Contract 28006-A10
CSC No.28006-A10 AMENDMENT No.10 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Dannenbaum Engineering Corporation, (ENGINEER) made and entered into City Secretary Contract No. 28006, (the CONTRACT) which was authorized by M&C C-19172 on the 30th day of July, 2002 in the amount of $721,899.76; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $111,800.52 which was authorized by M&C C- 19936 on January 20, 2004, Amendment No.2 in the amount of $329,406.00 which was authorized by M&C C-22535 on November 27, 2007, Amendment No. 3 in the amount of $96,825 .00 which was authorized by M&C C-23578 on June 9, 2009, Amendment No. 4 in the amount of $60,835.00 which was authorized by M&C C-24794 on March 22, 2011, Amendment No. 5 in the amount of $149,012.00 which was authorized by M&C C -28110 on February 14, 2017, Amendment No. 6 in the amount of $63,751.00 which was administratively authorized on October 11, 2017, Amendment No. 7 .in the amount of $21,860.00 which was administratively authorized on August 9, 2018, Amendment No. 8 in the amount of $11, 670.00 which was administratively authorized on November 20, 2018 and Amendment No. 9 in the amount of $242,055.00 which was authorized by M&C 19-0204 on September 24, 2019; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Main 257 and 325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design; and AREAS, it has become necessary to execute Amendment No. 10 to the CONTRACT to include an increased scope of work and revised fee. NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $29,400.00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall bean amount of $1,838,514.28 . OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Dannenbaum Engineering Corporation, bad& �2/ � Dana aurghdo(f( 4,2D2 1:50 CST) GV Dana Burghdoff Wayne G. Ahrens, P.E. Assistant City Manager Executive Vice-President DATE: Feb 4, 2021 DATE: January 29, 2021 APPROVAL RECOMMENDED: Ch.�irtodhe�h�de� � Christopher H rder(Feb 2,202111:17 CSC II Christopher Harder, P.E. i Director, Water Department { APPROVED AS TO FORM AND LEGALITY: �I II Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Il a l' John Kasavich, P.E. h Project Manager M&C: N/A wx�l Date N/A DBlack(Feb 4,202117:10 CST) A Douglas W. Black Senior Assistant City Attorney g ATTEST:aQ 0 ' �^ bpb FORT��d OF°°°°°°°°oo d Mary J. Kayser 0,0 o=d city Secretary ° °y °° °O"� OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX j ENGINEERING f_=XCELLLNCL DANNENBAUM ENGINEERING CORPORATION SINCE 2501 PARKVIEW DRIVE,SUITE 670,FORT WORTH,TEXAS 76102 1,945 January 22, 2021 Mr.John Kasavich, P.E. City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth,TX 76102 Re:Sanitary Sewer M-257& 325 Middle&Upper Village Creek Parallel Relief Alignment Study&Design City Secretary Contract No. 28006-Amendment No. 10 City Project No.01333 DEC Project No. 3642-32 Dear Mr. Kasavich: Dannenbaum Engineering Corporation, (Dannenbaum or ENGINEER) is pleased to provide the City of Fort Worth (CITY) with Amendment No. 10 for the Sanitary Sewer Main 257 & 325 Middle and Upper Village Creek Parallel Relief Alignment Study contract (the PROJECT). Dannenbaum Engineering was required to perform additional construction phase services under this contract that include: 1) Existing Bethesda Water Supply Corporation (BWSC) 8-inch Water Main Adjustment — Adjusting approximately 30 LF of an existing 8-inch water main crossing proposed Main 325 Relief Sewer at Sta. 34+53+/-and Deer Creek just east of S. Oak Grove Rd. to avoid a conflict with the Main 325 Relief Sewer profile alignment (Reference attached Exhibit A). This item will include design of required Deer Creek erosion protection for both the 8-inch water main adjustment and the Main 325 creek crossing. 2) Additional Month of Construction Phase Services - One additional month of: construction progress schedule reviews, submittal and RFl reviews/responses and weekly site observation visits/reports with site photos. These services are necessary because: 1) The existence of the 8-inch BWSC water main was not identified during the utility research/investigation portion of the design phase of the PROJECT. In August 2020, the Main 325, Phase 2 construction contractor, McKee Utility Contractors (McKee) encountered the BWSC water main during construction and determined it conflicted with the proposed M-325 alignment. After additional investigation and research, Dannenbaum Engineering (DEC)tracked down record drawings of the water main from BWSC. These record drawings provided minimal information regarding the actual horizontal and vertical location of the existing water main. 2) DEC then coordinated with McKee to obtain actual depth and location information for the existing water main, prepared preliminary construction documents for the adjustment and transmitted to BWSC to review/approve the concept. These documents were then transmitted to McKee to review and cost out the adjustment construction work and to prepare/submit an associated change order request to the CITY. After McKee's review, DEC made some design adjustments and resubmitted to McKee for use in their change order request. 3) In addition, to reduce PROJECT costs, the City requested that DEC modify the Main 325 Relief Sewer installation method at this location from open-cut vs. by-other-than-open-cut (BOTOC). This installation modification along with unexpected BWSC 8-inch water main crossing necessitated additional erosion protection along the entire length of the Main 325-Deer Creek crossing. Sanitary Sewer Main 257&325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design-Amendment No.10 DEC No.3642-32 Page 2 of 4 4) The current Scope of the project has increased with the addition of the BWSC water main adjustment, changed Main 325 installation method and associated additional erosion protection design services required at the referenced location. 5) The construction contractor's schedule was extended to install the additional erosion protection referenced in preceding item 3)necessitating additional construction progress schedule review,submittal and RFI reviews/responses and weekly site observation visits/reports with site photos. The additional services required are as follows: 1) Existing BWSC 8-inch Water Main Adjustment—Additional design for adjustment of approximately 30 LF of the existing BWSC 8-inch water main located in Deer Creek to avoid conflict with the Main 325 Relief Sewer profile at approximately Sta. 34+53. The approximate limits of the water main adjustment are shown in Exhibit A.This item includes: a. Research, investigation and coordination with BWSC, McKee and the CITY, b. Design of the water main adjustment and erosion protection for Deer Creek along the adjusted BWSC water main alignment.This item also includes additions/modifications to the Plans. 2) Deer Creek Erosion Protection Modifications for Main 325 Relief Sewer — Additional design for modifications to approximately 150 LF of erosion protection for Deer Creek along the proposed Main 325 Sewer Relief, Phase 2 alignment between Stas. 33+30 and 34+80. This item also includes additions/modifications to the Plans. Design Services Fee=$20,550(Lump Sum) 3) Additional Month of Construction Phase Services - One additional month of: construction progress schedule reviews, submittal and RFI reviews/responses and weekly site observation visits/reports with site photos. Construction Support Services Fee=$8,850(Lump Sum) Total Fee=$29,4000(Lump Sum) Dannenbaum will perform/manage the work described in the items above for this Amendment in accordance with the original Contract. We recommend that the City increase the budget by$20,550 for these additional services as follows: The recommended breakdown for engineering design during construction phase is: Description Fee BWSC Water Main Adjustment & $20,550 Erosion Protection Modifications Construction Support Services $8,850 Total (Work Phase 33) $29,400 The following table summarizes the Fee per Work Phase breakdown: Work Phase Fee 33 (Design/Construction Support) $29,400 Total $29,400 These Services are presented in further detail in attached Exhibit B,Tab Exhibit B-3. \\us-ftw-fsol\data\ftwdata\projects\1210\3642-32\admin\agreement\supplemental#10\main 325 sag cover letter sa#10rOl.docx Sanitary Sewer Main 257&325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design-Amendment No.10 DEC No.3642-32 Page 3 of 4 The following table summarizes our recommended budget revisions and shows the revised contract amounts: Current Contract Through Revised Contract Amend No.9 Description Amend No.10 Original Work New Work Original Work New Work Phase Phase Phase Phase Part 1-Alignment Study $145,727.46 $145,727.46 $145,727.46 $145,727.46 Part 2-Main 325 Design $1,072,879.99 $860,116.99 - $1,072,879.99 $860,116.99 Work Phase 51(Survey) $55,660.00 $55,660.00 Work Phase 33(Design/Constr Support) $432,688.00 - $29,400 $462,088.00 Part 3—Village Creek Basin Rehab Part 4 $231,929.54 - $231,929.54 Part 4—Main 238 Basin Rehab $82,992.29 - $82,992,29 Total Project $1,809,114.28 $29,400 $1,838,514.28 The following table summarizes original and supplemental agreement dates,fee and scope for this contract: Contract Summary to date: Description Date Amount Description Original Agreement 7/30/2002 $721,899.76 Supplemental Agreement#1 1/20/2004 $111,800.52 Addition&Modification of Various Lines Supplemental Agreement#2 12/26/2007 $329,406.00 Main 325 Design Supplemental Agreement#3 9/1/2009 $96,825.00 Addition and Modification of Alignment Supplemental Agreement#4 4/12/2011 $60,835.00 Revise Align.East of Huguley(Surv,Esmt,EID) Supplemental Agreement#5 3/5/2017 $149,012.00 Realignment of 7075 LF of Main 325 Supplemental Agreement#6 10/11/2017 $63,751.00 Incr.Pipe Size to 48",Util.Locates,Access Esmts. Supplemental Agreement#7 8/9/2018 $21,860.00 Tree Survey,TRWD Parcel Survey,Coord./Dgn Chgs-Deer Crk Pk Supplemental Agreement#8 11/20/2018 $11,670.00 2 Add.Access Esmts.Assoc.Plan Chgs/Dgn Coord. Supplemental Agreement#9 10/22/2019 $242,055.00 Sewer Profile Adjust.,16"WL Adjust.,Construction Support Svcs. Supplemental Agreement#10 Pending $29,400.00 8"BWSC WL Adjust.,Deer Crk Erosion Protection Mods/Add CS Svcs Total $1,838,514.28 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, Dannenbaum Engineering Corporation Douglas E. Guinn, P.E. Sr. Project Manager DG/JP/WG \\us-ftw-fs01\data\ftwdata\projects\1210\3642-32\admin\agreement\supplemental#10\main 325 sag cover letter sa#10r01.docx Sanitary Sewer Main 257&325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design-Amendment No. 10 DEC No.3642-32 Page 4 of 4 Attachments: Exhibit A—Bethesda Water Supply Corporation 8-Inch Water Main Adjustment&Deer Creek Erosion Protection Modifications Exhibit B—Summary of Manhours and Project Fees \\us-ftw-fs01\data\ftwdata\projects\1210\3642-32\admin\agreement\supplemental#10\main 325 sag cover letter sa#10r01.docx EXHIBIT A \\us-ftw-fs01\data\ftwdata\projects\1210\3642-32\admin\agreement\supplemental#10\main 325 sag cover letter sa#10r01.docx PLOTtED:Sep 11,20]0-11:18om c\,x,p\b.x-v\%+<,w-lzs�Pa,r\sz v-l3s rx°exn-xmse.a PK�NCE cVnn\b.-nWp.We1.T�.o+�Oavad:\n- c\I310\b1x-IIy�W�\xan v.W lxl\lu A.yrtml�xmB[]1eq�l c\1316\bIx-l3\sr..,W-lz5y�w,V+�o-uuta6w-.w�..�....�-upYa.z c Vnp\b.x-lxW:m\asV��sxe.Vxnm muvem am e.ey c Vna\b.x-l3\eQa=.\zam uuy lxsyvu n.Y.v.m.ss>_pxsn<y c Vno\b.aaa\s.,..,W-ns\v\ua.vs b umo:,.n�tbeq m hl nmv� f9r c ro 'm u a _ ' C m y [ MATCH UNE STA. 51+00 >- ..� - i' { _ ( g it STA SP 9.13 myi f I to t� r 4S I lr .. $° ¢q' - 12 - { ° 0 1' $ ruiox ran I 5$ a' IIs VA i0�.,. n' x v v ume wnce ma. - g• i MATCH UNE STA. 51+00 U ® D D a �s ear °� o, M. 0$A a$ Iyym� °m P $R ;u ° q s � u Km z s f o€ s" p f� °�� a �n z mZ uo g m a~ m a p °� �oe oee aAZ �fn .iA-O� p ®n$ �m .'J. L m �' $ noXiF "3mq 4 m >ON {��[a C7 ;� _ Q $ y ; 4 �� �$ $< N°pt m0 z .D Dtl §PEk� $$ z zA m �yv a m e�q=N$g� ��A .yHo o ~may N o A o Nmo O zU � o .moos Z k 3N © N ° ' o m ' D KOMD:Sep 11.2020 11:27om ¢Vzio\ixza]\v.e,W-sis\arq n,\ss u-s:s Fa�mtt-]aie.a.z PPoNCE G\tf o\µig3-v\�W.W+s+�i�]M.W']s°\T%-T/hi-sow-NY.e+-ean-,avie.y RON 21 ¢\+zio\ssg3-sz\amWsVt�a'a,Viev muazm zmsey ¢V]ioWgx-ss\s...,W-vs\xaW_:uxs ze T�zmsey ¢V]w\b,i-ss\e..e..\im]ury vsyo-e�zarze.q mbQ 08 oA 3 � H Q� s memo i� a �o Fri s zoa 2 I Imo z \ al Ap f= > - mz8 FX m= _ 0� ym� fy >� I >� F ` tiJ i ` w tie• �8 a !N� P=spa i � mgm> 4 $mp sm 88 A»fig» !a� a�'F�� �g�� �a 1� - Hu s za�oo N eAi s= Nab >a��q - ��=gym �� m59 meg9 g PH AO myog�G p3 A � � r G7-=i�4�� 81Pgo 0 Nn voz �n c > q o, o &l'^s m54 �6 h �m �y �� o > rQ � 9 mo aG A a o < am m hu zH u� o m i ii m o 6 2a 'mm z yoyos PAR m � ov a9>ZCA Jai 7J n1 g�c9a m m� n a qO Z � 'aP� P 'md SE4 g �A W vZ> 3��z oP o �> m RIX 0 a �6 oa D a�orrtn:s.p oe,aono-s:ai��evz�o�.z-ss�°h.�zmz ur ns�cx�z.9rzaw car�cs K 'n= £me g`4 EP Sn2oP ��� y �m j F U Z FR a p^$V�g m�S��fCP SSmy'ta e m pKY N i EPI sF a g 8 5-,�8 °_ �4 f 7 eDt 6t to A q zmo j m Opp o Saaa q� pp 00 a Z oc g �m� ?az z in z u) D m &C F n t K a o e$" mp ^'sz 'e 5 z 3 i 9 a f a^ d 6 F m W o m n e+ z pj o y£Z a z F O 9 W $^o° ao `gym ol zi 22 AM Pit i, a r p m 9 3 'Fp Y � 4E:i it'. E 2 i�uF o cQk co) gQP e z m m s n9 Zm F= v o G 8 o m C] t e m ® i 9 o m� t z o Z o 1 >2 L5§ VimNaZ Z o =� —] O 0 r a mm arm Z -� .&z Z �z ° p -0- 9 m� �z ?jW ra p 8 2m Z § A 9 ? o $A .WiD i O a s W < n 6 y o z�i� 0� u, 9 ^A u \ uO 1w o � z °° mk. 'e Z � N o aianm:s.p ho,xaxo-s:sq;��°Vx,a�se.z-�x�e.+ew.Vav°sti.x:swo-apA4rze., wg+ o .sells F,aRaea@aoa�; �H O FFa A-1 �F Am oo a yr_ �e it f I 'fl 1 � -11t Dnv =v I� �It 1. 1 ili it ili mr mf FI gy4 S � Nr� off# ,3 d y o G b �3 3 I, Y 10 01, gig MIN q1H w s S � z R• ssx qq 11 tg E 4G F>9 m a a'a R8 e`s8 sE�n e,�E eiE. IT m F gg L s 44 FFu ss czi C` 3ssg i� ,=e'a .'=gsa � '��' -€ e§ ga � e.a2�s a aed5�5s p= 3 •$ r_o.t a€E=sFF age€g € s D T i 'w'uw 2 0 OO H " 1 888 fp a`s.f € � '9Q•na�p{E ya•a gg�FF��a a gA of � � ��'s�� 1 IN20 3 �d��d�IIp4FFE?9 a.n d`3.�[[a $a q° a R�gEy:fiN a& FaF ag "pyps rsE Zsi$a }s e4e. 's; s 55# $e a,;s um� ) 4F `j]��i�a nS� q?�FI J,.11 A�8 g^a' A AID — ® ® w€swx � 03 s �a o ad g N o j Uf o L 5 F ode z� 6 §mm Z O �> �n� m s° ^pz Z �z Nag 7y m $�F �n Z "� iF m USN tv52 d qqNj uo fn Q r'yry�C �� ° 3y W �yAf�Z F.-ho v a b8 g D �'j TO�fQ t17 N it N w C r s 4 N f/1 I77 N Z ° EXHIBIT B \\us-ftw-fs01\data\ftwdata\projects\1210\3642-32\admin\agreement\supplemental#10\main 325 sag cover letter sa#10ro1.docx EXHIBIT B-3 Page 1 of 3 (SUPPLEMENT TO ATTACHMENT B) SUMMARY OF TOTAL PROJECT FEES -SUPPLEMENTAL AGREEMENT NO. 10 SANITARY SEWER MAIN 257 & 325 MIDDLE & UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY& DESIGN CITY PROJECT NO. 01333 DOE NO. 3650 Phase Scope of Services Fee SUBCONSULTANT %M/WBE I-Design Services During Construction Phase Plan Mods/Design Coordination $ 20,550.00 $ - 0.0% 11-Constr.Services Construction Support Services $ 8,850.00 $ - 0.0% TOTAL 29,400.00 $ - 0.0% Exhibit B-Summary of Manhours&Project Fees(Amendment 10 r01) 1/22/2021 EXHIBIT B-3A FEE SUMMARY Page 2 of 3 (SUPPLEMENT TO ATTACHMENT B) SUMMARY OF TOTAL PROJECT FEES -SUPPLEMENTAL AGREEMENT NO. 10 SANITARY SEWER MAIN 257 &325 MIDDLE & UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY& DESIGN CITY PROJECT NO. 01333 DOE NO.3650 ENGINEERING DESIGN SERVICES DURING CONSTRUCTION PHASE: FEE SUBCONSULTANT %M/WBE Plan Mods/Design Coordination $ 20,550.00 $ - 0.0% SUBTOTAL(ENGINEERING DESIGN SERVICES DURING CONSTRUCTION) $ 20,550.00 $ 0.0% CONSTRUCTION PHASE SERVICES Construction Support Services $ 8,850.00 $ - 0.0% SUBTOTAL(CONSTRUCTION SERVICES) $ 8,850.00 $ - 0.0% TOTAL LUMP SUM FEE(THIS ADDENDUM) $ 29,400.00 $ - 0.0% PROJECT TOTALS FEE M/WBE %M/WBE Original Contract $ 721,899.76 $ 203,001.00 28.1% Amendment#1 $ 111,800.52 $ 26,672.00 23.9% Amendment#2 $ 329,406.00 $ 130,728.00 39.7% Amendment#3 $ 96,825.00 $ 48,760.00 50.4% Amendment#4 $ 60,835.00 $ 31,240.00 51.4% Amendment#5 $ 149,012.00 $ 99,239.00 66.6% Amendment#6 $ 63,751.00 $ 7,850.00 12.3% Amendment#7 $ 21,860.00 $ 6,860.00 31.4% Amendment#8 $ 11,670.00 $ 4,800.00 41.1% Amendment#9 $ 242,055.00 $ - 0.0% This Amendment $ 29,400.00 $ - 0.0% TOTAL LUMP SUM FEE(PROJECT TOTAL) $1,838,514.28 $559,150.00 30.4% TOTAL M/WBE(CITY M/WBE GOAL=18%) $559,150.00 30.4% Exhibit B-Summary of Manhours&Project Fees(Amendment 10 r01) 1/22/2021 m o w o p con co m 7 v � tnc� -icn � � lncncnu� r nG� 0G) c-) 0 0v p tm c _ cn mOx * DDDDD = O � � mn mmmO O O 3 m � cznM ommzzzmDmmmmm COz -ZnC- - z m -< -AX 11 0 x xmmm � � � D � � x � m � � � CDD C) M mrrr � c m -I Z O m > Z—j > zmmmOEmDmnpm _0I nD = V) zo -- wFgF p -o � � -o � � z —i O mz D � W � va � � � � � 0 zmm -�'+ v 3G m PU o v z mm s c m - 07000r g. Fo � zz c D m3 m co < xO v� 0 n (n m mOOn -im Z cn sp < mZ � m� o:X �' � U) 0 o G) � Z �_ 0 m cn D O m m O z m N D m O CD z � � pO � pr �� z en Dc m z < C o� mm pp0 O v� � O m (/� 2 ,!� m Z 0 Z o N mzo oz m 0 -rn D rC < CD m m m D cn cn 0 a < � co m m Z cn _ _ � O D m ° v D z m D O c Z -4 - 0 0 o 0 0 N o o 0 o 00 0 - < D > g m Z m 03 c A-CD cn c k7 3m -ng m O --I D 3z � Dz cncncnG7cncncncncncncncncncn z m � n+ z m r � EZ � mmmmmmmmmmmmmm -�-1 pvmOZ z z g —+ —+ —immmmmmmmmmmmmm mr � cno m zmD -I -ncp W - C m =pC cmmrn- � �n>w > WDDDDDD -z-i m � Xz _m � -4 -n D mr00 (J G)a z X ;u 0 O O Z 0 C cn m 0 0 0 0 0 0 0 x p 9 Z U) Z Z m m 'o -q o O 00 O N O A ? O) ? Cl) Cf) 0 O o O O O O O O O co O z m ;u C _W _ _ v_ -4W A = � � O Oo O W A N 00 W z _� -n o CDO O O O cm) -n D n mO A O < O Fnp z 0 0 o D a o p v o m = 0 z � � v _ O o w m O O A O A O O A 0 0 0 0 0 0 O o o O O O O O O O O O O O O O O O O O O O o O `A N A -I n O -I kn 4 co O N N D Q ;u (C) NO CN fJ100000000000000 00 � � mD W N O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O W