Loading...
HomeMy WebLinkAboutContract 53670-A2 CSC No. 53670-A2 AMENDMENT No.2 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Neel-Schaffer, Inc. , (ENGINEER) made and entered into City Secretary Contract No.53670, (the CONTRACT) which was authorized by M&C 20-0094 on the 18th day of February, 2020 in the amount of $300,577 . 00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $27,690. 00 which was administratively authorized on October 10, 2020; and WHEREAS, the CONTRACT involves engineering services for the following project: Water & Sanitary Sewer Replacement, Contract 2019 WSM-D; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $8,795. 00 (Sewer) . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $337,062 . 00 . 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX Page -1- EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Neel-Schaffer, Inc. f Dana SurandoFF Dana aurghdoH CJa,15,20212132 CST) I Dana Burghdoff Ames P. Amick, P.E. f Assistant City Manager Engineer Manager DATE: Jan 15,2021 DATE: I APPROVAL RECOMMENDED: Cyirir��olc f�ardet- Christopher Harder(Jan 15,202107:50 CST) Chris Harder, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Liam Conlon Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A Wax, Douglas W. Black Senior Assistant City Attorney �oov�u��� ATTEST: O�F..... . a� ° O UI/� ova °g�=d� Q o*�0 Mary J. Kayser 0 *°°° ° i°°°°°5 as City Secretary n� EXA�- OFFICIAL RECORD CITY SECRETARY Page -2- FT.WORTH, TX III NEEL--SCHAFFER = Solutions you can build upon January 11, 2021 Mr. Liam Conlon City of Fort Worth-Water Department 311 West loth Street Fort Worth,Texas 76102 Reference: West Long Avenue Water and Sanitary Sewer Replacement Contract 2019, WSM-D, City Project Number 102300; Amendment 2 for Additional Services to Incorporate Second Consultant Sanitary Sewer Drawings and Specifications Manual into Existing Documents Dear Liam: Neel-Schaffer, Inc. offers additional Professional Engineering Services for this project. These additional services were requested by the City of Fort Worth, since there is a nearby sanitary sewer project which is desired to be included in our bid set. The sanitary sewer documents to be included into the Existing Contract 2019 WSM-D Project are being prepared by Visintainer Engineering,PLLC and include line segments: • A portion of L-4717 sewer line in existing alley between 20'h Street and 21"Street and being from approximate Station 4+60.00 to approximate Station 8+96.00 • A portion of L-2024 sewer line in existing alley between 22nd Street and 21" Street from approximate Station 4+61.99 (AHD)to approximate Station 10+67.40 • A portion of L-2023 sewer line in existing alley between 22❑d Street and 23' Street from approximate Station 0+00 to approximate Station 15+78.00 The above described four sanitary sewer plan and profile sheets along with an Overall Sanitary Sewer Layout sheet, a single Sanitary Sewer Details sheet, an Overall Traffic Control Plan sheet, two Traffic Control Detail sheets, an Overall Erosion Control Plan sheet and a single Erosion Control Details sheet, all prepared, signed and sealed by Visintainer Engineering, PLLC will be inserted into our drawing set at the back. Modifications to the existing cover sheet, to include depicting the general location of the above described lines and providing a space for seal and signature by Visintainer Engineering, PLLC will be included in this amendment, as will the coordination in providing a space for seal and signature by Visintainer Engineering,PLLC on the Specification Manual. 0:Vobs\15716-FTW Long Ave\Admin\Contract\Am 2\Amendment 2 Letter.doc ARLINGTON • DALLAS • FORT WORTH • HOUSTON engineers ^ planners • surveyors • environmental scientists • landscape architects 515 Houston St., Ste. 751 - Fort Worth, TX 76102 •phone: 817-870-2422 •fax: 817-870-2489 •www.neel-schaffer.com Mr. Liam Conlon January 11,2021 Page 2 Neel-Schaffer will provide the following: • Briefly flip through the drawings being added to evaluate inconsistencies between the old and new drawings. • Add specifications for the new drawings based on the City provided (from Visintainer Engineering,PLLC)opinion of probable construction cost. • Perform a site visit to the areas of new work to familiarize ourselves with the added sewers. • Revise existing drawings and specifications for coordination with new documents as determined by the City. • Incorporate the documents for bidding purposes and coordinate bidding questions. As discussed, there seem to be a few inconsistencies between the existing drawings and the new drawings. The City has agreed to have Visintainer Engineering,PLLC: • Provide a quantities sheet for their portion of the total project. • Acknowledge the existing General Notes sheet is adequate for covering the construction of their portion of the work. • Determine if Specification Section 33 31 12 (Cured in Place Pipe(CIPP))is needed. • Determine if Specification Section 33 11 10 (Ductile Iron Pipe)is needed. • Call out Specification Section 33 3120(Polyvinyl Chloride(PVC)if that is what is needed. • Determine if Bid list Item Number 11 for 3305.0113 —Trench Water Stops — Section 33 05 15 is needed. • Determine if Specification Section 33 05 15 is needed. • Determine if Bid list Item Number 13—3291.0100—Topsoil—Section 32 91 19 is needed. • Determine if Bid list Item Number 15 — 3211,0113 — 8" Flexible Base, Type A, GR-1 — Section 32 1123 is needed. • Determine if Bid list Item Number 17 —9999.0001 —As-Built Redline Survey— Section 01 71 23 — could be Pay Item 0171.0102 —Red Line As-Built Survey per City's most current pay item list. • Determine if Bid list Item Number 21 (the first 21) — 9999.0003 — Trench Cut Repair for Gravel Alley,2"Gravel—Section 99 99 99 is needed. • Determine if Bid list Item Number 22 (the second 22) - 9999.0002—Metal Fencing—Section 99 99 99 is needed. The minor differences in nomenclature in bid item descriptions between the new and old drawings will be not be addressed. NL Mr. Liam Conlon January 11,2021 Page 3 Neel-Schaffer, Inc. proposes to increase the contract amount by $8,795.00 for these additional services. See attached Level of Effort for backup. All additional services will be performed in accordance with the original contract dated March 18,2020. Summary of Contract Fee Original Contract Amount $300,577.00 Amendment No. 1 $27,690.00 Proposed Amendment No. 2 $8,795.00 Revised Contract Amount $337,062.00 If you have any questions or we may be of fiu-ther service,please call me at 817/909-2807. Sincerely, NEEL-SCHAFFER,INC. James P. Amick,P.E. Engineer Manager TBPE Firm Reg.No.F-2697 TBPLS Firm Reg.No. 10027200 I 0:Uobs115716-Fr'W Long Ave\Admin\Contraet\Am 2\Amendment 2 LcUmdoc I m � m aII d ' �m c d u n d o a.U M f , snow �� o uwi v m u�'i�NvoiN ow o 0 N N�n�mU O M O m 0 0 V w NU h N N O N n win h w w w win NU w w n � m N w Y N F yOj NON� wOOOU tOn vOi OM�O�nn� b i� O c y Cp N . W O N 0«N m m F- ww wmw ww wwww mm�� O � o Z U U U w w w N > O � C F. L N E a a c N Z N c o 0 0 0 0 0 w w w w w Q N m O o�hVO'1� Nw?N NN N owN O a H cl C!Oi% .mV'M M O U w U U U of m v a"i Z o F N 3', NO o o Nmv o to N Q L U M > H (0`1 w @ O m aW t❑f p� c ►-tq0.' �UZ v _�=C Cl � ❑ mo o mm NN o 0 W W 0 �d•O ❑ w w ox N L)a` i � � w 3 o w �n LL oO m a w O O A7U N N w w W •-00 0 0 0 O J v C N N N j ONO � ate+ � c �ro»whw h •� °'W w � N harN haN`- C'lN r m y y 0 .a N LL IL u' O C d A U N 0 0 0 0 O N O C 0 p O Z Z O O p 6 O 1: U M C U �j� a N arrN Nr O O �O 'a L LLj� •� 3� F �coi coi con m •c o_ ¢07U q Q O F- N O m O � a � •� = ama,� �_ ESN to ❑ yN� Noy m N Qnc❑N N �aei Own a m._ �3��-i mn o � Uu`. x`o3m C N p N> _ N Yid o M ❑�_^�N cN 2 o t o>ia K W Ufq cKQU vm p K pJ N m C U 3m z LL E A o yv I.CJ I.Ri U Q F-