HomeMy WebLinkAboutContract 51435-CO4 CSC No.51435-CO4
City of Fort Worth City Secretary Copy
Change Order Request
Project Name J City Sec No. 51435
Project No.(s) P286/56007 070SF30WF80 City Proj.No. CO2669
Project Description:[r Liquid Biosolid Storage Tank at VCWRF
Contractor:l Crescent Constructor, Inc. Change Order: ® Date: 1-28-2021
City Project Mgr. Selavash Mir City inspector: LNathan Gray
Phone Number: 817-392-8404 Phone Number: 817-944-9984
Dept, ewer Totals Contract Time
(Calendar days)
Original Contract Amount V6,4;37,1000.00 1$6,437j000.00 540
Extras to Date $98,800.00 J [$98,800;00 140
Credits to Date
Pending Change Orders On M&C Process)
Contract Cost to Date %535;800,00 1$6,535j800.00 680'.
Amount of Proposed Change Order 7,730.0 71730:04 092
Revised Contract Amount 65 806996 $8,5181069i96 772,
Original Funds Available for Change Orders $294,000.00 $294;000100
Remaining Funds Available for this CO $195,200.00 $195i200.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.26%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $8,046,250.00
JUSTIFICATION(REASONS) CHANGE ARDER
Change Order#4 tM1 provide for the following:
Plant power usage to run existing steel tank in Augost and September.
Deduction for Oncorelectrical service allowance.
RLC PLC mods for valve control.
Staff concors with the contractors request for 92 additional calendar days for the change order,
It Is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order,
Conlraotor's Com an Name: Contractor Name Efintractor Signature _ Date
Crescent Constructor,Inc. Ryan Glanz,P,,E,
inspector. *bate Pro eo[Manager Date
Nathan Gray 1/28/2021 Seiavash Mirdae,�,, 1/28/2021
Direotor'Water+Dept ; Date . Construction Manager(Stant-eQ.), Date
T• $• Feb 2 2021 01/28/2021
Chris Harder,P. _.,, Alex Visotski,P.E. fi=e6k
Assistant City Attorney Date Assistant:City Manager pate.
Doug Blac ,--(Feb4,"211]:V T) Feb 4,2021
C Dana Burdghdol -.u..1 e,&. ff1 . Feb
Council Action If Required OFFICIAL RECORD
M&C Number NIA M&C Date Approved CITY SECRETARY
FT.WORTH,TX
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Seiavash Mir
Name of Employee
Project Manager
Title
AT)TEESST;
° °0
Mary J, Kayser P—S
City Secretary �� o a��G
° °
° fy
a °°°°°°°°° d
)"ex As
V
i
t
n
OFFICIAL RECORD
CITY SECRETARY
u
FT.WORTH,TX
i
2560 Technology Drive#400
Plano, TX 75074
CONTRACT MODIFICATION REQUEST: PCM-11
PROJECT: VILLAGE CREEK BIOSOLIDS TANK DATE: 12/11/20
PROJECT NO. CO2669
ATTENTION: CITY OF FORT WORTH
1000 THROCKMORTON STREET
FORT WORTH, TX 76102
ATTN: SEIAVASH MIR
Attention:
The following change in contract on this project is proposed:
A breakdown of cost SHALL be attached.
YYork shall not commence until authorized by the OWNER.
I Pricing for the following
(1) RLC PLC Mods for Valve Control (PCM 12/03) _ $ 2,400
TOTAL AMOUNT $ 2,400
Ryan Glanz
Cescent
All work shall be in accordance with the terms,stipulations, and conditions of the
original Contract Documents. If the work herein provided for is Approved by
Change Order,the time of completion will be:
Increased By 92 ***Calendar Days
Decreased
Unchanged
El ACCEPTED
City of Fort Worth Date
❑ REJECTED