HomeMy WebLinkAboutContract 44919 (2)COMMiJNITY FACILITIES AGREEMENT
THE STAT� OF TEXAS
COUNTY OF TARRANT
WHEREAS, the
�
0
undersigned Developer
City Secretaiy
Contract No. �
("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project") within the City
of For-t Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the Improvements.
Developer and Project Information:
Developer Company Name: Cassco Development Co., Inc.
Address, State,
Phone, E-Mail: (81
Code: 4200 South Hulen Street, Suite 614 � Fort Worth, TX 76109
731-7396, robert.cook@trinityworks.net
Authorized Signatory/Title: Paxton Motheral ; Vice President
Project Name and Brief Description: Water, Sewer, Paving, Storm Drain and Street Light
Improvements to serve Edwards Ranch Riverhills Ph. 3
Project Location: NE of Intersection of Biyant-Irvin Rd. & Countiy Day Ln.
Plat Case No.: FP-013-024 Plat Name: Edwards Ranch Riverhills
Council District: 3
To be contpleted
Received by:
� � I � �. I `
Date: �' � �
T �V,
•� . , ' 'r 1'
- � ��.-
r . s : :� �• r �"
staff
No:02136 CFA: DOE: 7078
1 f;�CE� � �j a � ��
� Z�ii�
NOW, THEREFORE, Foi• and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to
comply with all provisions of said Policy in the perfortnance of its duties and
obligations hereunder and to cause all contractors hired by Developer to comply with
the Policy in connection with the work perfoimed by said conh�actors.
B. Developer shall provide financial security in conformance with paragraph 6, Section
II, of the Policy and recognizes that there shall be no reduction in the collateral until
the Project has been completed and the City has officially accepted the
Improvements. Developer further acknowledges that said process requires the
contractor to submit an Affidavit of Bills paid signed by its contractor and Consent
of Surety signed by its sw•ety to ensure the contractor has paid the sub-contractor
and suppliers in full. Additionally, the contractor will provide in writing that the
contractor has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by
this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accardance with all City standards and the City-
approved consh•uction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked e�ibits are made a part hereof: Water (A� X, Sewer (A-1)
X� Paving (B) X, Storm Drain (B-1) _X , Street Lights & Signs (C) X.
E. The Developer shall award all contracts for the constiuction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in confoi7nance with paragraph 8, Section II, of the Policy.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be const�vcted, said
conri�actor to meet City's requirements for being insured, licensed and bonded to do
work in public streets and/or prequalified to perform water/waste water
construction as the case may be.
ii. To require its contractor to fuinish to the City a payment and performance bond in
2
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the Improvements, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the Improvements for
a period of two (2) years insuring the maintenance and repair of the constructed
infrash•ucture during the tei�rn of the maintenance bond. All bonds to be furnished
before work is commenced and to meet the requirements of Chapter 2253, Texas
Government Code.
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional
insured on all insurance required by said documents and same will be evidenced on
the ACORD Certificate of Insurance supplied by the contractor's insurance
provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction Services
Division of intent to commence construction so that City inspection personnel will
be available; and to require the contractor to allow the construction to be subject to
inspection at any and all times by City inspection forces, and not to install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents submitted to
the City to schedule a Pre-Construction Meeting. The submittal should occur no
less than 10 working days prior to the desired date of the meeting. No construction
will commence without a City-issued Notice to Proceed to the Developer's
contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and service
lines have been completed to the satisfaction of the Water Department.
G. Developer agrees to provide, at its expense, all engineering drawings and documents
necessary to consh•uct the improvements required by this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
L City shall not be responsible for any costs that may be incurred by Developer in the
relocation of any utilities that are or may be in conflict with any of the community
3
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current
and future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real or
asserted, brought for or on account of any injuries or damages sustained by any
persons (including death) or to any property, resulting from or in connection
with the construction, design, performance or completion of any work to be
performed by said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the work, or
on account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or employees,
tvltether or not srrclt iniuries, deatlt or danta�es are caused, in wliole or in
part, bv tl:e alleQed ne�li�ence of ilre Ci1v of Fort Wortlr, its ofrcers, servants,
or emnlovees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and all
claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, wlretlter or not suclt
inirtries, death or dama�es �rre caused, in w/iole or in part, bv tlie a1leQed
neQli�ence of tlte Citv of Fort Wortlt, its of�cers, servants, or emplovees. Further,
Developer will require its contractors to indemnify, and hold harmless the City for
any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in
a good and workmanlike manner, free from defects, in conformance with the
Policy, and in accordance with all plans and speci�cations.
N. Upon completion of all work associated with the construction of the infrash•ucture and
Improvements, Developer will assign to the City a non-exclusive right to enforce the
�
0
contracts entered into by the Developer with its contractor along with an assignment of
all warranties given by the contractor, whether express or implied. Further, Developer
agrees that all contracts with any contractor shall include provisions granting to the
City the right to enforce such contracts as an express intended third party beneficiary
of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of the
total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of
the developer's share of the total construction cost as stated in the consn•uction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. If applicable, the City's obligation to participate (exclusive of front foot charges) in
the cost of the Improvements shall terminate if the Improvements are not
completed within two (2) years; provided, however, if construction of the
Improvements has started within the two year period, the developer may request
that the CFA be extended for one year. If the Improvements are not completed
within such extension period, there will be no further obligation of the City to
participate. City participation in a CFA shall be subject to the availability of City
funds and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years from the date of this Agreement the Improvements have
not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion of
�
the conshuction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANI�
�
Cost Summary Sheet
Project Name: Edwards Ranch Riverhills Ph. 3
CFA No.: 2013-051
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Wafer and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub-Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub-Total for TPW Construction Fees
Total Construction Fees:
DOE No.:7078 '
Developer's Cost
$ 273,900.50
$ 215,858.00
$ 489,758.50
$ 645,645.25
$ 159,407.00
$ 68,050.00
$ 873,102.25
$ 1,362,860.75
$ 9,795.17
$ 9,795.17
$ 19,590.34
$ 32,202.09
$ 16,101.05
$ 2,722.00
$ -
$ 51,025.14
$ 70,615.48
Choice
7
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secreta�y, with the corporate seal of the City affixed, and said Developer has executed t is
instrument in q adruplicate, at Fort Worth, Texas this �,� �� day of 'J �� �G'�'`---
, 20 1� �.
CITY OF FORT WORTH - Reconrf�rende�l by:
Water Department
' �".
_ ✓ !� _ --, ;
Wendy Chi-�,3abulal, EMBA, P.E.
Developmerit Engineering Manager
Appf�oved as to Fof�r�� & Legality:
�� �,.- _ / �;�,
�-� �,�� _ ���-.�
Douglas W. Black
Assistant City Attorney
M&C No. %,/ j�
Date:
ATTEST:
�
� �gnature
(Print) Name: �-��,� 1 �
Title: .� `�,Q.�,�� �
..�
�
Transpoi�tation & Public Works Department
W, (�✓
Douglas �'. Wiersig, P.E.
Director
Appr�oved by City Ma�aager�'s O�ce
�����_
Fernando Costa
Assistant City Manager
� `�
,� • ,•
� ��;
� . i.lt
. � � t�1��
1� .
I� • ' C
Cassco Development Co., Inc.
(Print) Name:
Title:
:
Signature
e .' - �C'eS�� Clei��-
� . �i
� � � �.�
.
.��
ATTEST: , �
Check items associated with the project being undertaken; checked items must be included as
Attachments to this Agreement
Included Attachment
� Location Map
� E�chibit A: Water Improvements
� Water Estimate
� Exhibit A-1: Sewer Improvements
� Sewer Estimate
� Exhibit B: Paving Improvements
� Paving Estimate
� Exhibit B-1: Storm Drain Improvements
� Storm Drain Estimate
� Exhibit C: Street Lights and Signs Improvements
� Street Lights and Signs Estimate '
(Remainder of Page Intentionally Left Blank)
0
CFA QUANTITIES
EXHIBIT A - WATER 1MPR0['EMENTS
Item No. City Bid # Description Unit of B�d Quantity Unit Price Bid Value
Measure
1 01292 16" PVC Water Line, C-905, DR-18 L.F. 438 $58.00 $25,404.00
2 00719 16" Gate Valve & Vault EA 2 $10,800.00 $21,600.00
3 16"x8" Reducer EA 2 $800.00 $1,600.00
4 00591 12" PVC Water Line L.F. 133 $40.00 $5,320.00
5 00717 12" Gate Valve & Box EA 1 $2,000.00 $2,000.00
6 00618 8" PVC Water Line L.F. 4555 $29.00 $132,095.00
7 00749 8" Gate Valve & Box LF 12 $1,050.00 $12,600.00
8 00568 Cast Iron Fittings TON 4.3 $3,500.00 $15,050.00
9 00546 Fire Hydrant, Including 6" Vaive EA 5 $3,200.00 $16,000.00
10 Connect to Existing Water Line EA 3 $500.00 $1,500.00
11 00762 1" Water Service & Meter Box EA 53 $450.00 $23,850.00
12 00767 2" Irrigation Service & Meter eox EA 8 $1,200.00 $9,600.00
13 00713 1" Combination Air Release Valve & Vault EA 2 $3,000.00 $6,000.00
14 00372 Trench Safety �.F. 5126 $0.25 $1,281.50
Total �Vater Improvements $273,900.50
EXIIISIT Al - SeiNITARY SEWER Ill3PR0�'EMENTS
Item No. City Bid # Description Unit of Bid Quantity Unit Price Bid Value
Measure
1 00351 8" PVC Pipe, SDR-35 L.F. 3059 $34.00 $104,006.00
2 00350 8" PVC Pipe, SDR-26 L.F. 389 $38.00 $14,782.00
3 00213 Standard 4' Diameter Manhole ForAll Depths EA 16 $2,800.00 $44,800.00
4 00214 4' Drop Manholew/ Protective Coating ForAll Oepths EA 3 $4,600.00 $13,800.00
5 00213 Standard 4' Diameter Manhole Over Existing Main EA 1 $4,500.00 $4,500.00
6 00354 4" Sanitary Sewer Service EA 53 $450.00 $23,850.00
7 Demolish & Remove Existing 8" PVC Pipe L.F. 48 $10.00 $480.00
8 00372 Trench Safety L.F. 3448 $1.00 $3,448.00
9 00458 Sawcut, Demolish, Remove & Replace Existing Concrete Pvmt. S.Y. 86 $72.00 $6,192.00
Total Sanitary Sewer Improvements $215,858.00
EXHIBi1' B - PAVING IlYYIPROYEMENTS
Il
Item No. City Bid # Description Unit of Bid Quantity Unit Price Bid Value
Measure
1 00452 ��� Reinforced Concrete Pavement (Variabie Width Section), Inciuding S.Y. 15,511 $25.50 $442,063.50
Roll Over Concrete Curb & Gutter
2 00484 6" Lime Stablized Subgrade S.Y. 16,597 $2.75 $45,641.75
3 00496 7% Hydrated lime (-30#/SY) TON 249 $160.00 $39,840.00
4 00527 4'x4" Pedestrian Sidewaik LF 7,600 $12.00 $91,200.00
5 00181 Traffic Control L.S. 1 $4,500.00 $4,500.00
6 01021 End of Road Barricade EA 3 $500.00 $1,500.00
7 00532 Barrier Free Ramp EA 22 $950.00 $20,900.00
Total Paving Improvements $645,645.25
EXHIBIT Bl - STORM DRAIN IlYIPRflVEMENTS'
Item No. Ciry Bid # Descriprion Unit of Bid Quantity Unit Price Bid Value
Measure
1 00081 21" RCP L.F. 113 $45.00 $5,085.00
2 00082 24" RCP L.F. 553 $48.00 $26,544.00
3 01092 27" RCP L.F. 257 $50.00 $12,850.00
4 00087 48" RCP L.F. 197 $110.00 $21,670.00
5 01281 8'x5' RCB L.F. 152 $295.00 $44,840.00
6 00106 10' Standard Curb Inlet EA 9 $2,200.00 $19,800.00
7 00118 4' Square Manhole EA 3 $2,800.00 $8,400.00
8 00117 5' Square Manhole EA 1 $3,500.00 $3,500.00
9 01287 Storm Junction Box & Connection to Existing Storm l.ine EA 1 $7,250.00 $7,250.00
10 00104 4'x4' Area Wye Drop Inlet EA 1 $3,000.00 $3,000.00
11 00101 Temporary Earthen Swale 12' wide x 1.5' deep LF 137 $8.00 $1,096.00
12 00065 Remove Existing Headwall EA 2 $1,000.00 $2,000.00
13 00065 Remove Existing Rock Rip Rap EA 1 $600.00 $600.00
14 00065 Remove Existing 20' Curb Inlet EA 1 $1,500.00 $1,500.00
15 00372 Trench Safety LF 1,272 $1.00 $1,272.00
Total Storm Drain Improvements $159,407.00
EXHIBTT C-STREET LIGAT IA3PROVEMENTS
Item No. City Bid # Descriprion Unit of gid Quantity Unit Price Bid Va(ue
Measure
1 00379 NO. 8 Insulated Electrical Conductor L.F. 8,340 $1.50 $12,510.00
2 00969 Light, concrete foundation type 7 EA 16 $1,000.00 $16,000.00
3 00398 100 MH PC Light Fixture - Pole Provided EA 16 $600.00 $9,600.00
4 00391 Ground Box, Large w/ Lid EA 11 $700.00 $7,700.00
5 00388 1-1/4" in Trench (T) L.F. 2,780 $8.00 $22,240.00
Total Street Light Improvements $68,050.00
-�.
�'1
,��r�
��
f—!
�'�: � '.. � �. l �. � ��
��
�''�
,�
.f
�
F
',,
..R
,� ,.
k��fylt� Luurstry
t_'I�b
�I!_I '.
t_� � t� C'E'��J'; �E
'��"��' E� � F� 1 �� � E
i
I�',
�,�a
. �����
����' ,j,,,;�-;.,F' ��L�:=�`,'+,
,$� .
z� �,
i k •�
; 'f�ei
_,��;
�'�� L��J ����'-i
�,_; I : i �tiJ �i.4��
!_ , �'_;
i+tii�•.f'r' !_�I k;
�ei�`i�ilJ�'
�`' ��1$3 .
� �� -
1����
stiti� ��o� e�� ��.:. �._.� �
,�
,.��
. '.i
�
c:i'
`� -`.
�
�ri
� �
hCf'4��- IV�i��.�;,�_��-;�C_�
�t; �� _ r
Park
�. i��1�r�#, Ur 5
��r
'\
�
�'w-'� �.� f`J k � �_ � �'�
c�
�
�
�
��ry
s�
�+
�
�
,�
�
�
�
�
, __ =�
�_�',�+�;� f ��i . '���v :-��_.���+_
�
�•
�
�
; �� f
�� ti
�. -
- _ - _--_ w+ � -_- 43i _ _- - �i� _,
— Roc�a�d R�
� , _..��i-� � �
�. +. =.i��
',,',f, .,, T
-�--- • �9an. M.
� EDWARDS RANCH RIVERHILLS
NORTH P HAS E 3
NOT TO SCALE
OWNER / DEVELOPER:
CASSCO DEVELOPMENT
COMPANY
4200 SOUTH HULEN, SUITE 614
FORT WORTH, TX 76109
PHONE: 817-731-7396
lii�l P E LOTO N
II �eqo eo�urioNe
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
�
�
�
L
'L
�
❑
�
_. � �`1_7 P
! Q�
,� , �, �+�,'
L
w
�;
n
t
�
t1..
'�ROJECT
:�
:z
;w
; �
W
J
�w � '_�
�� � � `�
I I �O �
� �-I a� � � — — —
I I � °� � --� ___
� �
.W -�-----..._..._.._.... -- ... -- -- -- -------- -- -- -- --- --�------
> � � \ W �
J \ � ;
� W � Z � oo � :
W � _ � � � _ \ � ---- �
J W _rl=� � � .--
Q � > � ��.. � ai � � � ,;
/� W a. __---�--`� "� --- �-�"`� � � \ �
/ � �
V �.�..� � = r Z I .
❑ V V"� Q � Q —1 I I CO y\�\ / ( �
�Q Q � � � WQ I I W / /i f � ;
�� " ��' � � � �,��� m;
� � a�. � a �z a �
Q.. Q W � W Q. �� I ' ��� / // � X !
0 � /
�_�
_ i
i
• ��
��
----- -- -�
� �
i �
�� ' _—a_--
i _— � � �
� I
� ----- �— � � �
.— ---' i � ��
I � �
�
� � --
� -- _-_ � _
__� �i �
�a � �
I-- -- — � ' _ ____- - �o
II I. �
(Private OPe� SPa� �` �
public Pedestrian Access Lot) '
N
� i
�
�� _ _
—
�
� �
--a
�
�N
�rw
I~� N
�Z �
J Q
N
�I a O
;� � DRNE � � Z � �
� U �—LI
� � J ;,a�.. W�
I �W � � pa�J ��
:i` ' ' Q � O I �� � N�a6°1¢ Ou
"' m a
iW � � i� m VT- " U�
N J ^ N N
W V
� O � z � �—
O N W � N I ' N I
�X ' ' LO ' � N
�� N
j L�I ' m \ `_ N N
! � � �N`d� W131N38 �
I, Q � �_--
z Q �� MxP�,
;I � 9 ^ -- -- -- Q� ai
� ��j pa'� � lo�ssa��V �o�ssa� �
,)� �� J ` m U X O ueu�sapad ueuasapad
�� Q �$ � O �` �q9�d'd a�edS x i� n+g a�edg
. C� am a
�I CO U �
:I� � W" � W�I �
\�` O � ` ` Q� � ` o m m r Q' ( m �n c c� �v
:I ` `d A3ll � _ ' O � — —H 3l"I �
�x --__ __ _ ---- —_— —_— —�
� ---- �
� O
: � — — — — — — — — — — — — — — — — — — — — — —
— — — — __ _ _ c��rc�� r�onz�i a �vd��� — — — —
W
N
��
�
K N2�
QO �Z
Y7�N N
U K r �
o Z yP
moQ
U U
/I
'
N
I
� I
N
I �.
' �:
1 �'
Il
Z� w o
O o � � M
� � N M
� � � � �
O � W x �
J � �W�n
0�=�eo
_ �
� ; Y�'�Z
��Y �
� d
H
z
�w �
�� �
� ���
go�-��M
w � z `�X�
>wQW��
W>0..���
oW�=o�
wo°o�°
Z U/ `�oa
/� O LL
� v,^J V
� vi
�
U
�
�
�
�..�..�
�
= M
UW
Q=^
m
� LL N
N
� �
� �
u.i
Q a
� �
0
ya J V.
� QfJ N
OO�� \
�'a'a
>,y :
ao I '
J
� W
�• O �
N �
ICV � C�
--� �—; �
_ Ix; �� �
- �I w� z =
�W� ; a
¢>_
J� �
wo � o c�
___._.....__ -
EON�r,rzos �eReN �T� �
o�evv or�inc
_ AR�O�L�,WiV C?RIV� _ ��„`F�,_ _ -
I
1X t2 �
— _ _ — � =—=r�
� � ALLEY A 22
�
12 77 18 19 20 21
i6— �--_ �
I
I
�,
o'
��
�
fY_
h
�'
��
�'I
�
� 15 Space 8
Ped�es�
la
I W 14 13X
i J 72
13
I I � — �
I I ( 'Z �
I I I �
�
, „
10 7X
Qii,2
,
� � �,2 9 �
' m��o
8 �a��
Iana�
I 7 N a
�
4' DIA
DROP MH
�
�
— — -�
�E�I�/�IF2L
d��U�
i
i
II I �--
� I
�� � 5 sx
(I I 4 c
(I I (U3
Q
�� i �
� � J 2
1
�
�� ��
' 1X I
12
Private Open Space
Lot & Public Pedesirian
Access Lot
---'
/
/
I 2
,
� 23 22
* *
r------ Nie
W
1 Z
Z
g
27
J � 4' DIA i
I� DROP MH
� W 24 23 22
� � 25
� Z *
I C� * * *
�
Q
���LAi�r ��iv�
/
r
i
: EXHIBIT A1 -
�
WASTEWATER
` HUNTLY
DRIVE
22
--�----
- G—�C�O �PPg4 C ----
�pUNSR H SI \NG
GAE1t�`c�D,GN OL
LEGEND
---�— PROPOSED SEWER LINES
— � — EXIST SEWER LINES
�c SDR 26 SERVICES
NOTE: A�L PROPOSED SANITARY SEWER
LINES ARE 8" UNLESS OTHERWISE NOTED
o N� 200� EDWARDS RANCH RIVERHILLS OWNER / DEVELOPER: �j�I� pELOTON
CASSCO DEVELOPMENT I I ��No so��T�oN1
PHASE 3 COMPANY 5751 SUIOTEE$DRIVE
4200 SOUTH HULEN, SUITE 614 KEII.ER, TX 76244
FORT WORTH, TX 76109 pHONE: 817-562-3350
GRAPHIC SCALE DATE: JULY 25, 2013 PHONE: 817-731-7396
5
3 4 �
c_
�:
-�;
��
14 y
�
21 Z� �
N
* _�* �=
_-�
AGE L NE r
3 I 4
15
zzx
13
Pdvale Open
Space & Public
Pedestrfan
Access Lot
��
70
<
m
�,�_����—m_p��.�
: I
7 ., � I I I I I
�i
I. _I_�--�
-----
I --� — _----� __
� I � �
I I I I II
I� I II_ _-- � _-- � -
� i I I
II FpNP � I I I
�_�--��
_ ____-- -
___---- - -
� � ��
� � I I
I I Ii_ -�-_ - �-
I I
17 �s I I
18
* � � _ �
_ - - --�
21 20 19 I
I
2� 20 �9
* * *
zs CLOUDVEIL
TER CE
25 24
13
23 I g�O�K�PYPHRn24
' CpUN�RP g�1DG8
GAg\NP�� Z��, �
� SCNoo
..._...."'" ............."""""""'_"'""""" E�W'l+RDS GEREIJ LTO_"_"""
p197175�14
AR�Of�'LAWi�1 D6?IVE Fo-E'zor+v:� J,
- - _ __ _ VA ANi
��X
�
�s
ts
Q
i j 14
I J
� 13
ALLE
� 12
�
�
� 11
10
�----------------��-
- ��
_ �
m
����
� ��
�,
� ' � �
` �`i, "
\�:LZ...�.. �'_
� �—
� : ____"'
:_
�, � ..
� �.
� `"
�� "
�; �
_ �
I
�
— — J
�ELLAIRE
DRIVE -
i
�x " � o
� �
�
Private Open Space o 9
Lot & Public Pedesiria
Access Lol 01 �
m
�— I
i
� B�LLAIFZF � VRV E
�
�
. . � l
�■ � � �
3 4
15
22 21 20 19
- zzx II
13
Private Open
� Space & Public
27 Pedestrian
Access Lot
26 CLOUDVEII
TER CE
25 24
__ 13__—
g�pGK PRY P (aRK
CpUNSR� �g�\OL b`124
c�6�NFD G oo G
__—
-___ __--- ___—
� I ��
I I I I I
I I I I I
_ � � T,_____ � _____ i -
I I I I
FUTUS� I I
II PNP �
L-�--�
�' ��:
- -------- -
��� - � � -� �
I I I I
I I I �_ �� 1
� I
,e �� 76 � I
.IVE I
21 20 19
22 _ — I
g�OCK pPy PPRK 4
23 �pUNSRA g�\pE842
I �PB�NpO, ZpN� `G
SGHpO
I
LEGEND
0
�
29' B-B / 50' ROW (TYP) ,
12' B-B ALLEY / 16' ROW (TYP) i
TEMPORARY CONCRETE
TURNAROUND
PUBLIC SIDEWALK
BY DEVELOPER
PRIVATE SIDEWALK
BY DEVELOPER
H.C. RAMPS BY DEVELOPER :
OWNER / DEVELOPER: �j�Ij pELOTON
o N� 200� EDWARDS RANCH RIVERHILLS CASSCO DEVELOPMENT u�� �AND ,o��.,oN,
COMPANY 5751 KROGERDRIVE
PHASE 3 4200 SOUTH HULEN, SUITE 614 SUITE 185
FORT WORTH, TX 76109 KELIER, TX 76244
GRAPHIC SCALE DATE: JULY25, 2013 PHONE: 817-731-7396 PHONE: 817-562-3350
_j.tx 12 _
0
,s 2o z,
7 � � � � � � o �—
—_ �� � I I I I I
ZZ ., m � ��__�
5
g 4 c
2 ��
' m
d
am
O NO
14 � A
�_
22 2� 20 y9
��
o�
� 2
W
Z
�
J
W 24 23
� 25
W
m
e
�
�
O�
��
�
✓
�
�
�,
.�' �
�
�I
C�]
I
I
__J
BELLAIRE
dRIV�
i
i
EVv.,. -
o�a-r�reo�a
_ AR�OF�LRWN ��IV� _ P�A�P�;T'� _ _
— — �y �z �.�x _
�2 � � � ALLEY A �— 22
�X �2
�s 20 2�
Q 17 18
16 �. �
(Private open ANE
I �5 space & Public / � BEN E.LM
Pedestrian � /
� Q Access Lot)
� J 14 13X ' z 3 4
� �
( 13 _ _ 14
ALLEY C �
' 23 Zz 21
� � �2 � I
��� �
� I 11
10
,x
QII:--
i � � �2 s
� 8
� �
ALLEY
� �__
II � '—
5
�I I 4
I � v 3
�'
� 2
1
-��
ix
Private Op ac
.ot & Public Pe
Access Lo _
�
���La.e€�� �aR v�
�
7X I
12 '
v��o I
OdNJ
P?°adH
md��
'� ad Q
aN
�
�
�
sx
�a2„ a
oo-��
�°�vm
>�m$
a a°" a
h ,
0
�—
W �
Z
g -
2 � 3
IJ
W 24 23
Z25
m
27
��� _�
NiGHT SAGE
22 � 21
zvc
13
Private Open
Space & Public
Pedestrian
Access Lot
zs CLOUDVEII
TER CE
2s 2a
13
8�-��K �R�, PhR�� 4
C�UN.�RY OS \�� gA2
cr+eu°Po 7'or�� �
S�N�
�
---/---
--f-
_�
EXHIBIT B1 — STORM DRAINAGE
o N� Zao� EDWARDS RANCH RIVERHILLS
PHASE 3
DATE: JULY 25, 2013
5 �
Q�
��
�d —
om^
�O
��
�
20 yN
��
r ¢°
0
E
4
15
20 t9
��e--���`�`�`
I '-��
: I I I I I
' _I_ �J----� — — `
I
� —
�'I J��
I I I I I
I I I I I
_i����_�—�-
� � I I
I FPNP E � � I
.. L _ � —' ._ 1-------"� �
HUNTLY
DRIVE
22
�
23
_ _ �_ _ ...--------�---- — __
� � � �
I I I I
I I I�T_y
I I
17 16 I I
18
_ �
-- �
21 20 �g I
I
g�O�Y �PY PPa424
�pUN1R gU�G
cPe\NPD ZpN�N
S�H���
LEGEND
PROPOSED STORM DRAIN INLET
EXIST STORM DRAIN INLET
PROPOSED STORM DRAIN MANHOLE
PROPOSED STORM DRAIN HEADWALL
OWNER/DEVELOPER: Ii�1I pELOTON
CASSCO DEVELOPMENT � I ��NP so��T�oNs
COMPANY 5751 KROGERDRIVE
4200 SOUTH HULEN, SUITE 614 SUITE 185
FORT WORTH, TX 76109 KELLER, TX 76244
PHONE:817-731-7396 PHONE:817-562-3350
�
00
-- - - - -- -
�pWARO� GEREN �7O
e�ay�7so�n
A��o��aw�� ��iv� _ P��°NTI,� _
�. �_____- - - - _ _
� O
0 ,X� �
�_ � ----r-
� � � A�LEY A Q ZZ
�
Q17 18 19 20 21
1 16 � �
Space & Pubi(c BEN ELM
� 15 Pedestnan �
� Q Access Lot , �
�OOI� � J 14 �'X
i 0
� ,3
AILEY C
� � � �2 —
� � �
� II I 1�
Q i OO
�
� � 1X-
� �Z
CL'
hw
�i ��
�
�' I
CL�
I
I
__J
E3ELLRBF��
���VE
sx
d� o
Oa�J
muau
�� 0,4' Q
ay
I�
Z 3
,
t4
22 21
23
24 I 23
�' _
�- T NIGHT SAGE L NE
� 25
Z
W
m
27
z�x
�Ei �.Al��- �C�tVE
/ .�
�
i
i
I
EXHIBIT C - STREET LIGHTS
4 5 c
�:�
�<
-��
a�
�o
�?
3
20 y�
�n
�n m
rQ
0
22 � 21
20 19
HUNTLY
2� DRIVE
13 ZZ
Private Open
Space 8 Public
Pedestrian �
Access Lot
�_
23
26 CLOUDVEIL
TER ACE
25 24
—_ 13_— --
0� ��� pPY PP�24
GpUtJ�R N��G
c�e���Po ZO �
SCHpO
Q NOR H 200� EDWARDS RANCH RIVERHILLS
PHASE 3
�
�
�_--���_-�-�-�_
, -
: � � � � �
� _I_ J--'--`
I
�� —
_--- ----
� I —I ��---
I I I I I
I I I I _�I� -
--i-�- -�-- -T-�-- —�-
I � �
II FPNA � � � i
_J���"'_'_—��
�
�—�—
_ — _------
� � � � �
I I I II
I I I�� �_ 1.
I I
18 �� 16 I I
�
I
21 20 19 I
I
� g�pGK HR,� pPRK
I �Og1aETPS��o�aq2a
( �P , o ZON�N
P SCN���'
LEGEND
PROPOSED STREET LIGHTS
EXIST STREET LIGHTS
OWNER / DEVELOPER: �j�I� pELOTON
CASSCO DEVELOPMENT I I ��No ,o��T,oN�
COMPANY 5751 KROGERDRIVE
4200 SOUTH HULEN, SUITE 614 SUITE 185
FORT WORTH, TX 76109 KELLER, TX 76244
PHONE:817-731-7396 PHONE:817-562-3350
I�p 7X
�2
� 12 9
8
il
I �
ALLEY
� _ _
�
�
�
(
U
6s!� �
4
mafm� 2 3
iov�� W � 15
ao°'¢ Z
� g
I�
II �
� ' 5
a
I � 12 3
OO�� I �
� � 2
1
I
�� — �
I iX I
OO �
Private Open Space
Lot & Pubiic Pedesirian
Access Lot
--