HomeMy WebLinkAboutContract 55286 Received Date: 02/10/2021
Receivedlime• 9:02 am
Developer and Project Information Cover Sheet:
Developer Company Name: D.R.Horton—TX.LTD
Address, State,Zip Code: 1 6751 North Freeway,Fort Worth,TX 76131
Phone&Email: 817-230-0800,bmclarkna,drhorton.com
Authorized Signatory,Title: I Ben Clark,Vice President of Land Acquisition and Development
Project Name: Keller Crossing Phase 1
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: Northwest of the intersection of Keller Hicks Rd and Katy Rd.
Plat Case Number: Plat Name: Keller Crossing Phase 1
Mapsco: Council District: 7
CFA Number: CFA20-0120 City Project Number: 102875
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY
Standard Community Facilities Agreement
Rev.10/5/19[NPC] FT.WORTH,TX
CSC No.55286
STANDARD COMMUNITY FACILITIES AGREEMENT
This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by
and between The City of Fort Worth("City"), a home-rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and D.R. Horton — TX, LTD
("Developer"),acting by and through its duly authorized representative. City and Developer are referred to
herein individually as a"party"and collectively as the"parties."
WHEREAS, Developer is constructing private improvements or subdividing ]and within the
corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as
Keller Crossing Phase 1 ("Project");and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards;and
WHEREAS, as a condition of approval of the Project,Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement("Community Facilities" or"Improvements");and
WHEREAS, as a condition of approval ofthe Project,Developer is required to meet the additional
obligations contained in this Agreement,and Developer may be required to make dedications of land, pay
fees or construction costs, or meet other obligations that are not a part of this Agreement.;and
WHEREAS, the City is not participating in the cost of the Improvements or Project;and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW,THEREFORE, for and inconsideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
CFA Ordinance
The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated
into this Agreement by reference,as if it was fully set forth herein. Developer agrees to comply with all
provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this
Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exist between the terms and conditions
of this Agreement and the CFA Ordinance,the CFA Ordinance shall control.
2.
Incorporation of Engineering Plans
The engineering plans for the Improvements that have been accepted by the City ("Engineering
Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY
Standard Community Facilities Agreement
Rev.10/5/19[NPC] FT.WORTH,TX
at its expense,unless otherwise agreed to by City, all engineering drawings and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements;Exhibits and Attachments
The following exhibits describe the general location, nature and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
® Exhibit A. Water
® Exhibit A 1: Sewer
® Exhibit B: Paving
® Exhibit B-1: Storm Drain
® Exhibit C: Street Lights & Signs
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, A 1, B, B-1, C, the Location Map, or the Cost Estimates
conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 —
Changes to Standard Community Facilities Agreement, Attachment 2— Phased CFA Provisions, and
Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all
purposes.
4.
Construction of Improvements
Developer agrees to cause the construction ofthe Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer's contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee").
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance.
6.
Completion Deadline;Extension Periods
This Agreement shall be effective on the date this Agreement is executed by the City's Assistant
City Manager ("Effective Date"). Developer shall complete construction of the Improvements and
obtain the City's acceptance of the Improvements within two(2)years of the Effective Date ("Term").
City of Fort Worth,Texas Page 3 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPCI
If construction of the Improvements has started during the Term, the Developer may request that this
Agreement be extended for an additional period of time("Extension Period"). All Extension Periods shall
be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement.
In no event shall the Term of this Agreement plus any Extension Periods be for more than three years.
7.
Failure to Construct the Improvements
(a) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City.
(b) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Agreement,becomes insolvent, or fails to pay costs of construction.
(c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers
are not paid for construction costs or materials supplied for the Improvements the contractors and
suppliers may place a lien upon any property which the City does not have an ownership interest
that is the subject of the Completion Agreement.
(d) Nothing contained herein is intended to limit the Developer's obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's
contractors, or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer's contractors begin
constructing the Improvements,Developer agrees to the following:
(a) that Developer and City must execute a termination of this Agreement in writing;
(b) that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c) to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City's inspectors at preconstruction meetings.
9.
Award of Construction Contracts
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
(b) Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including,but not limited,to being prequalified, insured, licensed and bonded to
construct the Improvements in the City.
City of Fort Worth,Texas Page 4 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPCI
(c) Developer will require Developer's contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%)of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer's contractors to
provide the City with a maintenance bond naming the City as an oblige, in the amount of one
hundred percent(100%)of the cost of the Improvements,that guarantees correction of defects in
materials and workmanship for the Improvements by the contractor and surety for a period of two
(2)years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City's
Standard Conditions, Chapter 2253 of the Texas Government Code,and the Texas Insurance Code.
(d) Developer will require Developer's contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's
insurance provider,which shall be made apart of the Project Manual.
(e) Developer will require the Developer's contractors to give forty-eight(48)hours' advance notice
of their intent to commence construction of the Improvements to the City's Construction Services
Division so that City inspection personnel will be available. Developer will require Developer's
contractors to allow construction of the Improvements to be subject to inspection at any and all
times by the City's inspectors. Developer will require Developer's contractors to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives
consent to proceed, and to allow such laboratory tests as may be required by the City.
(f) Developer will not allow Developer's contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and
service lines have been completed to the satisfaction of the City.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project
and(2)to construct the Improvements required herein. City shall not be responsible for payment of any
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with
any of the Improvements to be constructed pursuant to this Agreement.
11.
Easements and Rights-of--Way
Developer agrees to provide, at its expense,all necessary rights-of--way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
City of Fort Worth,Texas Page 5 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPCI
12.
Liability and Indemnification
(a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND
HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY
PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES
SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT.
(b) THE DEVELOPER COVENANTS AND AGREES TO,AND BY THESE PRESENTS DOES
HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS
OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF
ANYCHARACTER, WHETHERREAL ORASSERTED,BROUGHT FOR OR ONACCOUNT
OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS,INCLUDING DEATH,
OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE
CONSTRUCTION,DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE
PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS,
OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO
PROPERLYSAFEGUARD THE WORK, OR ONACCOUNT OFANYACT, INTENTIONAL
OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS
CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES,
WHETHER OR NOT S UCH INJURIES,DEATH OR DAMAGES ARE CAUSED,IN WHOLE
OR IN PART,BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES.
(c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCL UDING DEATH,RESULTING FROM, OR IN ANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER
OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN
PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE
ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY
FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR
CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE
WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE
MANNER, FREE FROM DEFECTS,IN CONFORMANCE WITH THE CFA ORDINANCE,
AND IN ACCORDANCE WITH ALL PLANS AND SPECIFICATIONS.
13.
Right to Enforce Contracts
Upon completion of all work associated with the construction of the Improvements,Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors,along with an assignment of all warranties givenby the contractors,whether express or implied
Further,Developer agrees that all contracts with any contractor shallinclude provisions granting to the City
the right to enforce such contracts as an express intended third party beneficiary of such contracts.
City of Fort Worth,Texas Page 6 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPCI
14.
Estimated Fees Paid by Developer;Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees,and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements,the City will reconcile the actual cost of administrative material testing
service fees,construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer,
the Developer mustpay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund
the difference to the Developer. If the difference between the actual costs and the estimated payments made
by the Developer is less than fifty dollars ($50.00),the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
returned to the Developer until reconciliation has been completed by the City and any fees owed to the C1.y
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre-approved material testing laboratories. The Developer must
contract with material testing laboratories on the City's list. Material testing laboratories will provide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting. The City
will obtain proof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a party by hand-
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY: DEVELOPER:
Development Coordination Office D.R. Horton- TX,LTD
City of Fort Worth 6751 North Freeway
200 Texas Street Fort Worth, TX 76131
Fort Worth, Texas 76102
With copies to:
City Attorney's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
City of Fort Worth,Texas Page 7 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPCI
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
Developer agrees that,until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer's contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall,until the expiration of
three(3)years after final payment under the contract,have access to and the right to examine any directly
pertinent books,documents,papers and records of such contractor, involving transactions to the contract,
and further,that City shall have access during normal working hours to all of the contractor's facilities,and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer's contractors reasonable advance notice of intended
audits.
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants, officers,contractors, subcontractors,and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents,representatives or
employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement,
Developer shall have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co-employer or a joint employer of Developer or any employees,
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
Neither Developer, nor any officers,agents, servants, employees or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
City of Fort Worth,Texas Page 8 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPCI
all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents,
servants, officers,contractors,subcontractors,and volunteers.
The City, through its authorized representatives and employees, shall have the sole and exclusive
right to exercise jurisdiction and control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas,Fort Worth Division.
20.
Non-Waiver
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City's right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
24.
Review of Counsel
City and Developer, and if they so choose,their attorneys, have had the opportunity to review
and comment on this document; therefore any rule of contract construction or interpretation that would
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
construed solely on the basis of the language contained therein, regardless of who authored such
language.
City of Fort Worth,Texas Page 9 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPCI
25.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it:(1)does not
boycott Israel;and(2)will not boycott Israel during the term of the contract. The term"boycott Israel"bas
the meaning ascribed to it by Section 808.001 of the Texas Government Code. The term"company"bas
the meaning ascribed to it by Section 2270.001 of the Texas Government Code. To the extent that Chapter
2270 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer
certifies that Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel;and(2)will not boycott Israel during the term of this Agreement.
26.
Immigration and Nationality Act
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form(I-9). Upon
request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPED
DEVELOPER'SEMPLOYEES,SUBCONTRACTORS,AGENTS,ORLICENSEES. City,upon written
notice to Developer, shall have the right to immediately terminate this Agreement for violations of this
provision by Developer.
27.
Amendment
No amendment,modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof,and duly executed by the City and Developer.
28.
Assignment and Successors
Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this
Agreement without the prior written consent of City. Any attempted assignment or subcontract without the
City's prior written approval shall be void and constitute a breach of this Agreement.
29.
No Third-Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise,to any other person or entity.
City of Fort Worth,Texas Page 10 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPCI
30.
Compliance with Laws,Ordinances,Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state and local, including all ordinances,rules and regulations of City. It is agreed
and understood that, if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers,agents, servants, employees, or subcontractors,then Developer shall immediately
desist from and correct such violation.
31.
Signature Authority
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order,resolution, ordinance or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
32.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
33.
Entire Agreement
This written instrument,together with any attachments, exhibits,and appendices,constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder, and
any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall
be void.
[REMAINDER OF PAGE INTENITONALLY BLANK]
City of Fort Worth,Texas Page 11 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPCI
34.
Cost Summary Sheet
Project Name:Keller Crossing Phase 1
CFA No.: CFA20-0120 City Project No.: 102875
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 351,743.00
2.Sewer Construction $ 453,579.00
Water and Sewer Construction Total $ 805,322.00
B. TPW Construction
1.Street $ 618,509.00
2.Storm Drain $ 596,353.00
3.Street Lights Installed by Developer $ 79,385.60
4. Signals $ -
TPW Construction Cost Total $ 1,294,247.60
Total Construction Cost(excluding the fees): $ 2,099,569.60
Estimated Construction Fees:
C. Construction Inspection Service Fee $64,190.00
D. Administrative Material Testing Service Fee $14,602.00
E. Water Testing Lab Fee $1,140.00
Total Estimated Construction Fees: $ 79,932.00
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 2,099,569.60 x
Completion Agreement=100%/Holds Plat $ 2,099,569.60
Cash Escrow Water/Sanitary Sewer=125% $ 1,006,652.50
Cash Escrow Paving/Storm Drain=125% $ 1,617,809.50
Letter of Credit=125% $ 2,624,462.00
City of Fort Worth,Texas Page 12 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPC)
IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH DEVELOPER
D.R.Horton-TX,LTD
zwq aujd40 z
Dana Bur¢hdoff(F 9,2021 424 CST)
Dana Burghdoff Ben Clark(Feb 7,202120:14 CST)
Assistant City Manager Name:Ben Clark
Title: Vice President of Land Acquisition and
Date: Feb 9,2021 Development
Recommended by: Date: Feb 7,2021
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development
Approved as to Form&Legality:
Richard A.McCracken(Feb 8,202117:26 CST)
Richard A. McCracken Contract Compliance Manager:
Sr. Assistant City Attorney
M&C No. By signing, I acknowledge that I am the person
responsible for the monitoring and
Date: 444��n� administration of this contract,including
Form 1295: bpF four��� ensuring all performance and reporting
O°°° 'o dd
�o° oo�dd requirements.
ti
ATTEST: p o
vg o 2 ,d
�aQo.°° o° � a Scarlett Morales(Feb 8,202115:27 CST)
°O000000° ,o'
�EXASaap
Name: Janie Scarlett Morales
Mary J.Kayser/Ronald Gonzales Title: Development Manager
City Secretary/Assistant City Secretary
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY
Standard Community Facilities Agreement
Rev.10/5/19[NPC] FT.WORTH,TX
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments,the
language in the main body of this Agreement shall be controlling.
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
❑ Attachment 2—Phased CFA Provisions
❑ Attachment 3 —Concurrent CFA Provisions
® Location Map
® Exhibit A: Water Improvements
® Exhibit A 1: Sewer Improvements
® Exhibit B: Paving Improvements
® Exhibit 13-1: Storm Drain Improvements
® Exhibit C: Street Lights and Signs Improvements
® Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas Page 14 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPCI
ATTACHNUNT "1"
Changes to Standard Community Facilities Agreement
City Project No.102875
none
City of Fort Worth,Texas Page 15 of 15
Standard Community Facilities Agreement
Rev.10/5/19[NPCI
00 42 43
DAP-BID PROPOSAL
Page I of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Unit Price Bid Value
Section No. Measure Quantity
UNIT I:WATER IMPROVEMENTS
1 3311.0241 8"Water Pipe 33 11 12 LF 5459 $29,00 $158,311.00
2 3312.2003 1"Water Service 3312 10 EA 95 $970.00 $92,150.00
3 3312.2103 1 1/2"Water Service 33 1210 EA 3 $1,500.00 $4,500.00
4 3312.3003 8"Gate Valve 331220 EA 14 $1,360.00 $19,040.00
5 9999.0001 8"Quickvalve Insertion Valve 331220 EA 2 $7,560.00 $15,120.00
6 9999.0012 Pressure Plane Valve and Box 33 1220 EA 1 $1,360.00 $1,360.00
7 3312.0001 Fire Hydrant 33 12 40 EA 4 $3,800.00 $15,200.00
8 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 3.9 $7,400.00 $28,860.00
9 3304.0109 Trench Safety 3305 10 LF 5452 $1.00 $5,452.00
10 0241.1118 4"-12"Pressure Plug 0241 14 EA 2 $175.00 $350.00
11 3312.0117 Connection to Existing 4"-12"Water Main 33 1225 EA 2 $3,300.00 $6,600.00
12 3201.0127 10'Wide Asphalt Pvmt Repair,Arterial 3201 17 LF 30 $160.00 $4,800.00
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT I:WATER IMPROVEMENTS $351,743.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 20201 103_00 42 43_Bid Proposal DAP
00 42 43
DAP-BID PROPOSAL
Page 2 of 5
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Infonnation Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description P Unit Price Bid Value
Section No Measure Quantity_
UNIT II: SANITARY SEWER IMPROVEMENTS
1 3331.4115 8"Sewer Pipe 33 31 20 LF 2727 $28.00 $76,356.00
2 3331.4201 10"Sewer Pipe 33 11 10, 33 LF 1463 $36.00 $52,668.00
3 9999.0004 10"C900 Sewer Pipe 33 11 10, 33 LF 50 $65.00 $3,250.00
4 3331,4205 10"DIP Sewer 33 11 10 LF 385 $92.00 $35,420.00
5 3339.1001 4'Manhole 33 39 20 EA 18 $4,300.00 $77,400.00
6 3339.1002 4'Drop Manhole 33 39 20 EA 3 $6,200.00 $18,600.00
7 9999.0002 CSS Encasement for Utility Pipes 3305 10 LF 293 $50.00 $14,650.00
8 3339.1003 4'Extra Depth Manhole 33 39 20 VF 70 $100.00 $7,000.00
9 3339.0001 Epoxy Manhole Liner 33 39 60 VF 80 $240.00 $19,200.00
10 3331.3101 4"Sewer Service 3331 50 EA 112 $790.00 $88,480.00
11 9999.0003 Connect to Ex 4'Manhole 3331 20 EA 1 $2,600.00 $27600.00
12 3201.0127 10'Wide Asphalt Pvmt Repair,Arterial 3201 17 LF 20 $160.00 $3,200.00
13 3301.0101 Manhole Vacuum Testing 3301 30 EA 21 $100.00 $2,100.00
14 3305.0109 Trench Safety 3305 10 LF 4585 $2.00 $9,170.00
15 3301.0002 Post-CCTV Inspection 3301 31 LF 4585 $3.00 $13,755.00
16 9999.0020 Post TV inspection (Paving) 3301 31 LF 4585 $3.00 $13,755.00
17 9999.0021 Post TV Inspection Manholes 3301 31 EA 21 $200.00 $4,200.00
18 3305.1003 20"Casing By Open Cut 33 05 22 LF 55 $130.00 $7,150.00
19 3305.1002 16"Casing By Open Cut 33 05 22 LF 35 $120.00 $4,200.00
20 3305.0112 Concrete Collar 3305 17 EA 1 $425.00 $425.00
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
TOTAL UNIT II:SANITARY SEWER IMPROVEMENT $453,579.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019
20201103_00 42 43_Bid Proposal DAP
00 42 43
DAP-BID PROPOSAL
Page 3 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item S ecification Unit of�BidNo. Description pue
Section No. Measurety
UNIT III: DRAINAGE IMPROVEMENTS
1 3341.1103 4'x4'Box Culvert 3341 10 LF 192 $238.00
2 3341.1201 5'x3'Box Culvert $15,222.00
33 41 10 LF 59 $258.00 $15,222.00
3 9999.0017 5'x3'Box Culvert, Class IV 3441 20 EA 442 $258.00 $114,036.00
4 9999.0013 8'x3'Box Culvert 3341 10 LF 7 $1,537.00
5 3341.0409 48"RCP, Class III $32,760.00
33 41 10 LF 182 $180.00 $32,760.00
6 3341.0410 48"RCP, Class IV 3341 10 LF 450 $240.00 $108,000.00
7 3341.0403 42"RCP, Class IV 3341 10 LF 102 $172.00 $17,544.00
8 3341.0309 36"RCP, Class III 3341 10 LF 74 $113.00
9 3341.0209 27"RCP, Class IV 8, 2.00
33 41 10 LF 216 $87.00 $18,79
2.00
10 3341.0208 27"RCP, Class III 3341 10 LF 29
11 3341.0206 24"RCP, Class IV $71.00 , .00
334110 LF 147 $76.00 $1111,172172.00
12 3341.0205 24"RCP, Class III 3341 10 LF 25
13 3341.0202 21"RCP, Class IV $6 $1, .00
34 41 10 LF 46 $63.00.00 $2,89898.00
14 3341.0201 21"RCP, Class III 3341 10 LF 86 $57.00
15 3349.5001 10'Curb Inlet 4, 0
33 49 20 EA 10 $4,400.00 $44,000.00
.00
16 3349.0001 4'Storm Junction Box 33 49 10 EA 1 $4,350.00 $4,350.00
17 3349.0002 5'Storm Junction Box 33 49 10 EA 5 $6,500.00 $32,500.00
18 3349.0003 6'Storm Junction Box 33 49 10 EA 2 $10,000.00 $20,000.00
19 9999.0005 TxDOT 8'x3'CH-FW-0 Headwall 33 49 40 EA 1 $8,100.00
20 9999.0006 5'x3'Slo in Headwall $5,100.00
p g 33 49 40 EA 1 $5,100.00 $5,100.00
21 9999.0015 36"Sloping Headwall 33 49 40 EA 1 $4,600.00
22 9999.0014 TxDOT 42"CH-PW-0 Headwall 334940 EA $6,000.00
1 $6,000.00 $ ,000.00
23 9999.0024 TxDOT 36"CH-PW-0 Headwall 33 49 40 EA 1 $4,500.00 $4,500.00
24 9999.0016 4'x4'4:1 FW-0 Headwall 33 49 40 EA 1 $11,800.00 $11,800.00
25 3137.0102 Large Stone Riprap, dry 31 3700 SY 409
26 9999.0018 6"Concrete Lining 31 3700 SY $88.00 $29,21 .00
27 3305.0109 Trench Safety057 $$2.00 $$4,114.00
33 05 10 LF 2057 $2.00 $4,114.00
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
TOTAL UNIT III: DRAINAGE IMPROVEMENT $596,353.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019
20201103_00 42 43_Bid Proposal DAP
00 42 43
DAP-BID PROPOSAL
Page 4 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specificaton Unit of Bid
No. Description i
Section No. Measure Quantity Unit Price Bid Value
UNIT IV: PAVING IMPROVEMENTS
1 321.0101 6"Conc Pvmt 32 13 13 SY 12281 $35.60 $437,203.60
2 3213.0301 4"Conc Sidewalk 32 1320 SF 7318 $5.70 $41,712.60
3 3211.0501 6"Lime Treatment 32 11 29 SY 13128 $3.60 $47,260.80
4 3211.0400 Hydrated Lime 3211 29 TN 211 $199.00 $41,989.00
5 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 13 $1,600.00 $20,800.00
6 3217.0401 18"SLD Pvmt Marking HAE(W) 32 1723 LF 28 $25.00 $700.00
7 3291.0100 Topsoil 3291 19 CY 437 $22.00 $9,614.00
8 3292.0400 Seeding, Hydromulch 3292 13 SY 182 $9.00 $1,638.00�
9 3471.0001 Traffic Control 3471 13 MO 1 $6,675.00 $6.675.00
10 9999.0011 End-of-Road Barricade 00 00 00 EA 4 $900.00 $3,600.00
11 9999.0022 Concrete Street Header 00 00 00 LF 58 $15.00 $870.00
12 9999.0023 Connect to Exist Pavement 00 00 00 LF 158 $17.00 $2,686.00
13 3441.4006 Install Alum Sign Ground Mount 3441 30 EA 8 $470.00 $37760.00
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT IV: PAVING IMPROVEMENTS $618.509.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019
20201 103_00 42 43_Bid Proposal_DAP
00 42 43
DAP-BID PROPOSAL
Page 5 of 5
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid U
No. Description nit Pric-T e Bid Value
Section No. Measure Quantity
Bid Summary
UNIT I:WATER IMPROVEMENTS $351,743.00
UNIT II:SANITARY SEWER IMPROVEMENTS $453,579.00
UNIT III: DRAINAGE IMPROVEMENTS $596,353.00
UNIT IV: PAVING IMPROVEMENTS $618,509.00
Total Construction Bid $2,020,184.00
This Bid is submitted by the entity named below:
BIDDER: BY:
Jackson Construction,Ltd.
5112 Sun Valley Drive �
Fort Worth,TX 76119 TITLE: r0Y - aC Son
DATE: President
Contractor agrees to complete WORK for FINAL ACCEPTANCE within working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019
20201103_00 42 43_Bid Proposal DAP
00 42 43
DAP-BID PROPOSAL
Page 1 of 2
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No Description Unit Price Bid Value
SI I- ection No. Measure Quantity
UNIT V:STREET LIGHTING IMPROVEMENTS
1 2605.3015 2"CONDT PVC SCH 80(T) 26 05 33 LF 1420 $12.70 $18,034.00
2 3441.3050 Furnish/Install LED Lighting Fixture(70 watt
ATBO Cobra Head) 3441 20 EA 17 $273.00 $4,641.00
3 3441.3301 Rdwy Ilium Foundation TY 1,2, and 4 3441 20 EA 17 $1,252.00 $21,284.00
4 3441.3351 Furnish/Install Rdway Ilium TY 11 Pole 3441 20 EA 17 $1,373.00 $23,341.00
5 3441.1646 Furnish/Install Type 33B Arm 3441 20 EA 17 $316.00 $5,372.00
6 3441.1501 Ground Box Type B 3441 10 EA 2 $673.00 $1,346.00
7 9999.0008 No. 10 XHHW Insulated Elec Condr 3441 10 LF 4260 $1.26 $5,367.60
8
9 1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $79,385.60
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 20201103_00 42 43_Bid Proposal_DAP_Lighting
00 42 43
DAP-BID PROPOSAL
Page 2 of 2
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. Section No. Measure Quantity
Bid Summary
UNIT V:STREET LIGHTING IMPROVEMENTS $79,385.60
Total Construction Bid $79,385.60
This Bid is submitted by the entity named below: z
BIDDER:
BY: —�
Independent Utility Construciton,Inc.
5109 Sun Valley Drive
Fort Worth,TX 76119 TITLE: e.& � . C e
DATE:
Contractor agrees to complete WORK for FINAL ACCEPTANCE within SO working days,after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 20201103_00 42 43_Bid Proposal_DAP_Lighting
im
NORTH Fly
LIBERTY WAY
GPI
WESTPORT PKVN
0
a ^�
0
s�
S
02
A,
�u=
O
M_
}
F
Z
W
M �
LL
i KELLER-HICKS RD. KELLER-HICKS RD.
1 0o SITE
2
GOLDEN TRIANGLE BLVD.
VICINITY MAP
N.T.S.
CITY PROJECT# 102875
MAPSCO PAGE 23-E, J
OWNER: PELOTON
LOCATION MAP DR HORTON - TX, LTD. I I LAND SOLUTIONS
NORTH 6751 NORTH FREEWAY 9800 HILLWOOD PARKWAY
250
NOT TO SCALE KELLER CROSSING PHASE 1 FORT WORTH,TEXAS 76131 SUITE ,T
PHONE:817.230-0800 FORT WORTH,TX 76177
DATE: 12/07/2020 PHONE:817-562-3350
sae
pae,93
anav=° Qoa
Eea�a�9
�� SFaa`.�em9,a
ELBERT N WAY
w
z O I j �.
° PHASE 2
-� "'� �0 Q� ��' o
2
O Z
co
O
W
O z > E) DEWY ROSE
p LANE °
J_
EX 12" WL
X-12330 IKELLER—HICKS ROAD
LEGEND
PROPOSED WATER LINE
EXW EXISTING WATER LINE
04 PROPOSED GATE VALVE
EXW EXISTING GATE VALVE
� PROPOSED FIRE HYDRANT
NOTE: ALL PROPOSED WATER LINES
EXW EXISTING FIRE HYDRANT ARE 8" UNLESS OTHERWISE NOTED.
EXHIBIT A - WATER
WATER OWNER: PELOTON
0 NORTH 300' IMPROVEMENTS DR HORTON - TX, LTD. I I LAND SOLUTIONS
6751 NORTH FREEWAY 9800 HILLWOOD PARKWAY
250
KELLER CROSSING PHASE 1 FORT WORTH,TEXAS 76131 SUITE ,T
GRAPHIC SCALE PHONE:817.230-0800 FORT WORTH,TX 76177
DATE: 12/07/2020 PHONE:817-562-3350
Gc`Np.s\Gj' c
a^Gqt to Gog,�
J OWe1a R P
_ELBERTON WAY
777
Lu
z 0 W Q,
° PHASE 2
� wco
w°
cn
/ -0U) zo °, Q
ol
Z
O
� w
o z > O DEWY ROSE
p LANE °
- > IKELLER-HICKS ROAD
UTURE CONNECTION TO BE MADE
WHEN KELLER-HICKS ROAD IS IMPR V D
LEGEND
29' B-B /50' ROW (TYP)
SIDEWALK BY DEVELOPER
---- SIDEWALK BY HOMEBUILDER
O H.C. RAMPS BY DEVELOPER
® ROAD BARRICADE
EXHIBIT B - PAVING
PAVING OWNER: PELOTON
0 NORTH 300' IMPROVEMENTS DR HORTON - TX, LTD. I I LAND SOLUTIONS
6751 NORTH FREEWAY 9800 HILLWOOD PARKWAY
250
KELLER CROSSING PHASE 1 FORT WORTH,TEXAS 76131 SUITE ,T
GRAPHIC SCALE PHONE:817.230-0800 FORT WORTH,TX 76177
DATE: 12/07/2020 PHONE:817-562-3350
G lea S�e°�,1
ti A_SGt_ nF
an. aGo..g'SG
s 9,3 e�1
GM'oy eG GZ_ °mat
sE o�\aa
Sye
0�"spo aya'L 5
ngs eNmRS-
.n 3ce oe��2QS
�ELBERTON WAY
IT L
LLJ
Z Z'= 3, 0 W J 7
° PHASE 2 Lu
-10" SEWER p
�n
w 10" SEWER w a tl }—
w Lu
w �—
w c/) U)
0 10" SEWER o ° z o
_ T O r
I
o z > 16" SEWER o DEWY ROSE
p LANE °
EX 18" SEWER
X-12330 IKELLER-HICKS ROAD
LEGEND
PROPOSED SANITARY SEWER LINE
EXSS---&— EXISTING SANITARY SEWER LINE
NOTES:
1. ALL PROPOSED SANITARY SEWER LINES
ARE 8" UNLESS OTHERWISE NOTED.
2. ALL SANITARY SEWER MANHOLES ARE 4'
DIA UNLESS OTHERWISE NOTED.
EXHIBIT Al - SEWER
SEWER OWNER: PELOTON
0 NORTH 300' IMPROVEMENTS DR HORTON - TX, LTD. I I LAND SOLUTIONS
6751 NORTH FREEWAY 9800 HILLWOOD PARKWAY
250
KELLER CROSSING PHASE 1 FORT WORTH,TEXAS 76131 SUITE ,T
GRAPHIC SCALE PHONE:817.230-0800 FORT WORTH,TX 76177
DATE: 12/07/2020 PHONE:817-562-3350
°O GpS. is Co'936
s 9,^U Va9a
GJOWMec c�e_Pa9e9
0taG8 a g't.
laNmGRSG
_XJ
2-21" RCP e@G 19fi2Qa9 +
48" RCP 2-10' INL„
_L ELBERTON WAY '
5'x5' JB 42" TxDOT
CH-P, 0 HDWL
42" RCP
5'x5'JB w
w 5'x3' RCB z - z
z O w Q.
° PHASE 2 Lu
6'x6' JB r>- F— _Q 10°
N — �0 v)� �Z ��
—5'x3'SLOPING HDWL 210RINL 2-21" RCP > 0
2-21" RCP 24 RCP' 2-10' INL w
2-10' INL 10, INL` I 1 1 °
48" RCP- 27" RCP
i 4'x4' RCB 24" RCP
5'x5' JB
LJ 4'x4' RC '
B 4'x4' JB
O WILLINGTON DRIVE 5'x5' JB e 5x5'JB 21" RCP
T I T I H 5'x5' JB � : 21" RCP° 10' INL o
4'x4' 4:1 FW-0 HDWL— =10' INL
36" TxDOT 36"SLOPING HDWL
CH-PW-0 HDWL 36" RCP
8'x3' TxDOT
CH-PW-0 HDWL
LEGEND
r PROPOSED STORM DRAIN INLET
------- --- EXISTING STORM DRAIN INLET
PROPOSED STORM DRAIN MANHOLE
----< PROPOSED STORM DRAIN HEADWALL
EXHIBIT B1 - STORM DRAIN
STORM DRAIN OWNER: PELOTON
0 NORTH 100, IMPROVEMENTS DR HORTON - TX, LTD. I I LAND SOLUTIONS
6751 NORTH FREEWAY 9800 HILLWOOD PARKWAY
250
KELLER CROSSING PHASE 1 FORT WORTH,TEXAS 76131 SUITE FORT WORTH,T,T
PHONE:817230-0800 X 76177
.
GRAPHIC SCALE DATE: 12/07/2020 PHONE:817-562-3350
�a7 Rz
o3s�aga;93
Eca�ea9a9
II Qoca.
-ELBERTON WAY
w
Lu
PHASE 2
-o � o.
Qom .
2W
O Z
O
o P
> I 1 17
O1 - 1 DEWY ROSE
p LANE °
IKELLER-HICKS ROAD
LEGEND
• PROPOSED STREET LIGHT
O EXISTING STREET LIGHT
- PROPOSED STREET NAME SIGNS
0 EXISTING STREET NAME SIGNS
EXHIBIT C - STREET LIGHTS & STREET NAME SIGNS
STREET LIGHT OWNER: PELOTON
0 NORTH 100, IMPROVEMENTS DR HORTON - TX, LTD. I I LAND SOLUTIONS
6751 NORTH FREEWAY 9800 HILLWOOD PARKWAY
KELLER CROSSING PHASE 1 FORT WORTH,TEXAS 76131 SUITE FORT WORTH,T,T
PHONE:817230-0800 X 76177
.
GRAPHIC SCALE DATE: 12/07/2020 PHONE:817-562-3350