Loading...
HomeMy WebLinkAboutContract 54016-AR1 CSC No.54016-AR1 FORT WORTH City of Fort Worth Construction Allowance Request Project Na.mel Water and Sanitary Sewer Replacement Contract 2016 WSM-F,Part 2 City Sec No. 1 54016 Project No.(s) 59601-0600430•CO2727-CO1783 M&C: 20-0305 City Pro].No.1 2727 Project Description,l: Water,Sanitary Sewer and Paving Improvements on Mount Vernon Avenue,Newark Avenue Sanderson Avenue and Crestview Drive Contractor: Gra-Tex Utilities,Inc. Allowance No: Dale; 12/7/2020 City Project Mgr.1 J,Chris Underwood City Inspector: I Pedro Hernandez Phone Number: 817-392-2629 71 Phone Number: 817-992-3991 Dept, Water Sewer Paving Totals Contract Time Calender days) Original Contract Amount $2,625,868.25 $100,587.00 $1,283,697.75 4,,W0;1 10-'0 365 Previous Allowances Allocated SO.00 $0.00 $0.00 $0.00 0 Amount of Proposed Allocation $25,981.80 $0.00 $0.00 $251981,80 0 Original Allowance Available for Allocation $120,000.00 1 $10,000-00 $45,000.00 $'175,000.00 Remaining Funds Available for this Allocation $ 20;000.00 $10,0100;00' $45,000:00 $175,000,00 Revised Contract Time 365 JUSTIFICATION(REASONS)FOR ALLOWANCE Allowance No. 1 will provide reimbursement for emergency water main repair and paving repair on East Lancaster Avenue(TXDOT Right-of-way). The allowance,will also allow for the removal and replacement of existing storm drain that was encountered in direct conflict during water main installation at Crestview Drive and Martel Avenue intersection. i i I It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request, Contradtor's Con any Name Contractor Name C nlr for signature Date Gra-Tex Utilities,Inc. Jim Brent � Inspector Date F?roj ct ana er Date Vector.(Water Dept) Dale Con trucllo S perviso _fP1P epl bate :.e.� Feb 5,2021 Assistant City Attorney Date A3Sislarht City Ma agar Date Nor, Feb 8,2021 kwal ,� a5, eb 10,2021 OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX FORT WORTH City of Fort Worth Construction Allowance Request Project Name Water and Sanitary Sewer Replacement Contract 2016 WSM-F,Part 2 City Sec No. EEF6 Project No.(s) 59601-0600430-CO2727-CO1783 M&C: 20 0305 City Proj.No. 2727 Project Water,Sanitary Sewer and Paving Improvements on Mount Vernon Avenue,Newark Avenue Sanderson Avenue and Description Crestview Drive Contractor Gra-Tex Utilities,Inc. Allowance No: [= Date: 1217/2020 City Project Mgr. J.Chris Underwood City Inspector r Pedro Hernandez CONSTRUCTION ALLOWANCE ITEMS TO HE ADDED —ITEM-- MORIPTION DEPT Qty Unit Unit Cost Total W-56 45'of TxDOT Trench Repair(8"Reinforced HES Concrete Base) Water 1 LS $8,790.00 $8,790.00 and Full Lane width HMAC mill and Overlay W-57 Re-Chlorination of 12"Water Line Water 1 LS $2,050.00 $2,050.00 W-59 Traffic Control for E.Lancaster and Road Closure for Newark Water 1 LS $1,295.00 $1,295.00 W-59 Furnish and Install 30"RCP Storm Drain(Labor,Material&Equipment) Water 44 LF J$223.00 $9,812.00 W-60 Furnish and Install 24"RCP Storm Drain(Labor,Material&Equipment) Water 20 LF $201.74 $4,034.80 I Water $25,981.80 Sewer Paving Page 2 of 4 JAdditions Sub Total $25,981.80 FORT WOF2TH City of Fort Worth Construction Allowance Request Project Name Water and Sanitary Sewer Replacement Contract 2016 WSM-F,Part 2 City Sec No. 1 54016 Project No.(s) 59601-0600430-CO2727-CO1783 I M&C: 20 0305 City Proj.No. 2727 Project Description Water,Sanitary Sewer and Paving Improvements on Mount Vernon Avenue,Newark Avenue Sanderson Avenue and Crestview Drive Contractor Gra-Tex Utilities, Inc. Allowance No: = Date 1 21712 0 2 0 City Project Mgr. J.Chris Underwood City Inspector Pedro Hernandez CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Water Sewer Paving Page 3 of 4 Deletions Sub Total M1WBE Breakdown for this Change Order MWBE Sub Type;of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 4 of 4 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. o S KgnatL:e _ � 4�i2�S �l.�lfllrj2.Wc�� Name of Employee Sa. au Title 4 a pp fOR)" ATTEST: pp� °°°°°°°°00 a� 000 S=d ° 9 Mary J. Kayser �1 ° i�� City Secretary �aa��00000 4p OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX