Loading...
HomeMy WebLinkAboutContract 55287 Received Date: 02/10/2021 Received lime: 11:15 am Developer and Project Information Cover Sheet: Developer Company Name: Lennar Homes of Texas Land and Construction,LTD. Address, State,Zip Code: 1 1707 Market Place Blvd. Suite 100, Irving,Texas,75063 Phone&Email: 469-587-5383,Jennifer.EllerAlennar.com. Authorized Signatory,Title: Jennifer Eller, Authorized Agent Project Name: Chisholm Trail Ranch, Section 1 Phase 3 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: Southeast corner of McPherson Blvd. and Summer Creek Dr. Plat Case Number: PP-15-003 Plat Name: Mapsco: Council District: 6 CFA Number: CFA20-118 City Project Number: 102815 OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement Rev.10/5/19[NPC] FT.WORTH,TX CSC No.55287 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between The City of Fort Worth("City"), a home-rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager,and Lennar Homes of Texas Land and Construction, LTD ("Developer"), acting by and through its duly authorized representative. City and Developer are referred to herein individually as a"party"and collectively as the"parties." WHEREAS, Developer is constructing private improvements or subdividing ]and within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Chisholm Trail Ranch, Section I Phase 3("Project");and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards;and WHEREAS, as a condition of approval of the Project,Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement("Community Facilities" or"Improvements");and WHEREAS, as a condition of approval ofthe Project,Developer is required to meet the additional obligations contained in this Agreement,and Developer may be required to make dedications of land, pay fees or construction costs, or meet other obligations that are not a part of this Agreement.;and WHEREAS, the City is not participating in the cost of the Improvements or Project;and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW,THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated into this Agreement by reference,as if it was fully set forth herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exist between the terms and conditions of this Agreement and the CFA Ordinance,the CFA Ordinance shall control. 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been accepted by the City ("Engineering Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement Rev.10/5/19[NPC] FT.WORTH,TX at its expense,unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements;Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: ® Exhibit A. Water ® Exhibit A 1: Sewer ® Exhibit B: Paving ® Exhibit B-1: Storm Drain ® Exhibit C: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A 1, B, B-1, C, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2— Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction ofthe Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. 6. Completion Deadline;Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two(2)years of the Effective Date ("Term"). City of Fort Worth,Texas Page 3 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement,becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements,Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including,but not limited,to being prequalified, insured, licensed and bonded to construct the Improvements in the City. City of Fort Worth,Texas Page 4 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%)of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an oblige, in the amount of one hundred percent(100%)of the cost of the Improvements,that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2)years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions, Chapter 2253 of the Texas Government Code,and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider,which shall be made apart of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight(48)hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed, and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project and(2)to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. 11. Easements and Rights-of--Way Developer agrees to provide, at its expense,all necessary rights-of--way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. City of Fort Worth,Texas Page 5 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO,AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANYCHARACTER, WHETHERREAL ORASSERTED,BROUGHT FOR OR ONACCOUNT OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS,INCLUDING DEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION,DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERLYSAFEGUARD THE WORK, OR ONACCOUNT OFANYACT, INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT S UCH INJURIES,DEATH OR DAMAGES ARE CAUSED,IN WHOLE OR IN PART,BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCL UDING DEATH,RESULTING FROM, OR IN ANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS,IN CONFORMANCE WITH THE CFA ORDINANCE, AND IN ACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts Upon completion of all work associated with the construction of the Improvements,Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors,along with an assignment of all warranties givenby the contractors,whether express or implied Further,Developer agrees that all contracts with any contractor shallinclude provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. City of Fort Worth,Texas Page 6 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI 14. Estimated Fees Paid by Developer;Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees,and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements,the City will reconcile the actual cost of administrative material testing service fees,construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer mustpay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars ($50.00),the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the C1.y have been paid by the Developer. 15. Material Testing The City maintains a list of pre-approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtain proof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand- delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: DEVELOPER: Development Coordination Office Lennar Homes of Texas Land and Construction, LTD City of Fort Worth 200 Texas Street 1707 Market Place Blvd. Suite 100 Fort Worth, Texas 76102 Irving, TX, 75063 With copies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 City of Fort Worth,Texas Page 7 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that,until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall,until the expiration of three(3)years after final payment under the contract,have access to and the right to examine any directly pertinent books,documents,papers and records of such contractor, involving transactions to the contract, and further,that City shall have access during normal working hours to all of the contractor's facilities,and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants, officers,contractors, subcontractors,and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents,representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co-employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers,agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and City of Fort Worth,Texas Page 8 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers,contractors,subcontractors,and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas,Fort Worth Division. 20. Non-Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose,their attorneys, have had the opportunity to review and comment on this document; therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. City of Fort Worth,Texas Page 9 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it:(1)does not boycott Israel;and(2)will not boycott Israel during the term of the contract. The term"boycott Israel"bas the meaning ascribed to it by Section 808.001 of the Texas Government Code. The term"company"bas the meaning ascribed to it by Section 2270.001 of the Texas Government Code. To the extent that Chapter 2270 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel;and(2)will not boycott Israel during the term of this Agreement. 26. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form(I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPED DEVELOPER'SEMPLOYEES,SUBCONTRACTORS,AGENTS,ORLICENSEES. City,upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 27. Amendment No amendment,modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof,and duly executed by the City and Developer. 28. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 29. No Third-Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise,to any other person or entity. City of Fort Worth,Texas Page 10 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI 30. Compliance with Laws,Ordinances,Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances,rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers,agents, servants, employees, or subcontractors,then Developer shall immediately desist from and correct such violation. 31. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order,resolution, ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 32. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. 33. Entire Agreement This written instrument,together with any attachments, exhibits,and appendices,constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENITONALLY BLANK] City of Fort Worth,Texas Page 11 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI 34. Cost Summary Sheet Project Name:Chisholm Trail Ranch, Section 1 Phase 3 CFA No.: CFA20-0118 City Project No.: 102815 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 156,915.00 2.Sewer Construction $ 126,910.50 Water and Sewer Construction Total $ 283,825.50 B. TPW Construction 1.Street $ 658,673.50 2.Storm Drain $ 114,837.00 3.Street Lights Installed by Developer $ 45,120.00 4. Signals $ - TPW Construction Cost Total $ 818,630.50 Total Construction Cost(excluding the fees): $ 1,102,456.00 Estimated Construction Fees: C. Construction Inspection Service Fee $36,750.00 D. Administrative Material Testing Service Fee $9,604.00 E. Water Testing Lab Fee $390.00 Total Estimated Construction Fees: $ 46,7".00 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,102,456.00 x Completion Agreement=100%/Holds Plat $ 1,102,456.00 Cash Escrow Water/Sanitary Sewer=125% $ 354,781.88 Cash Escrow Paving/Storm Drain=125% $ 1,023,288.13 Letter of Credit=125% $ 1,378,070.00 City of Fort Worth,Texas Page 12 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH DEVELOPER Lennar Homes of Texas Land and Dana a"hdoff Construction,LTD Dana Burehdoff(reb 10.2021 08:56 CST) Dana Burghdoff Assistant City Manager Jennifer Eller(Feb 5,202109.01 CST) 2/10/2021 Name:Jennifer Eller Date: Title: Authorized Agent Recommended by: Date: Feb 5,2021 Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Approved as to Form&Legality: Richard A.McCracken(Feb 8,202117:38 CST) Richard A. McCracken Contract Compliance Manager: Sr. Assistant Ci%attorney M&C No. �H By signing, I acknowledge that I am the person Date: responsible for the monitoring and � � administration of this contract,including Form 1295: N/A �� °FORr�a� ensuring all performance and reporting requirements. G o ATTEST: Gvo =d ° °a*�� �itrcie-Sca�CsltMot� °0000000° a Janie Scarlett Morales(Feb 8,202114:58 CST) ��� ���nEXA`•�oo. Name: Janie Scarlett Morales Mary J.Kayser/Ronald Gonzales Title: Development Manager City Secretary/Assistant City Secretary OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement Rev.10/5/19[NPC] FT.WORTH,TX The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments,the language in the main body of this Agreement shall be controlling. Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ❑ Attachment 2—Phased CFA Provisions ❑ Attachment 3 —Concurrent CFA Provisions ® Location Map ® Exhibit A: Water Improvements ® Exhibit A 1: Sewer Improvements ® Exhibit B: Paving Improvements ® Exhibit 13-1: Storm Drain Improvements ® Exhibit C: Street Lights and Signs Improvements ® Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Page 14 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI ATTACHNUNT "1" Changes to Standard Community Facilities Agreement City Project No. 102815 None City of Fort Worth,Texas Page 15 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI ATTACHMENT"2" Phased CFA Provision City Project No. 102815 The improvements being constructed by Developer pursuant to this Agreement will connect to improvements Developer is constructing under a separate Community Facilities Agreement that have not been completed and accepted by the City. Therefore, this Agreement shall be considered a"Phased CFA"and the provisions contained in this section shall apply to this Agreement. The improvements being constructed by Developer under the separate Community Facilities Agreement shall be defined as the "Parent Project." The improvements being constructed by Developer under this Agreement shall be defined as the "Child Project." Developer acknowledges and agrees that due to Developer's election to construct a Phased CFA,the potential exists for technical, delivery, acceptance or performance problems (hereinafter "Construction Problems"). Construction Problems may include, but are not limited to: failure of the improvements to comply with the approved plans or City Specifications; failure of the improvements in the Parent Project and the Child Project to properly connect to each other; changes to the design or construction of the improvements in the Parent Project that impact the design and construction of the improvements in the Child Project; construction delays, delay claims, or claims for liquidated damages; increased costs for the Developer; failure of the improvements to pass inspection or material testing; or rejection by the City of some or all of the improvements and Developer having to remove and reconstruct the improvements at Developer's expense. In addition, Developer understands and agrees that disputes may arise between Developer's contractors or their subcontractors relating to responsibility for the Construction Problems. Developer shall be solely responsible for resolving disputes between contractors or disputes between contractors and subcontractors. Developer further acknowledges and agrees that Developer has notified all of Developer's contractors for the Project that Developer has elected to construct a Phased CFA, the provisions of this section, the risks associated with a Phased CFA, and that the City shall not bear any responsibility for Developer's decision to proceed with a Phased CFA. Developer shall not make the final connection of the improvements in the Child Project to the improvements in the Parent Project until the improvements in the Parent Project have been constructed and accepted by the City and the City has consented to Developer making the connection. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more single family residential homes or structures, the City will not record the plat related to the Project until the improvements are constructed and accepted City of Fort Worth,Texas Page 16 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI by the City. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more commercial buildings or structures, the Developer shall not receive a Certificate of Occupancy from the City for the building(s) related to the Project until the improvements in this Agreement are constructed and accepted by the City. Developer further understands and agrees that completion of the improvements under this Agreement does not entitle Developer to obtain a final plat of the property until all other requirements of Federal law, State law, or the City Code relating to the filing and recording of a final plat have been met by Developer. BY CHOOSING TO CONSTRUCT A PHASED CFA, DEVELOPER ASSUMES ALL RISKS AND DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY AND ALL DAMAGES, INCLUDING BUT NOT LIMITED TO ANY AND ALL ECONOMICDAMAGESPROPERTYLOSS,PROPERTYDAMAGESANDPERSONAL INJURY, (INCL UOINGDEA TH), OFANYKIND OR CHARACTER, WHETHER REAL OR ASSERTED. DEVELOPER HEREBYEXPRESSLY RELEASESAND DISCHARGES CITY FROM ANY AND ALL LIABILITYFOR DAMAGES, INCLUDING, BUT NOT LIMITED TOANYANDALLECONOMICDAMAGES,PROPERTYLOSS,PROPERTY DAMAGEANO PERSONAL INJURY(INCLUOINGDEA TH)ARISING OUT OF OR IN CONNECTION WITH,DIRECTLYOR INDIRECTLY, THE CONSTRUCTION OF THE IMPR 0 VEMENTS OR DEVELOPER'S DECISION TO CONSTRUCTA PHASED CFA. DEVELOPER,AT ITS SOLE COST AND EXPENSE,AGREES TO AND D OES HEREB Y INDEMNIFY, DEFEND PROTECT, AND HOLD HARMLESS CITY, AND CITY'S OFFICERS, REPRESENTATIVES, AGENTS, EMPLOYEES, AND SERVANTS FOIE FROMANDAGAINSTANYANDALL CLAIMS(WHETHER ATLA W OR INEQUITI9, LIABILITIES, DAMAGES (INCLUDING ANY AND ALL ECONOMIC DAMAGES PR OPER TY L OSS, PR OPER TY DA MA GES AND PERSONAL INJURIES INCL UOING DEATH), LOSSES, LIENS, CAUSES OF ACTION, SUITS, JUDGMENTS AND EXPENSES (INCLUDING, BUT NOT LIMITED TO, COURT COSTS, ATTORNEYS' FEES AND COSTS OF INVESTIGATION), OF ANY NATURE, KIND OR DESCRIPTIONARISING OR ALLEGED TO ARISE BYOR IN ANY WAYRELATED TO CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CFA, OR (2) BY REASON OF ANY OTHER CLAIM WHATSOEVER OFANYPERSON OR PARTY OCCASIONED OR ALLEGED TO BE OCCASIONED IN WHOLE OR IN PART BY THE CONSTRUCTIONS OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CFA WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS,SERVANTS, OR EMPLOYEES. City of Fort Worth,Texas Page 17 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI DEVELOPER: LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION,LTD qnnlo A Jennifer Eller(Feb 5,202109:01 CST) Name: Jennifer Eller Title: Authorized Agent City of Fort Worth,Texas Page 18 of 18 Standard Community Facilities Agreement Rev.10/5/19[NPCI 00 42 43 DAP-BID PROPOSAL Page 1 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. I I I Measure Quantity UNIT I:WATER IMPROVEMENTS 1 3305.0109 Trench Safety 33 05 10 LF 2,100 $2.00 $ 4,200.00 2 3311.0001 Ductile Iron Water Fittings w/Restraint 331111 TN 0.37 $4,500.00 $ 1,665.00 3 3311.0241 8"Water Pipe 33 1110,331112 LF 2,100 $35.00 $ 73,500.00 4 3312.0001 Fire Hydrant 331240 EA 3 $4,250.00 $ 12,750.00 5 3312.2003 V Water Service 331210 EA 62 $950.00 $ 58,900.00 6 3312.3003 8"Gate Valve 33 12 20 EA 3 $1,300.00 $ 3,900.00 7 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 2 $1,000.00 $ 2,000.00 TOTAL UNIT I:WATER IMPROVEMENTS 5156,915.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Chisholm Vail Rmuh.Sectlon 1,Ph—III Fora,Version Seplanber 1,2015 City Project No.102815 00 42 43 DAP-BID PROPOSAL Page 2 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Infonnation Bidder's Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. Measure Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 1 3301.0002 Post-CCTV Inspection 330131 LF 997 $3.00 $ 2,991.00 2 3301.0101 Manhole Vacuum Testing 330130 EA 4 $175.00 $ 700.00 3 3305.0109 Trench Safety 330510 LF 997 $2.00 $ 1,994.00 4 3331.3101 4"Sewer Service 333150 EA 38 $700.00 $ 26,600.00 5 3331.4115 8"PVC Sewer Pipe 33 1110,33 3112,33 3120 LF 997 $46.00 $ 45,862.00 6 3331.4116 8"Sewer Pipe,C55 Backfill 33 1110,33 3112,33 3120 LF 70 $58.00 $ 4,060.00 7 3339.1001 4'Manhole 33 39 10,33 39 20 EA 4 $4,000.00 $ 16,000.00 8 3339.1003 4'Extra Depth Manhole 34 3910,33 39 20 VF }IX1J $185.00 $ 3,903.50 9 3305.0106 Manhole Adjustment,Major 33 05 14 EA 4 $3,500.00 $ 14,000.00 10 0000.0000 Adjust Existing Sanitary Service 000000 EA 24 $450.00 $ 10,800.00 TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $126,910.60 CITY OF FORT NORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Chisholm T-d Ronch.Seclion I,PJmse III Fomr Version Sepinnber 1,2015 City Projeci No.102815 00 42 43 DAP-BID PROPOSAL Page 3 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. I I I Measure Quantity UNIT III:DRAINAGE IMPROVEMENTS 1 3305.0109 Trench Safety 330510 LF 791 $2.00 $ 1,582.00 2 3341.0201 21"RCP,Class III 334110 LF 180 $55.00 $ 9,900.00 3 3341.0205 24"RCP,Class III 334110 LF 182 $60.00 $ 10,920.00 4 3341.0302 30"RCP,Gass III 334110 LF 353 $75.00 $ 26,475.00 5 3341.0309 36"RCP,Class III 334110 LF 76 $105.00 $ 7,980.00 6 3349.0001 4'Storm Junction Box 33 49 10 EA 2 $5,000.00 $ 10,000.00 7 3349.5001 10'Curb Inlet 33 49 20 EA 6 $3,400.00 $ 20,400.00 8 3349.6001 10'Recessed Inlet 33 49 20 EA 1 $4,400.00 $ 4,400.00 9 3349.5002 15'Curb Inlet 33 49 20 EA 3 $4,400.00 $ 13,200.00 30 3349.2003 24"Parallel Headwall,I pipe 33 49 40 EA 1 $2,500.00 $ 2,500.00 11 3349.3007 36"Straight Headwall,1 pipe 33 49 40 EA 1 $4,000.00 $ 4,000.00 12 3137.0104 Medium Stone Riprap,dry 313700 SY 24 $95.00 $ 2,280.00 13 3123.0101 Unclassified Excavation by Plan(Grade to Drain) 312316 CY 100 $12.00 $ 1,200.00 TOTAL UNIT III:DRAINAGE IMPROVEMENTS $114,837.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT'S-DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 1,Phase 111 Form Version September 1,2015 City Project No.102815 00 42 43 DAP-BID PROPOSAL Page 4 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. Measure Quantity UNIT IV:PAVING IMPROVEMENTS 1 3211.0400 Hydrated Lime 311129 TN 211 $180.00 $ 37,980.00 2 3211.0501 6"Lime Treatment 321129 SY 8,081 $3.00 $ 24,243.00 3 3211.0502 8"Lime Treatment 321129 SY 3,648 $3.50 $ 12,768.00 4 3213.0101 6"Conc Pvmt 321313 SY 7,581 $36.50 $ 276,706.50 5 3213.0105 10"Conc Pvmt 321313 SY 3,376 $60.00 $ 202,560.00 6 3213.0301 4"Conc Sidewalk 321320 SF 9,811 $4.00 $ 39,244.00 7 0241,1100 Remove Asphalt Pvmt 024115 SY 298 $12.00 $ 3,576.00 8 3212.0401 HMACTransltion 321216 TN 36 $200.00 $ 7,200.00 9 3292.0100 Block Sod Placement 329213 SY 2,367 $6.00 $ 14,202.00 10 3291.0100 Topsoil 329119 CY 263 $18.00 $ 4,734.00 11 3213.0506 Barrier Free Ramp,Type P-1 311320 EA 4 $1,200.00 $ 4,800.00 12 3213.0501 Barrier Free Ramp,Type R-1 321320 EA 8 $1,500.00 $ 12,000.00 13 3441.4003 Furnish/Install Alum Sign Ground Mount City Std.(R3-1) 344130 EA 5 $650.00 $ 3,250.00 14 3441.4003 Furnish/Install Alum Sign Ground Mount City Sid.(D3-1) 344130 EA 12 $250.00 $ 3,000.00 35 0241.0100 Remove Sidewalk 024113 SF 2,705 $2.00 $ 5,410.00 16 0241.0900 Remove Misc Conc Structure(Curb,Gutter and Pavement) 024113 LS 1 $2,500.00 $ 2,500.00 17 3471.0001 Traffic Control 324150 MO 2 $1,500.00 $ 3,000.00 18 0000.0000 Remove Type III Barricade 000000 EA 3 $S00.00 $ 1,500.00 TOTAL UNIT IV:PAVING IMPROVEMENTS $658,673.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Chisholm Trent Ranch Sectlan 1,Phare!!/ Foms Version September 1,2015 City Project No.102815 00 42 43 DAP-BID PROPOSAL Page 5 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. I I I Measure Quantity UNIT V:STREET LIGHTING IMPROVEMENTS 1 2605.3015 2"Conduit PVC Schedule 80(T) 344120 LF 648 $12.00 $ 7,776.00 2 3441.1410 NO 10 Insulated Elec Condr 354110 LF 1,944 $1.00 $ 1,944.00 3 3441.1646 Furnish/Install Type 33B Arm 364120 EA 9 $800.00 $ 7,200.00 4 3441.3050 Furnish/Install LED Lighting Fixture(70 watt ATBO Cobra Head) 374120 EA 14 $600.00 $ 8,400.00 5 3441.3301 Rdwy Illum Foundation TY 1,2,and 4 384120 EA 9 $1,000.00 $ 9,000.00 6 3441.3351 Furnish/Install Rdway Ilium TY 11 Pole 404120 EA 9 $1,200.00 $ 10,800.00 TOTAL UNIT V:STREET LIGHTS AND SIGNAGE IMPROVEMENTS $45,120.00 Bid Summary UNIT I:WATER IMPROVEMENTS $156,915.00 UNIT II:SANITARY SEWER IMPROVEMENTS $126 910.50 UNIT III:DRAINAGE IMPROVEMENTS _ $114,837.00 UNIT IV:PAVING IMPROVEMENTS _ $658 673.50 UNIT V:STREET LIGHTING IMPROVEMENTS _ $45 120.00 Total Construction Bid $1,102,456.00 This Bid is submitted by the entity named below: BIDDER: BY:Brock Hu gins Conatser Construction TX,L.P. 5327 Wichita Street Fort Worth,Texas 76119 TITLE: rCSI CJ2Y1 DATE: O`1/ O 6/2 v 1 Contractor agrees to complete WORK for FINAL ACCEPTANCE within ,L2'0 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Chi holm TM11 Ranch Section 1,Ph.,III Fonn Version Sept—ber I,2015 City Pr jecl No.102815 MORNING � r y BROOKWAV L- z W 3 F8 x CS 1 � y � . a J SITE U J McPHERSON BLVD = H Q o ¢ O y B AUTYBERRY > QN � STUART�FELTZ- 0 LL r z' O o J ON c) O U O _� \ I FORT WORTH (n I x X W � ' WEST CLEBURNE-CROWLEY ' HALL j �o x X W i MAPSCO NO: 102Z & 103W CU COUNCIL DISTRICT: 6 O C'j DEVELOPER/OWNER: CPN 102815 LENNAR CORPORATION a> i 1707 MARKET PLACE BLVD,SUITE 100 cN IRVING,TX 75063 E o (469) 587-5383 NOT TO SCALE I'M O I o CV PAPS-DAWSOM N rai ENGINEERS CHISHOLM TRAIL RANCH VICINITY MAP Oj DALLAS SAN ANTONIO I AUSTIN HOUSTON I FORT WORTH 10/30/2020 5810 TENNYSON PKWY, STE 425 1 PLANO, TX 75024 1 214.420.8494 N TEXAS BOARD OF PROFESSIONAL ENGINEERS FIRM REGISTRATION#470 O � W THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL. LOT 1,BLOCK 1 LOT 3,BLOCK 1 CHI SHOLN TRAIL RANCH I INSTRUMENT NUMBER I CHISHOLM TRAIL RANCH D218073631 INSTRUMENT NUMBER OPRTCT D213073631 OPRTCT W W O w PRO OSED "WL LOT 111,BLOCK K W CHISHOLM TRAIL RANCH v PAINT BRUSH TRAIL INSTRUMENT NUMBER D216078366 _ OPRTCT Lu 8" STUB LL RAIL MAP DRIVE w Ld Lu C) > �$ o Q Lu w co o ¢ � � o O o s o a d LL a Q U _> Cp T 23X,BLOCK K O C OLM TRAIL RANCH O_ W STRUMENT NUMBER LLI D218056554 O OPRTCT / ¢ CO -n O O -n O co CV X CONNECT TO CONNECT TO LLI EXISTING 8" EX_W EXISTING 8" Q WATERLINE WATERLINE j BEAUTYBERRY DRIVE (50'RIGHT-OF-WAY) •'� INSTRUMENT NUMBER D218056554 L OPRTCT X LLI C14 LEGEND u > U o '4: EXISTING. WATER LINE 0 nj A-:/ rn PROPOSED WATER LINE DEVELOPER/OWNER: a� LENNAR CORPORATION SCALE: 1"= 200' cn oN 1707 MARKET PLACE BLVD,SUITE 100 0 200 /E IRVING,TX 75063 o M (469)587-5383 CV PAPS-DAWSOM CN ENGINEERS CHISHOLM TRAIL RANCH 1,10) o' rai EXHIBIT A - WATER Oj DALLAS I SAN ANTONIO I AUSTIN I HOUSTON I FORT WORTH 10/30/2020 5810 TENNYSON PKWY, STE 425 1 PLANO, TX 75024 1 214.420.8494 CPN 102815 N TEXAS BOARD OF PROFESSIONAL ENGINEERS FIRM REGISTRATION#470 O THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL. y LOT 1,BLOCK 1 LOT 3,BLOCK 1 1 IIr(1 CHSHOLM TRAIL RANCH CINSTRUM TRAIL RANCH I INSTRUMENT NUMBER INSTRUMENT NUMBER D216073631 D OPRTCT31 OPRTCT OPRTCT 1 W D" lJ W LOT 1X,BLOCK K 1 W - CHISHOL TRAIL RANCH Q PAINT BRUSH TRAIL INSTRUMENT NUMBER C) — — — -4- D218078388 w PROPOS _ OPRTCT CONNECT TO Z 0 I EXISTING 4' K—A MANHOLE — ol TRAIL MAP DRIVE xl W w I U b fF 0) cr w aoa g WI N 3 J ¢ I G) 0 V LLI Q LL I 0 m U 1 O O p f O w W I OT 23K4 BLOCK K ISUA TRAIL RANCH („) I INSTRUMENT NUMBER c) W D218056554 O Lu OPRTCT O I y I \ I v' x LI W L� EX 10" U BEAUTYBERRY DRIVE (50'RIGHT-OF-WAY) L INSTRUMENT NUMBER x D218D56554 W OPRTCT C\1 Y > 0 LEGEND _o '4: j EXISTING SANITARY SEWER c PROPOSED SANITARY SEWER DEVELOPER OWNER: a) SCALE: 1"= 200' i 0 LENNAR CORPORATION N 1707 MARKET PLACE BLVD,SUITE 100 0 200 /Eo IRVING,TX 75063 M (469) 587-5383 N PAPS-DAWSOM N ENGINEERS CHISHOLM TRAIL RANCH 1,10) 0 rai EXHIBIT Al - SEWER O j DALLAS I SAN ANTONIO I AUSTIN I HOUSTON I FORT WORTH 10/30/2020 5810 TENNYSON PKWY, STE 425 1 PLANO, TX 75024 1 214.420.8494 C P N 102815 N TEXAS BOARD OF PROFESSIONAL ENGINEERS FIRM REGISTRATION#470 O � W THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL. LOT 1,BLOCK 1 CHISHOLM TRAIL RANCH INSTRUMENT NUMBER LOT 3.CHISHOLM BLOCK RAIL RI D218073631 ANCH OPRTCT INSTRUMENT NUMBER D218D73631 OPRTCT 1 0 W LOT 1X,BLOCK K l W .. (.a�•. -••- ° CHISHOLM TRAIL RANCH U INSTRUMENT NUMBER PAINT BRUSH TRA D216078366 CC �; OPRTCT W c w TRAIL MAP DRIVE W fir Lu o c ¢ p > Lu Jr 3 n rn CC : a I � Q Q W Y U w CO ¢ O U SOT 23X,BLOCK K N Lu CHISHOLM TRAIL RANCH 1-1 INSTRUMENT NUMBER -3 02IW56554 O OPRTCT O O 1 s 1n L X W Q BEAUTY BERRY DRIVE (50'RIGHT-OF-WAY) U INSTRUMENT NUMBER +� D218056554 OPRTCT L X W i LEGEND o v PROPOSED PAVEMENT o N SIDEWALK BY DEVELOPER c SIDEWALK BY HOMEBUILDER • •••••••••••• DEVELOPER OWNER: a> SCALE: 1"= 200' ADA RAMPS BY DEVELOPER O LENNAR CORPORATION 0 1707 MARKET PLACE BLVD,SUITE 100 0 200 E o IRVING,TX 75063 00 M (469)587-5383 CV PAPS-DAWSOM N ENGINEERS CHISHOLM TRAIL RANCH 1,10) o' rai EXHIBIT B - PAVING Oj DALLAS I SAN ANTONIO I AUSTIN I HOUSTON I FORT WORTH 10/30/2020 5810 TENNYSON PKWY, STE 425 1 PLANO, TX 75024 1 214.420.8494 CPN 102815 N TEXAS BOARD OF PROFESSIONAL ENGINEERS FIRM REGISTRATION#470 O � W THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL. ' J LOT 1,BLOCK 1 LOT 3,BLOCK 1 7rA( CHSNOLM TRAIL RANCH CINSTRUM TRAIL RANCH I INSTRUMENT NUMBER INSTRUMENT NUMBER D218073631 D21OD73531 OPRTCT OPRTCT ( �1 w 0 PROPOSED 24" RCP Lu t t L BLOCK K 1 w 4RCP HISHOLM TRAIL RANCH PAINT BRUSH TRAIL INSTRUMENT NUMBER D216078385 CC OPRTCT w PROPOSED 30;36C PROPOSED TRAIL MAP DRIVE > / CT Lu 3 I, U�~I7 a rjo& I w ¢ LU 32 O ,-z L w c p O _J O I Q !wl CO > p p / CHI OLLM TROT 23)4 AILL RAOCK N% Y INSTRUMENT NUMBER O W D2�RSBs54 TCT Lo PROPOSED 21" RCP o PROPOSED 24" RCP % x Xbi r PROPOSED 24" RCP / BEAJTYBERRY DRIVE (5D'RIGHT-OF-WAY) L INSTRUMENT NUMBER x 0218056554 LLB OPRTCT CV ;> LEGEND O U o t PROPOSED STORM DRAIN j El PIPE & JUNCTION BOX c PROPOSED CURB INLET • • DEVELOPER/OWNER: SCALE: 1"= 200' c2i LENNAR CORPORATION o PROPOSED HEADWALL 1707 MARKET PLACE BLVD,SUITE 100 0 200 CV / IRVING,TX 75063 r, (469)587-5383 CV PAPS-DAWSOM N ENGINEERS CHISHOLM TRAIL RANCH 21 rai EXHIBIT B1 - STORM DRAIN O j DALLAS SAN ANTONIO I AUSTIN HOUSTON I FORT WORTH 10/30/2020 5810 TENNYSON PKWY, STE 425 1 PLANO, TX 75024 1 214.420.8494 CPN 102815 N TEXAS BOARD OF PROFESSIONAL ENGINEERS FIRM REGISTRATION#470 O THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL. I C LOT 1,BLOCK I 1 ',. M TRAIL RANCH LOT 3,BLOCK 1 I NSTRUMENT NUMBER I C SHOLM TRAIL RANCH D216073831 NSTRUMENT NUMBER OPRTCT D218073931 1 OPRTCT LLJ O LL LOT%BLOCK K uJ CHISHOLM TRAIL RANCH rr PAINT BRUSH TRAIL INSTRUMENT NUMBER U D216D78366 cc OPRTCT Lu mrF TRAIL MAP DRIVE > rn w3 A 3 [C N of U&iR$ On W b > p C3 GF I O a - w Ir in t Uj Q) o � a rz o O rt _J J V) Q m � Y U w w O U -� O LOT 23X,BL K W CHISHOLM TRAIL RANCH INSTRUMENT NUMBER j D218OSB554 OPRTCT Lo co O O N .N� xYBE DRIVE LI w Q BEAUTYBERRY DRIVE L. (50'RIGHT-OF-WAY) U INSTRUMENT NUMBER / D218056554 OPRTCT L LI W C14 U o N LEGEND o •� PROPOSED STREET NAME SIGNS DEVELOPER/OWNER: °' SCALE: 1"= 200' a) LENNAR CORPORATION o PROPOSED STREET LIGHTS N 1707 MARKET PLACE BLVD,SUITE 100 0 200 / IRVING,TX 75063 CL M (469)587-5383 N PAPS-DAWSOM N ENGINEERS CHISHOLM TRAIL RANCH 1,10) 0 rai EXHIBIT Cl - STREET NAME SIGNS & STREET LIGHTS Oj DALLAS I SAN ANTONIO I AUSTIN I HOUSTON I FORT WORTH 10/30/2020 5810 TENNYSON PKWY, STE 425 1 PLANO, TX 75024 1 214.420.8494 CPN 102815 N TEXAS BOARD OF PROFESSIONAL ENGINEERS FIRM REGISTRATION#470 � N O � w THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL.