HomeMy WebLinkAboutContract 44828 (2)�K� ►�a�� ���.i � �� y�y�N �Y�e� ��u� i�.�
THE STATE OF TEXAS §
City Secretary
�.
COiTNTY OF TARRANT § Contract No. � �.��
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project") within the City
of Fort Worth, Texas ("City"); and
WFIEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the Improvements.
Developer and Project Information:
er Company Name: Spiing Ranch Investments, L.P.
Address, State, Zip Code: 2588 E. Long Ave. � Fort Worth, TX 76137
Phone, E-Mail: (817) 877-0422, spatterson@pattersoncommercial.coin
Authorized Signatory/Title: Steve Patterson, Manager
Project Name and Brief Description: Water, Sewer, Paving, Drainage & Street Light Improvements to
serve Spring Ranch Ph. 2
Project Location: 12900 Block of Willow Springs Rd.
Plat Case No.: FP-013-015 Plat Name: Spring Ranch Phase Two
Council District: 7
To be completed by staff.
Received by:
City Project No: 02115 CFA: 2013-048
�
;� ` � - � ,: �
_,
�'�:'iMIaRTH, TX
DOE: 7058
c�
Date: i� ��:��5' l ( ,�
��ECEIIiED SE� 2 3 2r1►,�
NOW, THEREFORE, For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Coimnunity Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Foi�t Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to
comply with all provisions of said Policy in the performance of its duties and
obligations hereunder and to cause all contractors hired by Developer to comply with
the Policy in connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section
II, of the Policy and recognizes that there shall be no reduction in the collateral until
the Project has been coinpleted and the City has officially accepted the
Improvements. Developer further acknowledges that said process requires the
contractor to submit an Affidavit of Bills paid signed by its contractor and Consent
of Surety signed by its surety to ensure the contractor has paid the sub-contractor
and suppliers in full. Additionally, the contractor will provide in writing that the
contractor has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by
this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved constiuction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A�LSewer (A-1)
_X Paving (B) _X_, Storm Drain (B-1) _X_, Street Lights & Signs (C)_X_.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in confoi�-nance with paragraph 8, Section II, of the Policy.
F. For all I�nprovements included in this Agreement for which the Developer awards
construction conh•act(s), Developer agrees to the following:
i. To employ a constiuction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being insured, licensed and bonded to do
work in public streets and/or prequalified to perfonn water/waste water
conshuction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
2
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the Improvements, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the Improvements for
a period of two (2) years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be furnished
before work is commenced and to meet the requirements of Chapter 2253, Texas
Government Code.
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional
insured on all insurance required by said documents and same will be evidenced on
the ACORD Certificate of Insurance supplied by the contractor's insurance
provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction Seivices
Division of intent to commence construction so that City inspection personnel will
be available; and to require the contractor to allow the construction to be subject to
inspection at any and all times by City inspection forces, and not to install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents submitted to
the City to schedule a Pre-Constiuction Meeting. The submittal should occur no
less than 10 working days prior to the desired date of the meeting. No construction
will commence without a City-issued Notice to Proceed to the Developer's
contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and seivice
lines have been completed to the satisfaction of the Water Department.
G. Developer agrees to provide, at its expense, all engineering drawings and documents
necessaiy to construct the improvements required by this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in the
relocation of any utilities that are or may be in conflict with any of the community
3
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current
and future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real or
asserted, brought for or on account of any injuries or damages sustained by any
persons (including death) or to any property, resulting from or in connection
with the construction, design, performance or completion of any work to be
performed by said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the work, or
on account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or employees,
whether or not such iniu�ies, deatlz or danta�es are caused, ifz wlzole or in
part, bv the alle�ed ne�li�ence of the Citv of Fort YVortlt, its officeNs, servants,
or etnployees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its of�cers, agents and employees from and against any and all
claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, wlzether or not such
iniuYies, death oY dafna�es are caused, itt fvhole oN itt part, bv the alle�ed
neQli�ence of the Citv of Fort WoYth, its officers, servants, of• enaplovees. Further,
Developer will require its contractors to indemnify, and hold harmless the City for
any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in
a good and workmanlike manner, free from defects, in conformance with the
Policy, and in accordance with all plans and speci�cations.
N. Upon completion of all wark associated with the constiuction of the infrastructure and
Improvements, Developer will assign to the City a non-exclusive right to enforce the
�
�
contracts entered into by the Developer with its contractor along with an assignment of
all wananties given by the contractor, whether express or implied. Further, Developer
agrees that all contracts with any contractor shall include provisions granting to the
City the right to enforce such contracts as an express intended third party beneficiary
of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of the
total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of
the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. If applicable, the City's obligation to participate (exclusive of front foot charges) in
the cost of the Improvements shall terminate if the Improvements are not
completed within two (2) years; provided, however, if construction of the
Improvements has started within the two year period, the developer may request
that the CFA be extended for one year. If the Improvements are not completed
within such extension period, there will be no further obligation of the City to
participate. City participation in a CFA shall be subject to the availability of City
funds and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its �nancial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's iinancial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years fi�om the date of this Agreement the Improvements have
not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion of
E
the construction of the Improvements or to cause the payment of costs for
constiuction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the propei�ty which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
�
Cost Summary Sheet
Project Name: Spring Ranch Ph. 2
CFA No.: 2013-048
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Tota/
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub-Total for Water Construction Fees
E. TPW Inspection Fee (4°/a)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub-Total for TPW Construction Fees
Total Construction Fees:
DOE No.:7058
Developer's Cost
$ 70,524.10
$ 88,916.50
$ 159,440.60
$ 201,006.20
$ 21,177.40
$ 38,582.99
$ 260,766.59
$ 420,207.19
$ 3,188.81
$ 3,188.81
$ 6,377.62
$ 8,887.34
$ 4,443.67
$ 1,543.32
$ 245.00
$ 15,119.34
$ 21,496.96
Choice
Financial Guaiantee O tions, choose one Amount (ck one)
Bond = 100% $ 420,207.19
Com letion Agreement = 100% / Holds Piat $ 420,207.19
Cash Escrow Water/Sanita Sewer= 125% $ 199,300.75
Cash Escrow Paving/Storm Drain = 125% $ 325,958.24
Letter of Credit = 125% w/2 r ex iration eriod $ 525,258.99
%
Check items associated with the project being undertaken; checked items must be included as
Attachments to this Agreement
Included Attachment
� Location Map
� Exhibit A: Water Improvements
� Water Estimate
� Exhibit A-1: Sewer Improvements
� Sewer Estimate
� Exhibit B: Paving Improvements
� Paving Estimate
� Exhibit B-1: Storm Drain Improvements
� Storm Drain Estimate
� Exhibit C: Street Lights and Signs Improvements
� Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
�
IN TESTIMONY WIIEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the coiporate seal of the City affixed, and saicl Deve�lo�er has executed t�ii�-
instrument in q�adruplic�te, at Foi�t Worth, Texas this ,-�� �c I. day o£�.� ' �
, 20�Z•
CITY OF FORT WORTH - Recofntnett�ler� by:
Water Department
Wendy Chi-Babulal, EIVIBA, P.E.
Development Engineering Manager
Approved as to Fof�m & Legality:
�- � � �_
Douglas W. Black
Assistant City Attorney
M&C Na �''�i ;"
Date:
ATTEST:
. .
�l �
, / %/`� \ i
�
,r��l
aiy J. Kays '
City Secret���� �
ATTEST:
-� _�
..�
.�
�
DEVELOPER:
Spring Ranch Investments, L.P.
By: Bowie Holdings, LLC
its general partner
Signature
(Print) Name:
�
Transportation & Public Works Department
� (,✓�
Dougla�N. Wiersig, P.E.
Director
Approved by City Manager's Office
P ��-r�a�, .� �_.
Fernando Costa
Assistant City Manager
i�r�,-
6� ,
�` `
�
-:,.
��s,;
Signature
PrintName: .S•�-.e.`/.Z.- �'��;-(--�e.v^j��
Title: ;/Y� ��4� �,L
� , ,� -�,�
-,
�• .
r �.
LOCATION MAP
"SPRING RANCH, PHASE 2"
D.O.E. N0: 7058
WATER N0: P265-607150211583
SANITARY SEWER N0: P275-707130211583
STREET/STORM DRAIN N0: W-2268
CITY PROJECT �l�J. 02115
X-22289
WELCH ENGINEERIl�TG, I NC.
CO/VSUL T/NG ENG/NEERS
j 100� DEVEI.OPER'S COST 8"
T WATER LINES, FIRE HYORANTS,
~ GATE VAI.VES AND ASSOCIATED
APPURTENANCES
EXISTING WATER LINES, FIRE
' HYDRANTS, GATE VALVES AND
,;
z �`""`"" `" �" " - -"" ASSOCIATED APPURTENANCES
EXHIBIT "A"
WATER IMPROVEMENTS
"SPRING RANCH, PHASE 2"
SCALE: 1 "=200'
D.O.E. N0: 7058
WATER N0: P265-607150211583
SANITARY SEWER N0: P275-707130211583
STREET/STORM DRAIN N0: W-2268
�ITY PR�JECT N(i. 02115
X-22289
WELCH ENGINEERING, I NC.
CONSUL T/NG ENG/NEERS
100% DEVELOPER'S COST
8" SANITARY SEWER LINES AND
ASSOCIATED APPURTENANCES
- _ . ._.__ _..fy _ _....
EXISTING 8�� SANITARY SEWER
- �INES AND ASSOCIATED
APPURTENANCES
EXHIBIT "A-1 "
SANITARY SEWER IMPROVEMENTS
"SPRING RANCH,
WELCH
PHASE 2"
SCALE: 1'�=200'
O.O.E. N0: 7058
WATER N0: P265-60715021 t 583
SANITARY SEWER N0: P275-707130271583
STREET/STORM DRAIN N0: W-2268
CITY PROJECT R�O. 02115
X-22289
ENGINEERIl�TG, I NC.
CONSUL T/NG ENG/NEERS
��•. � •- - •
►`i•�'i�i�i
����������� . • .
.�
SCA�E: -1"=200'
EXHIBIT "B"
PAVING IMPROVEMENTS
"SPRING RANCH,
\� _�
PHASE 2"
D.O.E. N0: 7058
WATER N0: P265-607150211583
SANITARY SEWER N0: P275-707130211583
STREET/STORM DRAIN N0: W-2268
CITY PROJECT N0. 02115
X- 22289
ENGINEERIl�TG, I NC.
CONSUL T/NG ENG/NEERS
�.__._�__�__.____
GRADE TO DRAIN
H
.
��� �1
�:���:,
100� DEVELOPER'S
STORM SEWER AND
1009� DEVELOPER'S
ROCK RIP RAP
COST
HEADWALL
COST
EXISTING STORM SEWER AND
HEADWALL
SCALE: 1 "=300'
EXHIBIT "B -1 "
STORM DRAIN IMPROVEMENTS
"SPRING RANCH, PHASE 2"
D.O.E. N0: 7058
WATER N0: P265-607150211583
SANITARY SEWER N0: P275-707130211583
STREET/STORM DRAIN N0: W-2268
CITY PROJEGT R�O. 02115
X- 22289
WEI.,CH ENGINEERIl�TG, I NC.
CONSUL T/NG ENG/NEERS
! . _ � ._. I_. ' ' . ..
_ .._ ,._ . ._ ._ , ... _ . _ __ ._. _ -_� __ __ . ... ,.. _. .. - f-- .._ ._ . .{ _.. _.. .._
�� r- - i i �
�
�
f
1
�
_ _ _._. _._
BLUFF
, ?
' � i
SPRINGS� DRIVE j
! r__ � _. _�___
---__ _ T_ _ ^ _� �-_���::
__ . �-.
.. i,
�� � .
,ti , .
�
�
0
,,. �
//
DURANGO� SPRINGS ORIVE!
{ J
.� ...._�.�
�
i
�
. _ r.. i --
�
i
��
ol
=)
�
_
U
I
I
��
*-- PROPOSED STREET �IGHT (100� DEVELOPER'S COST)
p-- PROPOSED STREET SIGN (100� DEVELOPER'S COST)
�-- PROPOSED GROUND BOX (100% DEVELOPER'S COST)
�,�` -- EXISTING STREET LIGHT
WELCH ENGINEERIl�TG
CONSUL T/NG ENG/NEERS
� .._.��---
�
I
SCALE: 1 "= 200'
D.O.E. N0: 7058
EXHIBIT ��C�� WATER NO: P265-607150211583
SANITARY SEWER N0: P275-707130211583
STREET LIGHTS STREET/STORM DRAIN N0: W-2268
"SPRING RANCH, PHASE 2" X'T22289JECT N0. 02115
I rTc.
SECTION 00 42 43
PROPOSAL FORM
PROJECT:
SPRING RANCH - PHASE TWO
UNIT PRICE BID
UU 4L 43
BID PROPOSAL
Page 1 of 4
DATE: 07-21-13
Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item No. Descri tion Specification Unit of gid
p Section No. Measure Quantity Unit Price Bid Value
,: . _ ,.:
,
ZT�tIT l, WATEI� �1VIPROYEMENTS , `. = , : : - ; -
_.._ . , . .. , ,_. _,._. . .: _ :., . -.. _< ;� �...
_ __ __ . :. ,. ...� .�.
3311.0261 8" PVC Water Pipe 33 11 12 LF 1,576 $24.10 $37,981.60
3311.0141 6" PVC Water Pipe 33 11 12 LF 30 $16.20 $486.00
3312.3003 8" Gate Valve 33 12 20 EA 2 $1,185.00 $2,370.00
3312.3002 6" Gate Valve 33 12 20 EA 3 $950.00 $2,850.00
3312.0103 Connect. to Existing 8" Water Main 33 12 25 EA 2 $300:00 $600.00
3312.0001 Fire Hydrant 33 12 40 EA 3 $3,463.00 $10,389.00
3311.0001 Ductile Iron Water Fittings 33 11 11 TON 1 $2,612.00 $2,612.00
3305.0109 _ Trench Safety 33 OS 10 LF 1606 $0.25 $401.50
3312.2003 1" Water Service 33 12 10 EA 23 $558.00 $12,834.00
IJNIT 1: WATER IMPROVEMENTS BID SUMMARY $7o,52a.10
Project Item Information Bidder's Proposal
Bidlist Item No. Descri tion Specification Unit of Bid
p Section No. Measure Quantity Unit Price Bid Value
I�TIT 2;SAN�TA.1�Y SE�R IMPRO VEN�NTS .
_ . __, ., _, - ,�, , _ ,. �; � �, ,,. �
3331.4115 _ 8" PVC Se��er Pipe 33 I 1 10 LF 1,604 $28.50 $45,714.00
3331.4116 _ 8" PVC Se�ver Pipe, CSS Backfill 33 11 10 LF 83 $30.90 $2,564.70
3339.1001 4' Manhole 33 39 10 EA 5 $2,360.00 $11,800.00
9999.0003 _ 4' Manhole over Live line 33 39 10 EA 1 $3,294.00 $3,294.00
3331.3102 4" Se��er Service, T��o-��ay cleanout 33 31 50 EA 24 $525.00 $12,600:00
9999.0004 Connect to existing sanitary se�ver EA 2 $502.00 $1,004.00
3301.0002 _ Post-CCTV Inspection 33 O1 31 LF 1,687 $1.15 $1,940.05
3301.0101 Manhole Vacuum Testing 33 O1 30 EA 6 $135.00 $810.00
3305,0109 Trench Safety 33 OS 10 LF 1,687 $0.25 $421.75
0241.0401 Remove Concrete Drive 02 41 13 SF 135 $11.40 $1,539.00
0241.1000 Remove Concrete Pavement 02 41 15 SY 20 $94.00 $1,880.00
9999.0005 R/R Existing. Dual Storm Head1va11 EA i $4,584.00 $4,584.00
9999A006 Replace Grass Sod, Lot 1, Block 8 SY 250 $3.06 $765.00
IJNIT 2: SANITARY SEWER IMPROVEMENTS BID SUMMARY $8s,916.so
CITY OF FORT WORTH SPRING RANCH, PHASE TWO
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DOE: 7058
Form Revised 20I20120
('ifv Prnirrt Nn �(l� 1 1 S
SECTION 00 42 43
PROPOSAL FORM
PROJECT:
SPRING RANCH - PHASE TWO
UNIT PRICE BID
00 42 43
BID PROPOSAL
Page 2 of 4
DATE: 07-21-13
Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item No. Descri tion Specification Unit of
p Section No. Measure Bid Quantity Unit Price Bid Value
LTNI�' 3; STQI�M DRAiN Il!'�PRO�EMENTS` '
�; _, , �
� _ � . .. �, , _ . � � . ,� _
_ . _. , , � �� �
_ <:
3305.0109__ Trench Safety 33 OS 10 LF 144 $0.25 $36.00
3341.0302 30" RCP, Class III 33 41 10 LF 144 $59.35 $8,546.40
3349:4207 30" SET, 3 pipes 33 49 40 EA 2 $3,420.00 $6,840.00
3125.0101 _ SWPPP> 1 acre 31 25 00 LS 1 $1,835.00 $1,835.00
3137.0104 Mediaum Stone, Riprap, dry 31 37 00 SY 49 $80.00 $3,920.00
LTNIT 3: STORll�I DRAIN IMPROVEMENTS BID SUMMARY $21,1��.40
CITY OF FORT WORTH SPRING RANCH, PHASE TWO
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DOE: 7058
Form Revised 20120120 r�ry Pr�;P�r rr� m i t s
SECTION 00 42 43
PROPOSAL FORM
PROJECT:
