Project Na.mel Water and Sanitary Sewer Replacement Contract 2016 WSM-F,Part 2 City Sec No. 1 54016
Project No.(s) 59601-0600430•CO2727-CO1783 M&C: 20-0305 City Pro].No.1 2727
Project Description,l: Water,Sanitary Sewer and Paving Improvements on Mount Vernon Avenue,Newark Avenue Sanderson Avenue and
Crestview Drive
Contractor: Gra-Tex Utilities,Inc. Allowance No: Dale; 12/7/2020
City Project Mgr.1 J,Chris Underwood City Inspector: I Pedro Hernandez
Phone Number: 817-392-2629 71 Phone Number: 817-992-3991
Dept, Water Sewer Paving Totals Contract Time
Calender days)
Original Contract Amount $2,625,868.25 $100,587.00 $1,283,697.75 4,,W0;1 10-'0 365
Previous Allowances Allocated SO.00 $0.00 $0.00 $0.00 0
Amount of Proposed Allocation $25,981.80 $0.00 $0.00 $251981,80 0
Original Allowance Available for Allocation $120,000.00 1 $10,000-00 $45,000.00 $'175,000.00
Remaining Funds Available for this Allocation $ 20;000.00 $10,0100;00' $45,000:00 $175,000,00
Revised Contract Time 365
JUSTIFICATION(REASONS)FOR ALLOWANCE
Allowance No. 1 will provide reimbursement for emergency water main repair and paving repair on East
Lancaster Avenue(TXDOT Right-of-way). The allowance,will also allow for the removal and replacement
of existing storm drain that was encountered in direct conflict during water main installation at Crestview
Drive and Martel Avenue intersection.
i
i
I
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request,
Contradtor's Con any Name Contractor Name C nlr for signature Date
Gra-Tex Utilities,Inc. Jim Brent �
Inspector Date F?roj ct ana er Date
Vector.(Water Dept) Dale Con trucllo S perviso _fP1P epl bate
:.e.� Feb 5,2021
Assistant City Attorney Date A3Sislarht City Ma agar Date
Nor, Feb 8,2021 kwal ,� a5, eb 10,2021
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
FORT WORTH City of Fort Worth
Construction Allowance Request
Project Name Water and Sanitary Sewer Replacement Contract 2016 WSM-F,Part 2 City Sec No. EEF6
Project No.(s) 59601-0600430-CO2727-CO1783 M&C: 20 0305 City Proj.No. 2727
Project Water,Sanitary Sewer and Paving Improvements on Mount Vernon Avenue,Newark Avenue Sanderson Avenue and
Description Crestview Drive
Contractor Gra-Tex Utilities,Inc. Allowance No: [= Date: 1217/2020
City Project Mgr. J.Chris Underwood City Inspector r Pedro Hernandez
CONSTRUCTION ALLOWANCE ITEMS TO HE ADDED
—ITEM-- MORIPTION DEPT Qty Unit Unit Cost Total
W-56 45'of TxDOT Trench Repair(8"Reinforced HES Concrete Base) Water 1 LS $8,790.00 $8,790.00
and Full Lane width HMAC mill and Overlay
W-57 Re-Chlorination of 12"Water Line Water 1 LS $2,050.00 $2,050.00
W-59 Traffic Control for E.Lancaster and Road Closure for Newark Water 1 LS $1,295.00 $1,295.00
W-59 Furnish and Install 30"RCP Storm Drain(Labor,Material&Equipment) Water 44 LF J$223.00 $9,812.00
W-60 Furnish and Install 24"RCP Storm Drain(Labor,Material&Equipment) Water 20 LF $201.74 $4,034.80
I
Water $25,981.80
Sewer
Paving
Page 2 of 4 JAdditions Sub Total $25,981.80
FORT WOF2TH City of Fort Worth
Construction Allowance Request
Project Name Water and Sanitary Sewer Replacement Contract 2016 WSM-F,Part 2 City Sec No. 1 54016
Project No.(s) 59601-0600430-CO2727-CO1783 I M&C: 20 0305 City Proj.No. 2727
Project Description Water,Sanitary Sewer and Paving Improvements on Mount Vernon Avenue,Newark Avenue Sanderson Avenue
and Crestview Drive
Contractor Gra-Tex Utilities, Inc. Allowance No: = Date 1 21712 0 2 0
City Project Mgr. J.Chris Underwood City Inspector Pedro Hernandez
CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Sewer
Paving
Page 3 of 4 Deletions Sub Total
M1WBE Breakdown for this Change Order
MWBE Sub Type;of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
o
S KgnatL:e
_ � 4�i2�S �l.�lfllrj2.Wc��
Name of Employee
Sa. au
Title
4 a
pp fOR)"
ATTEST: pp� °°°°°°°°00 a�
000 S=d
°
9
Mary J. Kayser �1 ° i��
City Secretary �aa��00000 4p
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX