HomeMy WebLinkAboutContract 54210-CO3 CSC No.54210-CO3
FoRT WOPTH City of Fort Worth
Change Order Request
Project Name: Water and Sanitary Sewer Replacement Contract 2014 WSM-B,Part 1 City Sec No.: 1 54210 ,
Project No.(s): seootoboouacoveo-56WM7Oo4axoneaa0iooromo43vc02460 DOE No. N/A City Proj.No.; 2383
Project Description: Water,Sewer Replacement and Pavement Rehabilitation on Bellaire Circle,Ranch View Road,South Hills Circle and
Westcliff Road South
Contractor; Jackson Construction,Ltd. Change Order# 3 Date: 1121/2021
City Project Mgr, Scott Tay)or City Inspector: Ramon Chavez
Phone Number: 817-392-7240 Phone Numbed 817-392-8306
Dept. Water Sewer TPW Totals Contract Time
(Calenderdays)
Original Contract Amount $3,673,699.00 $1,802,598.00 $1,238,615,00 $6,614,912.00 540
Extras to Date $69,525.00 $0.00 $0.00 $69,525.00 070
Credits to Date
Pending Change Orders(in MSC Process)
Contract Cost to Date $3,643,224.00 $1,802,598.00 $1,238,615.00 $6,684,437.00 610
Amount of Proposed Change Order •$14,247.30 $0.00 $0.00 -$14,247.30 015
Revised Contract Amount $3,628,976.70 $1,802,598.00 $1,238,615.00 $6,670,189.70 625
Original FundsAvailable for Change Orders $107,211.00 $54,078.00 $0.00 $161,289.00
Remaining Funds Available for this CO $37,686.00 $54,078.00 $0.00 $91,764.00
Additional Funding(if necessary) L: I —i
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 0.84%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $8,268,640.00
JUSTIFICATION (REASONS)FOR CHANGE ORDER
Change Order No.3 provides forthe following:
I
. The installation of a 42"x 12"tapping sleeve and valve at the Ranch View Road/Overton Park Drive West
inersection in lieu of the proposed 42"x 12"Tee and 16-feet of prestressed concrete pipe to minimize
closure time of the intersection.
. The abandoment of five water services on a project water main.
. The deletion of pay items that are no longer needed on the project.
Staff recommends the approval of 15 additional calendar days on the change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order,
Contractor's Company Name Contractor Name ) Contractor Signptu e- Dale
Jackson Construction,Ltd. Carmen Estep
Inspector Date Project Manager Date
iPc�xer� 1/25/2021 cep/ z 1/21/2021
Director Water Dept) Date Construction Supegisor JPW Dept Date
¢adz Jan 25,2021 19� 1/25/2021
Assistant City Attorney Date Assistant City Manager Date
Jan 27,2021 Jan LL]
Council Action If Required)
M&C Date Approved
OFFICIAL RECORD
M&C Number NIA PP
CITY SECRETARY
FT.WORTH, TX
V"nT' VV4)RT14 City of Fort Worth
ll�'4 Change Order Additions
Project Name Water and Sanitary Sewer Replacement Contract 2014 WSM-B,Part 1 City Sec No.: 54210
Project No.(s): 56002/0600430/C01780-56002/0700430/C01780- DOE No, N/A City Proj.No.: 2383
Project Water,Sewer Replacement and Pavement Rehabilitation on Bellaire Circle,Ranch View Road,South Hills Circle and
Description Westclitf Road South
Contractor Jackson Construction,Ltd. Change Order: Date: 1/21/2021
City Project Mgr, Scott Taylor City Inspector FRamon Chavez
ADDITIONS
DEPT Qty. Unit., UniE;Cost Total
62 42"x 12"Tapping Sleeve and Valve Water 1.00 EA $33,696.00 $33,696.00
63 Abandon 1.5"Water Service,capping @ main Water 5.00 EA $811.34 $4,056.70
i
(I
I
i
I
Water $37,752.70 I
€
Sewer
TPW
rage a oi'3 Additions Sub Total $37,752.70
k
Y
F®P,T d lP,,m City of Fort Worth
— Change Order Deletions
Project Name Water and Sanitary Sewer Replacement Contract 2014 WSM-B,Part 1 City Sec No.: 54210
Project No.(s): DOE No. N/A City Proj.No.: 2383
Project Description Water,Sewer Replacement and Pavement Rehabilitation on Bellaire Circle,Ranch View Road,South Hills Circle
and Westcliff Road South
Contractor Jackson Construction,Ltd. Change Order: FT] Date 1/21/2021
City Project Mgr. Scott Taylor City Inspector: Ramon Chavez
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit, Unit Cost Total
10 42"PCCP Water 20.00 LF $300.00$6,000.00
12 Connection to Existing 42"Water Main Water 2.00 EA $23,000.00$46,000.00
i
i
I
c
Water $52,000.00
Sewer
TPW
Pace 1 of 1 IDeletions Sub Total $52,000.00
t
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co it DATE AMOUNT
Total $0.00
I
I
i
i
Page 1 of 1
j� i
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
�'ce�t is 4-1
Signature
Name of Employee
Q« r�
Title
apF°F°Rr��a
ATTEST; c � � 0 °Odd
wavf t�° To�
SMary J, Kayser do �c
000000
City Secretary dd�ar4 TEXIe►So�p
�b x x*
5
I
[tt
I;
7
5
8
3
i
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX