HomeMy WebLinkAboutContract 53804-CO1 CSC No.53804-COI FORTWORTH. City of Fort Worth Change Order Request Project Namel Arcadia Trails Park Playground Replacements City Sec# 53804 Client Project#(s)1 102031,102032,102033 Project Replacement of playgrounds#2,#5,#6 Description Contractorl L.J.Deisgn&Construction,LLC Change Order#1 1 Date 12/17/2020 City Project Mgr. Patrick Vicknair City InspeGtorl Daniel Roy Contract Time Dept. PARD Totals CD Original Contract Amount $567,289.24 $567,289.24 90 Extras to Date $0.00 Credits to Date $0.00 Pending Change Orders(in M&C Process) $0.00 Contract Cost to Date $567,289,24 $567,289.24 90 Amount of Proposed Change Order $23,169.42 $23,169.42 79 Revised Contract Amount 590,458.66 $590,458.66 169 Original Funds Available for Change Orders $25,000.00 $25,000.00 Remaining Funds Available forthis CO $25,000.00 $25,000.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 4.08% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $709,111.55 JUSTIFICATION(REASONS)FOR CHANGE ORDER 1.The pandemic delayed the delivery of Bid List Item No.2-09 Proposed Playground Equipment(Prototype#1)at Playground#5 and Bid List Items No.2-12 and 4-02 proposed benches which affected the cirtical path of the construction schedule. 2.An owner requested change required the addition of concrete curbs adjacent to two existing trees at playground#5. 3.A calculation error of estimated bid quantities at playground#2 required increases in Bid List Item No.1-03,1-04,1-06,1-09,4-01. 4.An owner requested change required the replacement of an existing sidewalk at the entrance to playground#5 which increased Bid List Item No.2-03 and 2-04. 5.An owner requested change required the removal of a proposed concrete sidewalk which decreased quantities at Unit#2-Arcadia Trail Park Playground#5 Bid List Item No.4-02 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor s Company Name Contrac or Name" Contract Signature Date L.J.Desi n&Construction,LLC Greg Woolsey ins ecloLtlnspe OR-Supewisor _. _ =Project Mana er[Pro ram Manager Date wade Miller SAP 01-19-21 ni, ( 0115 GCSTi ad- 11 ( 101 A.M M1 A,kkW k Assistarif Die rr De"`t cfor,aCl9,n N- —ST- I Deotratn )epartment(Dept) Date 11 Assistant CityAttorney ;-7,Assistant City Manager Date —Iffir kvz�_Vtv- Council Action(if required M&C Number M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX City of Fort Worth Change Order Additions Project Name I Arcadia Trails Park Playground Replacements City Sec# 53804 Client Project# 1 102031,102032,102033 Contractor L.J.Deisgn d Construction,LLC PM Patrick Vicknair nspector Daniel Roy Change Order Submittal# 0 Date 12117I2020 ADDITIONS ni UnitCost o a oncre e curb installed adjacent to 2 existing trees #1-03 Remove concrete walk PARD 0 .00000 F 3.5 Proposed concrete walk 5 . 7 #1-06Sub-drainage system(grave(and filter fabric) PARD 2,61 000 F #-09 Proposed wood fiber safety surfacing PARD 2,611. 00 F 28 1 oncrete walks adjacent to tennis courts PARD 7 . 0 0 7 #- Remove concrete walk PARD 80.00000000 SF $3.25 #- Proposed concrete walk PARD 80.00 0 F 6. 7 PARD 1 $23,944.84 Sub Total Additiond��;J Change Order Additions Page 2 of 4 FORT WVORTH City of Fort Worth Change Order Deletions Project Name Arcadia Trails Park Playground Replacements City Sec# 53804 Client Project# 102031,102032,102033 Contractor L.J.Deisgn&Construction,LLC PM Pai ck Vicknair nspector Daniel Roy Change Order Submittal# 0 Date 12/17/2020 DELETIONS ty Unit Unit Cost I ota Delete proposed concrete walk PARD $775.42 Sub Total Deletions $775.421 Change Order Deletions Page 3 of 4 MISBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Patrick Vicknair Name of Employee Park Planner Title ❑ This form is N/A as No City Funds are associated with this Contract Patrick Vicknair Jacrickvicknair(Jan 27,20211u:z4 CST) Printed Name Signature 19� o0000 Attested by:MOT �dp000F - o4 City Secretary �o o9��d dvo o=A o �a*o o�)i 0O p0 /y 'EXpS��a OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX