HomeMy WebLinkAboutIR 10536 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 21-10536 To the Mayor and Members of the City Council January 12, 2021 Page 1 of 2 i SUBJECT: TRANSPORTATION FUTURE IMPROVEMENT AGREEMENTS AND r rA ACKNOWLEDGEMENT OF COMPLETION This Informal Report is to provide an update on Transportation and Public Works' (TPW) efforts to verify construction of and apply Future Improvement Agreements (FIA) funds to those projects so as to recover general funds for future transportation infrastructure needs. Background During the development permitting process, the City assesses the impact of development on City infrastructure to determine the developer's requirements, if any,to construct infrastructure improvements. If it is not feasible or prudent to construct the required infrastructure at the time of the development,the City allows the developer to pay the estimated construction cost of the improvements to the City using a Future Improvement Agreement.The City then uses those funds when the transportation improvements are constructed. When incorporated into a larger city improvement project,the developer's FIA contributions are usually just a small portion of the total cost of that project.TPW appropriately prioritizes the expenditure of the City's funds based upon need, not based upon the timing of these relatively small developer contributions. As a result, many FIA funds collected for various future needs across the City's transportation network have accumulated over time.The list of FIAs compiled by TPW includes 183 FIAs, most of which are more than 10 years old -the oldest is from 1998.The average value of the 183 FIAs is$69,221,for an approximate total value of$12.8M. In an effort to ensure the City utilizes these FIA funds for transportation infrastructure,TPW reviewed the FIAs in coordination with the Legal Department with the following questions in mind: • Have the improvements been completed? • Were the developer contributions applied to project funding? • Do we have an active or planned project for the improvements in the FIA? • Is the previous funding amount sufficient to complete the work? • Is the project still feasible (for example is the needed ROW preserved)? TPW's review was completed based on the documentation currently available. In many cases the research was limited due to the age of the FIA and thus, logical assumptions had to be made to reach a conclusion. Due to the amount of effort needed to research each FIA, smaller FIAs—those with a value below$100k(the average value of which were$39k)were summarily reviewed based on the street condition to determine if improvements have been made. Results The review found that the 183 FIAs fell into four main categories: completed projects for which improvements have been performed, incomplete projects that are currently active or planned, incomplete projects with insufficient additional funding, and funds without associated scope (residuals or interest).These categories allowed staff to analyze the FIAs and the associated values.The analysis of the number of projects in each category and value of those categories are shown below. ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 21-10536 To the Mayor and Members of the City Council January 12, 2021 Page 2 of 2 i i7 Y SUBJECT: TRANSPORTATION FUTURE IMPROVEMENT AGREEMENTS AND rrn ACKNOWLEDGEMENT OF COMPLETION FIA Category Project Count Value of Projects Complete Project (Under$100K) 149 $5,675,505 Complete Project (Over$100K) 18 $3,871,897 Incomplete, Insufficient Funding 14 $2,751,572 Incomplete, Planned Project 1 $281,885 Funds Only(Interest Earnings) 1 $245,275 Total 183 $12,826,134 These results show that over time, TPW completed improvements specified by the respective FIAs, but did not, at that time, utilize the FIA funds for construction. The cumulative funding amounts for the projects deemed completed is $9,547,402, plus interest earnings in the amount of$245,275, for a total value of$9,792,677. Incomplete projects with insufficient funding will remain in the fund until the scope of work has been accomplished. Given these results and for fiscal stewardship, TPW and Legal staff recommend that these FIA projects be recognized as completed and the associated developer funds be applied toward them retroactively, thus freeing up the equivalent amount to be reallocated for future TPW infrastructure projects. Staff recommends using the funds to facilitate delivery of the 2022 bond program, such as design and right of way acquisition for high- priority arterial projects. A Mayor and Council Communication proposing to reassign project funds will be forthcoming. If you have any questions, please contact Lauren Prieur, Transportation and Public Works Assistant Director, at 817- 392-6035. David Cooke City Manager ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS