropriate.
• Plan and profile sheets which show the following: proposed water and/or sanitary
sewer plan/profile and recommended pipe size, fire hydrants, water service lines
and meter boxes, gate valves, isolation valves, manholes, existing meter
numbers and sizes that are to be replaced, existing sample locations, existing fire
line locations, existing utilities and utility easements, and all pertinent information
needed to construct the project. Legal description (Lot Nos., Block Nos., and
Addition Names) along with property ownership shall be provided on the plan
view.
• The ENGINEER shall make provisions for reconnecting all identifiable water and/or
wastewater service lines which connect directly to any main being replaced,
including replacement of existing service lines within City right-of-way or utility
easement. When the existing alignment of a water and sanitary sewer main or
lateral is changed, provisions will be made in the final plans and/or specifications
by the ENGINEER to relocate all service lines which are connected to the existing
main and connect said service lines to the relocated main.
• The following shall be applicable at all locations where it is necessary to relocate or
reroute the existing private sanitary sewer service line due to the abandonment or
realignment of the existing public sanitary sewer lateral or main: The CITY shall
furnish the ENGINEER with a sample format of how the sewer service line
reroute/relocation should be designed and submitted for construction. During
design survey, if a rod can be inserted through the cleanout to the bottom of the
service line, the ENGINEER will obtain the flow line elevation and design the
service line prior to advertising the project for bid. If the service flow line
information cannot be obtained during design survey, the ENGINEER shall delay
the design of the sewer service line until after a Quality Level A Subsurface Utility
Engineering (SUE investigation has been performed). The Level A SUE will be
performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY
prior to bidding if the CITY determines that it is needed for satisfactory completion
of the design; or (3) by the Contractor after the project has been bid, by means of a
bid item to that effect. In all options, the ENGINEER shall propose appropriate de -
hole locations in the project and collect flow line elevation and other applicable
information of the sewer service line. The ENGINEER shall use this information to
provide the design for the sanitary sewer service line to be rerouted or relocated.
• Provide map showing location of new manhole construction at the end of existing
sewer segments, 90 degree bends, or tee connections. Site survey or specific
design plans for manhole construction is not included as part of the scope. The
contract documents shall specify that it is the Contractor's responsibility to
coordinate utility location, etc, manhole construction.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 6 of 16
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 80
CITY PROJECT NO.: 01499
• The ENGINEER will prepare standard and special detail sheets for water line
installation and sewer rehabilitation or replacement that are not already included in
the D-section of the CITY's specifications. These may included connection details
between various parts of the project, tunneling details, boring and jacking details,
waterline relocations, details unique to the construction of the project, trenchless
details, and special service lateral reconnections.
3.2. Geotechnicallnvestigation
• Soil investigations, including field and laboratory tests, borings, related
engineering analysis and recommendations for determining soil conditions will be
made. In addition to the above investigations, borings and appropriate field and
laboratory analysis will be made at reasonable intervals along the project
alignment for the Contractor's use in determining soil conditions for preparing
bids and a Trench Safety Plan,
3.3, Constructability Review
• Prior to the 60 percent review meeting with the CITY, the ENGINEER shall
schedule and attend a project site visit with the CITY Project Manager and
Construction personnel to walk the project. The ENGINEER shall summarize the
CITY's comments from the field visit and submit this information to the CITY in
writing.
3.4. Utility Clearance
• The ENGINEER will consult with the CITY's Transportation and Public Works
Department, Water Department, and other CITY departments, public utilities,
private utilities, private utilities and government agencies to determine the
approximate location of above and underground utilities, and other facilities
(current and future) that have an impact or influence on the project. ENGINEER
will design CITY facilities to avoid or minimize conflicts with existing utilities, and
where known and possible consider potential future utilities in designs.
• The ENGINEER shall upload individual DWF files for each plan sheet of the
approved preliminary plan set to the designated project folder in Buzzsaw for
forwarding to all utility companies which have facilities within the limits of the
project. The DWF files should be created directly from the CAD files as opposed
to PDF files.
3.5. Traffic Control Plan
• Develop a traffic control plan utilizing standard traffic reroute configurations
posted as "Typicals" on the CITY's Buzzsaw website. The typicals need not be
sealed individually, if included in the sealed contract documents.
• Develop supplemental traffic control drawings as needed for review and approval
by the Traffic Division of the Transportation and Public Works Department.
These drawings shall be sealed by a professional engineer registered in the
State of Texas.
Clty of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 7 of 16
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT BO
CITY PROJECT NO.; 01499
3.6. Storm Water Pollution Prevention Plan
• For projects that disturb an area greater than one (1) acre, ENGINEER will
prepare the Storm Water Pollution Prevention Plan (SWPPP) required for the
Project for use by the Contractor during construction. ENGINEER will prepare
drawings and details for proposed SWPPP improvement that the Contractor must
use during construction. Contractor will be responsible for filing the SWPPP with
appropriate regulatory agencies.
ASSUMPTIONS
• 0 public meetings) will be conducted or attended during the preliminary design
phase.
• 0 borings at an average bore depth of feet each will be provided.
• Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an
additional 1 project specific traffic control sheet will be developed for the
construction of facilities within or near the Ramey Avenue and Stalcua
• 2 sets of 22"X34" size plans will be delivered for the Constructability
Review.
• 2 sets of specifications will be delivered for the Preliminary Design (60%
design).
• DWF files created from design CAD drawings will be uploaded to the designated
project folder in Buzzsaw.
• The CITY's front end and technical specifications will be used. The ENGINEER
shall supplement the technical specifications if needed.
• Post Utility Clearance Plans on Buzzsaw.
• ENGINEER shall not proceed with Final Design activities without written approval
by the CITY of the Preliminary Design plans.
DELIVERABLES
A. Preliminary Design drawings and specifications
B. Utility Clearance drawings
C. Traffic Control Plan
D. Storm Water Pollution Prevention Plan
E. Estimates of probable construction cost
F. Data Base listing names and addresses of residents and businesses affected by
the project.
Clty of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 8 of 16
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 80
CITY PROJECT NO.: 01499
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as
follows:
• Draft Final plans (90%) and specifications shall be submitted to CITY per the approved
Project Schedule.
• Following a 90% construction plan review meeting with the CITY, the ENGINEER shall
submit Construction Documents (100%) to the CITY per the approved Project Schedule.
Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in
State of Texas.
• The ENGINEER shall submit a final design estimate of probable construction cost with
both the 90% and 100% design packages. This estimate shall use ONLY standard CITY
bid items.
ASSUMPTIONS
• 2 sets of 11"X17" size drawings and 2 set of 22"X34" size drawings and 2
specifications will be delivered for the 90% Design package.
• A DWF file for the 90% Design will be created from design CAD drawings and will be
uploaded to the project folder in Buzzsaw.
• 1 set of 22"x34" size drawings and 1 specifications will be delivered for the ,
100% Design package.
• A DWF file for the 100% Design will be created from design CAD drawings and will be
uploaded to the project folder in BUZzOGI a
• Estimated number of plan sheets (see table below)
SHEET
NO.
SHEET TITLE
1
Cover Sheet
2
Legend
and General Notes
3
Project
Layout
4
Survey
Control
5
Easement/ROE
6
L-3005,
Sta 14+43 to Sta 18+00
7
L-3006,
Sta 0+00 to Sta 7+00
8
L-3007,
Sta 0+00 to Sta 10+00
9
L-30071
Sta 10+00 to Sta 16+04
10
L-3010,
Sta 14+47 to Sta 19+65
11
L-3013,
Sta 0+00 to Sta 1+64
12
L-3014,
Sta 0+00 to Sta 7+00
13
L-3292
Sta 21 +56 to Sta 24+85
14
L-3926,
Sta 0+00 to Sta 2+60
15
L-3927,
Sta 5+57 to Sta 10+08
Clly of Fort Worth, Texas
Aftachment A
PMO Releas° Date: 08.27.2010
Page 9 of 16
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 80
CITY PROJECT NO.: 01499
SHEET
NO.
SHEET TITLE
16 L-4129, Sta 0+00 to Sta 4+96
17 L4674, Sta 0+00 to Sta 6+37
18 L46751 Sta 0+00 to Sta 5+72
19 L4676, Sta 0+00 to Sta 6+00
20 L4676, Sta 6+00 to Sta 9+89
21 L4846, Sta 6+00 to Sta 9+30
22 L-4849, Sta 5+50 to Sta 8+63
23 L4992, Sta 1 +65 to Sta 4+00
24 L-5164, Sta 0+00 to Sta 7+52
25 L-5487, Sta 4+11 to Sta 5+89
26 L-5487, Sta 5+89 to Sta 6+34
27 L-5487, Sta 27+67 to Sta 32+11
28
-5489, Sta 0+00 to Sta 6+10
29 L-5490, Sta 5+51 to Sta 9+81
30 Pavement Repair, Embedment and Backfill Details
31 Traffic Control at Ramey Avenue and StalcuD Road
DELIVERABLES
A. 90% construction plans and specifications.
B. 100% construction plans and specifications.
C. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's standard bid items and format.
D. Original cover mylar for the signatures of authorized CITY officials.
TASK 5. BID PHASE SERVICES.
ENGINEER will support the bid phase of the project as follows.
5.1. Bid Support
• The ENGINEER shall upload all plans and contract documents onto Buzzsaw for
access to potential bidders.
• Contract documents shall be uploaded in a As file.
• Unit Price Proposal documents are to be created utilizing CFW Bidtools only
and combined in a specified spreadsheet workbook, Bid Proposal Worksheet
Template, and will be populated and configured so that all pages are
complete and the Summary Worksheet(s) in the workbook detail and
automatically summarize the totals from the inserted Unit Price Proposal
document worksheets.
• Plan Sets are to be uploaded to Buzzsaw in two formats, .pdf and .dwf files.
The .pdf will consist of one file of the entire plan set. The .dwf will consist of
individual files, one for each plan sheet, and will be numbered and named in
a manner similar to that of the plan set index.
Clty of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 10 of 16
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 80
CITY PROJECT NO.: 01499
• The ENGINEER shall sell contract documents and maintain a plan holders list on
Buzzsaw from documents sold and from Contractor's uploaded Plan Holder
Registrations in Buzzsaw.
• The ENGINEER will develop and implement procedures for receiving and
answering bidders' questions and requests for additional information. The
procedures shall include a log of all significant bidders questions and requests
and the response thereto. The log shall be housed and maintained in the
project's Buzzsaw folder titled Request for Information. The ENGINEER will
provide technical interpretation of the contract bid documents and will prepare
proposed responses to all bidders questions and requests, in the form of
addenda. The ENGINEER shall upload all approved addenda onto Buzzsaw and
mail addenda to all plan holders.
• Attend the bid opening in support of the CITY.
• Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract. A copy of the Bid
Tabulation is to be uploaded into the project's Bid Responses folder on Buzzsaw,
• Incorporate all addenda into the contract documents and issue conformed sets.
5.2 Mylar Drawings
• The ENGINEER shall submit a set of sealed conformed mylar drawings for
record storage.
• Record Drawings shall also be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file
and one (1) DWF Ole for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall contain all associated sheets
of the particular plan set. Singular PDF and DWF files for each sheet of a
plan set will not be accepted. PDF and DWF files shall conform to naming
conventions as follows:
I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is
of an original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
II. Water and Sewer Ole name example - 11X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shall be the total number
of sheets in this file.
Example: X-12755 org18.pdf
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 11 of 16
ATTACHMENTA
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 80
CITY PROJECT NO.: 01499
Both PDF and DWF files shall be uploaded to the project's Record Drawing folder
in Buzzsaw.
For information on the proper manner to submit files and to obtain a file number for
the project, contact the Department of Transportation and Public Works Vault at
telephone number (817) 39M426. File numbers will not be issued to a project
unless the appropriate project numbers and fund codes have been assigned and
are in the Department of Transportation and Public Works database.
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• 40 sets of construction documents wit! be sold to and made available on
Buzzsaw for plan holders and/or given to plan viewing rooms.
• 2 sets of 11"X17" size and 10 sets of 22"X34" size drawings plans
and 10 specifications (conformed, if applicable) will be delivered to the CITY.
• PDF and DWF files will be uploaded to Buzzsaw.
• 1 copy full size (22" x 34") mylar plans (conformed, if applicable) will be delivered
to the CITY.
DELIVERABLES
A. Addenda
B. Bid tabulations
C. Recommendation of award
D. Construction documents (conformed, if applicable)
E. Conformed mylar plans
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1 Construction Support
• The ENGINEER shall attend the preconstruc#ion conference.
• After the pre -construction conference, the ENGINEER shall provide project
exhibits and attend public meeting to help explain the proposed project to
residents. The CITY shall select a suitable location and mail the invitation letters
to the affected customers.
• The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe and report on progress.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 06,27.2010
Page 12 of 16
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 80
CITY PROJECT NO.:01499
• As requested by the CITY, the ENGINEER shall provide necessary interpretations
and clarifications of contract documents, review change orders, and make
recommendations as to the acceptability of the work.
• The ENGINEER shall attend the "Final" project walk through and assist with
preparation of final punch list.
ASSUMPTIONS
• 2 RFI's are assumed.
• 0 Change Orders are assumed.
A. Public meeting exhibits
B. Response to Contractor's Request for Information
C. Review of Change Orders
D. Review of shop drawings
E. Final Punch List items
F. Record Drawings
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CI I Y's Project Manager,
7.1. Right -of -Way Research
• The ENGINEER shall determine rights -of -way, easements needs for construction
of the project. Required temporary and permanent easements will be idened
based on available information and recommendations will be made for approval
by the CITY.
7.2. Right-of-Way/Easement Preparation and Submittal.
• The ENGINEER shall prepare documents to be used to obtain right-of-way and
permanent and/or temporary easements required to construct the improvements.
• The ENGINEER shall submit the right-of-way and/or easement documents to
CITY PM for real property acquisition
• The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Buzzsaw site.
Clty of Fort Worth, Texas
Attachment A
PMO Release Date: 08,27.2010
Page 13 of 16
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 80
CITY PROJECT NO.: 01499
7.3. Temporary Right of Entry Preparation and Submittal
• Prior to construction, the ENGINEER shall prepare and submit Temporary Right
of Entry documents for landowners to CITY PM for real property acquisition. It is
assumed that letters will only be required for land owners adjacent to temporary
construction easements or who are directly affected by the project and no
easement is required to enter their property.
• The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Buzzsaw site.
ASSUMPTIONS
• 0 Easements or right-of-way documents will be necessary.
• 245 Temporary right -of -entry documents will be necessary.
• Right-ofMay research and mapping includes review of property/right-of-way
records based on current internet based Tarrant Appraisal District (TAD)
information available at the start of the project and available on -ground property
information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain
of title research, parent track research, additional research for easements not
included in the TAD, right-of-way takings, easement vacations and
abandonments, right-of-way vacations, and street closures.
DELIVERABLES
A. Easement exhibits and meets and bounds provided on CITY forms.
B. Temporary Right of Entry Letters
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
ENGINEER will provide survey support as follows.
As Design Survey
• ENGINEER will perform field surveys to collect horizontal and vertical elevations
and other information needed by ENGINEER in design and preparation of plans
for the project. Information gathered during the survey shall include topographic
data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations,
location of buried utilities, structures, trees (measure caliper, identify overall
canopy, and have qualified arborist identify species of trees), and other features
relevant to the final plan sheets. Existing drainage at intersections will be verified
by field surveys. Spot elevations will be shown on intersection layouts with cross
slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans shall include the
following:
— A Project Control Sheet, showing ALL Control Points, used or set while
gathering data. Generally on a scale of not less than 1:400:
City of Fori Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 14 of 16
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 60
CITY PROJECT NO.; 01499
The following information about each Control Point;
a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a
referred bearing base. Z coordinate on CITY Datum only.
c. Descriptive Location (Ex. Set in the centerline of the inlet in the South
curb line of North Side Drive at the East end of radius at the Southeast
corner of North Side Drive and North Main Street).
Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the
same coordinate system, as the Control.
— No less than two horizontal bench marks, per line or location.
— Bearings given on all proposed centerlines, or baselines.
— Station equations relating utilities to paving, when appropriate.
8.2. Temporary Right of Entry Preparation and Submittal
• Prior to entering property, the ENGINEER shall prepare and submit Temporary
Right of Entry for landowners to CITY PM.
• The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Buzzsaw site.
ASSUMPTIONS
• Topographic survey at intersection will include no more than 100 ft. in each
direction.
DELIVERABLES
A. Copies of fields data and notes signed and sealed by a licensed surveyor.
B. Drawing of the project layout with dimensions and coordinate list.
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services -_CITY and
ENGINEER agree that the following services are beyond the Scope of Services
described in the tasks above. However, ENGINEER can provide these services, if
needed, upon the CITY's written request. Any additional amounts paid to the
ENGINEER as a result of any material change to the Scope of the Project shall be
agreed upon in writing by both parties before the services are performed. These
additional services include the following:
• Negotiation of easements or property acquisition including temporary right -of -
entries.
• Services related to development of the CITY's project financing and/or budget.
Cily of Fort Worth, Texas
Atiachment A
PMO Release Oate: 08.27.2010
Page 15 of 16
ATTACHGENTA
DESIGN SERVICES FOR
SANITARY SEWER REHABILITATION CONTRACT 00
CITY PROJECT NO,: 01499
• Services related to disputes over pre -qualification, bid protests, bid rejection
and re -bidding of the contract for construction.
• Construction management and inspection services
• Periodic site visits during construction phase
• Design phase public meetings
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of
God.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services related to submitting for permits (ie.TxDOT, railroad, etc,..)
• Services related to Subsurface Utility Engineering Levels A, B, C or D
• Services related to Survey Construction Staking
• Services related to acquiring real property including but not limited to
easements, right-of-way, and/or temporary right -of -entries.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Construction Shop drawing review, samples and other submittals submitted by
the contractor.
• Performance of miscellaneous and supplemental services related to the project
as requested by the CITY.
Cfty of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 18 of 16
ATTACHMENT B
COMPENSATION
Design Services for
SANITARY SEWER REHABILITATION CONTRACT 80
City Project No. 01499
Lump Sum Project
1. Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $174,972 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies,
and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
11. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit 13-1, Progress Reports as required in item III, of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B. The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document,
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Water Department monthly progress reports and schedules in the format
required by the City.
Ctty of Fora Worth, Texas
Attachment B
PMO OHIcial Release Date: 5.19.2010
Page t of 3
�1
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm
Primary Responsibility
Fee Amount
%
Prime Consultant
Halff Associates, Inc. Design $103,972 59.4%
Proposed M/WBE Sub=Consultants
Garcia Land Data, Inc.
Survey
$71,000
40.6%
Non-M/WBE Consultants
TOTAL
$174,972
100%
Project Number &Name
Total Fee
M/VUBE Fee
M/WBE
SS Rehabilitation Contract 80 1
$174,972
$71,000
I40.6%
City M/WBE Goal = 23%
C(ty of Fort Worth, Texas
Attachment B
PMO Official Release Dale: 5.19.2010
Page 2 of 3
Consultant Committed Goal = 40.6%
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across work types and work phases,
city o► For1 wonr,, rakes
A1lachment B
PMO O►►iclal Rolease Date: 5.19.2C)1p
Page 3 of 3
B-3
�
§
§
3
\
)
�
¥
/
a
a
k
k
U
k
�
m
�
)
k
£ t
Jo c l�� !
£ e_2a,o
OL
0 k§k)
ab 0IL U o>aumwZ
CT
E,
(
IK
§
fJ
{�
uƒ
2\
\a
■�
a§
u
�
2
k�
\�
t
/20
\
aJ
�0
s�
J
§§
kJ
«
§
oc
o
e
�
k
k
aeaa
f)})y(
k�
of
!§
ft
■�
$�
zJ
I�
a
§awG
,Bk§
222§)`Q
$�
4�
!
§
�aGRR
�
kk
/
�
»K)k
i/}§
§
j
Exhibit B.2 - Level of Effort Supplement
TASK/HOUR BREAKDOWN
Design Services for
Sanitary Sewer Rehabilitation Contract LXXX (80)
rite Proiect No. 01499
Teak No.
Task Description
Basis for
Hour
EstimateDirector
Unit
labor hours
Total Labor
Cost
Ex
ense
Total Expense
Coat
Task Sub Total
Proiect
$228
Project
Mana er
'. $146
Project
En ineer
:; $1pg
E1T
S88
CADD
- S80
Administrative
7- $76
Subconsuitant
Travel
Reproduction
P
MWBE
NOm•MWBE
1.0
1.1
Project Management
Managing the Team
0
11
23
0
0 32
$6 468
$0
$0
$0
SO
$0
$8 468
1.1.1
Internal Team Meetings
0
Ea
0
0
0
$0
SO
$O
1.1.2
QA/QC
3
Ea
-
3
$435
50
S435
1.2
Communications and Reporting
1.2.1
Pre -Design Coordination Meeting
1
Ea
4
4
$1,011
SO
$1
iol1
1.2.2
Quarterly Project
Update Meetings
4
Ea
14
$580
s0
$580
1.2.3
1.2A
1.2.5
Pre are Baseline SchedWe
Pre are Monthly Progress Reports
Update Monthly Schedule
1
15
0
Ea
Monthl
Monthlyp
4
15
15
2 $581
$2 738
0 SO
$O
So
SO
$581
$2 738
$0
1.2.6
1.2.7
Prepare Monthly MWBEReports
Invoicing
15
0
Monthly
Monthly
"0
15
$1121
0 SO
$0
-'$0
'-$1,121
$O
2.0
2.1
Conceptual Design 30-Percent
Data Collection
1 Ea
0
0
26
p
60
24
19
0 $9 085
S21962
$o
$0
$0
$16
$16
$O
$9100
$2,962
2.2
Communication and coordinate with other
agencies and City Departments
1 Ea
4
$431
$0
$431
2.3
City Review Meeting
0 Ea
0
$0
$0
$0
2.4
Conceptual Design Package
2AA
Cover Sheet
1 Ea
2
$120
SO
$120
2.4.2
Develop Plan Sheets With Conceptual
Layout
24
Sheet
a 24
16
$3 922
SO
- $3,922
2.4.3
Develop Conceptual Estimate of Probable
Construction Cost
1 Ea
4
8
$1,131
$0
$1 131
2.4.4
Submit Conceptual Design to City for Review
2
Ea
-
1
1
$168
S15
-$is
$183
2.4.5
Conduct Review Meeting w/City Develop
Minutes and action Items
1
Ea
-
o
4
$350
SO
- $350
2.4.6
Receive Permission to Proceed with
Preliminary Design
1
Ea
0
SO
$0
$0
3.0
Preliminary
Design 00 Percent
0 16
117.5
287
108.5
6
$47 05g
$0
$0
$0
$130
$130
$47 188
3.1
Development of Preliminary Design
Drawings and Specifications
'$0
-
$0
3.1.1
Revise Cover Sheet
1
Ea
1
S60
$0
$60
3.1.2
Develop Index
1
Ea
1
1
$168
$0
$168
3.1.3
Develop General Notes
1
Ea
1
0.5
$138
So
$138
3.1.4
Develop Project Control and Monument
Sheet on City Datum
1
Ea
0.5
1
2
$261
$0
$261
3.1.5
DevelopProject Right of Ent Sheet
1
Sheet
0.5
1
2
5261
$O
$261
3.1.6
Develop Overall Sewer Layout Sheets
1
Sheet
0.5
1
2
$261
- $O
$261
3.1.7
Develop Plan and Profile Sheets
24
Sheet
to
80
240
80
$36 744
` ' $0
$36 744
3.1.8
Prepare Standard and Special Detail Sheets
1
Sheet
2
2
2
$511
$0
$511
3.1.9
Develop Preliminary Specifications
2
Ea
10
4
$1 377
$0
$1,377
3.1.10
Develop Pr1immary Estimates of Probable
Construction Cost
1
Ea
2
8
$916
$0
- $916
3.2
Constructibilty Review with City
0
Ea
0
0
$0
$0
- $0
3.3
Meet on -site with
City1
Ea
4
4
S781
$O
$781
3.4
Submit Ullity Plans for Ullity Clearance
0
Ea
0
0
$0
$0
- So
$0
3.5
Consult with Other City Department and
other Agencies on Ullity Locations
3
Ea
8
- $862
SO
$862
3.6
Develop Standard Traffic Control Plans
1
Sheet
1 2
6
2
$861
$0
- - $861
3.7
Develop SWPPP Plan Sheet
24
Sheet
1
4
16
$1,418
$0
$1 418
3.8
Develop SWPPP Plan -
1
Ea
1
16
$10508
$0
$1,508
3.9
Submit Preliminary Plans to City for Review
2
Ea
0
0
2
$150
$130
$130
$280
3.10
Conduct Review Meeting
Minutes and action
w/Clly Develop
Items
1
Ea
4
4
$781
$0
$781
3.11
Receive Permission to Proceed with Final
Design
0
Ea
0
$0
$0
$0
.:
� .
.. ,
..
v.
:,
'. ' . -:
4.0
Final Design
0
8
51
88
42
4
$17
177
$0
$0
SO
$335
$335
$17 612
4.1
Develop90% Final Plans
31
Sheet
8
40
80
40
$14,872
S300
$300
- $15 172
4.2
Develop 90% Final Estimates of Probable
Construction Cost
Ea
2
8
$916
$0
$916
4.3
Develop 90% Final Construction
Specifications
1
Ea
8
4
$1,161
<.
$30
$30
$1191
4.4
Provide Cover M lar for Signature
1
Ea
1
2
$228
$5
-' $5
$233
5.0
Bid Phase
0
0
: 20
2
9
24
$4 665
$0
SO
$0
$180
$180
$4 845
5A
Bid Support
Ea
5.2 in
Upload Plans & Specifications into Buzsaw
PDF Format
Ea
1
4
$348
$0
$348
5.3
Sell Contract Documents and Maintain
Plan Holders List
40
Ea
4
16
$1.627
$o
$0
$1 627
5.4
Receive, log and respond to all bidders
questions and request
Ea
4
S431
$0
- $431
5.5
Develop addendas and upload addendas
in Buzsaw
Ea
4
$431
` So
$431
5.6
Attend Bid Opening
Ea
2
21
S391
SO
$391
5.7
Tabulate and Review Bids Received,
evaluate and make Recommendations
Ea
4
8
- $1,029
$0
$1,029
5.8
M lar Drawings
31 Sheet
4
$240
- $0
- $240
5.9
Submit M IarDrawin s
Ea
1
1
$168
$180
$180
$348
6.0 Construction
Phase Services
0
0
16
16
4
0
$3 365
$0
$0
$0
$0
$0
$39366
6.1 Construction
Support
So
$0
6.1A
Attend Preconstruction Conference
1
Ea
2
2
$391
$0
- $391
6.1.2
Develop Project
Exhibits
1 Sheet
4
4
4
$1,021
' $0
$1,021
6.1.3
Attend Public Meeting
1 Ea
2
2
$391
$0
$391
6.1.4
Project
Site Visits
2 Ea
4
4
$781
SO
$781
6.1.5
Submittal Review
0 Ea
0
So
$o
$0
City of Fort Worth, Texas
Attachment B - Level of Effon Supplement
PMO Oflicial Release Date: 5.19.2010
Exhibit B-2 - Level of Effort Supplement
TASKMOUR BREAKDOWN
Design Services for
Sanitary Sewer Rehabilitation Contract LXXX (80)
Citv Proiect No. 01499
Basis for
Labor hours
Ex ense
Project
Project
Project
EIT
CADD
Administrative
Subconsultant
Task No.
Task Description
Hour
Unit
Total Labor
Total Expense
Task Sub Total
Estimate
Director
Mene er
En ineer
Cost
Travel
Reproduction
Cost
=$228
$145
'+'$108
- $88
"$601
$751
MWBE
Non-MWBE
Request for Information/Change Order
6.1.6
Review
0
Ea
0
$0
$0
$0
6.1.7
Final Walk Through and Punch List
1
Ea
4
4
$781
$0
$781
6.1.8
Record Drawings
None
$0
$0
$o
6.1.9
Construction Survey none
Ea
$0
$0
$0
7.0
ROW/Easement Services
0
0
0
0
120
16
$8,396
$0
$0
s0
$0
$
$8396
7.1
Right -of -WaResearch None
Ea
$0
$0
$0
Right-of-Way/Easement Preparation and
7.2
Submittal None
Ea
$0
$0
$0
7.3
Temporary Right of Ent Submittal
245
Ea
120
16
$8,396
s0
$8,396
8.0
Survey
0
0
'0
0
0
0
$0
$71 000
$0
$0
s0
$71
tOOO
$71
000
Develop and submit Right of Entry letter for
8.1
survey
245
Ea
$0
s0
$0
8.2
Conduct Survey
LF
$0
$0
$0
8.3
Pre are Base Ma
LF
$0
$0
$0
8.4
Tem ora RI ht of Ent Submittal
245
Ea
$0
$0
$0
8.5
Construction Survey None
LF
$0
$0
$0
9.0
Permitting
0
0
0
0
0
0
$0
so
s0
$0
$0
$0
$0
9.1
Tx DOT None
Oka
0
0
0
0
0
$0
$o
$0
g.2
Railroad None
0
Ea
'- 0
0
0
0
01
Sol
0
$0
Totals
0
35
262.5
463
302.5
82
$96,2121
$71,0001 $0
$01
$660
$71,660 5167,872
Project Summar
Total Hours
1,125
Total Labor
$96,212
Total Expense
$71 t660
MWBE Subconsultant
$71 000
Non- MWBESubconsullant
$0
10% $ubconsultanl Markup
$7,100
MWBE Participation
40.6%
Total Project Cost
$174,972
City of Fort Worth, Texas
Attachment B -Level of Efton Supplement
PMO Official Release Date: 5.19.2010
Exhibit B-3
City of Fort Worth
Sanitary Sewer Rehabilitation
Contract LXXX (80)
(3005, 3006, 3007, 3010, 3013, 3014, 3292, 3926, 3927, 4129, 4674, 4675, 4676, 4846, 4849, 4992, 5164, 5487, 5489, 5490)
7/14/2011
Record No
DESCRIPTION
UNIT
L03005
L03006
L03007
L03010
L03013
L03014
L0329279tl
L04129 L04674
L04675
L04676
L04846
L04849
L04992
L05164
L05487
L05487
L05489
L05490
Total
Unit Price
Total Cost
-
1
$109000,00
$10,000000
1
BID-00100
P n > Than i Ac SWPPP - Install
Storm Water Polution Prevention la ha _
Lump Sum
1
1
4
2
2
2
2
1
2
1
3
2
1
1
3
21
2
1
37
$500.00
$18,500.00
2
BID-00198
Collar -Manhole 32 Inch -Frame &Cover Install
Each
2 7
9
496 `
6371
572 rr
989
330 :
313
235
i 752 `
1 045
444
560
430
11,886
$2.00
$23,771600
3
BID-00201
Ins° action -Post Construction Cleaning & TV -- Stud
foot
357'
700
1,604
518
164
700
3
Foot
357
700
19604
518
164
700
329
260
451
496
637
572
989
330
313
235
752
1,045
444
560
430
11,886
$3.00
$35,656.50
4
BID-00202
Ins ection-Preconstruction Cleanin & TV - Study
'
'i
1 `
3'
2
1
2
1
37
$500.00
$181500400
5
BID-00206
Manhole Remove, ',
Each
1
1
4-
2
2'
2';
2'
-2t
,1
1
2'
1
3'
2
1
6
BID-00211
Manhole -Paint & Coati n -Interior Protective Coating - Install
Vertical Foot
5
9
11
11
6
12
6
6
10
8
6
9
8
10
117
$200.00
$23,400.00
Each
1
4
2'
2
2
2
2
1
1
2
1
3
2
1
1'
"3
2
1:
2
1'
37
$2;300.00
$85,100:00
7
BID 00213
Manhote•Std 4 Ft Diam to 6 Ft Depth) -Install
.
1
8
BID-00214
Manhole-Std 4 Ft Diam-Added Depth over 6 Ft Depth) - Install
Vertical Foot
3
2
1
6
1
5
5
23
1 $125,00
$2,875.00
Each
1"
1
4
2
2
2;
2
2
1
1
2
1
3'
2
1
1
$'
2'
T'
2
1
37
$115.00
$4,255.00
9
BID-00217
Manhole Vacuum Test -Services
1
1
4
2
2
2
2
2
1
1
2
1
3
2
1
1
3
2
1
2
1
37
$100.00
$3,700.00
10
BID-00218
Manhole Watertight Insert - Install
Each
64
99
33
1
24
105
869
$90.00
$78,2i0.0070160
11
BID-00225
Pi e•Sa Adiustment for Pipe Rehab
Foot
36
16
70
Foot
518
496
752
444
442
430
31082
$45.00
$138,690,00
12
BID-00351
Pi a Sewer-8 Inch PVC All Depths) -Install
Foot
400
168
260'
144`
400
11371
$25A0
$34,275.00
13
BID-00354
Sewer Service 4 Inch Install
8
19
2
22
22
30
12
14
4
3
239
$300.00
$71,700.00
14
BID-00355
Sewer Service-4 Inch Service Tap - Install
Each
14
28
61
15
BID-00356
Sewer Service-41nch-2 Wa Clean Out Install
Each
14'
28
61-'
8'
19
2
22,
22'
30
12
14;
4'
3
8
75
1
253
$250A0
$63,250.00
1
1
2
1
2
7
$300.00
$21100.00
16
BID-00361 ISewer=Servicem6
Inch Service Tap - Install
Each
2
7
$250.00
$1,750400
17
BID-00362
Sewer-Servlce•6lnch-2 Way Clean Out Install
Each .
1
i
2'
1
Foot
100
20
752
434
100
1,406
$2.00
$2,812.00
18
BID-00372
Trench SafetySystem 5 Foot Depth - Install
496`
752'
444
442'
430'
3,082
$40.00
I-$123;280.00
19
BID•00443
Pavement-2 Inch Min'HMAC on 2/27 Concrete Base 2000•1A - Install STFW28
Foot
518
20
BID-00959
WIN
Ill
Pipe-8 Inch HDPE b Pipe Enlargement Techniques - Install
Foot
357
700
1,604
164
700
329
260
451
637
572
989
---
313
235
1,045
8,686
$145
$1,259,470.00
-
1
$121000400
$12 000.00
21
BID-01189
Si naI-Traffic Control - Desi n'& Provide = Install
Each
Subtotal
$2,0131295
15%Contengency
$301,994
TOTAL
$2,3159289
SAY
$21315,000
... .
standard cost estimate ractices. It �s understood,and a"reed
that this is an estimate
onl ,and
1hat,En
meet shall not be
liable to Owner or third
Ila w
a for an failure
to accurately
estimate the of the.
c o a
project, or part
thereof.
This
statement Was
prepared utilizm
R
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
Sanitary Sewer Rehabilitation Contract 80
City Project No. 01499
No Amendments
City of Fort Worth, Texas
Attachment C
PMO Reieaae Date: 05.19.2010
Pape 1 of i
CFW - Integrated Program Management
01499-Sanitary Sewer Rehabilitation Contract LXXX (80)
Attachment D: Tier 3 Consultant Schedule Update
July 2011
Program/ProfKl Pla(vu j
l4];
117:
�22Ji1-51
'; 21-Febf2
-; $6,03f:
So
10000 Notate to proDew -. _ --.-
... 0
0;_
0'A 2bA21t'
-
to
$0
NCGta to Praecd
1D010 :Pro-Dg%Fa Coa64nM:or Wlcebg
0.
0.
0% 22JJ-11
;22Ju1-it
$1,011
SO
PreOesign Coudnutm Mee[hp.
10020 Prepare Basarne SNasr?.e.
:.
- 3
-3
0%22-JUL 11
:26-,jut,ti
__..5581
$0
Pmpre BasH,ne SdwxAtle : ..
1w:x) Prepaa lAmihly Pragrass Reports
147-.
147.
0%. 22411...
;21-Feb02
W;ts
$0
10040 Prep" MUMiYMWBERepor;
147
147
0•%2"u;.11
:21-FHr12
51,12i
-so
IN50 Q:ertany Prgect updab Maaags -_ -.
147
147:.
0%.22Jdif
-$SEO
-.. y0
Design__
�21-Feb12
..
� Dggn
127
127
27
22
0% 2bJLLi1
N-jan-.
24Jan-t2
$D
$0
'^` -""':""`"""' 77s" ""='---"�.:
21-Feb 12 Prge_I PLxmsg
2,-F4bi2 Pmp amPrgecl Pwrnrg
Prepare 1•+�y Pr greys Reports
: Pr peal IhvNy MW BE Rtppls
OulMviy Protect Update W ertrgs
z4Jantz, Desgn
Design
Baseline Date: 22-Jul-11
Current Date: 14-Juki i
Data Date: 22-Ju1-11
F... '- - 1
'28 06 13: 2d 27 0.'+; 16, 17 " 24 01 03 16. 22 . 05 ,12 18 26 02 .09 16 r 23 ,3D V7 14121 :2a
'
20% Carxepluei Design 42 42 ;22Jd 1/ ffiSep11 $42;5 SO 20Sep-t1.30%Cafcepsaal Desgn
- 120W Bags Conceptual Design..__.-_.—p 0'-_ 0%22i�E-i, ,- -... _._$0 -_sc Begin ConcwWa DezIT
005 :
12-.. Data CoE tip --... 5 5'. Oi.'22Jti-11 �28-JuFil _52862 $0 DataCaect
12010 ,CvmsaOta5cn and Caced+wNr1 0 0': 0% 22J0-11 22Jui,i $431 S born and Coordination' :
12030 Cover shast - I, f'. OK: 28Ja-11 j29JuF11 $1W $0 Ca iulee!
12040 Derekp Man Sheets ustlr CaraupSW lapin 20 20 ri%29JLL-11 .26Augi1 $3,922:... $0 :
Da{etop Man 9taaap e5ri CajoapaW Laiout
12050 Develop CortapLal Estmate a Notable CauWcton Cost 5: 5: 0%26Aug ii 101-Sep 11-.$1,131:- -..$0 DawWPColce W EsMreY a Probatie Cassbixam Cost :
12060 StMld Conceptual Daslgn to City for Resew - i t 0%; 02-Sep-11 02-S 11 $183 -s0 SubmS Conceptual Design b City for Ill
12M Cry Review 10 10 0`X. 065ep/1 19SWI1 - $0:� $0 ^:,'-. •.: Qly ReHaH
INN CaMuct Rev(sw West" W Coy Oataop Whiles W Action Dena 1 1 _. 0%:. 20"Sepli 2D-&e 11 _$3W $0 CondKt Review Mae I - - -. _ __ .. to
Oily Da siplJn9 sarq ACEonitems
120W Redeye Pernyssbn b Proceed win Naranawy Design 0 0 - 0% -. _ -'r 20Sep11 $D. _... $O Raclw¢ Permtrslon io Proceed wth Prdeeena;y Design :
12090 1 QAOC - 42 42: 0% 22Jt411 j 20STI1 $145 $0 : OAQC,
60% Preliminary DesPBn_... -. -. � _W so 2USKyll `Di-Dsc-1f $471333 i0 01-Dec-1 1. 6^ Pr&wwy Design
- 130M as" Pte?nvary Dasign _.. -.. -. -.. _- 0 0.. _ 0% .-. -SCPIt _-. $0 -50 Begn Pre irni a Dmign
13005. _. -Rise Cover Sha4 -- / 1nv 21-Sep'11 '21SaF11 _E60•.. $0 : Retire Cover SMet..
13010 -Develop 1M 1 1' 0%21-Sep-11 21-&pl1 lit68 $0 mol :
Dawltp lydel
lW20 ! Devek4 Qenaal Noes t. 1.' 0%21Seyii 2/-Sep11 $130 s0 o4 Desvltp General Nobs
13M Dwekp Protect CaffidaM Mu,tanent ShM orrCM Whim _ i 1I 0%21Sep-11 21Sep11 $261.. $0 owl Develop Prq«t Contra and Momirerd Sleet onCity Dxarn: :
13040 Dwakp Prgea" d EMy Sheol $p -
. -. 1 is 0-i.21Se1a1 21-Sapit s26i- DeseiOp Pmjad Right 6t�1
/3050 : DaRkp Q.araB Sealer Layout Sloe, 1 t 0% 21-Svo i, : 21-SePf f $261 s0 P4 DeviAm Vera? Sever layout SlsN ...
13060 Develop Man arM Profule Sleep : 14 141. 0%05-0cl-71 N-Oct-11 $36744 SO
"""'r ":• Oe'vNap Plan artl Praia £lam
130M Prepare Startled ed Special Delay Sheep 2 2 0%.. 260ctil 2 Oct-11 S611 to Pepae Sprdard asl S'ecild Dell Sheep :
130W Develop Preirrulary Specautions 3 3, - DY. 27-0c111 31-Oct-11 $11377: s0 : Devvkp PrHrn9wy5pasificasaa :
13090 Demkp Pry ry Easmazes of Nobabb Carabucton Cost 3 31 0%l0l-NW-ll 03-Nuv Il $916' $0 : Date:ap PrNm. �y EEt'mabsd NOWlde Carstrucem Cmt
13100 ' meetonshevitn Csy I 1., 0%(WNwll ObNavll - $781, SO Meet On -rile w9t Gly. ..
131X ConstR win Outs; City DepareneMs and Oliver Agencies at lhay l¢atrau 3 3'. 0%,07-Not11 09-1410t/1 $90 .Sal
ConsWl wd.1t1W Coy DepeMalp end Other Apanoes m Dt&y LttaCvns
13130 Develop$tardarC Trallc Canby Plaits 2 2 0% 14Nw-f t i t-No+l l jB61, SO '.
I 13440 De.Ncp SWPPP Plan Sheet-- - - - 2 2' 0% to No111 ll-Narii - $1,418f - $0 _ : Daallop 6Wdaad TnlfS Sheet
Plans
131W Develop SWPPP Man -- - 2 2 -- O%10-14 -11 11-NOvIl $1,508. s0 _ Dos SWPPPPa1 Shah
131W Slbns Prataral Plartb for Revim 1 1 0% 14Nw-1/ 14-Nov-11 1 $280 $p Dasetcp SWPPP Pis;
bCdy to Rot
13165 'Coy Revisit 10; 10: O%:1SNw-il '301b:-11 §0: so Satins PrAmrwy Pbrs
13170 Coducl Review Meabng W" Deelopp W%ortes and Actin herris I It 0%'01-Doi;Al Of -Dec -It $781 so - -- CCReview
< - _ Conduct Ration W1 aeorgKnaussd WCey Develop aAction ibrta
131on R�e!se Penrissbnb Proceed w4h Final Design 0 0'. 0%:'91-Doc-it $0 $0 Receise Pamrssbnb Proceed wAh Final Dglp
13190 OAOC 50 so 0% 21Sepit r01-Dec-11 $145 -. s0 _. _ OAQC :
90% Final Design - --. -.-. - _...- 35 35•_.. 02-Dec-11 iiiWan-12 $17,657: s0 : .� 244ari-1 WA Fiad Design '
14000 Beget FaWDesgn ... -_. -... 0 0..-- Owm, 02-DK-1I - -.. -.._ _.-.so--.__so Begin Final Design
1005 -. Dwelcp 80%Fral PWts - - 19 t9 0%, 02Dao1/ 29-Dezii $15,172. $0 ."`. Develop 90%Fhat Piars :
14010 Dwekp 90% Feat Esbmafes a Probate Coretrvcaon Coals 5 6..-. 0%22-Dec-if 29-De 11 $916, -. $0 -. 90'.S Fatal Easmafisd Probate CasetuSm Costs
140W DeveW 90% Foal Gen;trucSon Specrbo ¢ 5. 5' - O%306Dac-ll r06Jarl 51,191 - $0
14025 Cry Review 10: 10. 0%':00Jan12 i 23-Jan-12 j $D.; $0 - Date'W 90%FaalCoatmclion 5peahwEaa
14030 PIMda Corr War for SlguNe 1 1 OX 24Janf2 NJant2 3233. s0 Provide Cover Mitu for Sgnatiae
14040 QAQC ..._ -. .... 34 34 _.. 0% 02-Dec-11 1233Jolt 12 - $145 - ... so OAOC _
. iQW1LSnS1 `; ,:�„- .,-... <,.w - ,> .�.�2�?iit twboD-1 =' e33g ;mac :�� z2Dec-n.Rownane
I . <. _r
NegotiatbnWEasements'LegiI Fees _ _ c— 1 . is2 v
.' t5 i6 .020ac-it 220ct-if 58396 §0 :VMMMNMMMMT 2IDec-1 f, Nego5a5as asemofprLe04 Fees
15000 Tarpaary Rghlof EnbYSubntltW -. _15 IS --. OX 02DK-1I 122Deo11 ' $8196 $D .•
S. ''s2 32i$-__A4ODi-si'�'<^- ,324iDo �"bo w ,,, seiner T wg E af
n .., ., rs,_.. an,Y .
Y _ dd Sin
Preliminary Surtsey w - 52 62: i22JtD-11 !o4Octll $78,100 s0 04 Ocbtl, NefvN;v;y 6rmeY :
16005 CaMuct Preirrrinnry Feb Smn(MWBE StbcareWta,O .- 15 15 0% 22Jte-il 11-Ng-11 $15,000 $0 CaMnciPre`:mhary FieSd6 YIM1'7BE t :
-- -. - )
16010 Conduct Design Fkii Survey (MWBE SabcrosataM) 10 /0, 0% 21Seµ11 OI.Oci-11 s63,100; SO -" " Cadeel Oesgn Field Sursey {Wi1YBE5 0
-_ Pubiic Igvolve!#i ,>: ,z .� �` ._:-� - _�. i f �=- irew*j� n h 2.. i..-.,.� ., �$° _ - - - - _ _ ..: - ♦ Dsu ;-12: P t+h dal
Public Meetings 1 1 immsr-12 100-AWA2 $391 - s0 ♦ 04WWA 24 Pubk Meetings
17000 AN" Nests: Meeting 1 0% 09-1 W-12 09 Me 12 $391 $0
Aft" Pubic Meeting
(iWltles1,sIWO ,. f2tJ 43tfa6 s .. #0 �02Dw-,1.u�sas
A.Uilily Cootd(nalioh`ttieerance ' 0. 0' } �f02-Dec-it 02-Dac-17� E0'. _ �$0 02Dec-i 1, UKy GoordytaDon'Cbarzrce ,
to" Sta)miu@ Piansta Clearance .- --.. 0 0 _-. 0%02-0ac-it i02-DocI -
>Y uMdY 30. SD - SWm't 1p3ry Pbrs to Ut4dy Ckaarce
Consiructon x = > ., $ _ "'iP12"ie�g, $u
Construction Advergsomom W 2o: 1254at-12 121-Fab42 $4A45' $0 �� zt-Fstrf .Coraauctbn AAa-Gsamnl