SPRING RANCH - PHASE TWO
UNIT PRICE BID
00 42 43
BID PROPOSAL
Page 1 of I
DATE: 07-21-13
Bidder's Application
Project Item Information Bidder's Proposal
Bidiist Item No. Descri tion Specification Unit of
p Section No. Measure Bid Quantity Unit Price Bid Value
7 S���k �,; f��� ������?z/ 4� �'S� � l 3i �t �� r� At .y' t :; . 'fa .
y�� Y� � F ,. t 's s
lJ�,�,��. Y � SJ�� a. ,,:_ a..'<� � ��., r�, y _„ ry r� t .� �S �, � � ,'i��rr r h...,�. > ,ir 4_. �t� . •�:Ur ,°--?� �,t�';� ��' �,,
..��.,.-.-. . -_ . s . ,.�—.�„ ..�:.e,ii�'
3213.0101 6"ConcPvmt 321�313 SY 5,095� $31.03 $158,097.85
3211.0501 6" Lime Treatment 32 11 29 SY 5,426 $3.00 $16,278,00
3211.0400 Lime • 321129 TN 81.39 $165.00 $13,429.35
3123.0101 Unclas. excavation in ROW incl. bar 31 23 16 CY 12000 $0.50 $6,000.00
ditches
9999.0007 4" Solid White Strip LF 3050 $1.50 $4,575.00
9999.0008 Street barricade LF 30 $39.00 $1,170.00
9999.0009 Connect to exist. conc. street pvmt. EA 1 $1,000.00 $1,000.00
3217.2102 REFL Raised Maker TY I-C 32 17 23 EA 38 $12.00 $456.00
UNIT 4: PAVING IMPROVEMENTS BID SUMMARY S2o1,o06.20
CITY OF FORT WORTH SPRING RANCH, PHASE TWO
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DOE: 7058
SECTION 00 42 43
PC�'• :_ •►U
PROJECT
SPRING RANCH - PHASE TWO
UNIT PRICE BID
UU 42 43
BID PROPOSAL
Page 3 of 4
DATE: 07-21-13
Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item No. Description Specification Unit of Bid Quantity Unit Price Bid Value
Section No. Measure
i�Ni� 5 'STREE� LYGHTI�7G IMFRO�'El�!IENT� :; -
34413101 D25-6 Pole �v/100W HPS PC Lighting 34 41 20 � EA �� $1,363.25 $9,542.75
Fixture
3441.3011 2" CONDT PVC SCH 80 (T) 26 OS 33 LF 1539 $8.93 $13,743.27
9999.0011 3#10 THWN Copper CLF 1539 $2.73 $4,201.47
9999.0012 Ground Boxes 34 41 ZO-D624 EA 2 $828.00 $1,656.00
9999.0013 Foundation - Type $ 34 41 20-D622 EA 7 $1,053.50 $7,374.50
3441.3002 Rd�vy. Illum. Assembly TY 8,11,D-25 34 41 20 EA 7 $295.00 $2,065.00
UNIT 5: STREET LIGHTING IMPROVEMENTS BID SUMMARY �3s,582.99
CITY OF FORT WORTH SPRING RANCH, PHASE TWO
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DOE: 7058
Form Revised 20120120 Ciry Project No.: 02ll 5
BID QUALIFICATION:
01 This proposal is submitted with the understanding that the owner's
credit and financial arrangements for making payment under the
Contract are satisfactory to Stabile & Winn, Inc.
02 Partial Payments on the Fifteenth of the next month, Final
Payment immediately upon acceptance from Owner.
03 Two Year Maintenance Bond is included.
04 All Testing, Soil Series, and Coring for Compliance to be furnished & paid for by others.
05 All Construction Staking is not Included.
06 Inspection Fees, if any, to be paid for by others.
07 Backfill all work is included.
08 Utility Reloc�tions, if any, to be furnished & paid for by others.
09 Temporary Barricades with Lites & Signage are included.
10 tmported Material (Topsoil, Select Fill, etc.) & Seeding Parkways are not included.
11 Concrete Header is Included (Included in Item 01).
12 After the Utility Contractar has completed their work, the Street
Subgrade and Parkways must be restored to +/- 0.10 Ft. by others
or it will be done on a Force-Account-Basis.
13 Sales Tax is not included.
14 The Erosion Control Plan (SWPPP) and the implementation of
the plan are not included. However, the maintaining of the
existing implementation is included.
15 Unit 4: Paving Improvements: Pay Item 3123.0101 Unclassified Street Excavation: This Pay
Item is Not A Part of This Contract.
16 Unit Prices are contingent upon all the incorporated materials being installed prior to
December 31, 2013. If all the incorporated materials cannot be installed within this time frame,
then our unit prices maybe subjected to increases due to delays that are not within our cause
or scope of work, and shall be treated as a Change Order to the Contract.
This Bid Qualification is a part of this Contract.
Contractor: STABILE & WINN, INC.
�
John W. Stabile
President
��,.
. �. ,
�� ,,:
PART B - PROPOSAL (Cont.)
Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and
will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the
faithful performance of the Contract.
The undersigned bidder certified that he has been furnished at least one set of the General Contract
Documents and General Specifications for Water, Sanitary Sewer, Drainage, Paving and Street Lighting that
said Contractor has read and thoroughly understands all the requirements and conditions of those General
Documents and the specific Contract Documents and appurtenant plans.
The successful bidder shall be required to perform the work in accord with City of Fort Worth Construction
Standards
The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors, or employment agency in either furnishing or referring employee applicants
to the under'signed are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as
amended by City Ordinance No. 7400.
The Bidder agrees to begin construcfion within /c calendar days after issue of the work order, and
to complete the contract within �'� working days after beginning construction as set forth in the
written work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
✓A, The principal place of business of our company is in the State of % r�� �
Nonresident bidders in the State of , our principal
place of business, are required to be percent lower than resident bidders
by state law. A copy of the statute is attached.
Non resident bidders in the State of , our principal
place of business, are not required to underbid resident bidders,
B. The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
I(we) acknowledge receipt of the following addenda to the plans and specifications, all of the
provisions and requirements of which have been taken into consideration on preparation of the
foregoing bid:
Addendum No. 1 (Initials)
Addendum No. 3 (Initials
Addendum No. 2(Initials) Addendum No. 4(Initials)
Respectfully submitted,
�`I�—' .�' G-�' `r/.`.e•�, �''..+�.
. � '
.
, �
.�'�
Title /�..�c.r%d�«�
Address
�-b 8�� � 9.��a
••r,.ac�., %�'�rc.+d �s �7 9
Telephone: �i7—�7-2o�G
(Seal)
Date: A�.,...ti° �� z o i3
PART B - PROPOSAL (Cont,)
Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and
will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the
faithful performance of the Contract,
The undersigned bidder certified that he has been furnished at least one set of the General Contract
Documents and General Specifications for Water, Sanitary Sewer, Drainage, Paving and Street Lighting that
said Contractor has read and thoroughly understands all the requirernents and conditions of those General
Documents and the specif c Contract Documents and appurtenant plans.
The successful bidder shall be required to perform the work in accord with City of Fort Worth Construction
Standards
The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors, or employrnent agency in either furnishing or referring employee applicants
to the under'signed are not discriminated against as prohibited by the terms of City Ordinance No, 7278 as
amended by City Ordinance No, 7400.
The Bidder agrees to begin construcfion within �_ calendar days after issue of the work order, and
to complete the contract within �_ working days after beginning construction as set forth in the
written work order to be furnished by the Owner.
(Complete A ar B below, as applicable:)
A. The principal place of business of our company is in the State of
Nonresident bidders in the State of , our principal
place of business, are required to be percent lower than resident bidders
by state law. A copy of the statute is aitached.
Non resident bidders in the State of , our principal
place of business, are not required to underbid resident bidders.
B, The principal place of business of our company or our parent company or
ajority owner is m the State of Texas.
I(we) acknowledge receipt of the following addenda to the plans and specifications, all of the
provisions and requirements of which have been taken into consideration on preparation of the
foregoing bid:
Addendum No. 1 (Initials)
Addendum No. 2 (Initials
Respectfully s�bmitted,
C��� L�/�l5fn�
.
.
�,r. , . �dI .�.._..�.
_� .� �
.
Addendum No. 3 (Initials)
Addendum No. 4 (Initials)
�
�i�,�
Telephone: ����� ���
(Seal)����j�
Date:
��:�/����5� � � .