HomeMy WebLinkAboutContract 51435-CO4 CSC No.51435-CO4 City of Fort Worth City Secretary Copy Change Order Request Project Name J City Sec No. 51435 Project No.(s) P286/56007 070SF30WF80 City Proj.No. CO2669 Project Description:[r Liquid Biosolid Storage Tank at VCWRF Contractor:l Crescent Constructor, Inc. Change Order: ® Date: 1-28-2021 City Project Mgr. Selavash Mir City inspector: LNathan Gray Phone Number: 817-392-8404 Phone Number: 817-944-9984 Dept, ewer Totals Contract Time (Calendar days) Original Contract Amount V6,4;37,1000.00 1$6,437j000.00 540 Extras to Date $98,800.00 J [$98,800;00 140 Credits to Date Pending Change Orders On M&C Process) Contract Cost to Date %535;800,00 1$6,535j800.00 680'. Amount of Proposed Change Order 7,730.0 71730:04 092 Revised Contract Amount 65 806996 $8,5181069i96 772, Original Funds Available for Change Orders $294,000.00 $294;000100 Remaining Funds Available for this CO $195,200.00 $195i200.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.26% MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $8,046,250.00 JUSTIFICATION(REASONS) CHANGE ARDER Change Order#4 tM1 provide for the following: Plant power usage to run existing steel tank in Augost and September. Deduction for Oncorelectrical service allowance. RLC PLC mods for valve control. Staff concors with the contractors request for 92 additional calendar days for the change order, It Is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order, Conlraotor's Com an Name: Contractor Name Efintractor Signature _ Date Crescent Constructor,Inc. Ryan Glanz,P,,E, inspector. *bate Pro eo[Manager Date Nathan Gray 1/28/2021 Seiavash Mirdae,�,, 1/28/2021 Direotor'Water+Dept ; Date . Construction Manager(Stant-eQ.), Date T• $• Feb 2 2021 01/28/2021 Chris Harder,P. _.,, Alex Visotski,P.E. fi=e6k Assistant City Attorney Date Assistant:City Manager pate. Doug Blac ,--(Feb4,"211]:V T) Feb 4,2021 C Dana Burdghdol -.u..1 e,&. ff1 . Feb Council Action If Required OFFICIAL RECORD M&C Number NIA M&C Date Approved CITY SECRETARY FT.WORTH,TX Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Signature Seiavash Mir Name of Employee Project Manager Title AT)TEESST; ° °0 Mary J, Kayser P—S City Secretary �� o a��G ° ° ° fy a °°°°°°°°° d )"ex As V i t n OFFICIAL RECORD CITY SECRETARY u FT.WORTH,TX i 2560 Technology Drive#400 Plano, TX 75074 CONTRACT MODIFICATION REQUEST: PCM-11 PROJECT: VILLAGE CREEK BIOSOLIDS TANK DATE: 12/11/20 PROJECT NO. CO2669 ATTENTION: CITY OF FORT WORTH 1000 THROCKMORTON STREET FORT WORTH, TX 76102 ATTN: SEIAVASH MIR Attention: The following change in contract on this project is proposed: A breakdown of cost SHALL be attached. YYork shall not commence until authorized by the OWNER. I Pricing for the following (1) RLC PLC Mods for Valve Control (PCM 12/03) _ $ 2,400 TOTAL AMOUNT $ 2,400 Ryan Glanz Cescent All work shall be in accordance with the terms,stipulations, and conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order,the time of completion will be: Increased By 92 ***Calendar Days Decreased Unchanged El ACCEPTED City of Fort Worth Date ❑ REJECTED