HomeMy WebLinkAboutContract 50061-R3FP1 FORTWORTH CSC No. 50061-R3FP1
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
NOTICE OF PROJECT COMPLETION 00
Cs 5-0 d (V
DOE. Ns: N/A
S"'O 0(c)
Regarding contract 5091-R3 for 2018 Water Lead Services Replacement Contract Third Renewal as required bar
the Water Department as approved bar City Council on 9/9/19 through M&C C-28499 the Director of the Water
Department,upon the recommendation of the Sr. Capital Projects Officer, Capital Projects Delivery,Water Department,
has accepted the project as complete.
Original Contract Prices: $450,000.00
Amount of Approved Change Orders: No 0
Revised Contract Amount: $450,000.00
Total Cost Work Completed: $449,778.00
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Other Deductions(see comments):
Total Deduction Amount: $0.00
Total Cost Work Completed: $449,778.00
Less Previous Payments: $449,778.00
Final Payment Due $0.00
Recommended for Acceptance Date
Assistant Director, Water Department
Christopher harder �f
Christopher Harder(Feb 8,202111:46 CST) Feb 9, 2021
Accepted Date
Director, Water Department
� b2021Daur Fe 02
City Manager Date
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Project Name: 2018 eater Lead Sen ices Replacement Contract Third Renewal DOE. Ns:N/t�
Comments:
City Project Numbers 101100 DOE Number 1111
Contract Name 2018 Water Lead Scn iccs Replacanent Contract 'third Renewal Estimate Number 27
Contract Limits All Council Districts Payment Number 27
Project Type water For Period Ending 11/30/2020
Project Funding
STOW
Project Manager Anderson City Secretary Contract Number -56004 R3
Lispectors Johnson / Giegcr Contract Date 9/9/2019
Contractor 'FEJAS COMMERCIAL CONS1'RUC1'ION Contract Time 355 CD
1613 LAURA ROAD Days Charged to Date 410 CD
RIVER OAKS, TX 76114 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
---- ---------------------- -- -- ----- ---------
Total Cost of Work Completed $449,778.00
Less 0 %Retained $0.00
Net Earned $449,778.00
Earned This Period $0.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days Gv $0.00 i Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $449,778.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $0.00
Friday,January 22,2021 Pagc 5 of 5
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name 2018 Water Lead Services Replacement Contract Third Renewal
Contract Limits All Council Districts
Project Type Water
City Project Numbers 101100
DOE Number ]III
Estimate Number 27 payment Number 27 For Period Ending 1 113 0/2 02 0
CD
City Secretary Contract Number 56001 R3 Contract Time 356D
Contract Date 9/9/2019 Days Charged to Date 410
Project Manager Anderson Contract is 51.000 Complete
Contractor TEJAS COMMERCIAL CONSTRUCTION
1613 LAURA ROAD
RIVER OAKS, TX 76114
Inspectors Johnson / Gieger
Friday,January 22.2021 Page 1 of 5
City Project Numbers 101100 DOE Ntunber 1111
Contract Name 2018 Water Lead Services Replacement Contract Third Renewal Estimate Number 27
Contract Limits All Council Districts Payment Number 27
Project Type Water For Period Ending 11/30/2020
Project Funding
Water
Item Description of Items Estimated Unit Unit Cost Eslintnted Completed Completed
No. Quanity Total Qttanin' Total
-------------------------------------- ------
10 1-1/2 inch Water Service,0'-10'L 5 EA $4,000.00 $20,000.00
11 1-1/2 inch Water Service,0'-IO'L 2 EA $4,000.00 $8,000.00
12 1-1/2 inch Water Service, 10.F-25 5 EA $3,500.00 $17,500.00
13 1-I/2 inch Water Service,10.V-25 5 EA $4,800.00 $24,000.00
14 1-1/2 inch Water Service, 10.V-25 2 EA $4,800.00 $9,600.00
15 1-l/2 inch Water Service,25.V-40 5 EA $5,800.00 $29,000.00 1 $5,300.00
16 1-1/2 inch Water Service,25.V-40 2 EA $5,800.00 $11,600.00
17 2 inch Water Service,0'-10'Lengt 5 EA $4,000.00 $20,000.00
13 2 inch Water Service,0'-10'Lengt 5 EA $4,300.00 $21,500.00
19 2 inch Water Service,0'-IO'Lent 2 EA $4,300.00 $8,600.00
20 2 inch Water Service,10.P-25'Le 5 EA $4,000.00 $20,000.00
21 2 inch Water Service,10.1'-25'Le 5 EA $5,000.00 $25,000.00
22 2 inch Water Service,10.1'-25'Le 2 EA $5,000.00 $10,000.00
23 2 inch Water Service,25.1'-40'Le 5 EA $5,800.00 $29,000.00
24 2 inch Water Servicc,25.1'-40'Le 2 EA $5,800.00 $11,600.00
25 6-inch PVC Water Pipe 100 LF $55.00 $5,500.00
26 6-inch DIP Water 100 LF $70.00 $7,000.00
27 3-inch PVC Water Pipe 100 LF $65.00 $6,500.00
28 8-inch DIP Water 100 LF $85.00 $3,500.00
29 10-inch PVC Pipe 100 LF $70.00 $7,000.00
30 104rich DIP Water 100 LF $90.00 $9,000.00
31 12-inch PVC Water Pipe 100 LF $90.00 $9.000.00
32 12-inch DIP Water 100 LF $95.00 $9,500.00
33 Bullhead Set-up(Branch,Curb Stop& 10 EA $550.00 $5,500.00 9 $4,950.00
34 3/4-inch Private Water Service,Relo 100 LF S35.00 $3,500.00 103 $3,605.00
35 I-inch Private Water Service,Rcloca 100 LF $40.00 $4,000.00 20 $300.00
36 1.5-inch Private Water Service,Relo 20 LF $45.00 $900.00
A52 Water Service Removal&Plug at Main 2 EA $700.00 $1,400.00
A53 Additional Footage over 40'1-inch s 40 LF $145.00 $5,800.00
A54 Basic Mob when WO cannot be complete 10 EA $350.00 $3,500.00
37 2-inch Private Water Service,Reloca 20 LF $50.00 $1,000.00
Friday,January 22,2021 Pagc 2 of 5
City Project Numbers 101100 DOE Number 1111
Contract Name 2018 Water Lead Services Replacement Contract Third Renewal Estimate Number 27
Contract Limits All Council Districts Payment Number 27
Project Type Water For Period Ending 11/30/2020
Project Funding
38 Imported Embedment/Backfill CLSM 10 CY $100.00 $1,000.00
39 5-foot Wide Asphalt Pavement Repair, 300 LF $65.00 $19,500.00 85.8 $5,577.00
40 5-foot Wide Asphalt Pavement Repair, 150 LF $70.00 $10,500.00
41 Concrete Pavement Repair,Residentia 150 SY S88.00 S13,200.00
42 Concrete Pavement Repair,Arterial/ 75 SY S90.00 $6,750.00
43 3-inch Extra Width Asphalt Pavement 250 SY $30.00 $7,500.00
44 6-inch Concrete Curb&Gutter,Repla 50 LF $45.00 S2,250.00 12 S540.00
45 4-inch Concrete Sidewalk,Replacemen 75 SF $12.00 $900.00 123 S1,476.00
46 6-inch Concrete Driveway,Replacemen 75 SF $15.00 S1,125.00 662 S9,930.00
47 Traffic Control,Residential 30 EA $600.00 $18,000.00 38 $22,800.00
48 Traffic Control,Arterial/Industri 10 EA $1,000.00 $10,000.00 6 $6,000.00
49 Traffic Control,Major Arterial/In 10 EA $1,200.00 $12,000.00 1 $1,200.00
50 Street Use Permit 50 EA $100.00 $5,000.00 46 $4,600.00
1 1 inch Water Service,0'-10'Lengt 15 EA $3,100.00 $46,500.00 5 $15,500.00
2 1 inch Water Service,0'-10'Lengt 15 EA $3,900.00 $58,500.00 17 $66,300.00
3 1 inch Water Service,0'-10'Lengt 5 EA $3,900.00 $19,500.00
4 1 inch Water Service,10.F-25'Le 15 EA $3,400.00 $51,000.00
5 1 inch Water Service, 10.V-25'Le 15 EA $4,800.00 $72,000.00 21 S 100,800.00
6 1 inch Water Service,10.V-25'Le 5 EA $4,800.00 $24,000.00
7 1 inch Water Service,25.F-40'Le 15 EA $5,800.00 $87,000.00 31 $179,800.00
8 I inch Water Service,25.F-40'Lc 5 EA $5,800.00 $29,000.00
9 1-1/2 inch Water Service,0'-10'L 5 EA $3,500.00 $17,500.00
A52 Water Service Removal&:Plug at Main 2 EA $700.00 $1,400.00 12 $8,400.00
A53 Additional Footage over 40'1-inch Service in asphalt 40 LF $145.00 $5,800.00
Pavement
A54 Basic Mob when WO cannot be completed 10 EA $350.00 $3,500.00 3 $1,050.00
A55 Exploratory Excavation 0-5'deep 6 EA $1,200.00 $7,200.00 8 $9,600.00
A56 Remove/Replace Stamped Conc TXDOT Median 1 LS $1,050.00 $1,050.00 1 $1,050.00
---------------- --------- ------ --- -------
Sub-Total of Previous Unit $884,675.00 $449,778.00
---------------------------------------
Friday,January 22,2021 Page 3 of 5
City Project Numbers 101100 DOE Number 1111
Contract Name 2013 Water Lead Services Replacement Contract Third Rcnc%val Estimate Number 27
Contract Limits All Council Districts Payment Number 27
Project Type Water For Period Ending 11/30/2020
Project Funding
Contract Information Summa►-y
Original Contract Amount S450,000.00
Change Orders
Total Contract Price $884,675.00
i ,�—� ✓��Lf Date �/' /F i Total Cost of M'orlt Completed g449,778.00
Contract r Less 0 %Retained $0.00
Date �l Net Earned $449,778.00
ills ection Supervisor Earned This Period $0.00
Retninage This Period $0.00
Date Less Liquidated Damages
roject Manager
{{��
Days a /Day $0.00
�`
r `� / A Date LessPavement Deficiency $0.00
Asst.DirectorrfPW Less Penalty $0.00
Christonherffarder Feb 9,2021 Less Previous Payment $449,778.00
Chdstapher arder(F.b8,202111:46CST) Date
Director/Contracting Department Plus Material oil Hand Less 15% $0.00
Balance Due This Payment $0.00
Friday,January 22,2021 Page 4 of 5
j®RTWO
T rev 03105/07
WATER ENGINEERING &FISCAL SERVICES
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:27
NAME OF PROJECT: 2018 Water Lead Services Replacement Contract:Third Renewal
PROJECT NO.: 101100 CONTRACTOR: Tejas Commercial Cont.LLC
CITY PROJECT 101100
PERIOD FROM 11/15/20 TO: 11/30/20 FINAL INSPECTION DATE: 11/24/2020
WORT{ORDER EFFECTIVE:9/23/2019 CONTRACT TIME: 365 O WD OQ CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
I l. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL
& HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS
0 0
PERIOD
PREVIOUS
PERIOD 410 410
TOTALS 410 410
TO DATE
*REMARKS:
CONTRACTOR DATE INSPECTOR DATE
Capital Projects Delivery,\eater Department
The City of Dort Wordi• 1000 Tlirockmorton Street •Fort\Forth,T176012-6311
(817)392-4477•Fax:(817)392-8460
FORTWORTHREV:02/20/07
Capital Projects Deliver=,Water Department
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTORS PROJECT DATA
Nance of Contractor Project Name
Teas Commercial Construction, LLC 2018 Water Lead Services Replacement Contract:3rd Ren.
Malec Engineering Inspector DOE Number
Paul L.Gieger 101100
!Pater Engineering Inspector Project,lfauager
❑� Water ❑Waste Water ❑Storm Drainage Pavement J.Chris Underwood
Initial Com•act Amount Project Difficulty
$450,000.00 Q Simple Q Routine Q Complex
Final Contract Amount Date
$449,778.00 1/21/2021
11)PERFORMANCE EVALUATION
0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAN SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 3 60 45
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 3 20 1 15
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 3 20 15
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 348
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 348
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MSj *100%) 348 / 448 = 78%
Performance Category Good
<20%=Inadequate 20%10<40%=Deficient 40%to<60%=Standard 60%to<SO%=Good >_S0%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature Inspector V f tr, G/ I Signature Contractor
Signature Inspector's Supervisor
CONTRACTOR'S COMMENTS
Capital Projects Deliver}',Water Department
The City of Fort North• 1000 Throckmorton Street•Fort North,TX 76012-6311
(817)392-4477•Fax:(817)392-8460
ORT VWO RT H REV:02/22/07
Capital Projects Delivery,Water Department
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 21-Jan-21
Name of Contractor Projecl Nance
Tejas Commercial Construction,LLC 2018 Water Lead Services Replacement Contract:3rd Ren.
I Paler Engineering Inspector Project Manager
Paul L.Gieger J.Chris Underwooed
DOENumber Project Difficulty Type of Contract
101 100 *Simple Q Routine Q Complex ❑J Water ❑Waste Water ❑Storm Drainage ❑� Pavement
Initial Contract 11mou nt Final Contract Amount
$450,000.00 $449,778.00
I1)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) 1 (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
l Availability of Inspector (/ 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity R Sufficiency of Details y'
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism = 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
I Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 14 Resolution of Utility Conflicts `
3 Bid Opening to Pre-Con Meeting Timefi•ame t f
I1I)COMMENTS&SIGNATURES
COI`IM ENTS
Signature Contractor
Signauure Inspector
Signature Inspector's Supervisor 0
INSPECTOR'S COMMENTS
Capital Projects Delivery,stater Department
The City of Fort Worth- 1000 Throckmorton Street•Fort Worth,T176012-6311
(817)392-4477•Far:(817)392-8460
i
AFFIDAVIT
STATE OF Texas
COUNTY OF Parker
Before me. the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Charles D. Allen,
Vice President Of Tejas Commercial Construction, known to me to be a
credible person, who being by me duly sworn, upon his oath deposed and
said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
2018 Water Lead Service Replacement Contract 3)'d Renewal
CPN: 101100
BY
Charles D. Allen Vive President
Subscribed and sworn before me on this date of February,2021.
ti►� ?Ly !ETICIA ANN FioJO
==6' ._Notary Public. State of Texas
Notary Public = '
F Comm Expire; 11.12.2023
Tarrant County Texas °;,r` Notary ID 1247p2839
a
r
i
I
SURETEC INSURANCE COMPANY
9737 Great Hills Trail, Suite 320, Austin, Tx 78759
OWNER ❑
CONSENT OF SURETY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
❑
BOND NO.: OTHER
4422884
TO OBLIGEE:City of Fort Worth
(Name and Address) CONTRACT FOR:$450,000 j
PROJECT: CONTRACT DATED:August 20,2019
2018 Water Lead Services Replacement Contract
Project No. 101100—Third and Final Renewal
PRINCIPAL:Tejas Commercial Construction,LLC
At the request of the Obligee and the Principal indicated above,
SureTec Insurance Company, 9737 Great Hills Trail, Suite 320,Austin,Texas 78759
, SURETY,
on bond of
(Insert name and address of Conhactor)
Tejas Commercial Construction,LLC,PO Box 10395,River Oaks, Texas 76114
, CONTRACTOR,
and conditioned on the representation by Obligee that all Contract provisions relating to the payment of final
payment under the Contract have been satisfied by Principal as of the date of final payment, and that no claims
by Obligee or any third party are lmown or believed by Obligee or its representatives to exist as of the date of
final payment,representations as to the truth and accuracy of the foregoing conditions being deemed to have been
made by Obligee in connection with this request for Consent of Surety,hereby approves of the final payment to
the Principal,and agrees that final payment in accordance with the terms hereof shall not relieve the Surety of its
obligations to(Insert mmne and address of Obltgee)
City of Fort Worth, 200 Texas Street,Fort Worth, Texas 76102, OBLIGEE,as set forth in said Surety's bond.
i
IN WITNESS WBEREOF,the Surety has hereunto set its hand on this date:
i
(Insert in writing the month followed by the nzmieric date and year.)
SureTec Insurance Company
(Surety)
(Signature of authorized representative)
Attest Chris Holt,Attorney-in-Fact (Seal):
(Printed name and title)
SURETEC CONSENT TO FINAL PAYMENT REV. 1.1.2004
i
POA fi: 4221828
i
SureTec Insurance Company
]LIAHTED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston,Harris County, Texas, does by these presents
make,constitute and appoint
Chris Lynn Holt,Mark Mitchell,Natalie R.McCalment,Jim H.Barr,
Russell Board,Roger A.Redden,Rhonda Wells
its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute,acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for,providing the bond penalty does not exceed
Five Million and 00/100 Dollars($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the CEO,sealed with the corporate seal
of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney-in-Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President,any Vice-President,any Assistant Vice-President,any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attorneys)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute,acknowledge and
deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 201 of April,
1999.)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its CEO,and its corporate seal to
be hereto affixed this 16th day of August ;A.D.2018 .
S�Oft"Aw SURETEC INS + ANY
RAN
¢xwvue
�G�.. '9�ooae By.
w w ;a John Kno ,CE
State of Texas ss: s�:.•h 6:'
County of Harris ......•"'
'On this 16th day of August ,A.D.2018 before me personally came John Knox Jr„to me known,who,being by me duly sworn,did depose and say,
that he resides in Houston,Texas,that he is CEO of SURETEC INSURANCE COMPANY,the company described in and which executed the above
instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the q
Board of Directors of said Company;and that he signed his name thereto by like order. C
i
o"""'it, JACOUELYN GREENLEAF
i
1:�,_I,lolary Pul)lic,State of Texas t
I "'• `e Comm.Expires05-18-2021
r! ''•,;,�;,;��` Notary ID 126903029 Jacq eIyn Greenleaf,Notary Public
My commission expires May 18,2021
I,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney,executed by said Company,which is still in full force and effect;and furthermore,the resolutions of the Board of Directors,set
out in the Power of Attorney are in full force and effect. �/
Given under my hand and the seal of said Company at Houston,Texas this� --day oMi —
���A.D.
t
Bre'nary
• j
Any instrument issued in excess of the penalty stated above Is totally void and without any validity.
For verification of the authority of this power you may call(743)812-0800 any business day between 8:30 am and 5:00 pm CST.
j
I
s
i
s
SureTec Insurance Company
IMPORTANT NOTICE
Statutory Complaint Notice/Filing of Claims
To obtain information or make a complaint:You may call the Surety's toll free telephone number for information or to make
a complaint or file a claim at: 1-866-732-0099.You may also write to the Surety at:
SureTec Insurance Company
9737 Great Hills Trail, Suite 320
Austin,TX 78759
You may contact the Texas Department of Insurance to obtain information on companies,coverage, rights or complaints
at 1-800-252-3439.You may write the Texas Department of Insurance at:
PO Box 149104
Austin,TX 78714-9104
Fax#:512-490-1007
Web:http://www.tdi.texas.,qov
Email:ConsumerProtection@tdi.texas.gov
PREMIUM OR CLAIMS DISPUTES:Should you have a dispute concerning your premium or about a claim,you should
contact the Surety first. If the dispute is not resolved,you may contact the Texas Department of Insurance.
---------------------------------------------------------------------------------------------------------- i
Texas Rider8/2019
1
FORTWORTH
January 22,2021
Tejas Commercial Construction
1613 Laura Road
River Oaks,TX 76114
Re:Acceptance Letter
Project Name: 2018 Water Lead Services Replacement Contract Third Renewal
Project Type: Water
Project Ns: 101100
D.O.E. Ns: N/A
Contract Ns: 569"R3 Dated: 9/9/2019
S00(a�
Gentleman:
On November 24,2020 a final inspection was made on the subject project. There were no punch list items
identified at the time. The final inspection indicates that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on November 24,2020,which is the date of final
inspection and will extend for (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance,please feel free to contact me at(817) 392-6054
Yours Truly,
/an Ct
Tony Sholola,P.E.,Assistant Director Water Department
NIP /
cc: Chris Harder,P.E.,Director,Water Department
Laura Wilson,P.E.,Deputy Director,Water Department
Captain Michael Skains,Fuse Department
Cesar Zavala,Field Operations Superintendent,Water Department
Bill Lundvall,Field Operations Superintendent,Waste Water Department
Chris Underwood,Project Manager
Chris Undet%vood, Consultant
Tejas Commercial Construction, Contractor
David Johnson,Inspection Supervisor,Water Engineering and Fiscal Services
Paul Gieger,Inspector,Water Engineering and Fiscal Services
File
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102
817-392-8240 * FAX 817-392-8195
Q, Printed on recycled paper