HomeMy WebLinkAboutContract 53362-FP1 FORTWORTH CSC No. 53362-FP1
S� Oo �_ 1 bl 003
U
WATER DEPARTMENT C S 5-3 3 6 a
ENGINEERING AND FISCAL SERVICES
NOTICE OF PROJECT COMPLETION
DOE. Ns: N/A
Regarding contract 53362 for Sanitary Sewer Replacement M-402B Part I as required by the Nater Department as
approved by City Council on 12/10/19 through M&C 19-0380 the Director of the Water Department,upon the
recommendation of the Sr. Capital Projects Officer, Capital Projects Delivery,Water Department,has accepted the
project as complete.
Original Contract Prices: $2,600,364.20
Amount of Approved Change Orders: $2,000.00 Ns 1
Revised Contract Amount: $2,602,364.20
Total Cost Work Completed: $2,587,603.32
Less Deductions:
Liquidated Damages: 0 Days @$630.00/Day
Other Deductions(see comments):
Total Deduction Amount: $0.00
Total Cost Work Completed: $2,587,603.32
Less Previous Payments: $2,532,099.81
Final Payment Due $55,503.51
U � V� � � o � 2 1 � 2 �
Recommended for Acceptance Date
Assistant Director, Water Department
amniE6� ref' Jan 7 2021
Chris*--tier Harder(Jan 6,202110:23CST)
Accepted Date
Director, Water Department
Dana Bu Gghdoff T) Jan 7, 2021
City Manager Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
. ................... .. ......... .
Project Name: Sanitary Sewer Replacement IVI-402B Part I DOE. Ns:N/A
Comments:
FORTWORTH
December 09,2020
S.J.Louis Construction of Texas,LTD
520 S. 6 Ave
Mansfield,TY 76063
Re:Acceptance Letter
Project Name: Sanitary Sewer Replacement IVI-402b Part I
Project Type: Sewer
Project Ns: 101003
DOE. Ns: N/A
Contract Ns: 53362 Dated: 12/10/2019
Gentleman:
On October 06,2020 a final inspection was made on the subject project. There were punch list items identified
at the time. The punch list items were completed on October 09,2020. The final inspection and the corrected
punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by
the City. The warranty period will start on October 09,2020,which is the date of punch list completion and will
extend for(2)years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance,please feel free to contact me at (817) 392-6054
Yours Truly,
Tony Sholola,P.E.,Assistant Director,Water Department
TS /
cc: Chris Harder,P.E.,Director,Water Department
Laura Wilson,P.E.,Deputy Director,Water Department
Captain Michael Skains,Fire Department
Bill Lundval,Sanitary Sewer Systems Superintendent,Water Department
Cesar Zavala, Water Systems Superintendent,Water Department
Walter Norwood,P.E.,Project Manager
David R Johnson,Inspection Supervisor,Capital Projects Delivery,Water Department
Jesse Reed,Inspector,Capital Projects Delivery,Water Department
Amy R.Robinson,P.E., CDM Smith,Consultant
S.J.Louis Construction of Texas,LTD,Contractor
File
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH,TEXAS 76102
817-392-8240 * FAx 817-392-8195
C. Printed on recycled paper
PO 7203
Receipt 35075 12/10/2020
() 0 '2- /0) 003
C5 �5-33� �
City Project Numbers 101003 DOE Number 0104
Contract Name Sanitary Sewer Replacement M-402B Part I Estimate Number 12
Contract Limits Adjacent to Concil District 4 in North Richland Hills Payment Number 12
Project Type Sewer For Period Ending 11/20/2020
Project Funding
Project Manager UNKNOWN City Secretary Contract Number 53362
Inspectors Johnson / Reed Contract Date 12/10/2019
Contractor S.J.LOUIS CONSTRUCTION OF TEXAS,LTD Contract Time 120 CD
Days Charged to Date 259 CD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
——---——————————————————————————————————
1 56002-101003 $2,600,364.20 $3,828.05 $ +51,675.46 $55,503.51
56002--2060000--101003-RETAIN--
Total Cost of Work Completed $2,587,603.32
Less 0 %Retained $0.00
Net Earned $2,587,603.32
Earned This Period $55,503.51
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $2,532,099.81
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $55,503.51
Tuesday,December 1,2020 Page 5 of 5
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name Sanitary Sewer Replacement M-402B Part I
Contract Limits Adjacent to Concil District 4 in North Richland Hills
Project Type Sewer
City Project Numbers 101003
DOE Number 0104
Estimate Number 12 Payment Number 12 For Period Ending 11/20/2020
CD
City Secretary Contract Number 53362 Contract Time 31ED
Contract Date 12/10/2019 Days Charged to Date 259
Project Manager UNKNOWN Contract is 99.000 Complete
Contractor S.J.LOUIS CONSTRUCTION OF TEXAS,LTD
Inspectors Johnson / Reed
Thursday,December 10,2020 Page 1 of 5
City Project Numbers 101003 DOE Number 0104
Contract Name Sanitary Sewer Replacement M402B Part I Estimate Number 12
Contract Limits Adjacent to Concil District 4 in North Richland Hills Payment Number 12
Project Type Sewer For Period Ending 11/20/2020
Project Funding
Sewer
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
30 9999.0008 Temporary Irrigation,incl 1 LS $26,000.00 $26,000.00 1 $26,000.00
31 0171.0001 Construction Staking 1 LS $6,000.00 $6,000.00 1 $6,000.00
32 9999.0009 Tifruf Bermuda Sod Placeme 12000 SY $5.50 $66,000.00 13200 $72,600.00
33 0171.0009 Post Construction Grade Ve 1 LS $2,000.00 $2,000.00 1 $2,000.00
34 0171.0010 Redline(as-built utility 1 LS $2,000.00 $2,000.00 1 $2,000.00
35 9999.0010 6'Chain Link Fence and 5' 115 LF $66.00 $7,590.00 115 $7,590.00
36 3305.0103 Exploratory Excavation of 4 LF $700.00 $2,800.00 4 $2,800.00
37 9999.0011 Relocation of Oncor Power 1 EA $8,000.00 $8,000.00 1 $8,000.00
38 9999.0008 S.S.Construction Allowance(CO#1) 0.971428 LS $70,000.00 $67,999.96
IA* 3331.4514 48"Sewer Pipe(PVC,ASTM 1040 LF
1B* 3331.4514 48"Sewer Pipe(FRP,D326 1040 LF $1,019.00 .,059,760.00 1040 .1,059,760.00
2 3305.3015 48"Sewer Carrier Pipe(s 240 LF $1,013.00 $243,120.00 240 $243,120.00
3 3305.1206 68"Casing funnel Liner P 240 LF $2,161.00 $518,640.00 240 $518,640.00
4 3339.1205 6'Type A Manhole 3 EA $16,200.00 $48,600.00 3 $48,600.00
5 3339.1211 6'Tee Base Manhole 1 EA $18,000.00 $18,000.00 1 $18,000.00
6 9999.0001 6'Vented Tee Base MH w/ I EA $25,600.00 $25,600.00 1 $25,600.00
7 9999.0002 Wager-Odor Control Valve- 1 EA $9,600.00 $9,600.00 1 $9,600.00
8 3339.1203 6'Extra Depth Manhole 54.421 VF $276.00 $15,020.20 54.42 $15,019.92
9 3339.0001 Epoxy Manhole Liner 84 VF $381.00 $32,004.00 84 $32,004.00
10 3305.0112 Concrete Collar 4 EA $700.00 $2,800.00 4 $2,800.00
11 0241.2116 48"Sewer Abandonment Plu 2 EA $1,200.00 $2,400.00 2 $2,400.00
12 3301.0101 Manhole Vacuum Testing 5 EA $200.00 $1,000.00 5 $1,000.00
13 3305.0203 Imported Embedment/Backfi 190 CY $150.00 $28,500.00 190 $28,500.00
14 0241.2001 Sanitary Line Grouting 491 CY $100.00 $49,100.00 491 $49,100.00
15 9999.0004 Concrete Pad for Wager Odo 2 EA $1,000.00 $2,000.00 2 $2,000.00
16 3213.0301 4"Cone Sidewalk 500 SF $8.00 $4,000.00 5562 $44,496.00
17 3232.0100 Cone Ret Wall with Sidewa 90 SF $34.00 $3,060.00 90 $3,060.00
18 3110.0104 18"-24" Tree Removal(wi 2 EA $1,500.00 $3,000.00 4 $6,000.00
19 3110.0105 24"and Larger Tree Remov 6 EA $2,000.00 $12,000.00 7 $14,000.00
20 9999.0005 Repair/Replace Exist Irri 1 LS $48,000.00 $48,000.00 1 $48,000.00
21 9999.0006 Orange Construction Fencin 1 LS $3,000.00 $3,000.00 1 $3,000.00
Tuesday,December 1,2020 Page 2 of 5
City Project Numbers 101003 DOE Number 0104
Contract Name Sanitary Sewer Replacement M-402B Part I Estimate Number 12
Contract Limits Adjacent to Concil District 4 in North Richland Hills Payment Number 12
Project Type Sewer For Period Ending 11/20/2020
Project Funding
22 9999.0007 Under Canopy Tree Protecti 700 LF $95.00 $66,500.00 700 $66,500.00
23 3301.0001 Pre-CCTV Inspection 1055 LF $3.00 $3,165.00 1021 $3,063.00
24 3301.0002 Post-CCTV Inspection 2650 LF $3.00 $7,950.00 2455.8 $7,367.40
25 3125.0101 SWPPP >_1 acre I LS $8,000.00 $8,000.00 1 $8,000.00
26 3291.0100 Topsoil 850 CY $38.00 $32,300.00 850 $32,300.00
27 3305.0109 Trench Safety 1427 LF $2.00 $2,854.00 1427 $2,854.00
28 3303.0001 Bypass Pumping(North) 1 LS $1.00 $1.00 1 $1.00
29 3303.0001 Bypass Pumping(South) I LS $160,000.00 $160,000.00 1 $160,000.00
39 Preconstruction grade Verification(CO#1) 1 LS $2,000.00 $2,000.00 1 $2,000.00
46 6'Chain Limk Fence(CO#2) 40 LF $29.00 $1,160.00 40 $1,160.00
41 Seeding w/Curlex Erosion Protection(CO#2) 1334 SY $2.00 $2,668.00 1334 $2,668.00
--------------------------------------
Sub-Total of Previous Unit $2,604,192.16 $2,587,603.32
--------------------------------------
Tuesday,December 1,2020 Page 3 of 5
City Project Numbers 101003 DOE Number 0104
Contract Name Sanitary Sewer Replacement M-402B Part I Estimate Number 12
Contract Limits Adjacent to Concil District 4 in North Richland Hills Payment Number 12
Project Type Sewer For Period Ending 1 1/2 012 02 0
Project Funding
Contract Information Summary
Original ContractAmount $2,600,364.20
Change Orders
Change Order Number 1 $2,000.00
Total Contract Price $2,604,19116
47 IZ to Zo Total Cost of Work Completed Date C I $2,587,603.32
Contractor Less 0 %Retained $0.00
Net Earned $2,587,603.32
Date 1.7—/—
I�ection Qe i or Earned This Period $55,503.51
A �II� �G h Retains a This Period $0.00
�( �G �� p( +u� Date �2110/� g
Less Liquidated Damages
Project Manager
f y� Days rJ /Day $0.00
N / N" Date LessPavement Deficiency $0.00
Asst.Director/TPW Less Penalty $0.00
�' �� Less Previous Payment $2,532,099.81
Christopher rder(Jan6,202110:23CST) Date
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $55,503.51
Tuesday,December 1,2020 Page 4 of 5
POT O T H rev 03/05/07
WATER ENGINEERING& FISCAL SERVICES
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:12
NAME OF PROJECT: Sanitary Sewer Replacement M-4702B Partl
PROJECT NO.: 101003 CONTRACTOR: SJ Louis
CITY PROJECT
PERIOD FROM 09/01/20 TO: 11/20/20 FINAL INSPECTION DATE: 10/6/2020
WORK ORDER EFFECTIVE:12/4/2019 CONTRACT TIME: 120 O WD eQ CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS, CHARGED DAYS
THIS
PERIOD
PREVIOUS
PERIOD 178 178
TOTALS
TO DATE
*REMARKS:
CONTRACTOR DATE INSPECTOR DATE
Capital Projects Deliveq,Water Department
The Cin,of Fort Worth•1000 Throchnnorton Street•Fort Wordi,TX 76012-6311
(817)392-4477•Fax:(817)392-8460
CSC No. 53362-CO2
1FC_R-r W®m"'M City of Fort Worth
r--.— Change Order Request
Project Name:I Sanitary Sewer Replacement M-4026, Part 1 City Sec No.: 53362
Project No.(s):[ 66002 0700430 101003 DOE No. F N/A City Proj.No.: 101003
Project Description: Replace 48"Sanitary Sewer M-402B in Iron Horse Golf Course
Contractor: S.J. Louis Construction of Texas,Ltd. Change Order 11 0 Date: 10/28/2020
City Project Mgr.I Walter Norwood City Inspector: Jesse Reed
Phone Number: (817)392-5026 Phone Number: (817)392-8362
Dept. Water I Sewer I c o,_a0s Contract Time
j� (Calender days)
Original Contract Amount _ _ $2,600,364.20 $2,600,364.20 120
Extras to Date 05
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $2,600,364.20 $2,600,364.20 L12posed Change Order $0.00 $0,00 RevisedContract Amount $2,600,364.20 $2,600,364.20 315
Original Funds Available for Change Orders $78,011.00 $78,011.00 !I
Remaining Funds Available for this CO $78,011.00 $78,011.00 IJ
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $3,250,455.25
JUSTIFICATION (REASONS)FOR CHANGE ORDER
This Change Order Number 2 provides for Fence and Grass Replacement in Work Areas on the Golf Course.Staff recommends the
addition of 190 calendar days for the Change Order for the time it look to reach an agreement with the golf course for the areas where
grass would be installed and for the grass to grow.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidenlal to,the above Change Order.
Contraclor's Com an Name Contractor Name A Contractorgignature Date
S.J.Louis Construction of Texas,Ltd. Adam Lundsford
In eclor Date projpctManager _ Date
r-14— ` —3 2d 2 z
Director Water Del Date Construction Su ervlsor Water Dept) / Date
Nov3,2020
Assistant City Attorney Date Assistant City Manager _ Date
Nov 4,2020 zia
—,#V-0 Nov S,2020
Council Action If Required)
F7&C Number N/A M&C Date Approved I��—
City of Fort Worth
�- �— Change Order Additions
Project Name Sanitary Sewer Replacement M-40213,Part 1 City Sec No.: 53362
Project No.(s): 56002 0700430 101003 DOE No. N/A City Proj.No.: 101003
Project Replace 48"Sanitary Sewer M-402B in Iron Horse Golf Course
Description
Contractor S.J.Louis Construction of Texas,Ltd. Change Order:= Date: 10/2812020
City Project Mgr. Walter Norwood City Inspector FJesse Reed
_ ADDITIONS
Il"EM bEC111�'fl� DCPT Q ty uniL �uni Co T ofaf
40 6'Chain Link Fence Sewer 40.00 LF $29.00 1$1,160.00
41 Grass Seeding with Curlex Erosion Protection Sewer 1334.00 SY $2.00 $2,668.00
I
i
I
Water
Sewer $3,828.00
Page 2 of 4 Additions Sub Total $3,828.00
-F 1 \�,70p FM City of Foil Worth
Change Order Deletions
Project Name Sanitary Sewer Replacement M-40213,Part 1 City Sec No.: 53362 i
Project No.(s): 56002 0700430 101003 7 DOE No. N/A City Proj.No.: 101003
Project Description Replace 48"Sanitary Sewer M-402B in Iron Horse Golf Course
Contractor S.J. Louis Construction of Texas,Ltd. Change Order: F-2—] Date 10/28/2020
City Project Mgr. Walter Norwood City Inspector: Jesse Reed
_ DELETIONS
ITEM DESCRIPTION ; ;I pEPT ` _ ,:02ty UniE Unit Cast—�Total
38 Sanitary Sewer Construction Allowance Sewer 0.05 LS $70,000.00 $3,828.00
I
I
Water
Sewer $3,828.00
Page 3 of 4 Deletions Sub Total $3,828.00
MMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total
Previous Change Orders
co# PATE AMOUNT
1 2/24/2020 $0.00
Total
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Gl� 2�
Signature
Name of Employee
Title
ATTEST:( t
OUTU I
Mary I Kayser
City Secretary
FORTWORTH
WATER ENGINEERING& FISCAL SERVICES
PIPE REPORT FOR:
PROJECT NAME: Sanitary Sewer Replacement M-402B Partl
PROJECT NUMBER: 101003
DOE NUMBER: 104
WATER
PIPE LAID SIZE TYPE OF PIPE LF
FIRE HYDRANTS: VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
Sewer 48" FRP 1040
PIPE ABANDONED SIZE TYPE OF PIPE LF
Sewer 48" RCP 1040
DENSITIES: YES, &
NEW SERVICES:
WATER ENGINEERING&FISCAL SERVICES
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TZ 76012-6311
(817)392-4477 •Fax:(817)392-8460
FORT FORTHRH CONTRACTOR'S AFFIDAVIT
OF RELEASE OF LIENS
The City of Fort Worth
PROJECT: Sanitary Sewer Replacement M-40213, Part 1 PROJECT NUMBER:
OWNER: City of Fort Worth,Texas 101003
CONTRACTOR: S.J. Louis Construction of Texas, Ltd. 21910
ENGINEER: Shield Engineering Group, PLLC
The Contractor, in accordance with the Contract Documents, and in consideration for the full and final payment to
the Contractor for all services in connection with the project, does hereby waive and release any and all liens, or
any and all claims to liens which the Contractor may have on or affecting the project as a result of its contracts)
for the Project or for performing labor and/or furnishing materials in any way connected with the construction of
any aspect of the project. The Contractor further certifies and warrants that all subcontractors of labor and/or
materials for the Project, except as listed below, have been paid in full for all labor and/or materials supplied to, for,
through or at the direct or indirect request of the Contractor prior to, through and including the date of this affidavit.
EXCEPTIONS: (If none,write"NONE". The"Contractor shall furnish a bond, acceptable to the Owner,for
each exception.)
None
``,�t1Ylp1���'' r1;,ja eol. ROARK
?_°� e4�Notary Puol;.-, State of Texas
Comm.Expires 08-26-2023
Notaiy 10 -124104300
CONTRACTOR S.J. Louis Construction of Texas Ltd.
BY �s . ,, Les Whitman
Title President
Subscribed and s orn to before me this 20th day of November , 20 20
Notary Public:
My Commission xpires: tble172) Z?
IL
FORT WORTH CONTRACTOR'S AFFIDAVIT OF
PAYMENT OF DEBTS AND CLAIMS
City of Fort Worth,TX
PROJECT: Sanitary Sewer Replacement M-402B, Part 1 PROJECT NUMBER:
OWNER: City of Fort Worth,Texas 101003
CONTRACTOR: S.J. Louis Construction of Texas Ltd. 21910
ENGINEER: Ishield Engineering Group,PLLC
The Contractor, in accordance with the Contract Documents,hereby certifies that, except as listed below, all
obligations for all materials and equipment furnished, for all work labor, and services performed, and for all known
indebtedness and claims against the Contractorfor damages arising in any mannerin connection with the
performance of the Contract referenced above for which the Owner or his property might in any way be held
responsible have been paid in full or have otherwise been satisfied in full.
EXCEPTIONS: (If none,write"NONE". The Contractor shall furnish a bond, acceptable to the Owner,
for each exception.)
None
TINA M. ROARK
Notary Public,State of Texas
CONTRACTOR S.J. Louis Construction of Texas, Ltd. SV. Comm.Expires 08-26-2023
:,�yrF.. `�.
,/ /.� o,,°;,r� Notary ID 124104300
BY l� ,<Y�-Glhc�r—T Les Whitman
TITLE President
Subscribed and orn t(o�Ibefore me this 20th day of November , 2020
Notary Public: -Y►�l KU
My Commission Expires: 5124/?)Z3
FORT WORTH
CONSENT OF SURETY COMPANY
TO FINAL PAYMENT
City of Fort Worth,TX
Bond No. 190042536
PROJECT: Sanitary Sewer Replacement M-402B,Part 1 PROJECT NUMBER:
OWNER: City of Fort Worth Texas 1101003
CONTRACTOR: S.J. Louis Construction of Texas,Ltd. 121910
ENGINEER: IShield Engineering Group, PLLC
The Surety Company, on bond of the Contractorlisted above for the referenced project,in accordance with the
Contract Documents,hereby approves final payment to the Contractor,and agrees that final payment to the
Contractorshall not relieve the Surety Company of any of its obligations to the Owner under the terns of the
Contract and as set forth in said Surety Company's bond.
In witness whereof,the Surety Company has hereunto set its hand this 20th day of November 2020
Liberty Mutual Insurance Company
Surety Company
By
Authorized Representative
Title Heather R. Goedtel,Attorney-in-Fact
Address:
8400 Normandale Lake Blvd., Suite 1700
Bloomington, MN 55437
Attach Power of Attorney
This Power of Attorney limits the acts of those named herein,and they have no authority to
bind the Company except in the manner and to the extent herein stated.
Libertx Liberty Mutual Insurance Company
11/I1 Utug° The Ohio Casualty Insurance Company Certificate No:3202635-190003
SURETY West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS:That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire,that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts,and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana(herein collectively called the'Companies'),pursuant to and by authority herein set forth,does hereby name,constitute and appoint, Blake S.
Bohlig,Brian D.Carpenter,Kelly Nicole Enghauser,Heather R.Goedtel,Michelle Halter,Jessica Hoff,Nicole Langer,Craig Olmstead,Laurie Pflug
all of the city of Bloomington state of Minnesota each individually if there be more than one named,its true and lawful attorney-in-fact to make,
execute,seal,acknowledge and deliver,for and on ifs behalf as surety and as its act and deed,any and all undertakings,bonds,recognizances and other surety obligations,in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 21st day of November , 2019
Liberty Mutual Insurance Company
P�INSJJ P�IY INS& INSUgq The Ohio Casualty Insurance Company
�`� ooaPOnar 2� 5J°off°Rqr"�y °kar?'p West American Insurance Company
J 3 Fo fi VQ Fo m a 2 Fo fi ro
1912 0 1919 1991 /� )
(� U)
dJ}�`rAc11u`�".aa 0�eAM25` a �s �NDIAHr' .da B r C
r� * Y
David M.Carey,Assistant Secretary
State of PENNSYLVANIA
County of MONTGOMERY ss
(> On this 21st day of November 2019 before me personally appeared David M.Carey,who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance o
o - Company,The Ohio Casualty Company,and West American Insurance Company,and that he,as such,being authorized so to do,execute the foregoing instrument for the purposes—
`) > therein contained by signing on behalf of the corporations by himself as a duly authorized officer. u a w
Ca
IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at ling of Prussia,Pennsylvania,on the day and year first above written. W n
v> P PAS o 0
O QFi�'�\orrly rcc� COMMONWEALTH OF PENNSYLVANIA Q
O O
e0�� Notarial Seal
� n2f� o OF � 9 Teresa Paslella,Notary Public ` C
p Upper Merion rvrp.,Montgomery County By: ro
C "` �3' My Commission Expires March 28,2021 E
y ASyIVP Teresa Pastella,Notary Public 0 W
N SARI'PU0\\ Member,Pennsylvania Association of Notaries CD
N O
This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual w°�
o.E- Insurance Company,and West American Insurance Company which resolutions are now in full force and effect reading as follows: o (D
ARTICLE IV-OFFICERS:Section 12.Power ofAttomey.
3
o c` Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President,and subject to such limitation as the Chairman or the 2 a
>. President may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal,acknowledge and deliver as surety >o
roc any and all undertakings,bonds,recognizances and other surety obligations.Such attomeys-in-fact,subject to the limitations set forth in their respective powers of attorney,shall N
> have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation.When so executed,such 0?Z � instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attomey-in-fact under the CO
provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authority. o 0
ARTICLE All-Execution of Contracts:Section 5.Surety Bonds and Undertakings. r'-
Any officer of the Company authorized for that purpose in writing by the chairman or the president,and subject to such limitations as the chairman or the president may prescribe, F
shall appoint such altomeys-in-fact,as may be necessary to act in behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,
bonds,recognizances and other surety obligations.Such anomeys-fn-fact subject to the limitations set forth in their respective powers of attomey,shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company.When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation-The President of the Company,acting pursuant to the Bylaws of the Company,authorizes David M.Carey,Assistant Secretary to appoint such attomeys-in-
fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety
obligations.
Authorization-By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company,wherever appearing upon a certified copy of any power of attomey issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I,Renee C.Llewellyn,the undersigned,Assistant Secretary,The Ohio Casualty Insurance Company,Liberty Mutual Insurance Company,and West American Insurance Company do
hereby certify that the original power of attomey of which the foregoing is a full,true and correct copy of the Power ofAttomey executed by said Companies,is in full force and effect and
has not been revoked.
IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this 20th day of November 2020
P�INSU� P�11 INS& �INSU�
j4°aror�ro�fi �J`4onaorzgr'Pgy� �4P�ofi'ORaro fi
COF
r 1912 on o 1919 2 1991 0
� 'Ss � 3 6 �?y ��"a� s 3 By:
d
, +CHus da 0 HArarsa �NO1p1'P La Renee C.Llewellyn,Assistant Secretary
LMS-12873 LMIC OCIC WAIC Multi Co 062018
FORT WORTH CONTRACTOR'S AFFIDAVIT OF
y PAYMENT OF DEBTS AND CLAIMS
City of Fort Worth,TX
PROJECT: Sanitary Sewer Replacement M-40213, Part 1 PROJECT NUMBER:
OWNER: City of Fort Worth,Texas 101003
CONTRACTOR: S.J. Louis Construction of Texas Ltd. 21910
ENGINEER: IShield Engineering Group, PLLC
The Contractor, in accordance with the Contract Documents,hereby certifies that, except as listed below, all
obligations for all materials and equipment furnished, for all work labor, and services performed, and for all known
indebtedness and claims against the Contractorfor damages arising in any mannerin connection with the
performance of the Contract referenced above for which the Owner or his property might in any way be held
responsible have been paid in full or have otherwise been satisfied in full.
EXCEPTIONS: (If none,write"NONE". The Contractor shall furnish a bond,acceptable to the Owner,
for each exception.)
None
pY"�� TINA M. ROARK
PV6�:
I--Notary Public,State of Texas
CONTRACTOR S.J. Louis Construction of Texas, Ltd. Comm.Expires 08-26-2023
Notary ID 124104300
BY !� �h-Gy�c�� Les Whitman
TITLE President
Subscribed ands orn to before me this 20th day of November , 20 20
Notary Public: -rvl
My Commission Expires:
FORT WORTH
CONTRACTOR'S AFFIDAVIT
OF RELEASE OF LIENS
The City of Fort Worth
PROJECT: Sanitary Sewer Replacement M-40213, Part 1 PROJECT NUMBER:
OWNER: City of Fort Worth,Texas 101003
CONTRACTOR: S.J. Louis Construction of Texas, Ltd. 21910
ENGINEER: IShield En2ineering Group, PLLC
The Contractor, in accordance with the Contract Documents,and in consideration for the full and final payment to
the Contractorfor all services in connection with the project,does hereby waive and release any and all liens, or
any and all claims to liens which the Contractor may have on or affecting the project as a result of its contract(s)
for the Project or for performing labor and/or furnishing materials in any way connected with the construction of
any aspect of the project. The Contractor further certifies and warrants that all subcontractors of labor andlor
materials for the Project, except as listed below, have been paid in full for all labor andlor materials supplied to, for,
through or at the direct or indirect request of the Contractorprior to, through and including the date of this affidavit.
EXCEPTIONS: (If none,write"NONE". The`Contractor shall furnish a bond,acceptable to the Owner,for
each exception.)
None
�����YP�i,� r!N/ rvt. ROARK
,o1P�:..UB 4
2° ��:Notary Puo';c;, State of Texas
Comm.Expires 08-26-2023
',,F,or Notaiy tU 124104300
CONTRACTOR S.J. Louis Construction of Texas Ltd.
By Les Whitman
Title President
i
Subscribed and orn to before me this 20th day of November , 20 20
Notary Public:
My Commission xpires: 021P(7,v Z?
I
FORTWORTHREV:02/22/07
Capital Projects Delivery,Water Department
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: I- l0 o
Name of Canracior Projecl Nante
S.J, LouN 5 Co,is'f- of Tv—)CAA, L+J 5A>J1A►R ! eIEOI 2 REPIACert ,Jr
!Pater Engineering Inspector Project ifanager
�TtSSE Rcec> �QRl-vct- tJoes-�Cf
DOEAlumber Project Difficult), Tape of Contract
0104 QQ Simple Q Routine Q Complex ❑Water [Waste Water ❑Storm Drainage ❑Pavement
Lifrial Contract Amormt Final Contract Amount
$ Z(,ob 3t•y,L= 2 (.c`I l9z i4
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector H 1 Accuracy of Plans to Existing Conditions 3
2 Knowledge of Inspector• t{ 2 Clarity&Sufficiency of Details 3
3 Accuracy of Measured Quantities 4 3 Applicability of Specifications N
4 Display Of Professionalism H 4 Accuracy of Plan Quantities 3
5 Citizen Complaint Resolution 4 PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs y I Knowledge And/Or Problem Resolution y
ADMINISTRATION 12 Availability of Project Manager N
1 Change Order Processing Time 3 3 Communication y
2 Tim]iness of Contractor Payments 1 4 Resolution of Utility Conflicts y
3 Sid Opening to Pre-Con Meeting Timeframe 2
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature Inspector --
Signature Inspector's Supervisor
INSPECTOR'S COMMENTS
Capital Projects Delivery,Water Department
Tlie City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-4477•Fqx:(817)392-8460
FORTWORTHREV:02/20/07
Capital Projects Delivery,Water Department
PERFORMANCE EVALUATION OF CONTRACTOR
n CONTRACTOR&PROJECT DATA
Mane ojContraclw' Project Mane
SJ Louis Sanitaiy Sewer Replacement M-402B Part
lhater Engineering hnspector DOE Number
Jesse Reed 104
Hater Engineering Inspector Project dlmnager
❑Water ❑✓ Waste Water ❑Storm Drainage ❑Pavement Walter Norwood
Initial Contract Annount Project Dlffncultp
$2,600,364.20 *Simple 0 Routine 0 Complex
Final Contract Annomt Date
$2,604,192.16 12/9/2020
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
I Submission of Documents 2 Y 2 8 4
2 Public Notifications 5 Y 2 20 10
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 3 60 45
8 Traffic Control lvlaintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 2 20 10
10 Citizen's Complaint Resolution 5 Y 1 3 1 20 1 15
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 354
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 354
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MS]'100%) 354 / 448 = 79%
Performance Category Good
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%—Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
i
Signature Inspector Signature Contractor
Signature Inspectot•'s Supervisor
CONTRACTOR'S COMMENTS
Capital Projects Delivery,Water Department
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX'76012-6311
(817)392-4477•Fax:(817)392-8460
CSC No. 53362-CO2
l°c31,"I- `Wo-o_,'>Hi City of Fork Worth
�— Change Order Request
Project Name:I Sanitary Sewer Replacement M•40213, Part 1 City See No.: 53362
Project No.(s):[ 56002 0700430 101003 DOE No. N/A CityPrcj.No.:J 101003
Project Description: Replace 48"Sanitary Sewer M-402B in Iron Horse Golf Course
Contractor] S.J.Louis Construction of Texas,Ltd. Change Order it Date: 10/28/2020
City Project Mgr.[ Waller Norwood City Inspector: I Jesse Reed
Phone Number: (817)392-5026 Phone Number:[ (817)392-8362
Dept. Water ! Sewer Totals Contract Time
I (Calender days)
Original Contract Amount _ _ $2,600,364.20 $2,600,364.20 120
Extras to Date 05
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date � $2,600,364.20 $2,600,364.20 125
Amount of Proposed Change Order $0.00 $0.00 190
Revised Contract Amount $2,600,364.20 $2,600,364.20 2,'3
Original Funds Available for Change Orders $78,011.00 $78,011.00
Remaining Funds Available for this CO $78,011.00 $78,011.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT I 0.00%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) 1$3,250 455,25
JUSTIFICATION(REASONS)FOR CHANGE ORDER
This Change Order Number 2 provides for Fence and Grass Replacement in Work Areas on the Golf Course.Staff recommends the
addition of 190 calendar days for the Change Order for the time it took to reach an agreement with the golf course for the areas where
grass would be installed and for the grass to grow.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name J A gontractorsignature Dale
S.J.Louis Construction of Texas,Ltd. Adam Lundsfordyj,
In ector Date Proj ct Mana er Date
f=�- d iySsrr jL�nfJ 6 -3 2d �� 2�
Director Water Dept) Date Con$liucllon Supervisor Water Dept) Dale
Nov3,2020
Assistant City Attorney Dale Assistant Clt Mana er Date
Nov 4,2020 A8��
._..,: Nov 5,2020
Council Action If Required)
M&C Number N/A M&C Date Approved [—NIA—�
FC--)P,-T '\'ATaZ 3r--F IHl City of Fort Worth
�-� --- Change Order Additions
Project Name Sanitary Sewer Replacement M-40213,Part 1 City Sec No.: 53362
Project No.(s): 56002 0700430 101003 DOE No. N/A Cily Prcj.No.: 101003
Project Replace 48"Sanitary Sewer M-402B in Iron Horse Golf Course
Description
Contractor S.J.Louis Construction of Texas,Ltd. Change Order:= Date: 10/28/2020
City Project Mgr. Walter Norwood City Inspector Jesse Reed
ADDITIONS
—11'EI :tSESCRIP IJO — —
DEFT City Unit Unic Cost .ora2
40 6'Chain Link Fence Sewer 40.00 LF $29.00 J$1,160.00
41 Grass Seeding with Curlex Erosion Protection Sewer 1334.00 SY $2.00 $2,668.00
Water
Sewer $3,828.00
Page 2 of 4 Additions Sub Total J$3,828.00
City of Foil Worth
Change Order Deletions
Project Name Sanitary Sewer Replacement M-402B,Part 1 City Sec No.: 1 53362
Project No.(s): 56002 0700430 101003 DOE No. = City Proj.No.: 101003
Project Description Replace 48"Sanitary Sewer M-402B in Iron Horse Golf Course
Contractor S.J.Louis Construction of Texas,Ltd. Change Order: F2-] Dale 10/28/2020
City Project Mgr. Walter Norwood City Inspector: FJesse Reed
DELETIONS
ITEM DESCRIPTION °pEPTty ; Unit' Unit Cosi ToiaO
38 Sanitary Sewer Conslruction Allowance Sewer 0.05 LS a7C,000.00$3,828.00
Water
Sewer $3,828.00
Page 3 of 4 Deletions Sub Total $3,828.00
MMBE Breakdown For this Change Order
MWBE Sub Type of Service .. Amount For this CO
U
Total LE--$0.00
Previous Change Orders
co# DATE AM_Q;UNT
2/24/2020 $0.00
I
Total 10.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
GCS
Signature
Name of Employee
Title
ATTEST:
( �i�
Mary J. Kayser
City Secretary