81 AAversaareN -.- 20 20 0%.25Jan I2 ;21•Feb12 $0.
Adverse
ent
P2MXiD%jgnCar4Auo
_ _._ _. .' : �7 09-Feb12 &d Pz tlROad PWs $Spec4cazasinb Blusmin PDF Forrtal i 1. D§. 25Jan-12 i25Jan-12 5348 ED- -. tpbslPWa sSpecifwLaulnn 8ussmbPOF Fomv :Beget Adertaerreni 0-. 0; 0%.26Jan-12'so- SO i Soli Conbacl Oeamsn6 atd Ma49an PWt 1bba+s Let 1/ 11 0% 26Jani2 09 Febt2 $1,6ZI:SD : „"", '. Conbxt p and MznWn PurFladers Lbl
Revrorw Log and Respond ball adders 0ueztos and request t1Il' 0%26Jani2 09-Fab-12 $431 s0 --': ¢neLop arq R prod b Y tiddac WygSon; eM reaaesliDaekp sddaatlas ewd uphbaddsndu bBuzsaw 11 t0%26Jani2 iO4Febi2 i131 SD � '.--'"`. afdoadu Wlwd addenda; b Buzsm
-. .... r7 21-Feb1 CuibazlAwerCAuad Bd Opa;i+g 1' ,: 0%16FW-12 '16Feb-12 $39ii SQ ADaM SidTabWs3s and Review lids Racased, E a`uate and Mass Recannandabots I 1 0% 17-Fi b12 17-FW 12 51,029. $0 : _ Tabuzla,MyW Draam9z _- -.._ - 1, 1 0%20Feb-12 120Feb12 $240: ... $0 : Wtyty :ngs
Stbnr4 LW Draanngs I 1 0% 21-Fab"12 21-Fcb12 $346' $0 : SWmt Dry ngs
!D%jgn Car4Auo 0:0 0% 21.Feb/2'SD' SO .pas.,le
Pro -Construction Activities _- _... _. 2; 2 107-WW-12 pa-Wte f2 $1Af2:. Sal r OS-Ms.12 Pre Corctructm Actii4g
21000 Abend Precostruebon Covaerwe I. 1' 0% 07.Mar-12 07.14br-12 $391' so : At" Precastructm Came n e
21010 DeveRp Protect Eds-bp - - - - 1 1 6% 08-M-12 MMU-12 $17021 s0 : Develop Project Eiltbip
ConsWetion contract - _.. j 128 128 _._ 064Ae-12 06SeP12 -' $1,662 s0 -
22000 'Prgad like Y its -. -0 0 _-. 0%08Mar-12 06WIar42 S781 -_$0 �--. - PtgadSile Vaits
22010 'FYW Waat Ttragh and Push List i i' 0%: 06Sep12 06Se 12 $781 s0 -
rxlary Sawcv�ieTi155'�la .Sn LmTra=. f i
obsep-,2 caratruc5m
ObSep-12 Construttim Cmtrac,
� Primary Baseline Remaining Work ♦ ♦Milestone Baseline Schedule 01499 -Sanitary Sewer Rehabilitation Contract Page, ot,
Actual Work Critical Remaining Work �i Summary LXXX �80�
ATTACHMENT E
L03292
of 21 Council District 5
ATTACHMENT E
L03927
2 of 21 Council District 5
r=� r_T�: �►�il���
3 of 21 Council District 5
ATTACHMENT E
L03005
vau
N
F
fill
Ar
r
Rol
Not,
3.«',
r
S'k
Ta
✓ram -,'
'}�
ta::�
v
Its
Eisanhowgr
All
,o
x
i
q
m
F r
r
M.
¢
s
u
3
,m
s'
z.
t°f
x
�` 711
Alexander
z
E
w
rw�
4 of 21 Council District 5
ATTACHMENT E
5 of 21 Council District 5
ATTACHMENT E
L03007
6 of 21 Council District 5
ATTACHMENT E
L04992
7 of 21 Council District 5
ATTACHMENT E
8 of 21 Council District 5
ATTACHMENT E
L04676
9 of 21 Council District 5
ATTACHMENT E
L04849
10 of 21 Council District 5
. ATTACHMENT E
L04675
11 of 21 Council District 5
ATTACHMENT E
12 of 21 Council District 5
ATTACHMENT E
L04129
13 of 21 Council District 5
ATTACHMENT E
L05487
14 of 21 Council District 5
ATTACHMENT E
L05164
r r 11011001.0
r
u
„� �a t
wT-
-gig
t
F, itzhugh �.05164
-
Ar►do on
�.r
s
U
µ
x
x
15 of 21 Council District 5
ATTACHMENT E
L05489
16 of 21 Council District 5
ATTACHMENT E
L05490
17 of 21 Council District 5
}
ATTACHMENT E
L05487
18 of 21 Council District 5
ATTACHMENT E
L03013
19 of 21 Council District 5
ATTACHMENT E
L030'10
20 of 21 Council District 5
ATTACHMENT E
21 of 21 Council District 5
M&C - Council Agenda
Page 1 of 2
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on it12/2011 - Ordinance No. 19754-07-2011
DATE: Tuesday, July 12, 2011
LOG NAME: 60SS80-HALFF
REFERENCE NO.: **C-25001
SUBJECT:
Authorize an Engineering Agreement in the Amount of $174,972.00 with Halff Associates, Inc., for Sanitary
Sewer Rehabilitation Contract 80 in an Area of Southeast Fort Worth that is Generally Bounded by East
Rosedale Street, Anderson Street, Ramey Avenue, Carverly Drive and Dillard Street and Adopt
Appropriation Ordinance (COUNCIL DISTRICT 5)
RECOMMENDATION.
It is recommended that the City Council:
1. Authorize the transfer of $189,972.00 from the Water and Sewer Fund to the Sewer Capital Projects
Fund;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Sewer Capital Projects Fund by $189,972.00; and
3. Authorize the City Manager to execute a contract in the amount of $174,972.00 with Halff Associates,
Inc., for Sanitary Sewer Rehabilitation Contract 80 in an area bound by Rosedale Street, Anderson Street,
Ramey Avenue, Carverly Drive and Dillard Street.
DISCUSSION:
This project consists of the preparation of plans and specifications for the rehabilitation of deteriorated
sewer mains in an area that is generally bound on the north by Rosedale Street, on the south by Anderson
Street, Ramey Avenue, Carverly Drive and on the west by Dillard Street.
Halff Associates, Inc., proposes to perform the design work for a lump sum fee of $174,972.00. City staff
considers this fee to be fair and reasonable for the scope of services proposed.
M/WBE — Halff Associates, Inc., is in compliance with City's M/WBE ordinance by committing to 41
percent M/WBE participation. The City's goal on this project is 23 percent.
In addition to the contract amount, $15,000.00 is required for project management, real property
acquisition and utility coordination.
The project is located in COUNCIL DISTRICT 5.
FISCAL INFORMATION /CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above recommendations,
and adoption of the attached appropriation ordinance, funds will be available in the current capital budget,
as appropriated, of the Sewer Capital Projects Fund.
FUND CENTERS:
http://apps.cfwnet.org/ecouncil/Printmc.asp?id=15268&print=true&DocType=Print 9/7/2011
M&C -Council Agenda Page 2 of 2
TO Fund/Account/Centers FROM Fund/AccountlCenters
1&2) P258 476045 7051701499ZZ $189,972.00 1) PE45 538040 0709020 $189.972.00
2) P258 511010 705170149930 $10.000.00 � P258 531200 705170149931 $31,192.00
2) P258 531200 705170149931 $31,192.00 3) P258 531200 705170149932 $62,383.00
2) P258 531200 705170149932 $62,383.00 3) P258 531200 705170149933 $10.397.00
2) P258 531200 705170149933 $10,397.00 3) P258 531200 705170149951 $71,000.00
2) P258 541100 705170149941 2 000.00
2) P258 531350 705170149942 2 000.00
2) P258 531200 705170149951 $71.000.00
2) P258 531350 705170149973 1 000.00
CERTIFICATIONS:
Submitted for City Manager's Office b� Fernando Costa (6122)
Originating Department Head• S. Frank Crumb (8207)
Additional Information Contact: John Kasavich (8480)
ATTACHMENTS
1. 60SS80 HALFF MAP_pdf (Public)
2. 60SS80-HALFF AO Rev'd.doc (Public)
3. 60SS80-HALFF COMPLIANCE pdf (CFW Internal)
4. 60SS80-HALFF REVISED FAR pdf (CFW Internal)
5. Accounting info.doc (CFW Internal)
6. PE45-538040-0709020.doc (CFW Internal)
http://apps.cfwnet.org/ecouncil/printmc.asp?id=15268&print=true&DocType=Print 9/7/2011