Loading...
HomeMy WebLinkAboutContract 37972 CITY SECRETARY 3- n1io0M'01� co - NO SPECIFICATIONS ��..�ON7RACrOR AND �• ucmffmy CONTRACT DOCUMENTS -.�p1Yq�CE low FOR r CONCRETE RESTORATION (2008-1) ---- AT VARIOUS LOCATIONS IN THE CITY OF FORT WORTH, TEXAS CITY PROJECT NO. 01063 TPW PROJECT NO. C293-541200-204330106383 .: 2008 - MIKE MONCRIEF DALE A. FISSELER, P.E. MAYOR CITY MANAGER GREG SIMMONS, P.E., ACTING DIRECTOR TRANSPORTATION AND PUBLIC WORKS DEPARTMENT GEORGE A. BEHMANESH, P.E., ASSISTANT DIRECTOR TRANSPORTATION AND PUBLIC WORKS DEPARTMENT PREPARED BY TRANSPORTATION AND PUBLIC WORKS DEPARTMENT INFRASTRUCTURE GROUP OF to �.es •s•�•�IVAe ��•e/ • BMW s ♦.O• P OFFICIAL RECORD CITY SECRETARY ORIGINAL FT.WORTH,TX Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 8/5/2008 DATE: Tuesday, August 05, 2008 LOG NAME: 2000NCRE 2008-1 REFERENCE NO.: C-22959 SUBJECT: Authorize Execution of a Contract in the Amount of $613,900.00 with Laughley Bridge and Construction, Inc., for Concrete Restoration 2008-1 at Various Locations (City Project No. 01063) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract in the amount o $613,900.00 with Laughley Bridge and Construction, Inc., for 150 working days for Concrete Restoration 2008-1 at various locations. DISCUSSION: In the Fiscal Year 2007-2008 Contract Major Maintenance Program, various types of street maintenance techniques are grouped into specific contract packages. Concrete Restoration 2008-1 at various locations provides for repair of concrete panels in concrete streets at various locations funded from the Contract Street Maintenance Fund. The City reserves the right to increase or decrease quantities of individual pay items within the contract, provided that the total contract amount remains within plus or minus 25 percent of the contract award. This project was advertised for bid in the Fort Worth Star-Telegram on April 24, and May 1, 2008. On May 22, 2008, the following bids were received: BIDDERS AMOUNT Laughley Bridge and Construction, Inc. $613,900.00 McMahon Contracting, L.P. $623,400.00 Advanced Paving Co. $690,325.00 Cates, Courtney and Roebuck, Inc. $720,900.00 Laughley Bridge and Construction, Inc., is in compliance with the City's M/WBE Ordinance by committing to 19 percent M/WBE participation. The City's goal on this project is 19 percent. This project is located in COUNCIL DISTRICT 4. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Contract Street Maintenance Fund. http://apps.cfwnet.org/council_packet/Reports/mc_print.asp 8/8/2008 Page 2 of 2 TO Fund/Account/Centers FROM Fund/Account/Centers C293 541200 204330106383 $613,900.00 Submitted for City Manager's Office by: Fernando Costa (8476) Originating Department Head: Greg Simmons (8255) Additional Information Contact: George Behmanesh (7914) http://apps.cfwnet.org/council_packet/Reports/mc_print.asp 8/8/2008 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CONCRETE RESTORATION (2008-1) AT VARIOUS LOCATIONS IN THE CITY OF FORT WORTH,TEXAS CITY PROJECT NO. 01063 TPW PROJECT NO. C293-541200-204330106383 NAJIB FWRES,P.E. V DATE INFRASTRUCTURE MANAGER TRANSPORTATION AND PUBLIC WORKS DEPARTMENT �-0g� DhID TOWNSEND,P.E. DATE ENGINEERING MANAGER WATER DEPARTMENT TABLE OF CONTENTS 1. Notice to Bidders 2. Special Instructions to Bidders 3. Prevailing Wage Rates 4. Proposal S. Vendor Compliance 6. Minority and Women Business Enterprise Specifications 7. Special Provisions 8. Item 360,Concrete Pavement(Modified Specification) 9. Contractor Compliance with Worker's Compensation Law 10. Certificate of Insurance 11. Equipment Schedule 12. Experience Record 13. Performance Bond 14. Payment Bond 15. Maintenance Bond 16. Contract 17. Green Cement Policy Compliance Statement 18. Notice of Construction Detail 19. Project Designation Sign Detail 20. Other Details 21. Street Locations Sealed Proposals for the following: CONCRETE RESTORATION(2008-1) AT VARIOUS LOCATIONS CITY PROJECT No.01063 TPW PROJECT NO.C293-541200-207330106383 Submit package to City of Fort Worth, Purchasing Division, in the lower level of the Municipal Building, 1000 Throckmorton, Fort Worth, Texas 76102 until 1:30 P.M., Thursday, May 22, 2008, and then publicly read aloud at 2:00 p.m.,in the Council Chambers. As mandated by Fort Worth City Council Resolution 3535,all cement utilized for this project shall be procured from a kiln utilizing a dry kiln process or from any kiln that does not produce an excess of 1.71b of NOx emissions per ton of clinker produced. Bidder shall submit the `Green Cement Policy Compliance Statement' at the time of bid opening of the project. A copy of the Compliance Statement is included in the Contract Documents. Failure to comply with the `Green' Cement Policy shall be grounds for rejecting the bid as non-responsive. Specifications and Contract Documents for this project may be purchased for twenty dollars($20)per set at the office of the Transportation and Public Works Department, Municipal Office Building, 1000 Throckmorton Street,Fort Worth,Texas 76102. These documents contain additional information for prospective bidders. A pre-bid conference will be held at 10:00 A.M.Thursday,May 8,2008,in the Transportation and Public Works Conference Room,2nd Floor,Municipal Building,RM 270. The major work on the above-referenced project shall consist of the following: Paving Improvements: 9,000 S.Y. Reinforced Concrete Pavement 5,000 L.F. 7"Concrete Curb Replacement Included in the above will be all other miscellaneous items of construction as outlined in the Plans and Specifications. For additional information,please contact Riad Nusrallah, Street Program Manager at(817)392-2729. CHARLES R. BOSWELL ROBERT GOODE,P.E.,DIRECTOR CITY MANAGER TRANSPORTATION AND PUBLIC WORKS DEPARTMENT Advertising Dates: By: ul April 24,2008 gad Nusrallah,P.E. May 1,2008 Street Program Manager SPECIAL INSTRUCTIONS TO BIDDERS 1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of " Fort Worth, in an amount of not less than 5 percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeit in the event the successful E bidder fails to execute the contract documents within ten days after the contract has been awarded. F To be an acceptable surety on the bid bond, the surety must be authorized to do business in the state of Texas. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess -• of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 2. PROPOSAL: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. M The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. E Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the F Owner. _ The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials E furnished in strict accordance with the Contract Documents and Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided, without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. 3. ADDENDA: Bidders are responsible for obtaining all addenda to the Contract Documents prior to the bid receipt. Information regarding the status of addenda may be obtained by contacting the Transportation and Public Works Department at (817) 392- 2729. Bids that do not acknowledge all applicable addenda will be rejected as non- responsive. .e M SPECIAL INSTRUCTIONS TO BIDDERS - 1 - .. 4. AWARD OF CONTRACT: The contract, if awarded, will be awarded to the lowest responsive bidder. The City reserves the right to reject any or all bids and waive any or all irregularities. No bid may be withdrawn until the expiration of forty-nine (49) City •• business days from the date that the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") is received by the City. 5. PAYMENT, PERFORMANCE AND MAINTENANCE BONDS: The successful bidder entering into a contract for the work will be required to give the City surety in a sum equal to the amount of the contract awarded. The successful bidder shall be required to furnish bonding as applicable in a sum equal to the amount of the contract awarded. The form of the bond shall be as herein provided and the surety shall be acceptable to the City. All bonds furnished hereunder shall meet the requirements of Chapter 2253 of the Texas Government Code, as amended. A. If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump sum. Payment shall not be made for a period of 45 calendar days from the date the work has been completed and accepted by the City. B. If the contract amount is in excess of $25,000, a Payment Bond shall be executed, in the amount of the contract, solely for the protection of all claimants supplying labor and material in the prosecution.of the work. _ C. If the contract amount is in excess of $100,000, a Performance Bond shall be executed, in the amount of the contract conditioned on the faithful performance of the work in accordance with the plans, specifications, and contract documents. Said bond shall solely be for the protection of the City of Fort Worth. D. A Two-year Maintenance Bond is required for all projects to insure the prompt, full and faithful performance of the general guarantee as set forth in Paragraph 7 of the Special Provisions. To be an acceptable surety on the performance, payment and maintenance bonds, the surety must be authorized to do business in the state of Texas and meet all requirements of Texas Insurance Code, section 7.19-1. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall •• be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. No sureties will be accepted by the City that are at the time in default or delinquent on any bonds or which are interested in any litigation against the City. Should any surety on SPECIAL INSTRUCTIONS TO BIDDERS -2- the contract be determined unsatisfactory at any time by the City, notice will be given to the contractor to that effect and the contractor shall immediately provide a new surety satisfactory to the City 6. LIQUIDATED DAMAGES: The Contractor's attention is called to Part 1 - General Provisions, Item 8, Paragraph 8.6, Standard Specifications for Street and Storm Drain Construction of the City of Fort Worth, Texas, concerning liquidated damages for late DOW completion of projects. 7. EMPLOYMENT AND NON-DISCRIMINATION: The Contractor shall not discriminate against any person(s) because of sex, race, religion, color or national origin and shall comply with the provisions of sections 13A-21 through 13A-29 of the Code of the City of Fort Worth (1986), as amended, prohibiting discrimination in employment practices. 8 WAGE RATES: All bidders will be required to comply with provision 5159a of "Vernons Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates as established by the City of Fort Worth, Texas, and set forth in Contract Documents for this project. 9. FINANCIAL STATEMENT: A current certified financial statement may be required by the Director of the Transportation and Public Works for use by the CITY OF FORT k WORTH in determining the successful bidder. This statement, if required, is to be prepared by an independent Public Accountant holding a valid permit issued by an .. appropriate State Licensing Agency. 10. INSURANCE: Within ten days of receipt of notice of award of contract, the Contractor must provide, along with executed contract documents and appropriate bonds, proof of insurance for Workers Compensation (statutory); Comprehensive General Liability ($1,000,000 per occurrence, $2,000,000 aggregate); and Automobile Insurance ($1,000,000 each accident on a combined single basis or $250,000 property k damage/$500,000 bodily injury per person per occurrence. A commercial business policy shall provide coverage on "any auto", defined as autos owned, hired, and non- owned). Additional lines of coverage maybe requested. If such a request is made after bid opening, Contractor shall be entitled to additional compensation equal to 110% of the additional premium cost. For worker's compensation insurance requirements, see Special Instructions to Bidders - Item 16. ADDITIONAL INSURANCE REQUIREMENTS: A. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance -� coverage under Contractor's workers' compensation insurance policy. i� B. Certificates of insurance shall be delivered to the City of Fort Worth, contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on the contracted project. t SPECIAL INSTRUCTIONS TO BIDDERS -4- C. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. D. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non-renewal, and/or material change in policy terms or coverage. A ten days notice shall be acceptable in the event of non-payment of .. premium. E. Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A: VII or equivalent measure of financial strength and solvency. F. Deductible limits, or self-funded retention limits, on each policy must not exceed $10,000.00 per occurrence unless otherwise approved by the City. G. Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. The City must approve in writing any alternative coverage. H. Workers' compensation insurance policy(s) covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. I. City shall not be responsible for the direct payment of insurance premium costs for contractor's insurance. F J. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self-funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. K. In the course of the project, Contractor shall report, in a timely manner, to City's officially designated contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which could result in a property loss. L. Contractor's liability shall not be limited to the specified amounts of insurance required herein. M. Upon the request of City, Contractor shall provide complete copies of all insurance policies required by these contract documents. 11. NON-RESIDENT BIDDERS: Pursuant to Texas Govemment Code, art. 2252.002, the City of Fort Worth will not award this contract to anon-resident bidder unless the non- resident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a SPECIAL rNSTRUCTIONS TO BIDDERS non-resident bidder to obtain a comparable contract in the state in which the non- resident's principal place of business is located. "Non-resident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company of majority owner has its principal place of business in this state. "Texas resident bidder" means a bidder whose principal place of business is in this state, and includes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if the project is funded in whole or in part with federal funds. The appropriate blanks of the Proposal must be filled out by all non-resident bidders in order for its bid to meet specifications. The failure of a non-resident contractor to do so will automatically disqualify that bidder. h 12. MINORITY/WOMEN BUSINESS ENTERPRISE: In accordance with City of Fort Worth Ordinance No. 11923, as amended by Ordinance No. 13471, the City of Fort Worth has goals for the participation of minority business enterprises and women i business enterprises in City contracts. You may obtain a copy of the Ordinance from the Office of the City Secretary. The M/WBE Utilization Form, Prime Contractor Waiver Form and the Good Faith Effort Form, as applicable, must be submitted no later than 5:00 p. m. five (5) City business days after the bid opening date, exclusive of the bid opening date. The bidder shall J0 submit the documentation at the reception area of the Transportation and Public Works Department ("Managing Department"), 2nd floor, City Hall, and shall obtain a receipt. Failure to comply shall render your bid non-responsive. Upon contract execution between the City of Fort Worth and the successful bidder, now known as Contractor, a pre-construction meeting will be scheduled at which time the Contractor is required to submit either Letters of Intent or executed agreements with the M/WBE firm(s) to be utilized on this project. Such Letters of Intent or executed agreements shall include the following information: 1. Name of Contract 2. Name of M/WBE firm utilized 0 3. Scope of Work to be performed by the M/WBE firm 4. Monetary amount of work to be performed by the M/WBE firm 5. Signatures of all parties A notice to proceed will not be issued until the signed letter(s) or executed agreement(s) have been received. SPECIAL INSTRUCTIONS TO BIDDERS -6- Throughout the duration of this project, the Contractor comply with the M/WBE Ordinance by complying with the following procedures: lam • A M/WBE Participation Report Form must be submitted monthly until the contract is completed. The first report will be due 30 days after commencement of work. The monthly report MUST have an original signature to ensure accountability for audit purposes. • Reports are to be submitted monthly to the M/WBE Office, regardless of whether or not the M/WBE firm has been utilized. If there was no activity by an M/WBE in a particular month, place a "0" or "no participation" in the spaces provided, and provide a brief explanation. The Contractor shall provide the M/WBE Office proof of payment to the M/WBE subcontractors and suppliers only. The M/WBE Office will accept the following as proof of payment: 1. Copies of submitted invoices with front and back copies of canceled check(s), OR } 2. A notarized letter explaining, in detail: a Subcontractor/supplier Scope of Work b. Date when services were received from subcontractor/supplier c. Amounts paid to the subcontractor/supplier d. Original signatures from both parties must be included on this letter. • If the Contractor foresees a problem with submitting participation reports and/or proof of payment on a monthly basis, the M/WBE Office should be notified. .. If the Contractor wishes to change or delete an M/WBE subcontractor or supplier, adhere to the following: 1. Immediately submit a Request for Approval of Change Form to the M/WBE Office explaining the request for the change or deletion. 2. If the change affects the committed M/WBE participation goal, state clearly how and why in documentation. a. All requests for changcs must be reviewed and pre-approved by the M/WBE !' Office. b. If the Contractor makes change(s) prior to approval, the change will not be considered when performing a post compliance review on this project. • Upon the Contractor's successful completion of this project, and within ten days after receipt of final payment from the City of Fort Worth, The Contractor will provide the M/WBE Office with a Final Participation Report Form to reflect the total SPECIAL rNSTRUCTIONS TO BIDDERS .� -7- r participation from ALL subcontractors/suppliers utilized on the project. • All forms are available at the M/WBE Office, 3rd floor - City Hall. For additional information regarding compliance to the M/WBE Ordinance, call (817) 871-6104. Upon request, Contractor agrees to provide to Owner Complete and accurate information regarding actual work performed by a Minority/Women Business Enterprise (M/WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the ow actual work performed by an M/WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud _ will result on the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three years. 13. AMBIGUITY: In case of ambiguity or lack of clearness in stating process in the proposal, the City reserves the right to adopt the most advantageous construction thereof or to reject the proposal. 14. PROGRESS PAYMENTS FINAL PAYMENT PROJECT ACCEPTANCE AND WARRANTY: r a. The contractor will receive full payment (less 5% retainage) from the city for each pay period. b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. c. The project shall be deemed complete and accepted by the City as of the date the final , punch list has been completed, as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed. e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding (i) final quantities, or (ii) liquidated damages, city shall make a pr-egress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages, the parties shall attempt to resolve the differences within 30 calendar days. SPECIAL INSTRUCTIONS TO BIDDERS -8- 15. AIR POLLUTION WATCH DAYS: The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through October 31, with 6:00 a.m. - 10:00 a.m. being critical because emissions from this time period have enough time to bake in the hot atmosphere that leads to early afternoon ozone formation. The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service, will issue the AIR POLLUTION WATCH by 3:00 p.m. on the afternoon prior to the WATCH day. On designated AIR POLLUTION WATCH DAYS, the Contractor shall bear the responsibility of being aware that such days have been designated AIR POLLUTION WATCH DAYS and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1-hour, or if equipment is new and certified by EPA as "Low M Emitting", or equipment bums Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. e If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated AIR POLLUTION WATCH DAY, that day will be considered as a weather day and added onto the allowable weather days of a given month. 16. WORKERS COMPENSATION INSURANCE COVERAGE: Contractors compliance } with Workers Compensation shall be as follows: A. Definitions: Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity employees providing services on a project, for the duration of the project. Duration of the project - includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ("subcontractor" in, 406.096) - includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or SPECIAL INSTRUCTIONS TO BIDDERS .� -9- employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. M E. The contractor shall obtain from each person providing services on a project, and provide to the City: w (1) a certificate of coverage, prior to that person beginning work on the project, so the City will have on file certificates of coverage showing coverage for all persons providing services on the project; and (2) no later than seven days after receipt by the contractor, a new certificate of i coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. E. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten days after the contractor knew or should have known, of ,. any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: SPECIAL INSTRUCTIONS TO BIDDERS - 10- (1) provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; (2) provide to the contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; �. (3) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (4) obtain from each other person or entity with whom it contracts, and provide to the contractor: (a) a certificate of coverage, prior to the other person or entity beginning work on the project; and (b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; F (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter. (6) notify the governmental entity in writing by certified mail or personal delivery, within ten days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and e (7) contractually require each person with whom it contracts, to perform as required by paragraphs (1) - (7), with the certificates of coverage to be provided to the — person for whom they are providing services. J. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by workers' compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-Insurance Regulation. Providing false of misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties or other civil actions. K. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the City to declare the contract void if the contractor OF SPECIAL INSTRUCTIONS TO BIDDERS "� - 11 - 1 =9 does not remedy the breach within ten days after receipt of notice of breach from the City. "The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Workers' Compensation Act or other Texas Workers' Compensation commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: �■ REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. �. This includes persons providing, hauling, or delivering equipment or materials, or i providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at (512) 440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." 17. AGE DISCRIMINATION: In accordance with the policy ("Policy") of the Executive Branch of the federal government, contractor covenants that neither it nor any officers, members, agents or employees who engage in the performance of this contract shall, in connection with such employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against any person because of their age except on the basis of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents or employees i acting on their behalf, shall specify in solicitations or advertisements for employees to work on those contract a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirement. Contractor warrants that it will fully comply with the Policy and will defend, indemnify and hold City harmless against any and all claims or allegations filed by third parties against City arising out of Contractor's alleged failure to comply with the Policy in the performance of this contract. SPECIAL INSTRUCTIONS TO BIDDERS - 12- 18. DISCRIMINATION DUE TO DISABILITY: In accordance with the provisions of the Americans with Disabilities Act of 1990 ("ADA"), Contractor warrants that it will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms or conditions of employment for applicants for employment with, or current employees of, Contractor. Contractor warrants that it will fully comply with the ADA's provisions and any other applicable federal, state, or local laws concerning disability and will defend, indemnify and hold City harmless against any and all claims or allegations filed by third parties against City arising out of Contractor's alleged failure to comply with the ADA in the performance of this contract. .. END OF SECTION 4 "r we SPECIAL INSTRUCTIONS TO BIDDERS - 13- Classifications Hourly Rates Classifications Hrly Rts Air Tool Operator $10.06 Scraper Operator $11.42 Asphalt Raker $11.01 Servicer $12.32 Asphalt Shoveler $8.80 Slip Form Machine Operator $12.33 Asphalt Distributor Operator $13.99 Spreader Box Operator $10.92 Asphalt Paving Machine Operator $12.78 Tractor operator, Crawler Type $12.60 Batching Plant Weigher $14.15 Tractor operator, Pneumatic $12.91 Broom or Sweeper Operator $9.88 Traveling Mixer Operator $12.03 Bulldozer operator $13.22 Truck Driver-Single Axle(Light) $10.91 Carpenter(Rough) $12.80 Truck Driver-Single Axle(Heavy) $11.47 Concrete Finisher-Paving $12.85 Truck Driver-Tandem Axle Semi-Trailer $11.75 Concrete Finisher-Structures $13.27 Truck Driver-Lowboy/Float $14.93 Concrete Paving Curbing Mach. O er. $12.00 Truck Driver-Transit Mix $12.08 Wagon Drill, Boring Machine, Post Hole Concrete Paving Finishing Mach.O er. $13.63 Driller $14.00 Concrete Paving Joint Sealer O er. $12.50 Welder $13.57 Concrete Paving Saw O er. $13.56 lWork Zone Barricade Servicer $10.09 Concrete Paving Spreader O er. $14.50 Concrete Rubber $10.61 Crane,Clamshell, Backhoe,Derrick, Dragline,Shovel $14.12 Electrician $18.12 Fla er $8.43 Form Builder-Structures $11.63 Form Setter-Paving&Curbs $11.83 Foundation Drill Operator, Crawler Mounted $13.67 Foundation Drill Operator,Truck Mounted $16.30 Front End Loader $12.62 Laborer-Common $9.18 Laborer-Utility $10.65 Mechanic $16.97 Milling Machine Operator, Fine Grade $11.83 Mixer Operator $11.58 Motor Grader Operator Fine Grade $15.20 Motor Grader Operator, Rough Oiler $14.50 Painter,Structures $13.17 Pavement Marking Machine Oper. $10.04 Pie Layer $11.04 Roller,Steel Wheel Plant-Mix Pavements $11.28 Roller,Steel Wheel Other Flatwheel or Tamping $10.92 Roller, Pneumatic, Self-Propelled Scraper $11.07 Reinforcing Steel Setter(Paving) $14.86 Reinforcing Steel Setter Structure $16.29 Source is AGC of Texas (Hwy,Hvy,Utilities Industrial Branch) www.access.gpogov/davisbacon/ 5/4/2007 PROPOSAL TO: CITY OF FORT WORTH PURCHASING DIVISION 1000 THROCKMORTON ST FORT WORTH,TEXAS 76102 FOR: CONCRETE RESTORATION(2008-1) AT VARIOUS LOCATIONS CITY PROJECT NO.01063 TPW PROJECT NO.C293-541200-204330106383 Pursuant to the foregoing "Notice to Bidders", the undersigned has thoroughly examined the plans, specifications and the site,understands the amount of work to be done,and hereby proposes to do all the work and furnish all labor, equipment, and materials necessary to fully complete all the work as provided in the plans and specifications,and subject to the inspection and approval of the Director of the Transportation and Public Works Department of the City of Fort Worth. Total quantities given in the bid proposal may not reflect actual quantities; however, they are given for the purpose of bidding on and awarding the contract.The City also reserves the right to increase or decrease quantities of individual pay items within the contract provided that the total contract amount remains within plus or minus (t) 25% of the contract award. The contractor is not entitled to any additional compensation or renegotiation of individual pay item bid prices. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish Performance, Payment and Maintenance Bonds acceptable to and approved by the City of Fort Worth for performing and completing the said work within the time stated and for the following sums,to-wit: SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT BID S.P. 1 2 EA. Sign-Project Designation—Install @ Two Hundred Dollars & No Cents Per EA. $ 200.00 $ 400.00 S.P. 2 LUMPSUM Utility Adjustment—Repair @ Six Thousand Dollars & No Cents Per L.S. $ 6,000.00 $ 6,000.00 P-1 SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT BID S.P. 3. 9,000 S.Y. Reinforced Concrete Pavement- 3l4 Remove&Replace @ 360 V7kFliq-5,rioo Dollars& IAA Cents Per SY. $ 5 3- $ S.P. 4. 10,000 L.F. Silicon Joint Sealant for Concrete Pavement-Install @ (Joints t i/."wide) �o .- Dollars $ & TEri1 Cents Per LF. S.P. 5. 5,000 L.F. 7"Concrete Curb-Remove& Replace @ 0 yag Dollars $ 2' & - Cents Per LF. S.P. 6. 500 S.Y. Flex Base-Install @ Dollars & i::,r V Cents Per SY. $ t 5 l $ 5_0 S.P. 7. 500 C.F. Excavation-Remove @ C),,v Dollars $ $& V�.p Cents Per CF. S.P. 8. 60 C.Y. Concrete-Install @ Tw Q "a 640 Dollars 1-0O o� coo & r� Cents Per CY. $ $ I ZI S.P. 9. 5 EA. Manhole-Adjustment @ C*4,ee_P%. Atg, Dollars & ur✓ Cents Per Each S.P. 10. 5 EA. Water Valve-Adjustment @ 1kf-ec 1 ,o Dollars & N E Cents Per Each P-2 SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT BID o� TOTAL BID S (['3 0Lj P-3 This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04(F)of the Texas Limited Sales,Excise and Use Tax Act. Taxes. All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under House Bill 11,enacted August 15,1991. The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in, employment practices. The undersigned agrees to complete all work covered by these contract documents within one hundred fifty 1(0)Working Days from and after the date for commencing work as set forth in the written Work order to be issued by the Owner,and to pay not less than the "Prevailing Wage Rates for Street,Drainage and Utility Construction" as established by the City of Fort Worth,Texas. Within Ten (10) Calendar Days of receipt of notice of acceptance of this bid, the undersigned will execute the formal contract and will deliver an approved Surety Bond for the faithful performance of this contract. The attached check in the sum of G12 0 Dollars($ V. is to become the property of the City of Fort Worth,Texas,or the attached Bidder's Bond is to be forfeited in the event the contract and bond are not executed within the time set forth,as liquidated damages for delay and additional work caused thereby. The Contractor shall mobilize within ten (10)calendar days of the notice given by the Construction Engineer for any of the locations. If the contractor fails to begin the work within ten (10) calendar days,a$200 dollars liquidated damage will be assessed per Block per day. I (we), acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration in preparation of the foregoing bid: Respectfully submitted, 1 Addendum No.l (Initials) L►Ak.4 rl, �o4E i C—Rk4,,a7wt- ` c. Addendum No.2(Initials)_ Company alne Addendum No.3(Initials)_, By: (/l Signature (Seal) C",L",- C- �.►N�c o '� �p+ Printed Name of Principal Address: Q•0 • VA�, l23$00 o�tc t►�aizl"?t � (�-380� E-mail Address: C�o"w" to •co.� Date: 5 0$ Telephone: '6 l 1-Ll 01_3 30 to P-4 VENDOR COMPLIANCE TO STATE LAW The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to non-resident bidders. This law provides that, in order to be awarded a contract as low bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal place of business are outside of the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required too underbid a non-resident bidder in order to obtain a comparable contract in the State in which the non-resident's principal place of business is located. The appropriate blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state or non- resident contractors to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Non-resident vendors in (give State), our principal place of business, are required to be percent lower than resident bidders by State law. A copy of the Statute is attached. Non-resident vendors in (give State), our principal place of business,are not required to underbid resident bidders. B. Our prjacipal place of business or corporate offices are in the State of Texas. Bidder: Company By: (Please print) 0 i0c) Address Signature �.A� �'IX 900 EWIDAZY7 City Sta a Zip Title(Please print) THIS FORM MUST BE RETURNED WITH YOUR QUOTATION GREEN CEMENT POLICY COMPLIANCE STATEMENT (To be furnished by the Contractor to the City at the time of bid opening) (Submit separate forms for each supplier/retailer) This goes to certify that the cement used for this project meets the following criteria: Ii The cement was manufactured in a kiln utilizing the dry process (list source below) that met the emission standard of 1.71b or / less of NOx /ton of clinker released into the atmosphere. The cement meets ASTM C-150 requirements Source of Cement: Name of Concrete Supplier N R-t5�Q I- Nk(4 ?hew 4nA to/O Name of Plant (Kiln) & Address ( A Name of Manufacturer ( MkDw tic" , '[ CONTRACTOR G SUPPLIER C-�4�'i-�-� E _ �u c, L kkt,l���'ll SJ'i 1OL E 4 1 — ., t-C , �/�►/WLG Name Name ?tS-. 0 . Title Title Company pany a c'}_LA-0(-3--�o�p g tq - - 151�► Phone Number Phone Number MIWBE REQUIRED DOCUMENTATION RECEIPT Transportation & Public Works Official Date: / " / Official Time: r� Bid Date: Project Name: Al ' 119 r, Project Manager: a Forms Submitted By Name: Company: _ CGu F .Ce;r-1 Received By: 05-29-OOPO4 : 32 FIl-F ATTACHMENT 1A Page 1 of 4 F T%bRTH City of Fort Worth .. SubcontractorSISupptiers Utilization form FUME COMPANY NAME: I Check applicable block to describe prime .. L AaAA to V, z ks rp-kk Lc ions tJ L, WUINIDBE NON-Ww/DBE PRO iECT NAME. j W D&TE �dNGr 5 `�v►3 Zt B- AT VA#-t%%6 "as 5 IZZ h$ Cby's kMiVV E Pmiect Gook Prwne's Pttroject lltMrrtion: CT MME ER % i % 1Tf W L I Z tx7 oV Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00-p.m.five(5)City business days afterbid opening,exclusive of bid opening date, will result in the bid being considered non-responsive to bid.specifications_ The -undersigned Offeror agrees to enter into a formal agreement with the M/WBE firms) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disquaffikudim and will-result in the bid being-considered non-responsive to.bid specifications M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, .. Parker,Johnson, C411in, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subconbaeft below the prime contactor, i:e., a direct payment from the prime contractor to a subcontractor is considered 1 d tier, a payment by a subcontractor.to its sty is considered 2"d tier ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace,that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise(DBE)is synonymous with Minority/Women Business Enterprise(M/WBE). if hauling services are utilized, the prime will be given credit as long as the M/WBE fisted owns and operates at least one fully-licensed and operational truck to be used on the contact_ The.MNi/BE may lease trucks hwn another MI BE firm, including MIWBE owner-operators, and receive full M/WBE credit The .. M/WBE may lease trucks from non-M/WBEs, including owner operators, but will only receive credit for the -tees and commissions earned by the M1WBE as outlined in the lease agreement. t MENT IA �TWORTH ATTF►Page t of f4 Page 2 4 Primes are required to identify ALL subcontractorslsuppliers.regardless of status;i.e., 'Women and non-M/V1/BEs. Please list MIWBE firms first,use additional streets if necessary. Certification (che(*am) a T n Ckxnpa"Name i N T Detail Detail Address e Y W C A M Sufic Work Supplies Purchased Dollar Amount Telephone/Fax r B B T D 8 E E R O C T E A � �o-Bofc Q�-Z3Z� CPO Vou TE CA? (vi �. ,, ATTAGNM€NT 1A Foxy j�7ORTH Page 4 of 4 Total Dollar Amount of MIME Subcoi it,actors/Suppfiiers $ o0 Total Dollar Amount of Non_IWWBE Subcontractors/Suppliers $ •._ TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ 1 ,6c, 00 The Contractor will not make additions, deletions, or substitutions to this cerfied fist without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for AWoval of Change(Addiiion. Any-unjustified-change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance.The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WSE goat. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/WIDBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppbwWcontradors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one(1)year- AuthoNzad s .. L 5cw C'MS'T lop-) y INIMM Telephopo 4PW*r Fax a�ghleyhr, ,com • © (Z3 8� E-mail Address t 3ov`1'44 5-1 21 o B s� SPECIAL PROVISIONS FOR: CONCRETE RESTORATION(2008-1) AT VARIOUS LOCATIONS CITY PROEJCT NO.01063 TPW PROJECT NO.C293-541200-204330106383 1. SCOPE OF WORK: The work, covered by these specifications, includes removing failed reinforced concrete pavement and replacing with a minimum of 7-inches of new reinforced concrete pavement and removing failed joint material and replacing with new joint material and new silicone joint sealant. The work also consists of all other miscellaneous items of construction to be performed as outlined in the details and specifications which are necessary to satisfactorily complete the work The Contractor shall mobilize within ten (10) working days of the notice given by the Construction Engineer for any locations. If the contractor fails to begin the work within ten (10)working days,a$200 dollars liquidated damage will be assessed per block per day. It shall be the responsibility of the prospective bidder to visit the project sites and make such examinations and explorations as may be necessary to determine all conditions that may affect construction.of this project. Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during preparation of the Proposal and all unusual*conditions that may give rise to later contingencies should be brought to the attention of the City prior to the submission of the Proposal. The contractor shall verify these locations with the Construction Engineer. For street locations see list at the back of this document. At the sole discretion of the City, the City reserves the right to add, delete or substitute streets in this contract. The City also reserves the right to increase or decrease quantities of individual pay items within the contract provided that the total contract amount remains within plus or minus (t) 25% of the contract award. The contractor is not entitled to any additional compensation or renegotiation of individual pay item bid prices. SP-1 All short turnouts that intersect with a street to be repaired shall be included in this contract, even though they may not be listed with the street locations at the back of this document due to their size. The contractor shall verify these locations with the Construction Engineer prior to construction. The construction of these turnouts includes; but, is not limited to, milling, cleaning,tack coating,overlaying and facility adjusting. Total quantities given in the bid proposal may not reflect actual quantities, but represent the best estimate based on a reasonable effort of investigation; however, they are given for the purpose of bidding on and awarding the contract. 2. AWARD OF CONTRACT: Contract will be awarded to the lowest responsible bidder. 3. SUBMITTALS FOR CONTRACT AWARD: The City reserves the right to require contractor who is the apparent low bidder(s) for a project to submit such information as the City,in sole discretion may require,including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted'information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the information if requested may be grounds for rejecting the apparent low bidder as non-responsive.Affected contractors will be notified in writing of a recommendation to the City Council. 4. CONTRACT TRIAE: The Contractor agrees to complete the Contract within the allotted number of days. If the Contractor fails to complete the work within the number of days specified,liquidated damages shall be charged, as outlined in Part 1, Item 8, Paragraph 8.6,of the "General Provisions" of the Standard Specification for Street and Storm Drain Construction of the City of Fort Worth, Texas. The contract time will be counted from the date set at the pre-construction conference and will continue until a time the inspector determines the project is ready for a final inspection. At SP-2 that time a final inspection will be scheduled. If in the opinion of the inspector the project has not been made ready, the final inspection will be cancelled and time will continue to be counted. A five working day period is required for the rescheduling of a final inspection. The Contractor also agrees to complete the final punch list within ten (10)working days after receiving it. If the Contractor fails to complete the work within ten (10) working days, the counting of the number of days to complete the Contract will resume and liquidated damages shall be charged,as outlined in Part 1,Item 8,Paragraph 8.6, of the "General Provisions" of the Standard Specification for Street and Storm Drain Construction of the City of Fort Worth, Texas. 5. EARLY WARNING SYSTEM FOR CONSTRUCTION: Time is of the essence in the completion of this contract. In order to insure that the contractor is responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule,the following process shall be applicable: The work progress on all construction projects will be closely monitored. On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the contractor is less than the percentage of time allowed by 20% or more (example: 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken: A. A letter will be mailed to the contractor by certified mail; return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the contract time. In the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. B. The Construction Engineer and the Director of the Transportation and Public Works Department will be made aware of the situation. If necessary, the City Manager's Office and the appropriate city council members may also be informed. SP-3 C. Any notice that may, in the City's sole discretion, is required to be provided to interested individuals will distributed by the Construction Engineer. D. Upon receipt of the contractor's response, the appropriate City departments and directors will be notified. The Construction Engineer will, if necessary,then forward updated notices to the interested individuals. E. If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract, the bonding company will be notified appropriately. 6. RIGHT TO ABANDON: The City reserves the right to abandon, without obligation to the Contractor, any part of the project, or the entire project, at any time before the Contractor begins any construction work authorized by the City. 7. CONSTRUCTION SPECIFICATIONS: This contract and project are governed by the two following published specifications,except as modified by these Special Provisions: STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION- CITY OF FORT WORTH and STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION-NORTH CENTRAL TEXAS.General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. A copy of these specifications may be purchased at the Office of the Transportation and Public Works Department, 1000 Throckmorton Street, 2nd floor of the Municipal Building, Fort Worth, Texas 76102. The specifications applicable to each pay item are indicated in the call- out for the pay item in the Proposal. If not shown,then applicable published specifications in any of these documents may be followed at the discretion of the Contractor. 8. CONTRACT DOCUMENTS: SP-4 Bidders shall not separate, detach or remove any portion,segment or sheets from the contract documents at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non-responsive" and rejecting bids or voiding contract as appropriate and as determined by the Director of the Transportation and Public Works Department. 9. MAINTENANCE STATEMENT: The Contractor shall be responsible for defects in this project due to faulty materials and workmanship,or both,for a period of two Q years from date of final acceptance of this project by the City of Fort Worth and will be required to replace at his expense any part or all of the project which becomes defective due to these causes. See Special Instructions to Bidders Item No. 14 for further requirements. 10. TRAFFIC CONTROL: The contractor will be required to obtain a"Street Use Permit" prior to starting work. As part of the "Street Use Permit" a traffic control plan is required. The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways", codified as Article 6701d Vernon's Civil Statues, pertinent sections being Section Nos.27,29,30 and 31. A traffic control plan shall be submitted for review to Mr. Charles R. Burkett, City Traffic Engineer (4817-392-8712 at least 10 working days prior to the preconstruction conference. Although work will not begin until the traffic control panel has been reviewed, the Contractor's time will begin in accordance with the time frame established in the Notice to the Contractor. The Contractor will not remove any regulatory sign, instructional sign, street name sign, or other sign which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department,Signs and Markings Division(phone number 817-392-7738),to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual and such temporary SP-5 sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications,the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be re-installed,the Contractor shall again contact the Signs and Markings Division to re-install the permanent sign and shall leave his temporary sign in place until such re-installation is completed. The Contractor shall limit his work within one continuous lane of traffic at a time to minimize interruption to the flow of traffic upon the approval of the City Engineer. Work shall not be performed on certain locations/streets (primarily arterials) during "peak traffic periods(7 a.m.to 9 a.m. and to 4 p.m.to 5 p.m.)"; or,as determined by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas." See "Street By Street Quantity Determination Spread Sheet",in the back of this document,for designated locations. The contractor will be responsible for coordination, of proposed construction activities, with public or private school administration. The proposed construction activities shall accommodate school operating schedules, including school bus/parent drop off and pick up periods. The contractor shall provide proper traffic and pedestrian control to ensure safety at all times. Construction areas shall be properly barricaded/fenced to prevent public entry. 11. PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION: Prior to beginning construction on any street in this contract, the contractor shall, prepare and deliver a notice/flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice/flyer shall be posted three (3) working days prior to beginning construction activity along each street. The flyer shall be prepared on the Contractor's letterhead and shall include the following: o Project name/Contract name o Project number o Expected dates of construction o Contractors and project inspector's contact information SP-6 A sample notice/flyer is included in the contract documents. The Electronic version of the notice/flyer can be obtained from the Office of the Transportation and Public Works Department(817)392-2729 It will be the contractor's responsibility to create and distribute a follow-up notice/flyer informing residents if for any reason work should stop on a project for more than five (5) working days after construction begins. The flyer should also include the anticipated date of when the work will begin again. It will be the contractor's responsibility to re-distribute a three(3)working day notification/flyer prior to beginning the construction activity. In addition, all copies of the notice/flyer shall be delivered to the City inspector for his review prior to distribution.The contractor will not be allowed to begin construction on any street until the flyer is delivered to all residents of the street. All work involved with the notice/flyer shall be considered subsidiary to the contract price and no additional compensation shall be made. 12. PAYMENT: Payment will be made to the contractor twice a month for work completed during the pay periods ending on the 151h ,and the 30'h day of each month. Checks (less 5% retainage)will be sent to the contractor within the two(2)week window following each payment period. Payment of the retainage will be made with the final payment upon acceptance of the project. See Special Instructions to Bidders Item No. 14 for further requirements. 13. DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material,if any,which is to be furnished by the City. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Engineer and if by him found correct shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay is caused by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary SP-7 instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approval of the City and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. 14. DETOURS AND BARRICADES: The Contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. Contractor shall protect construction,as required by Engineer, by providing barricades. Barricades, warning and detour signs shall conform to the Standard Specifications "Barriers and Warning and/or Detour Signs",Item 524,and/or as shown on the plans. Construction signing and barricades shall conform with the.latest edition of the "Texas Manual on Uniform Traffic Control Devices,Vol.No. 1". 15. DISPOSAL OF SPOIL/FILL MATERIAL: Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of the Department of Engineering acting as the City of Fort Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the contractor intends to dispose of such material. Contractor shall not dispose of such material until.the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinance of the City of Fort Worth (Ordinance No. 10056) and a flood plain permit issued. All disposal sites must be approved by the Administrator to ensure the filling is not occurring within a flood plain without a permit. A flood plain permit can be issued upon approval of necessary engineering studies. No fill permit is required if disposal sites are not in a flood plain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary engineering studies,shall be at Contractor's expense. In the event that the Contractor disposes of spoil/fill material at a site without a fill permit or a letter from the Administrator approving the disposal site,upon notification by the Director of the Department SP-8 of Engineering, Contractor shall remove the spoil/fill material at its expense and dispose of such materials in accordance with the Ordinance of the City and this section. No temporary storage of material, rubble, equipment or vehicles within parkway is allowed. Damage to sodded/landscaped areas shall be replaced at Contractor's expense to the satisfaction of City Engineer. 16. ZONING REQUIREMENTS: During the construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. 17. PROPERTY ACCESS: Access to adjacent property shall be maintained at all times unless otherwise directed by the Engineer. 18. CONSTRUCTION SCHEDULE: Contractor shall be responsible for producing a project schedule at the pre-construction conference. This schedule shall detail all phases of construction, special coordination with schools (see Item No. 10 Traffic Control for details), including project clean up, and allow the contractor to complete the work in the allotted time. Contractor will not move on to the job site nor will work begin until said schedule has been received and approval secured from the Construction Engineer. However, contract time will start even if the project schedule has not been turned in. Contract start date would be outlined in the pre-construction work order notice. Proiect schedule will be updated and resubmitted at the end of every estimating period. All costs involved with producing and maintaining the project schedule shall be considered subsidiary to this contract. 19. SAFETY RESTRICTIONS-WORK NEAR HIGH VOLTAGE LINES: The following procedures will be followed regarding the subject item on this contract: SP-9 (1) A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING --UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." (2) Equipment that may be operated within ten feet of high voltage lines shall have an insulating cage-type of guard about the boom or arm,except back hoes or dippers,and insulator links on the lift hood connections. (3) When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (TXU Electric Delivery) which will erect temporary mechanical barriers,de-energize the line,or raise or lower the line.The work done by the power company shall not be at the expense of the City of Fort Worth.The notifying department shall maintain an accurate log of all such calls to TXU Electric Delivery and shall record action taken in each case. (4) The Contractor is required to make arrangements with the TXU Electric Delivery for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. (5) No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3). 20. RIGHT TO AUDIT: Contractor agrees that City shall, until the expiration of three (3)years after final payment under this contract is made by City, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of Contractor involving transactions relating to this contract. Contractor agrees that City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that City shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine any SP-10 directly pertinent books,documents,papers and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with Article VI. City shall give the subcontractor reasonable advance notice of intended audits. Contractor and subcontractor agree to photocopy such documents as may be requested by City. City agrees to reimburse Contractor and/or subcontractor for the cost of copies at the rates as contained in the Texas Administrative Code at the time payment is made. 21. CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor Covenants and agrees to indemnify City's Engineer and Architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of City, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the City from and against any and all injuries to City's officers,servants and employees and any damage, loss or destruction to property of the City arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence or alleged negligence of City, its officers,servants or employees. In the event City receives a.written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to City satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides City with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may,if deemed appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is.outstanding as.a result of work performed under a City Contract. SP-11 22. SUBSTITUTIONS: The specifications for materials set out the minimum standard of quality that the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material that has been specified. Where the term "or equal",or"or approved equal' is used, it is understood that if a material, product,or piece of equipment bearing the name so used is furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed substitutes is procured by the Contractor. Where the term "or equal', or "approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall have the full responsibility of providing that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City,shall be the sole judge of the acceptability of substitutions. The provisions of the sub-section as related to "substitutions"shall be applicable to all sections of these specifications. 23. WATER FOR CONSTRUCTION: Water for construction will be furnished by the Contractor,at his own expense. 24. SANITARY FACILITIES FOR WORKERS: The Contractor shall provide all necessary conveniences for the use of workers at the project site. Specific attention is directed to this equipment. 25. MATERIAL STORAGE: Material shall not be stored on private property unless the Contractor has obtained written permission from the property Owner. A copy of the written permit shall be provided to the assigned inspector prior to utilization of the property. 26. PROTECTION OF EXISTING UTILITIES AND IMPROVEMENTS: SP-12 The Contractor shall take adequate measures to protect all existing structures, improvements and utilities,which may be encountered. 27. LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's particular attention is directed to the requirements of Item 7, "Legal Relations and Responsibilities to the Public" of the "Standard Specifications for Street and Storm Drain Construction". 28. CONSTRUCTION The City of Fort Worth maintains a "CONFINED SPACE ENTRY PROGRAM" for its employees and all contractors and their sub-contractors must comply with this program as a condition of the contract. All active sewer manholes, regardless of depth, are defined, as "permit required confined spaces".Contractors will be required to complete the "CONFINED SPACE ENTRY PERMIT" used by the Fort Worth Water Department (Field Operations Division) for each entry and possess and use the equipment necessary to comply with this program. The cost of complying with this program will be considered subsidiary to the pay items involving work in confined spaces(e.g.vacuum testing,cleaning,televising,construction, etc.). 29. `GREEN CEMENT'POLICY: As mandated by Fort Worth City Council Resolution 3536, all cement utilized for this project shall be procured from a kiln utilizing a dry kiln process or from any kiln that does not produce an excess of 1.71b of NOx emissions per ton of clinker produced. In cases where cement meeting the above requirement is not available, and where cement from a non-compliant source must be utilized,the contractor shall furnish good faith effort documentation in form of letters from two North Texas cement manufacturers of`Green Cement' stating that no stock of `green' cement available for the contractor at that time. These letters shall be considered valid for a maximum of one week after which new letters must be submitted to the Project Inspector if `green cement' continues to remain unavailable. All related costs for complying with the`Green Cement Policy' shall be considered subsidiary to the applicable project pay items. This policy shall also apply to all cement products including concrete,cement coated pipes and concrete pipes. The contractor shall submit the `Green Cement Policy Compliance Statement' at the time of bid opening of the project. A copy of the Compliance Statement is attached at the end of the SP-13 Special Conditions. Failure to comply with the `Green' Cement policy shall be grounds for rejecting the bid as non-responsive. 30. QUALITY CONTROL TESTING: (a) The contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on the project, including a mix design for any asphalt and/or Portland cement concrete to be used and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto. (b) Tests of the design concrete mix shall be made by the contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate,cement and mortar which are to be used later in the concrete. The contractor shall provide a certified copy of the test results to the City. (c) Quality control testing of in situ material on this project will be performed by the City at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the contractor and will be billed at commercial rates as determined by the City.The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish materials and equipment conforming to the requirements of the contract. (d) Not less than 24 hours notice shall be provided to the City by the contractor for operations requiring testing. The contractor shall provide access and trench safety system (if required) for the site to be tested and any work effort involved is deemed to be included in the unit price for the item being tested. (e) The contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. NON-PAY ITEM No. I -SPRINKLING FOR DUST CONTROL: SP-14 All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered incidental to this contract. NON-PAY ITEM NO.2-REMOVAL OF TRAFFIC BUTTONS AND TEMPORARY LANE TAPE: The Contractor shall be responsible for the documentation of all street markings prior to the removal and disposal of the pavement markings. All traffic buttons shall be removed from the existing asphalt surface before resurfacing begins. The contractor shall be responsible for the removal and disposal of all buttons and markings. Upon completion of the job the City will install new buttons after proper notification. The contractor shall also be responsible for all materials, equipment and labor to place temporary adhesive lane marking tape to control and direct traffic in the same way as they were prior to start of construction. Any corrective action required on the temporary lane markings shall be the total responsibility of the Contractor and at no extra cost to the City. The contractor shall notify the Construction Engineer and T/PW Traffic Services to arrange for the replacement of the buttons and adhesive lane markers (arrows, etc.). All costs to the contractor shall be figured as subsidiary to this contract. NON-PAY ITEM No.3—LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES: The contractor shall be responsible for locating and marking previously exposed manholes, water valves and any other utility cover in each street of this contract before the resurfacing process commences for a particular street. The method used to document locations shall be one in which the covers can be found exactly the first time. Proof of documentation must be provided to the assigned inspector prior to start of any overlay process. The contractor shall attempt to include the Construction Engineer or his designee (if available) in the observation and marking activity. In any event, a street shall be completely marked a minimum of two (2) working days before resurfacing begins on SP-15 the street. Marking the curbs with paint may be allowed if and only if a water base paint is used. It shall be the contractor's responsibility to notify the utility companies that he has commenced work on the project. As the resurfacing is completed (within same day), the contractor shall locate the covered manholes and valves and exposed and clean them. Upon completion of a street the contractor shall notify the utilities of this completion and indicate the start of the next one in order for the utilities to adjust facilities accordingly. The following are utility contact persons: Company Telephone Number Contact Person SBC—Telephone 817-338-6202 Mr. Gary Tillory 214-384-3732 Cell TXUElectric Delivery: Downtown 817-215-6424 Mr. Scott King Other than Downtown 817-215-6688 Mr. Robert Martinez Atmos Energy(Gas) 817-215-4366 Mr. John Crane 469-261-2314 Cell CFW-Street Light 817-392-7738 Mr. James Turner CFW—Light Signal 817-392-2538 Mr. Frank Brock 817-392-2535 Mr. Monte Wilson CFW—Pavement Marking 817-392-8101 Mr. Marion Goodspeed CFW-Storm Drain 817-392-5196 Mr. Rodney Smithey CFW- Water 817-212-2699 Mr. Roger Hauser 817-925-2360 Cell CFW-Sewer 817-212-2699 Mr. Rick Davis 817-944-8399 Cell Of course, under the terms of this contract, the contractor shall complete adjustment of the storm drain and Water. Department facilities, one traffic lane at a time within seven (7) SP-16 All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered incidental to this contract. NON-PAY ITEM NO. 2-REMOVAL OF TRAFFIC BUTTONS AND TEMPORARY LANE TAPE: The Contractor shall be responsible for the documentation of all street markings prior to the removal and disposal of the pavement markings. All traffic buttons shall be removed from the existing asphalt surface before resurfacing begins. The contractor shall be responsible for the removal and disposal of all buttons and markings. Upon completion of the job the City will install new buttons after proper notification. The contractor shall also be responsible for all materials, equipment and labor to place temporary adhesive lane marking tape to control and direct traffic in the same way as they were prior to start of construction. Any corrective action required on the temporary lane markings shall be the total responsibility of the Contractor and at no extra cost to the City. The contractor shall notify the Construction Engineer and T/PW Traffic Services to arrange for the replacement of the buttons and adhesive lane markers (arrows, etc.). All costs to the contractor shall be figured as subsidiary to this contract. NON-PAY ITEM No.3—LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES: The contractor shall be responsible for locating and marking previously exposed manholes, water valves and any other utility cover in each street of this contract before the resurfacing process commences for a particular street. The method used to document locations shall be one in which the covers can be found exactly the first time. Proof of documentation must be provided to the assigned inspector prior to start of any overlay process. The contractor shall attempt to include the Construction Engineer or his designee (if available) in the observation and marking activity. In any event, a street shall be completely marked a minimum of two (2) working days before resurfacing begins on SP-15 the street. Marking the curbs with paint may be allowed if and only if a water base paint is used. It shall be the contractor's responsibility to notify the utility companies that he has commenced work on the project. As the resurfacing is completed (within same day),the contractor shall locate the covered manholes and valves and exposed and clean them. Upon completion of a street the contractor shall notify the utilities of this completion and indicate the start of the next one in order for the utilities to adjust facilities accordingly. The following are utility contact persons: Company Telephone Number Contact Person SBC—Telephone 817-338-6202 Mr. Gary Tillory 214-384-3732 Cell TXUElectric Delivery: Downtown 817-215-6424 Mr. Scott Icing Other than Downtown 817-215-6688 Mr. Robert Martinez Atmos Energy(Gas) 817-215-4366 Mr. John Crane 469-261-2314 Cell CFW-Street Light 817-392-7738 Mr. James Turner CFW—Light Signal 817-392-2538 Mr. Frank Brock 817-392-2535 Mr.Monte Wilson CFW—Pavement Marking 817-392-8101 Mr.Marion Goodspeed CFW-Storm Drain 817-392-5196 Mr. Rodney Smithey CFW- Water 817-212-2 699 Mr. Roger Hauser 817-925-2360 Cell CFW-Sewer 817-212-2699 Mr. Rick Davis 817-944-8399 Cell Of course, under the terms of this contract, the contractor shall complete adjustment of the storm drain and Water Department facilities, one traffic lane at a time within seven (7) SP-16 working days after completing the laying of proposed H.M.A.C. overlay adjacent to said facilities. Any deviation from the above procedure and allotted working days may result in the shut down of the resurfacing operation. The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. NON-PAY ITEM NO.4-PROTECTION OF TREES PLANTS SOIL ETC.: All property along and adjacent to the Contractor's operations including lawns, yards, irrigation systems, shrubs, trees, etc. shall be preserved or restored after completion of the work to a condition equal or better than existed prior to start of work. By ordinance, the contractor must obtain a permit from the City Forester before any work (trimming, removal or root pruning) can be done on trees or shrubs growing on public property including street rights-of-way and designated alleys. This permit can be obtained by calling the Forestry Office at (817) 871-5738. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association. A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due to the Contractor by the City. To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. This is the only instance when pruning paint is recommended. NON-PAY ITEM NO.5—PROJECT CLEAN-UP: During the construction of this project, all parkways that are excavated shall be shaped, including bar ditches, and backfilled at the same time the roadway is excavated. Excess excavation will be disposed of at locations approved by the Engineer. The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered 1� SP-17 subsidiary to the appropriate bid items. Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, clean up shall be done on a daily basis. Clean up work shall include, but not be limited to: • Sweeping the street clean of dirt or debris • Storing excess material in appropriate and organized manner • Keeping trash of any kind off of the roadway and residents' property If it has been determined that the jobsite has not been kept in an orderly condition,the next estimate payment (and all subsequent payments until completed) of the appropriate bid item(s)will be reduced by 25%. The Contractor shall make a final cleanup of each street as soon as the paving and curb and gutter has been constructed. No more than Seven (7) working days shall elapse after completion of construction before the roadway and right-of-way is cleaned and restored. Failure to do so will be cause to stop the contractor from starting work on other streets. Project time will not be suspended and a $200 charge per day will be made as liquidation damages. The Contractor shall make a final cleanup of all parts streets before acceptance of the project is made. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. NON-PAY ITEM NO.6—STORM DRAIN INLET PROTECTION: All pulverization and overlay streets with storm drain inlets shall use inlet protection for sediment control, in accordance with the Standard Specifications for Public Works Construction-North Central Texas. The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. NON-PAY ITEM NO. 7—AGREEMENT OF QUANTITIES The streets will be measured and all quantities per street will be documented,a copy of the measured quantities will be provided to the contractor. If the Contractor in agreement of SP-18 the measured quantities, then the Contractor is required to sign it and return it with in ten (10)working days. If the Contractor is not in agreement,then the Contractor is required to, within five (5) working days, arrange a field trip with the assigned inspector to show proof of the difference. PAY ITEM NO. 1 Sign-Proiect Designation Install: The contractor shall construct and install two (2) Project Designation Signs and it will be the responsibility of the contractor to maintain the signs in a presentable condition at all times on each project under construction. Maintenance will include painting and repairs as directed by the Engineer. It will be the responsibility of the Contractor to have the individual project signs lettered and painted in accordance with the enclosed detail. The quality of the paint, painting and lettering on the signs shall be approved by the Engineer. The height and arrangement of the lettering shall be in accordance with the enclosed detail. The sign shall be constructed of% inch fir plywood,grade A-C(exterior) or better. These signs shall be installed on barricades or as directed by the Engineer and in place at the project site upon commencement of construction. The work, which includes the painting of the signs, installing and removing the signs, furnishing the materials, supports and connections to the support and maintenance shall be to the satisfaction of the Engineer. The unit price bid per each will be full payment for materials including all labor, equipment,tools and incidentals necessary to complete the work. PAY ITEM NO.2 Utility Adjustment—Repair: This item is included for the basic purpose of establishing a contract price which will be comparable to the final cost of making necessary adjustments required due to street improvements to water,sanitary sewer,and natural gas service lines and appurtenances where such service lines and appurtenances are the property owner's responsibility to maintain. An arbitrary figure has been placed in the Proposal; however, this does not guarantee any payment for utility adjustments, neither does it confine utility adjustments to the amount shown in the Proposal. It shall be the Contractor's responsibility to provide the services of a licensed plumber to make the utility adjustments determined necessary by the Engineer. No SP-19 payment will be made for utility adjustments except those adjustments determined necessary by the Engineer. Should the Contractor damage service lines due to his negligence,where such lines would not have required adjustment or repair otherwise,the lines shall be repaired and adjusted by the Contractor at the Contractor's expense. The payment to the Contractor for utility adjustments shall be the actual cost of the adjustments plus ten percent (10%) to cover the cost of bond and overhead incurred by the Contractor in handling the utility adjustments. PAY ITEM No.3—Reinforced Concrete Pavement—Remove&Replace: This item shall include the removal and replacement of all failed existing reinforced concrete pavement and replacing with a minimum of 7-inches as designated by the Construction Engineer with same day haul-off of the removed material to a suitable dumpsite. For specifications governing this item, see the Green Cement Policy (enclosed) and City Standard City Specifications, Item No. 104 "Removing Old Concrete", and Item No. 314 "Concrete Pavement",and Item No.360"Concrete Pavement"(enclosed)shall apply. In addition, this item includes removing failed joint material and replacing with new joint material and new silicone joint sealant. Joint material and silicone joint sealant shall be in accordance with the enclosed technical specification "Silicone Joint Sealing for Concrete Pavement"and joint details. For situations where extensive slab replacement is next to existing deteriorated or damaged curb, the contractor shall replace both slab and curb. The Engineer shall determine locations of curb replacement. Payment for slab replacement shall be addressed under Pay Item No. 3 "Reinforced Concrete Pavement" and payment for curb replacement shall be addressed under Pay Item No.6"Concrete Curb Repair". Contractor must remove existing failed pavement in a manner that subgrade is not disturbed. Contractor must re-compact subgrade and areas re-compacted shall have a uniform density not less than 95% of maximum density(ASTM D-698). In place density test per each repaired surface area shall be undertaken. The guidelines for compacting, per standard specification Item No. 202, "Rolling", may be waived due to physical construction restrictions. Engineer may accept other compaction methods. Payment for compacting, including labor and.equipment,shall be incidental to other pay items in the contract. SP-20 If in the process of removing failed concrete pavement, it is revealed that the subgrade, even after attempts to compact and re-shape, is not meeting requirements of standard specification Item No. 204 "Subgrade Preparation", and is exhibiting severe ruts and poor material composition that can not be manipulated and compacted, the Contractor shall remove 6-inches of top subgrade and replace with flexible base. The cost of removing and disposing of subgrade and placing of flexible base shall be covered in Pay Item No. 7, "Flex Base". If failed concrete pavement has a depth that is less than 6-inches (distance between top of new pavement surface and re-compacted subgrade surface), the Contractor shall remove excess subgrade material. Subgrade must be re-shaped and re-compacted to allow a replaced 7-inches thick concrete pavement section. Cost of removing and proper disposal of excess excavated material shall be covered under Pay Item No.8,"Excavation". If replaced pavement section depth exceeds 7-inches and subgrade meets compaction requirements, the Contractor must pour a uniform pavement section exceeding 7-inches in depth. The cost of additional concrete shall be covered under Pay Item No. 9, "Concrete" and shall be full compensation for labor,material and equipment used. The concrete shall be designed to include a minimum of 6 sacks of Type I. or Type III cement. The maximum water cement ratio shall not exceed 5.5 gallons per sack. A Type A water-reducing admixture and a Type C non-chloride set-accelerating admixture may be used with minimum 5.5 sacks of type I or Type III cement to achieve the earliest possible concrete-setting times. The use of a set-retarding admixture will not be permitted. The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch in seventy two(72) hours. Concrete pavement may be opened to traffic as long as the minimum compressive strength requirement of 3000 pounds per square inch has been met. If the concrete fails to reach the required 48-hour strength, the Engineer may direct that the concrete be redesigned as necessary to meet these requirements. Slump shall not exceed 3 inches. An entrained air content of three (3) to six (6) percent, as directed by the Engineer,shall be provided. The fine aggregate shall have fineness modules of 2.60 to 2.80. All admixtures used shall conform to the requirements of standard specifications Item No. 314, "Concrete Pavement" except that the Type C set-accelerating admixture may require addition, at the job site, when the temperature of the concrete is above 55 T. Either transit-mix or central-mix concrete will be permitted. SP-21 Existing concrete pavement shall be sawed full depth. Reinforcing bars (No. 3 @ 24" OCBV), dowels and tie bars shall be placed as shown on the enclosed joint details. All concrete pavement not placed by hand shall be placed using a fully automated paving machine as approved by the Engineer. Screeds will not be allowed except if approved by the Engineer. Actual measured material in square yards, in place, shall be the basis for payment. Payment shall be full compensation for labor, material and equipment used, at the locations determined by the Engineer. PAY ITEM No.4—Silicon Joint Sealing for Concrete Pavement—Install: This item addresses existing joints undergoing rehabilitation and newly formed joints that require new joint material and sealant. This item shall be in accordance with the technical specification "Silicone Joint Sealing for Concrete Pavement" and pavement joint details contained in this contract document. The Engineer shall outline limits of work. This item includes the removal, clean up and replacement of polyethylene bond breaker tape and redwood expansion joint filler at an expansion joint (when a slab is replaced at one side of a joint) (Joint Detail No.1), backer rod at a dummy joint(Joint Detail No.2) and silicone joint sealant. Silicone joint sealant shall be applicable for existing joints (transverse,longitudinal,either construction or an expansion joint). Removal and clean up of existing joint surfaces must yield uniform straight surface that would allow the proper installation of silicone sealant per manufacturer guidelines. Removal of existing joint material must be removed by an appropriate method such as a joint plow,a router or hooks. Sand blasting or water could be used to clean inside surfaces of joint in preparation of silicon application. Joint surfaces must be free of all contaminants and residue as called for by silicone manufacturer criteria and as indicated in the construction method of the technical specification "Silicone Joint Sealing for Concrete Pavement". Joint material/silicone joint sealant shall be measured in linear feet,in place,shall be full compensation for all labor,materials,equipment,tools,and incidentals necessary to complete the work PAY ITEM No.5-7" Concrete Curb—Remove and Replace: SP-22 This item includes the replacement of curb where extensive slab replacement is required next to existing deteriorated or damaged curb with same day haul-off of the removed material to a suitable dumpsite. The contractor shall replace both slab and curb. The Engineer shall determine locations and limits of curb replacement. Standard specification Item No.502, "Concrete Curb and Gutter", shall apply except as follows: Integral curb shall be constructed along the edge of the pavement as an integral part of the slab and of the same concrete as the slab. The concrete for the curb shall be deposited no more than thirty (30) minutes after the concrete in the slab is placed. In situations where only curb replacement is called for, new slab and curb shall be drilled into existing pavement per detail sheet. Concrete slab shall be paid for under Pay Item No. 3, "Reinforced Concrete Pavement" and curb shall be paid under Pay item No.6,711 Concrete Curb Repair. The curb shall be measured in linear feet, in place, shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. Cost of back filling behind curb, grading, turf re-establishment and watering of sod shall be included in this pay item. PAY ITEM No.6—Flex Base—Install: This item addresses subgrade that has irregularities, weak spots; ruts, and not meeting compaction requirements. Contractor shall replace top 6-inches of subgrade with flexible base material. Application of flexible base material shall be accordance with standard specification Item No.208,"Flexible Base". Measurement is in square yards and shall cover actual area and depth of 6-inches of material used. Payment is full compensation and covers the cost of labor, material, and equipment used in excavating and hauling off failed subgrade material and manipulating, spreading,and compaction of flexible base material. Use of material shall be determined in the field by the Engineer or his Representative. PAY ITEM No.7—Excavation—Remove: This item covers the cost of removing excess subgrade material in areas where the existing failed pavement section is 6-inches or less in thickness and the.proposed pavement is 7- SP-23 inches or greater in thickness. This item covers the removal and proper disposal of excess subgrade material and shall be in accordance with standard specifications Item No. 106, "Unclassified Street Excavation". Measurement is in cubic yards and payment shall be for all labor,equipment used and the removal and disposal of material. (Manipulation, re-shaping, and compaction of subgrade is covered under Pay Item No. 3., "Reinforced Concrete Pavement".) Excavation shall be determined in the field by the Engineer or his Representative. PAY ITEM No. 8—Concrete—Install: This item covers the cost of additional concrete used in the replaced pavement sections that exceeds 7-inches in depth. Replaced pavement section to be uniform, concrete to be cast monolithically. Mix requirement, material selection, compressive strength, etc., shall match requirements highlighted in Pay Item No.3.,"Reinforced Concrete Pavement". Actual measured material in cubic yards,in place,shall be the basis for payment. Payment would be full compensation for labor, material and equipment used. Additional concrete shall be determined in the field by the Engineer or his Representative. PAY ITEM NO.9—Manhole—Adiustment: This item shall include adjusting the tops of existing manhole to match proposed grade as shown on the plans, in the detail at the back of this document or as directed by the Engineer. Standard specification Item Nos.450 "Adjusting Manholes and Inlets" and 406 "Concrete for Structures" shall apply except as herein modified. The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch.Work shall be completed and street open to traffic within seven(7)working days. If the contractor fails to complete the work within seven (7) working days, $100 dollars liquidated damage will be assessed per each manhole per day. Prior to beginning of work, the Contractor shall make an inventory of the condition of existing manholes. The Engineer will field verify this inventory and provide the Contractor SP-24 replacements for broken manhole covers. The contractor shall replace the manhole covers which are damaged during construction at no cost to the City. Included as part of this pay item shall be the application of a cold-applied preformed flexible butyl rubber or plastic sealing compound for sealing interior and/or exterior joints on concrete manhole sections,as per current City Water Department Special Conditions. The unit price pre bid per each will be full compensation for all labor,materials,equipment, tools,and incidentals necessary to complete the work. PAY ITEM NO. 10—Water valve—Adjustment: Contractor will be responsible for adjusting water valve boxes to match new pavement grade in accordance with the detail at the back of this document or as directed by the Engineer and the Standard Specification 406 "Concrete for Structures" shall apply except as herein modified. The water valves themselves will be adjusted by City of Fort Worth Water Department forces. Prior to beginning of work, the Contractor shall make an inventory of the condition of existing water valve boxes. The Engineer will field verify this inventory and provide the Contractor replacements for broken valve boxes. The contractor shall replace the valve boxes,which are damaged during construction at no cost to the City. The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch.Work shall be completed and street open to traffic within seven (7)working days. If the contractor fails to complete the work within seven (7) working days, $100 dollar liquidated damage will be assessed per each water valve box per day. The unit price pre bid per each will be full compensation for all labor, materials,equipment, tools,and incidentals necessary to complete the work. END OF SECTION SP-25 NOTE: THiS SPECIFICATION HAS BEEN MODIFIED TO DELETE NON- APPLiCABLE ITEMS FOR USE AS A*GUiDE SPECIFICATION FOR CITY STREETS.' item 360 CONCRETE PAVEMENT 300.1. Description. Construct Portland cement concrete pavement with or without curbs on the concrete pavement. 300.2. Materials. A. Portland Cement Concrete. Provide Portland cement concrete to meet a minimum compressive strength of 3,0d0 psi at 28 days; unless shown otherwise in the contract documents. Use Class A concrete for curbs that are placed separately from the pavement. Provide concrete that is workable and cohesive, possesses satisfactory finishing qualities, and conforms to the mix desidn and mix design slump. B. Reinforcing Steel.Provide Grade 60 deformed steel for bar reinforcement. Provide approved positioning and supporting devices (baskets and chairs) capable of securing and holding the reinforcing steel in proper position before and during paving.Provide corrosion protection when shown on the plans. 1. Dowels. Provide Grade 60 smooth, straight dowels of the size shown on the plans,free of burrs or deformations. Coat dowels with a thin film of grease or other approved de-bonding material. Provide dowel caps.on the lubricated end of each dowel bar used in an expansion Joint. Provide dowel caps filled with a soft compressible material with enough range of movement to'allow complete closure of the expansion joint. 2. Tie Bars. Provide straight deformed steel tie bars. Provide either multiple-piece tie bars or single-piece tie bars at shown on the plans:Provide multiple-piece tie bars composed of 2 pieces of deformed reinforcing steel with a coupling capable of developing a minimum tensile strength of 125% of the design yield strength of the deformed steel when tensile-tested irr the assembled configuration. Provide a minimum length of 33 diameters of the deformed steel in each piece. C. Curing'Materials. Provide Type 2 membrane curing compound conforming to DMS-4650, 'Portland Cement Concrete Curing Materials and Evaporation Retardants." D. Epoxy. Provide Type III epoxy in accordance with DMS-6100, "Epoxies and Adhesives,"for installing all drilled-in reinforcing steel. E. Evaporation Retardant.Provide evaporation retardant conforming to DMS-4650, "Portland Cement Concrete Curing Materials and Evaporation Retardants." F. Joint Sealants and Fillers. Provide Class 5 or Class 8 joint-sealant materials and filers unless otherwise shown on the plans or approved and other sealant materials of the size,shape,and type shown on the plans in accordance with DMS-6310, "Joint Sealants and Fillers." 300.3..Equipment. Furnish and maintain all equipment in good working condition. Use measuring, mixing, and delivery equipment conforming to the requirements of Item 421, `Portland Cement Concrete."Obtain approval for other equipment used. ' CP-� s' A. Placing, Consolidating, and Finishing Equipment. Provide approved self- propelled paving equipment that uniformly distributes the concrete with minimal segregation and provides a smooth machine-finished consolidated concrete pavement conforming to plan line and grade. Provide an approved automatic grade control system orr slip-forming equipment. Provide approved mechanically operated finishing floats capable of producing a uniformly smooth pavement surface. Provide equipment capable of providing a fine, light water fog mist. Provide mechanically operated vibratory equipment capable of adequately consolidating the concrete. Provide immersion vibrators on the paving equipment at sufficiently close intervals to provide uniform vibration and consolidation of the concrete over the entire width and depth of the pavement and in accordance with the manufacturer's recommendations. Provide immersion vibrator units that operate at a frequency in air of at least 8,000 cycles per minute. Provide enough hand-operated immersion vibrators for timely and proper consolidation of the concrete along forms, at joints and in areas not covered by other vibratory equipment. Surface vibrators may be used to supplement equipment-mounted immersion vibrators. Provide tachometers to verify the proper operation of all vibrators. For small or irregular areas or when approved, the paving equipment described in this Section is not required. • B. Forming Equipment. 1. Pavement Forms. Provide metal or wood side forms of sufficient cross-section, i strength, and rigidity to support the paving equipment and resist the impact and vibration of the operation without visible springing or settlement. Use forms that are free from detrimental kinks, bends, or warps that could affect ride quality or alignment. Provide flexible or curved metal or wood forms for curves of 100-ft. radius or less. 2. Curb Forms. Provide curb forms for separately placed curbs that are not slipformed that conform to the requirements of Item 529, "Concrete Curb, Gutter, and Combined Curb and Gutter." C. Reinforcing Steel inserting.Equipment. Provide inserting equipment that accurately inserts and positions.reinforcing steel in the plastic concrete parallel to the profile grade and horizontal alignment in accordance to plan details. D. Texturing Equipment, 1. Carpet Drag. Provide a carpet drag mounted on a work bridge or a moveable support system. Provide a single piece of carpet of sufficient transverse length to span the full width of the pavement being placed and adjustable so that a sufficient longitudinal length of carpet is in contact with the concrete being placed to produce the desired texture. Obtain approval to vary the length andwildth of the.carpet to accommodate specific applications. Use an artificial grass-type carpet having a molded polyethylene pile face with a blade length of 518 in.to 1 W., a minimum weight of 70 oz. per square yard,and a strong, durable, rot- resistant backing material bonded to the facing. 2. Tining Equipment. Provide a self-propelled transverse metal tine device equipped with 4-in.to 6-'in. steel tines and with cross-section approximately 1132 in.thick by 1112 in.wide, spaced at 1 in., center-to-center. Hand-operated tining equipment that produces an equivalent texture may be used only on small or.irregulady shaped areas or, when permitted, in emergencies due to equipment breakdown. It. Curing Equipment. Provide a self-propelled machine for applying membrane curing compound using mechanically pressurized spraying equipment with atomizing nozzles. Provide equipment and controls that maintain the required uniform rate of application over the entire paving area. Provide curing equipment that is independent of all other equipment when production rates are such that the first application of membrane curing compound canndt be accomplished immediately after texturing and after free moisture has disappeared. Hand-operated pressurized spraying equipment with atomizing nozzles may only be used on small or irregular areas or, when permitted, in emergencies due to equipment breakdown. F. Sawing Equipment. Provide power-driven concrete saws to saw the joints shown on the plans. Provide standby power-driven concrete saws during concrete sawing operations. Provide adequate illumination for nighttime sawing. G. Grinding Equipment.When required, provide self-propelled powered grinding equipment that is specifically designed to smooth and texture concrete pavement using circular diamond blades. Provide equipment with automatic grade control capable of grinding at least a 3-ft.width longitudinally in each pass without damaging the concrete. 300.4. Construction. Obtain approval for adjustments to plan grade-line to maintain thickness over minor subgrade or base high spots while maintaining clearances and drainage. Maintain subgrade or base in a smooth, clean, compacted condition in conformity with the required section and established grade until the pavement concrete is'placed. Keep subgrade or base damp with water sufficiently in advance of placing pavement concrete.Adequately light the active work areas for all nighttime operations, if required. A. Reinforcing Steel and Joint Assemblies.Accurately place and secure in position all reinforcing steel as shown on the plans. Place dowels at mid-depth of the pavement stab, parallel to the surface. Place dowels for transverse contraction joints parallel to the pavement edges Tolerances for location and alignment of dowels will be shown on the plans.Stagger the longitudinal reinforcement splices to avoid having more than 1/3 of the splices within a 2-ft. longitudinal length of each lane of the pavement.Use multiple-piece tie bart or drill and epoxy grout be bars at longitudinal construction joints. 1. Manual Placement. Secure reinforcing bars at alternate intersections with wire ties or locking support chairs.lie all splices with wire. 2.. Mechanical Placement If mechanical placement of reinforcement results in steel misalignment or improper location, poor concrete consolidation, or other inadequacies, complete the work using manual methods. B. Joints. Install joints as shown on the plans. Clean and seal joints in accordance with Item 438, "Cleaning and Sealing Joints and Cracks (Rigid Pavement and Bridge Decks)."Repair excessive spalling of the joint saw groove using an approved method before installing the sealant. Seal all joints before opening the pavement to all traffic.When placing of concrete is stopped, install a rigid transverse bulkhead, accurately notched for the reinforcing steel and shaped accurately to the cross- section of the pavement ' 1. Placing Reinforcement at Joints.Where the plans require an assembly of parts at pavement joints, complete and place the assembly at the required location'and elevation with all parts rigidly secured in the required position. Accurately notch joint materials for the reinforcing steel. C P..3 �� • r 2. Curb Joints. Provide joints in the curb of the same type and location as the adjacent pavement. Use expansion joint material of the same thickness,type, and quality required for the pavement and of the section shown for the curb.' Extend expansion joints through the curb. Construct curb joints at all transverse pavement joints. For.non-monolithic curbs, place reinforcing steel irito the plastic concrete pavement as shown on the plans unless otherwise approved. Form or saw the weakened plane joint across the full width of concrete pavement and through the monolithic curbs. C. Placing and Removing Forms. Use clean and oiled forms. Secure forms on a base or firm subgrade that is accurately graded and that provides stable support without deflection and movement by form riding equipment. Pin every form at least at the middle and near each end.Tightly join and key form sections together•to prevent relative displacement, : Set side forms far enough in advance of concrete placement to permit inspection. Check conformity of the grade, alignment, and stability of forms immediately before placing concrete, and make all necessary corrections. Use a straightedge or other approved method to test the top of forms to ensure that the ride quality requirements for the completed pavement will be met. Stop paving operations if forms settle or deflect more than 118 in. under finishing operations. Reset forms to line and grade, and refinish the concrete surface to'correct grade. Avoid damage to the edge of the pavement when removing forms. Repair damage resulting from form removal and honeycombed areas with a mortar mix within 24 hr. after form removal unless otherwise approved. Clean joint face and repair honeycombed or damaged areas within 24 hr. after a bulkhead for a transverse construction joint has been removed unless otherwise approved. When forms are • removed before 72 hr. after concrete placement, promptly apply membrane curing compound to the edge of the concrete pavement. Forms that are not the same depth as the pavement but are within 2 in. of that depth are permitted if the subbase is trenched or the full width and length of the form base is supported with a firm material to produce the required payerhent thickness, Promptly repair the form trench after use. Use flexible or curved wood or metal forms for curves of 100-ft. radius or less. D. Concrete Delivery. Clean delivery equipment as necessary to prevent accumutpOon of bid concrete before loading fresh concrete. Use agitated delivery equipment for concrete designed to have a slump of more than 5 in. Segregated concrete is subject to rejection. Place agitated concrete within 60'min, after batching. Place no concrete within 45 min. after batching. In hot weather or under conditions causing quick setting of the concrete,times may be reduced by the Engineer.Time limitations may be extended if the Contractor can demonstrate that the concrefe can be , property placed, consolidated, and finished without the use of additional water. E. Concrete Placement. Do not allow the pavement edge to deviate from the established paving line by more than 1/2 in. at any point. Place the concrete asnear as possible to its final location, and minimize segregation and rehandling.Where i ..; hand spreading is necessary, distribute concrete using shovels. Do not use rakes or vibrators to distribute concrete. - 1. Pavement. Consolidate all concrete by approved mechanical vibrators operated on the front of the paving equipment. Use immersion-type vibrators that simultaneously consolidate the full width of the placement when machine . . ' finishing. Keep,vibrators from dislodging reinforcement. Use hand-operated vibrators to consolidate concrete in areas not accessible to the machine-mounted Vibrators.Do not operate machine-mounted vibrators while the paving equipment is stationary. 2. Temperature Restrictions. Place concrete that is between 40°F and 95°F at the time of discharge, except that concrete may be used if it was already in transit when the temperature was found to exceed the allowable maximum.Take _ immediate corrective action or cease concrete production when the concrete temperature exceeds 95°F. Do not place concrete when the•ambient temperature in the shade is below 40OF and falling unless approved. Concrete may be placed when the ambient ' temperature in the shade is above 35OF and rising or above 40°F.When temperatures warrant protection against freezing, protect the pavement with an approved insulating material capable of protecting the concrete for the specified curing period.Submit for approval proposed measures to protect the concrete' from anticipated freezing weather for the first 72 hr.after placement. Repair or replace all concrete damaged by freezing- F. Spreading and Finishing. Finish all concrete pavement with approved self- propelled equipment. Use power-driVen spreaders, power-driven vibrators, power- driven strike-off, and screed, or-approved alternate equipment. Use the transverse finishing equipment to compact and strike off the concrete to the required section and grade without surface voids. Use float equipment for final finishing. Use concrete with a consistency that allows completion of all finishing operations without addition of water to the surface. Use the minimal amount of water fog mist necessary to • Maintain a moist surface. Reduce fogging if float or straightedge operations result in excess slurry. 1. Finished Surface. Perform sufficient checks with long-handled 10-ft. and 15-ft. straightedges bn the plastic concrete to ensure that the final surface is'Within the tolerances specified in the contract documents. Check with the straightedge parallel to the centerline. 2. Maintenance of Surface Moisture. Prevent surface drying of the pavement, before application of the curing system. Accomplish this by fog applications of evaporation retardant on the pavement surface.Apply evaporation retardant at. the rate recommended by the manufacturer. Reapply the evaporation retardant as.neede'd to maintain the concrete surface in a moist condition until curing system is applied. Do not use evaporation retardant as a finishing aid. 3. Surface Texturing. Perform*surface texturing using a combination of a carpet drag and metal fining, if required by the contract documents. Complete final texturing before the concrete has attained its initial set. Draw the carpet drag longitudinally along the pavement surface with the carpet contact surface area adjusted to provide a satisfactory coarsely textured surface. Operate the metal-tine device to obtain grooves spaced at 1 in., approximately 3116 in.'deep,with a minimum depth of 118 in., and approximately 1112 in.wide. Do not overlap a previously tined area. Use manual methods for achieving similar results on ramps and other irregular sections of pavements. Repair damage to the edge of the slab and joints immediately after texturing. Do not tine pavement that-ill be overlaid.. ' • 4. SmaIi or irregular Placements.Where machine placements and finishing of concrete pavement are not practical, use hand equipment and procedures that produce a consolidated and finished pavement section to the line and grade. S. Ernergency Procedured. Use hand-operated equipment for applying tw1ure, evaporation retardant and cure in the event of equipment breakdown, 0. Curing. Keep the concrete pavement surface from drying by water fogging until the txuflng material has been applied. MalhWn and promptly repair damage to curing materials on exposed surfaces of concretes pavement continuously for at lent 3 curing days.A curing day is datined as a 24-hr. period when either the fermpemture taken in the shade away from artificial Beat is above 6VF for at Least 19 hr.or when the surface temperature of the c*ncreW is maintalned above 4VF for 24 hr.Curing begins when foie concrete curing systam has been applied. Stop concrete pawing if curing compound is not being applied promptly and maintained adequately.Other methods of curing in accordance wrlh item 420, `Concrete Structures,"may bs used when speckled or approved. . 1. Membrane Curing.After texturing and immediately after the free surface moisWra has disappeared, spray the s onerete surface uniformly with 2 coats of membrane airing compound at an incrMdual application rate of not more than 180 sq.& per gallon.Apply Me tsar coat within 10 rnin. after con plefing t nturing oporations.Apply the second coati wit h 30 min.after cornpiefing texturing operations. Before and during application,mainWm curing compounds In a uniformly agitated condition,free of settlement Do riot thin or d7ute the cu ft compound. Where the coating shows disoontinnuities or other defects or If rain'falls on the newly coated surface before the film has dried enough to refit damage,apply - addlHonai compound at the some rate of coverage to correct the damage i~nsute that the caring compound eats the sides of the fining grooves. H. Sawing Joints,Saw joints to the depth shown out the plans as soon as sawing can be accomplished without damage to the pavement regardiess of time of day or Weather Conditions. Some minor raveling of the saw cut is acceptable. Use a chalk line'string Rne, sawing template, or other approved method to provide a true joint atignmeitt. Provide enough saws to match the leaving producftn rate to ensure sawing completion at the earliest possible time to avoid unconttollerd cracldng; Reduce paving production if necessary to ensure timely sawing ofid'hta. Promptly restore membrane cure damaged within the first 72 hr. of curing. 1. Protezion of Pavement and Opening to Trarff'ic.Testing for early opening is the responsi'bMy of the Contractor regardless of job-control testing responsibilities unless otherwise shown in the plans or directed. Testing result interpretation for opning to traffic is subject to the approval of the Engineer. 1. Proferc#ion of Pavement Erect and mairdain barricades and other dsndard and approved devices that will exclude all vehicles and equipment from the newly . placed pavement for the periods spoc'rfied. Before opening to traff e. protect the pavement from damage due to crossings using approved methods.!Maintain an adequate supply of sheeting or other material to cover and protect fresh concrete eurfac a from weather damage.Apply as needed to protect the pavement surface from weather. 2_ Opening Pavement to Traffic. Before opening to traffic, clean pmmmenk place stable material agafnst the pavement edges, seal jaunts, and perfonn all other tmffa safety related work. C PIG CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A. Labor Code §406.96 (2000), as amended, Contractor certifies that it provides workers' compensation insurance coverage for all of its employees employed on City of Fort Worth Project Concrete Restoration 2008-1 At Various Locations and City of Fort Worth Project No. C293-541200-204330106383. CONTRACTOR: LA"01 —,� b"W",,q lK C By:Y Name: CLJ-�"---J �_ (. kAL,ak gy Title: V6--toeout Date: 01 06 STATE OF TEXAS § . a § COUNTY OF TARRANT § Before me, the undersigned authority, on this day personally appeared 1 .Mrf�� E L4 A C., known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of 'Inn, .s�p�vT for the purposes and consideration therein expressed and in the capacity therein stated. y- Given Under My Hand and Seal of Office this day of 20L. CYNTHIA J.CATES Notary Public,State of Texas '4ubli n and fo`r b-e State of My Commission ExpiresIs �e t 2-6-2008 do �D. CERTIFICATE OF LIABILITY INSURANCE ii%i�/2008 7 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Bradley Insurance Agency ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 1415 Summit Avenue HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Fort Worth, TX 76102 817-332-8288 INSURERS AFFORDING COVERAGE NAIC# INSURED Laughley Bridge & Construction, Inc. INSURER A: Companion Property & Casualty Laughley, Charles INSURER B: Progressive 7 P.O. Box 123800 INSURERC: Unitrin Fort Worth, TX 76121 INSURERD: Texas Mutual Ins. Co. 817/ 401-3306 INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADIYL POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS LTR NSRD TYPE F INSURANCE DATE MM/DD/YY DATE MMlDD1YY GENERAL LIABILITY EACH OCCURRENCE $ 11000,000 X COMMERCIAL GENERAL LIABILITY PREMISES Ea occurence $ 10 0 000 ICLAIMS MADE CI OCCUR MED EXP(Any one person) $ 5,000 A X DJGL084337 2/05/2008 2/05/2009 PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 21000,000 GEN'LAGGREG ATE LIMIT APPLIES PER PRODUCTS-COMP/OPAGG $ 2,000,000 X POLICY PRO LOC JECT AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 ANY AUTO (Ea accident) ALL OWNED AUTOS BODILY INJURY X SCHEDULED AUTOS (Per person) $ B X HIREDAUTOS 06317534-0 2/29/2008 2/29/2009 BODILY INJURY X NON-OWNED AUTOS (Per accident) $ PROPERTY DAMAGE $ (Per accident) 7 GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY EACH OCCURRENCE $ OCCUR CLAIMS MADE AGGREGATE $7 DEDUCTIBLE $ RETENTION $ $ 7- WORKERS COMPENSATION AND X W AT - H- EMPLOYERS'LIABILITY 70RYL1MITS ER ANY PROPRIETORIPARTNER/EXECUTIVE SBP0001166538 3/06/2008 3/06/2009 E.L.EACH ACCIDENT $ 500 000 D OFFICERIMEMBER EXCLUDED? E.L.DISEASE-EA EMPLOYE $ 500,000 If yes,describe under SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT $ 500,000 OTHER C Auto Liability FCNCCV1354368 3/01/2008 3/01/2009 Combined Single Limits 500,000 DESCRIPTION OF OPERATIONS LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS City of Fort Worth is named as additional insured on the general liability policy. Project:Concrete Restoration - 2008-1 CERTIFICATE HOLDER CANCELLATION City of Fort Worth (5) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION 1000 Throckmorton DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MA&O DAYS WRITTEN Ft. Worth, TX 76120 NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR Att• Gloria REPRESENT.ATtVES. AUTH IZ REPRESENTATIVE Fax: 817/392-2852 cc ACORD25(2001108) © ORPORATION 1988 CERTIFICATE OF INSURANCE TO: CITY OF FORT WORTH,TEXAS Date: NAME OF PROJECT: PROJECT NUMBER: THIS IS TO CERTIFY THAT (Name and Address of Insured) is, at the date of this certificate, Insured by this Company with respect to the business operations hereinafter described, for the type of insurance and in accordance with the provisions of the standard policies used by this Company,and further hereinafter described. Exceptions to standard policy noted on reverse side hereof. TYPE OF INSURANCE Policy No. Effective Expires Limits of Liability Worker's Compensation MW Comprehensive General Bodily Injury: Liability Insurance Ea.Occurrence: $ (Public Liability) Property Damage: Ea Occurrence: $ Blasting Ea.Occurrence: $ Collapse of Buildings or structures adjacent to Ea.Occurrence: $ excavations Damage to Underground Utilities Ea.Occurrence: $ Builder's Risk Bodily Injury: Comprehensive Ea.Person: $ Automobile Ea.Occurrence: $ Liability Property Damage: Ea Occurrence: $ Bodily Injury: Contractual Liability Ea.Occurrence: $ Property Damage: Ea.Occurrence: $ Other Locations covered: Description of operations covered: The above policies either in the body thereof or by appropriate endorsement provide that they may not be changed or canceled by the insurer in less than five (5) days after the insured has received written notice of such change/or cancellations. Where applicable local laws or regulations require more than five(5)days actual notice of change or cancellation to be assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached. Agency Fort Worth Agent By Address Title EQUIPMENT SCHEDULE List of Equipment owned by Bidder that is in serviceable condition and available for use: Portions of work Bidder proposes to sublet in case of Award of Contracts including amount and type: EXPERIENCE RECORD List of projects your organization has successfully completed: Amount Of Contract Type of Work Date Accepted Name and Address of Owner Award List of projects your organization is now engaged in completing: Amount Of Contract Type of Anticipated Name and Address of Owner Award Work Date of Completion List Surety Bonds in force on above incomplete work: Date of Contract Award Type of Work Amount of Name and Address of Bond Bond Surety Bond#4369812 PERFORMANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, (1) Laughley Bridge and Construction, Inc., as Principal herein, and (2) SureTec Insurance Company 1 a corporation organized under the laws of the State of (3) Texas , and who is authorized to issue surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the sum of Six Hundred Thirteen Thousand, Nine Hundred Dollars and No Cents Dollars (1613,900.00) for the payment of which sum we bind ourselves, our heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these presents. WHEREAS, Principal has entered into a certain written contract with the Obligee dated the a day of August , 2008, a copy of which is attached hereto and made a part hereof for all purposes, for the construction of CONCRETE - RESTORATION 2008-1 AT VARIOUS LOCATIONS - C293-541200-204330106383. NOW, THEREFORE, the condition of this obligation is such, if the said Principal shall faithfully perform the work in accordance with the plans, specifications, and contract documents and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default, then this obligation shall be void; otherwise, to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of such statute, to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal 'J and the Surety have executed this instrument. SIGNED and SEALED this 5T" day of August _IJ Laughley Bridge and Construction,Inc. PRINCIPA ATTEST- By: cz, Name: C t�t,�� C - i A4,f�I (Prin i al) T cretary Title: V'dA'--(PE$r(- e(�) (S E A L) Address: P.O.Box 123800 u Fort Worth,TX 76121 a Wine a o P cipal a rr SureTec Insurance Company (� SURETY ++� ATTEST: By: ` Name: Beverly 4.Trimble Cin y Fowler,Witness Attorney in Fact Address: 9737 Great Hills Trail,Ste.320 Austin,TX 78759 .w Witness as t urety John Hankins Telephone Number: 866-732-0099 NOTE: (1) Correct name of Principal (Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of bond shall not be prior to date of Contract. `�l �1 Bond# 4369812 PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: .. COUNTY OF TARRANT § QThat we, (1) Laughlev Bridge and Construction, Inc., as Principal herein, and (2) SureTec Insurance Company a corporation organized and existing under the laws of the State of (3) Texas as surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the amount of Six a Hundred Thirteen Thousand, Nine Hundred Dollars and No Cents Dollars ( 613,900.00) for the payment whereof, the said Principal and Surety bind themselves and their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, the Principal has entered into a certain written contract with the Obligee dated the 5s' day of August , 2008, which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied at length, for the Q following project: CONCRETE RESTORATION 2008-1 AT VARIOUS LOCATIONS- W C293-541200-204330106383. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant (as defined in Chapter 2253, Texas Government Code, as amended) supplying labor or materials in the prosecution of the work under the contract, then this obligation shall be void; otherwise, to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute, to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. SIGNED and SEALED this 5t' day of August , 2008. Laughley Bridge and Construction,Inc. PRINCIPAL ATTEST. By: ,- Name: C `� (Prin al) Se retary Title: T&---5%cy.:F7 n (S E A L) Address: P-o.Box 123800 �Jf Fort Worth,TX 76121 �n f.J Wiinieiis as td Prin al SureTec Insurance Company OSURETY ` ATTEST: By:4. Name: Beverly M.Trimble Cindy Fowler,Witness Attorney In Fact Address: 9737 Great Hills Trail,Ste.320 Austin,TX 78759 M Wlfness as t urety John Hankins Telephone Number: 866-732-0099 �1 NOTE: (1) Correct name of Principal (Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original cop of Y Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of bond shall not be prior to date of Contract. U Ll .. Bond# 4369812 (� MAINTENANCE BOND LP THE STATE OF TEXAS § § COUNTY OF TARRANT § KNOW ALL BY THESE PRESENTS: That Lauahley Bridge and Construction, Inc., ("Contractor"),as principal, and, SureTec Insurance Company a corporation organized under the laws of the State of Texas , ("Surety"), do hereby acknowledge themselves to be held and bound to .+ pay unto the City of Fort Worth, a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City') in Tarrant County, Texas, the sum of Six Hundred Thirteen Thousand, Nine Hundred Dollars and No Cents Dollars ( 613,900.00), lawful money of the United States, for payment of which sum well and truly be made unto said City and its successors, said Contractor and Surety do hereby bind themselves, their heirs, executors, administrators, assigns and successors,jointly and severally. This obligation is conditioned, however, that: WHEREAS, said Contractor has this day entered into a written Contract with the City of Fort Worth, dated the a of Auaust , 20 08, a copy of which is hereto attached and made a part hereof, for the performance of the following described public improvements: CONCRETE RESTORATION 2008-1 AT VARIOUS LOCATIONS the same being referred to herein and in said contract as the Work and being adesignated as project number(s) C293-541200-204330106383 and said contract, including all of the specifications, conditions, addenda, change orders and written instruments referred to therein as Contract Documents being incorporated herein and being made a part hereof; and, WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during a period of after the date of the final acceptance of the work by the City; and WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of 2(Two)Years ; and WHEREAS, said Contractor binds itself to repair or reconstruct the Work in whole or in part at any time within said period, if in the opinion of the Director of the City of Fort Worth Department of Engineering, it be �r Lnecessary; and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to repair or reconstruct said Work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said Work in accordance with all the terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwise, this Bond shall be and remain in full force and effect, and L► Bond# 4369812 the City shall have and recover from Contractor and Surety damages in the premises as prescribed by said aContract. This obligation shall be a continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. _ IN WITNESS WHEREOF, this instrument is executed in 6 counterparts, each of which shall be deemed an original, this 5�' day of August , A.D. 2008. Laughley Bridge and Construction,Inc. PRINCIPAL QATTEST By: Name. (P ' pal) S cretary r� Title: riarS IuewT' (S E A L) Address: P.O.Box 123800 Fort Worth,TX 76121 Witne4i as t rin pal I:J SureTec Insurance Company SURETY ATTEST: By: _ u�4-%� �L - Name: Beverly M.Trimble find Fowler,Witness Attorney in Fact (Sq�A Address: 9737 Great Hills Trail,Ste.320 = Austin,TX 78759 Witness as to Sureti John Hankins Telephone Number: 866-732-0099 Iul NOTE: (1) Correct name of Principal (Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of bond shall not be prior to date of Contract. POA#: 4221003 i SureTec Insurance Company LIMITED POWER OF ATTORNEY Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents make,constitute and appoint L.Ray Pitts,Jr.,Beverly M.Trimble,Connie Jean Kregel,Jeffrey Todd McIntosh,Cynthia Watson Fowler of Dallas, Texas its true and lawful Attomey(s)-in-fact,with full power and authority hereby conferred in its name,place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety, providing the bond penalty does not exceed Five Million and no/100 Dollars($5,000,000.00) and to bind the Company thereby as fully and to the same extent as if such bonds were signed by the President,sealed with the corporate seal of the Company and duly attested by its Secretary,hereby ratifying and confirming all that the said Attomey(s)-in-Fact may do in the 1 premises. Said appointment shall continue in force until 12/31/09 and is made under and by authority of the following resolutions of the Board of Directors of the SureTec Insurance Company: Be it Resolved,that the President,any Vice-President,any Assistant Vice-President,any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute,acknowledge and deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved,that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20 of April, 1999) In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal to be hereto affixed this 20th day of June,A.D.2005. MHMU URETEC INSL CE COMPANY w0 xAN Nvr By , w:w ;A Bill King, re nt State of Texas ss: �`•.L 4 co,tl County of Hams .. .. 4110 On this 20th day of June,A.D. 2005 before me personally came Bill King,to me known, who,being by me duly sworn,did depose and say,that he resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the Board of Directors of said Company;and that he signed his name thereto by like order. Michelle Denny 11D Notary Publlo State d Texas �My commission Expires Michelle Denny,Notary Public August 27,2008 My commission expires August 27,2008 I,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attomey,executed by said Company,which is still in full force and effect;and furthermore,the resolutions of the Board of Directors,set out in the Power of Attorney are in full force and effect. ' Given under my hand and the seal of said Company at Houston,Texas thisVT day of ,2 ) ,A.D. M.Brent Beaty,Assistant Se re ry, My instrument issued In excess of the pe!jagy stat®d above is totally void and without any validity. For verification of the authority of this poweryou►uny call(743X8t2-0800 any business day between 8:00 am and 5:00 pm CST. d �r SureTec Insurance Company - . THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION Statutory Complaint Notice To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make a complaint at: 1-866-732-0099 You may also write to the Surety at: SureTec Insurance Company 9737 Great Hills Trail, Ste. 320 Austin, TX 78759 You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints at 1-800-252-3439. You may write the Texas Department of Insurance at e. PO Box 149104 Austin, TX 78714-9104 Fax#: 512-475-1771 PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ---------------------------------------------------------------------------------------------------------------------------- Important Notice Regarding Terrorism Risk Insurance Act of 2002 The Bond to which this Rider is attached does not provide coverage for, and the surety shall not be liable for, losses caused by acts of terrorism, riot, civil insurrection, or acts of war. ---------------------------------------------------------------------------------------------------------------------------- Exclusion of Liability for Mold, Mycotoxins, and Fungi The Bond to which this Rider is attached does not provide coverage for, and the surety thereon shall not be liable for, molds, living or dead fungi, bacteria, allergins, histamines, spores, hyphae, or mycotoxins, or their related products or parts, nor the remediation thereof, nor the consequences of their occurrence, existence, or appearance. Triple Rider with Mold Excl.doc rev. 11_03 1 CITY OF FORT WORTH, TEXAS CONTRACT THE STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS: COUNTY OF TARRANT This agreement made and entered into this the 5t' day of August , 2008 .. by and between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under and by virtue of a special charter adopted by the qualified voters within said City on the 11th day of December, A.D., 1924, under the authority (vested in said voters by the "Home Rule" provision) of the Constitution of Texas, and in accordance with a resolution duly passed at a regular meeting of the City Council of said city, and the City of Fort Worth being hereinafter termed Owner, and Laughley Bridge and Construction, Inc., HEREINAFTER CALLED Contractor. WITNESSETH: That said parties have agreed as follows: 1. That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: CONCRETE RESTORATION 2008-1 AT VARIOUS LOCATIONS Designated as project number: C293-541200-204330106383. 2. That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents prepared by the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein. 3. The Contractor hereby agrees and binds himself to commence the construction of said work within ten (10) days after being notified in writing to do so by the Transportation and Public Works Department of the City of Fort Worth. 4. The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Transportation and Public Works Department of the City of Fort Worth and the City Council of the City of Fort Worth within a period of 150 working days. If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided in the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of $315 per calendar day, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency. 5. 4 Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications, and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete the same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if, in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said Plans and Specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. 6. Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this R- C-2 Contract, whether or not any such injury or damage is caused in whole or in part by the ne_gli_gence or alleged ne_gli_gence of Owner, its officers, servants or employees. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7. The Contractor agrees, on the execution of this Contract, and before beginning work, to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful performance of the terms and stipulations of the Contract and for the payment to all claimants for labor -- and/or materials furnished in the prosecution of the work, such bonds being as provided and required in Texas Government Code Section 2253, as amended, in the form included in the Contract Documents, and such bonds shall be 100 percent (100%) of the total contract price, and the said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth. 8. Said City agrees and binds itself to pay, and the said agrees to receive, for all of the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in by-weekly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates NIA shall be SIX HUNDRED THIRTEEN THOUSAND, NINE HUNDRED DOLLARS AND NO CENTS $613.900.00 C-3 9. It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or assigned to anyone else by said Contractor without the written consent of the Director of the Transportation and Public Works Department. ,. 10. The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto and made a part hereof the same as if it were copies verbatim herein. 11. •• The Contractor shall procure and shall maintain during the life of this contract insurance as specified in paragraph 8 of Special Instruction to Bidders of this contract documents. 12. It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with references to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of the same. IN WITNESS WHEREOF, the City of Fort Worth has caused this instrument to be signed in Six 6 counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in Six 6 counterparts with its corporate seal attached. R 1 C-4 Done in Fort Worth, Texas, this the 5T" day of August , 2008 . APPROVAL: CITY OF FORT WORTH DIREC ii PORTATION AND ASSISTANT CITY MANAGER PUBLIC PARTMENT F ' � r I.�NG L�,2t t CaKmk,,�.10G. ATTEST: •• (Contractor) CITY SECRE Y r (SEAL) BY: �Vl� Re pre entative) Contract Authoriaatiox (TITLE) Date P'� 3 123boo APPROVED7AS TO M & (Address) LEGALI (City/State/Zip) ASSIST 'PITY ATTORN mo OFFICIAL PECDRD Revised June 2008 CITY Se;CITE ARY u FT.WORTH,TX dw GREEN CEMENT POLICY COMPLIANCE STATEMENT (To be furnished by the Contractor to the City at the time of bid opening) (Submit separate forms for each supplier/retailer) This goes to certify that the cement used for this project meets the following criteria: ❑ The cement was manufactured in a kiln utilizing the dry process (list source below) that met the emission standard of 1 .71b or less of NOx /ton of clinker released into the atmosphere. ❑ The cement meets ASTM C-150 requirements Source of Cement: Name of Concrete Supplier Name of Plant(Kiln) & Address Name of Manufacturer CONTRACTOR SUPPLIER Name Name We Title Company Company Phone Number Phone Number Project Name: City Project Number: Street Maintenance Work Notice As a part of the City of Fort Worth's street Maintenance Program, has been contracted to repair your street. During the maintenance work, there will be a brief time that you may not have access to your residence or business. On the day specified below, vehicles can not be parked on the street. Also, please turn off your sprinkler adjacent to the street. If you have any questions or concerns, please contact contractor at If we are not able to resolve your concerns to your satisfaction, you may contact City of Fort Worth Inspector at Monday—Friday between 7:30 AM and 4:30 PM After 4:30 PM and on weekends, call(8 17)392-8 100 Expected Construction dates Block Limits Street Name Project Limits (Weather Permitting) 1100-1200 Brown street Yates Ave to Keller Springs Pkwy From 5/5/08 to 5/29/08 Nombre del proyecto: Numero del proyecto: Notificacion del Mantenimiento de la Calle Como parte del programa de mantenimiento de las Calles de la Ciudad de Fort Worth, ha sido contratado para reparar su calle. Durante este trabajo de mantenimiento, Habra un tiempo breve en que no tenga acceso a su hogar o negocio. En los dias especificados abajo, vehiculos no deben estacionarse el la calle. Tambidn, por favor apague su sistema de regar el crisped cerca de la calle. Si tiene alguna pregunta o preocupacion, por favor llame al contratista al Si no resuelve su preocupacion a su satisfaccibn, puede tambidn llamar a la Oficina de inspeccion de la Ciudad de Fort Worth al , de lunes a viernes entre las 7:30 AM y 4:30 PM Despuds de las 4:30 PM o en los fines de semana llame al(817) 392-8100 Limites Nombre limites Fechas de construccion de la cuadra de la Calle de proyecto permitiendo el estado de tiempo 1100-1200 Brown Street Yates Ave a Keller Springs Pkwy de 5/5/08 a 5/29/08 PROJECT DESIGNATION SIGN 41 - 0 " 11/4�� FORTWORTIF- PMS 288 4 PMS 167 311 Y ET MAINTECE 3111 PROGRAM -- 0 3" �t i 1'/2 Contractor: 21/2„ Contractor's Name , 1'/2" TELEPHONE NUMBER /2 16'/2 1 __j FORT WORTH IN LOGO- CHELTINGHAM BOLD ALL OTHER LETTERING IN ARIAL BOLD LOGO COLORS: FORT WORTH - PMS 288 LONGHORN LOGO- PMS 167 a I 1 [ I 1 JOINT SEALANT. SEE JOINT DETAIL 2 SEE TABLE VERTICAL CUT SAW ZW � °s a d • • • ° ° ° °d • °o dp • s ° d Ln u • °d a d e ° . • d • • e X= • d° e e ° •d ° e W F_ n ° e • ° EXISTING NO. 3 BARS�24" � C—C BOTH WAYS EXIST. SUBGRADE PER. TYPICAL Cx Y SA WED DUMMY JOINT T NOT TO SCALE TRANSVERSE EXPANSION JOINT FORMED GROOVE ROUNDED T0�/4" RADIUS WITH SILICONE JOINT SEALANT AND REDWOOD EXPANSION JOINT NO. 6X24" SMOOTH DOWEL FILLER. REPLACE FILLER IF NEEDED. @ 24' C—C SEE JOINT DETAIL 1 16" DOWEL COATING *SEE TABLE 2"MIN. 1 114" MIN. CLEARANCE • 6„ 60, • d e ,,. I BAR STOP F' ° •d ° ` DOWEL SLEEVE OR CAP TO FIT #6 DOWEL & BE • • ° �10° /16 ' d SECURED NO. 3 BARS @ 24" DOWEL SUPPORT EXIST. SUBGRADE PER. NO. 3 BARS @ 24" C—C BOTH WAYS �R BASKET �fYP. ROADWAY SECTION C—C BOTH WAYS EXISTING TRAINS VERSE EXPANSION JOIN T NOT TO SCALE TRAVERSE EXPANSION JOINT WITHOUT DOWEL SUPPORT BASKET SEE DETAIL 1 12" NO.5X24" SMOOTH DOWEL @ 24" C—C AND EPDXYED 1N 12" FIILLERAREDWOOD 2" MI 1 1/4" MIN CLEARANCE #q Ca 18" C—C � BAR STOP z T XIST. CONC. PAVEMELA DOWEL SLEEVE OR CAP XLEEABLE ,a PROP. PAVEMEN TO FIT #5 DOWEL 8 BE w SECURED EXIST. UBGRADE PER. TYPICAL TRANS VERSE EXPANSION CONS TRUC TION BU T T JOIN T (BETWEEN EXIST. AND PROP. PAVEMENT) NOT TO SCALE 5.1 TRANSVERSE CONSTRUCTION BUTT JOINT WITH NO. 5 DOWELED & EPDXIED SILICONE JOINT SEALANT. SEE JOINT DETAIL 2 = BARS @ 24" O.0 #4 @ 18" C-C a _ EXISTIN C NCRETE SLAB NEW CONCRETE SLAB o T/2 s• Z � O • a . • O H . G ° • wr+ NO. 3 BARS @ 24" C-C BOTH WAYS EXIST. SUBGRADE PER. TYPICAL TRANS VERSE CONS TRUC TION BU T T JOIN T NOT TO SCALE LONGITUDINAL CONSTRUCTION BUTT JOINT WITH 5.. SILICONE JOINT SEALANT. SEE JOINT DETAIL No. 2 N x 3O" DOWEL # a 4 @ 118" C-C W _ EXISTING CONCRETE SLAB NEW CONCRETE SLAB J.— T/2 o i o Z dl a• d N a . x r— NO. 3 BARS @ 24" C-C BOTH WAYS EXIST. SUBGRADE PER. TYPICAL ROADWAY SECTION L ONGI T UDINAL CONS TRUC TION BU T T JOIN T NOT TO SCALE 5 1 1 1 ! { f SILICONE JOINT SEALANT ( REMOVE & REPLACE ) t3/4" -1/4 ao Z SILICONE JOINT N v SEALANT ° POLYETHYLENE BONDIL BREAKER TAPE w ( REMOVE & REPLACE ) o SAWED JOINT FACE e � � REDWOOD EXPANSION z ° #6 SMOOTH -4 JOINT FILLER o (EXISTING REBAR) ° (EXISTING TO BE REPLACED- 3/8" DIA. CLOSED IF ADJACENT PAVEMENT SLAB CELL EXPANDED IS TO BE REPLACED) ? ° POLYETHYLENE FOAM V) BACKER ROD EXISTING DOWEL x SUPPORT BASKET w JOINT DETAIL NO. I JOINT DETAIL NO. 2 SEAL FOR TRANS VERSE SEAL FOR SAWED EXPANSION JOIN T DUMM Y JOIN T NOT TO SCALE NOT TO SCALE' NOTES: A- DETAIL JOINT 1& 2 APPLY TO JOINTS WITH EXISTING PAVEMENT SECTIONS ON BOTH SIDES OF CENTERLINE OF JOINT & WHERE CONTRACTOR IS CLEANING & REMOVING EXISTING JOINT MATERIAL & REPLACING WITH SILICONE JOINT SEALANT B- DETAIL JOINT 1 & 2 APPLY TO JOINTS WITH EXISTING 'PAVEMENT SECTIONS NEXT TO REPLACED CONCRETE SECTIONS STEEL REINFORCEMENT PLACEMENT PAVEMENT CLEAR DISTANCE THICKNESS FROM FACE OF PAVEMENT T = 6 " 2 " T = 7 " 2 1 /3 " T = 8 " 2 2 /3 " NOTEa ALL DOWELS TO BE PLACED @ T/2 #3 "U" BARS ® 18" O.C. THESE BARS MUST BE PLACED AT THE TIME THE PAVING SLAB IS POURED 2'-0' 1' - 4 li4' 6' OD 1/2 R N0. 4 BARS 18" C C BOTH WAYS SLOPE 1 4" R F00T STD. 1.5' CUTTER SLOPE EXISTING. 3/4 PER FOOT(USUAL) 4 TAMPED CONCRETE ^ TOPSOIL W n 3�� 3"R #3 CONT. $ z W v .. TAMPED j r SELECT ° BACKFILL EXISTING MINIMUM EXCAVATION OUTLINE SUBGRADE FOR STREET CONSTRUCTION 12' 3' V-6' 3" 6' 7" CURB REPAIR DETAIL NOT .TO SCALE #4 "U" BARS @ 18" O.C. THESE BARS MUST BE PLACED AT THE TIME THE PAVING SLAB IS POURED 1 4' „ NO. 4 BARS 18" 3' C-C BOTH WAYS 1/2"R N0. 4 BARS 1/8" SLOPE C-C BOTH WAYS 1/8" SLOPE 1/2"R PAVING SLAB 'R PAVING SLAB i� #3 CONT. - , . .3"R 1— 3"R •a' CONSTRUCTION ^ YR PAY 2 1/3. a_. .. JOINT 1 2 1/3" ff I�NIIT• �Q1 r 1 1/2rr ` I• .. �! f .�` • Q ` d - \\�, �/`' •• •� •.••:` .y ., -d •. ..ate .. P � // PROP .SUBGRADE PER. TYPIC a �� /. i�: • PROP. SUBGRADE.PER• TYPCA ROADWAY SECTION ' ROADWAY SECTION ZI SUPERIMPOSED CURB MONOLITHIC CURB NOT TO SCALE NOT TO SCALE NOTE: IF CURB SECTION IS POURED AFTER THE PAVING SLAB HAS BEEN CONSTRUCTED, THE SECTION MAY BE USED AS AN ALTERNATE METHOD FOR CONSTRUCTING THE ATTACHED CURB. (FOR ATTACHED CURB) CLEANOUT NOTES PROPERTY LINE ** 1. THE SWEEP TEE AND PIPE FITTINGS STANDARD FORT WORTH CLEANOUT INSTALLED SHALL BE SDR-35 OR STA SDR-26 PVC MATERIAL. 6" #3 BARS 4' CONCRETE I 12" CAP (PVC OR CAST IRON) COLLARCOLD JOINT REQUIRED 2. CONNECTIONS TO THE EXISTING SERVICE SHALL BE MADE USING RUBBER SLEEVE STANDARD PARKWAY Y4"/FT. COUPLINGS WITH STAINLESS STEEL s — — — DOUBLE BAND REPAIR SLEEVES. THE 4" �' h •`,*'f '' I 1 I_111—1 TI-1 11=1 I I_I I SLEEVES SHALL BE TIGHTENED TO THE 14" 1`''•`" `' '.'` `•' TORQUE RECOMMENDED BY THE 7,. ZX -�A I I-1 I I, .: :. �a v;tY: -� ". EXIST. OR PROP. 4' SIDEWALK "��' s MANUFACTURER. .';tip::.,':.. ••.'i•'�. 12. � �;:,:�y,.Y.;i •.;�:;�.;{._;.; DOUBLE BAND STAINLESS 3. SLOPE OF THE SANITARY SEWER SERVICE STEEL COUPLING SHALL BE A MINIMUM OF 2 PERCENT. CONCRETE COLLAR +: BACKFILL CLEANOUT STACK WITH 4. IN HIGH TRAFFIC AREAS (STREETS, <-= `ti'i. NATIVE TOPSOIL COMPACTED TO DRIVEWAYS, SIDEWALKS & WALKWAYS), (PLAN VIEW) »a:;t ;,;. •.:;:� 95% STANDARD PROCTOR DENSITY SERVICE CLEANOUT STACK AND CAP "''?"''• STACK (IRON OR PVC) SHALL BE CAST IRON. "`'•':` - 4" CONCRETE _ 5. IN NON-TRAFFIC AREAS, SERVICE ANCHOR ',� TWO WAY SWEEP TEE CLEANOUT STACK AND CAP SHALL BE CLEANOUT TEE PVC MATERIAL ifiiiii1 ORPOPDS _ SEWIR GE SDR-3 OOR SDR-26 SERNCE, 6. PIPE AND FITTINGS SHALL BE SDR-35 SLOPE—vARIEs 2%MIN. OR SDR-26 PVC WHEN NOT IN HIGH FERNCO FLEXIBLE ''�`••:'-'i ''' TRAFFIC AREAS. COUPLING REQUIRED " Y~ 6" MIN. :.e... IF EXISTING SERVICE 7. CONCRETE USED AROUND CLEANOUT IS PRESENT, 1' MIN. 6' ASSEMBLY SHALL BE 5 SACK, 3,000 PSI OTHERWISE PLUG. MIN• SEWER MAIN MIX. PAID FOR AS CLEANOUT PROPERTY LINE PVC CLEANOUT _ -- PROPERTY LINE - DRIVEWAY - --— PRODUCT INFORMATION •� From Stanley Roberts & Assoc., Information Subject To Change. DESCRIPTION WEIGHT PART NO. Cast Iron Lateral Cleanout 18 Ibs ATL-424 SIDEWALK SIDEWALK W/ SS Bolts and Coupling Plastic Sewer Lateral Cleanout 2.25 Ibs ATL-1524 CAST IRON W/ SS Bolts and Coupling CLEANOUT CURB CURB Yt" SS BOLTS DRIVEWAY APPROACH 1.5-•I p A� STREET STREET _1L 0 RING PVC CLEANOUT BOOT CAST IRON CLEANOUT BOOT T. CITY OF FORT WORTH, TEXAS DATE: 09-2004 7.5 , ORT WORT TWO WAY SERVICE CLEANOUT SAN-011 ATTENTION: CURB RAMPS* SHALL BE CONSTRUCTED PERPENDICULAR TO THE CURB AT STREET CROSSINGS WITH LANDINGS IN LIEU OF DIAGONAL CROSSINGS WHERE FEASIBLE. SEE FIGS. 58, 59 & 60. RAMPS STANDARD WH UHAIR . D- Al S CITY OF FORT WORTH, TEXAS - CONSTRUCTION STANDARD -OCTOBER, 1992, REDRAWN OCTOBER 2002 R.O.W. • sw MONOLITHIC - SIDEWALK CIRB STREET CURB LINES TOB E EXISTING PARKWAY 1/4" DEEP a n 18,t 4 J.OINT,• 4" GAP 1" R F p w w 4 O 51oEwALK CURB PAY LIMIT MAX. LENGTH OF SURFACE TREATMENT (GROOVE) 5' FROM THE BACK OF CURB. EXPANSION•MATERIAL RECESSED 1/4" AND SEALED W/ SILICONE (APPLICABLE TO ALL COLD—JOINTS) NOTES TYPICAL RAMP X-S ECTI 0 N 1. FOR PARKWAY WITH ELEVATION BELOW STREET ELEVATION, THE SIDEWALK CURB MUST BE 2" CITY OF FORT WORTH, TEXAS — CONSTRUCTION STANDARD HIGHER THAN THE STREET CURB. OCTOBER, 1992, REDRAWN. OCTOBER 2002 2. SIDEWALK CURB SHALL NOT ENCROACH ON THE PROPOSED WIDTH OF THE SIDEWALK RAMP. 3. FOR TYPE i RAMP MAXIMUM SIDEWALK CURB HEIGHT 0" TO 7". 4RT WARTC1TY OF FORT WORTH, TEXAS DATE' 09/200+ ACCESSABI LITY RAMP •- TYPICAL CROSS SECTION STR--031 EXISTING •15' R SCALE 1" 5' SIDEWALK RAMP W/ COLORED SURFACE NOTES 1)'EXPANSION JOINT AND SILICONE SEALING . SHALL BE SUBSIDIARY TO UNIT PRICE BID FOR SIDEWALK. AND GUTi GUTTER 27 THE ACTUAL UMIT OF -REMOVAL OF EXIST BE ASCDIRECTTED BY THE AND ENGINEER IN TH SHALL FIELD. 3)MONOUTINSTALLED ON 8 BOTH RSIDDEESR OF THE RAMP SLOPES Y BE 6" DEPENDING ON THE FIELD CONDITION OR AS DIRECTEEDD BY THE ENGINEER. ` 4) USED WHERE WITH PEDESTRIANS WOULD NO MAY BE 18' OR 24" NORMALLY WALK ACROSS THE RAMP. 5) SLOPE OF CURB RAMP AND/OR SIDEWALK SHALL BE.A MAXIMUM OF 1,12. FLARED SIDES CO CR FOR ` OF.RAMP SHALL HAVE A MAXIMUM SLOPE OF PAVVEMEN ACRoSSNTHE PEDESTRIANS MP THEN THCOULD MAXIMUM SLOPE SHALL BE 1:12. SODDING AS REQUIRED PROK OF P.CURB ac MONOLITHIC SIDEWALK CURB SNP ONOLITHIC BFLARE•DOR (SEE NOTES) ONOUTHIC 0% CUURRS OR O ti SEE NOTES) C-1�� FLARED SURFACE OR CURB • SODDING AS REQUIRED ACK OF PROP. CURB T� 4+ FACE OF PROP. 7" CURB • v ro , PAY C MMI G SAWCUT FOR HMAC PAVEMENT STANDARD PAY LIMIT DETAIL oR`t�oA CITY OF FORT WORTH, TOM DATE 09/2004 ACC ESSAB I LITY RAMP - PAY LIMITS STR-032 EXISTING 15' R SCALE 1" = 5' SIDEWALK RAMP ' W/ COLORED SURFACE NOTE �) EXPANSION JOINT AND SILICONE SEALING SHALL BE SUBSIDIARY TO UNIT PRICE BID FOR SIDEWALK, �D ING CURB 2) THE ACTUAL LIMIT OF REMOVAL OF EXIST BE ASCDIREC AND BYTt•IE ENGINE ER INL THE�LL FIELD. s" 18" OR 24" SAWCUT P VNEMENT R SODD NG AS RE IRED CK OF PROP. CURB MONOLITHIC SIDEWALK CURB TOOL " GROOVE JbINTlNG TOOL 'SODDING AS.REQuUIRED EXPANSION JOINT do SILICONE SEALING CK OF PROP. CURB FACE OF PROP. 7" CURB SAWCUT FOR HMAC PAVEMENT JOINT DETAIL ORT'VYOR'� MY OF FORT WOIfrH, TEXAS ' DATE: 09/2004 ACCESSABILITY RAMP - JOINT DETAIL STR-033 PER tDtout PuvU0SIDEWALICCURBRAUP v PMMJ.EL PUBLIC SIDWALK CURB RAMP �f FLNRU 312C _ t xo , Leval L.mon aB_t TcP crr Pagwndimiar Publa c COMBINED(P )PURL IC Fig.50 Pubtle Sklam ft Curb Ramp ORT CITY OF FORT WORTH, TEXAS DATE: 09/2004 ACCESSABILITY RAMP - TYPICAL CROSS SEC11ON STR-034 ATTENTION: CURB RAMPS SHALL BE CONSTRUCTED PERPENDICULAR TO THE CURB AT STREET CROSSINGS WITH LANDINGS IN LIEU OF DIAGONAL CROSSINGS WHERE FEASIBLE. SEE FIGS. 59, 59 & 60. 14.2.8 Vehicular Ways and Facilitieb Perpendicular public sldowalk curb ramp Aerpendiauiar public sidewalk curb ramp In public sidewalk with parkway in public sidewalk Q I f , c� (b) (c) arallel public sidewalk curb ramp Combinatrcn publlc sidewalk curb ramp Perpendicular public sidewalk curb ramp In public sidewalk in public sidewalk with parkway at procted intersaction Fig. 50 Public Sidewalk Cirb Ramps at Marked Crossings &R.IT ORPTH CITY OF FORT WORTH, TEXAS DATE 09/2004 ACCESSABILITY RAMP — FIGURE 60 STR--035 • x Y RUNNING SLOPE RUNNING SLOPE 1.20 MAX 1:12 MAX COUNTRR SLOPE - 1:20 MAX , 1fALK CURB RAMP STREET . crarrE: • . . (1) slope = T/z where r is it le•►el slope (2) Counter slope shall not eueed 1120 Fog. B4.7.2 Measure=eat of Curb Ramp Slope PLANMG OR OTHER r NaNWAUUNG SURFACE x ' FLARED.SIDE • 1`mil/ • • l0 • N0T& It A <•4a" (1220 mm) then the elope of the [fared fides shall'not emeed 1:11 (a) Flared Sldes ' N Raturaed Curb • Frig. B4.7.5 Sides of Curb Ramps 38 min 91 • 1 . 1a Fig. B 4.7.6 Built—up .Curb. Ramp OCTOBER, 1992, REDRAWN.00TOBER 2002 CITY OF'FORT WORTH, TEXAS DATE. 09/2004 FORTWORTH ACCESS_ ABILITY RAMP -- RAMP SLOPE DETAILS . STR-036 ATTENTION; CURB RAMPS SHALL BE CONSTRUCTED PERPENDICULAR TO THE CURB AT STREET CROSSINGS WITH LANDINGS IN LIEU OF DIAGONAL CROSSINGS WHERE FEASIBLE.' SEE FIGS. 58, 59 & 60. YPICA AYOU -S CITY OF FORT WORTH, TEXAS - CONSTRUCTION STANDARD OCTOBER, 1992, REDRAWN OCTOBER 2002 TYPE . I EXISTING 15' R. SCALE 1" = 4' PROP. 4' RAMP WITH COLORED SURFACE 0 o U , - 1:48 • 1:12 if 1:12 VARIABLE HEIGHT CURB 1 1/2' R. (TYP) UBTU CITY OF FORT WORTH, TEXAS DATE: 09/2004 ACCESSABILITY RAMP - TYPE I (W/15' RADIUS) STR--037 ... TYPE I EMSTING 20' R. SCALE 1" = 4' PROP. 4' RAMP WITH z COLORED SURFACE Q U • 1:48 -mot---- , 1:12 VARIABLE HEIGHT CURB 1 1/2- R. (TYP) I`dRT WART CITY OF FORT WORTH, TEXAS DATE: 09/2004 ACCESSABILITY RAMP -- TYPE 1 (20" RAD.) STR-038 R • EffiSMG CURB & GUTrM TYPE •III- EXISTING 15' R. SCALE 1" = 4' a- ® SIDEWALK RAMP WITH COLORED SURFACE 16' OR W BROOM FINISH SkwCuT FOR .. muc Pm. � HMAC TIE—IN 9' SODDING AS MUMM BACK OF PROP. CH: 1:12 MONOLITSIC CURB 1:s6 t ti~ 1:48 SODDING -•-d AS REgUIItBD HACK OF PROP CURB FACE OLD 7' CURB - ESLSi�fG.CURB de GUTTER SAA'CUT FOR CONCRETE PAVE30M ORTWORT CITY OF FORT. WORTH, TEXAS DAZE 09/2004 ACCESSABUTY RAMP - TYPE III (15' RADIUS) STR-039 CONCRETE RESTORATION (2008-1) Block No. Street Name Street Limits Map LM CD 6600-8199 N BEACH ST WESTERN CENTER BLVD-THOMPSON RD 36 E 11.39 4 2564-3899 MEACHAM BLVD NORTH FRWY SR NB-N BEACH ST 49 R 5.66 4 14600-15099 TRINITY BLVD AMON CARTER BLVD-FRYE RD 56 R 2.62 5 19.67