HomeMy WebLinkAboutContract 49245-FP1 FORTWORTH CSC No.49245-FP1
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
S NOTICE OF PROJECT COMPLETION � �^
C s e,4
DOE. Ns: 6913
Regarding contract 49245 for Sanitary Sewer Rehabilitation Contract 82 as required by the Water Department as
approved by City Council on 8/7/17 through M&C C-28266 the Director of the Water Department,upon the
recommendation of the Sr. Capital Projects Officer, Capital Projects Delivery,Water Department,has accepted the
project as complete.
Original Contract Prices: $2,732,782.00
Amount of Approved Change Orders: $6.00 Ns 4 1
Revised Contract Amount: $2,732,788.00
Total Cost Work Completed: $2,280,441.97
Less Deductions:
Liquidated Damages: Days @$630.00/Day
Other Deductions(see comments):
Total Deduction Amount: $0.00
Total Cost Work Completed: $2,280,441.97
Less Previous Payments: $2,220,213.57
Final Payment Due $60,228.40
v nt) S o e 3 a12— 0
Recommended for Acceptance Date
SR. Capital Projects Officer Capital Projects Delivery
Chris--apher r Feb 15 2021
Christopher Harder(Feb 10,202116:05 CSC 7
Accepted Date
Director, Water Department
2021
Dana Burghdoff(Feb 10,20 19:38 CS
Feb 15,
City Manager Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Project Name: Sanitaq,Sewer Rehabilitation Contract 82 DOE. Ns: 6913
Comments:
Sanitary Sewer Rehabilitation Contract 82
Reason for Delays
• Several Franchise utilities were in the existing ditch line,which necessitated some redesign.
• One of the existing line that was to be replaced had a gas line in the ditch line in a narrow alley.
After Waiting 9 months for the gas to be relocated, it was removed from the contract.
c5 Q4424s
City Project Numbers 01501 DOE Number 6913
Contract Name Sanitary Sewer Rehabilitation,contract 82 Estimate Number 21
Contract Limits Council District 2 Payment Number 21
Project Type Water -a U IG�3 For Period Ending 1/31/2020
Project Funding Ho
Project Manager Conlon City Secretary Contract Number 49245
Inspectors Johnson / Garcia Contract Date 8/7/2017
Contractor CONATSER CONSTRUCTION TxLP Contract Time 300 CD
5327 WICHITA ST Days Charged to Date 390 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
----------------------------
5 lUul-- UlCON -C bt-CgE-TAlk)
2 5gLp0-(W 1 2 l M LM UCH 3-7,hll2.03 +_ l ln;�52,3� Sy, 15LI.�33
I
Total Cost of Work Completed $2,280,441.97
Less 0 %Retained $0.00
Net Earned $2,280,441.97
Earned This Period $60,228.40
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $2,220,213.57
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $60,228.40
Thursday,January 30,2020 Page 6 of 6
FORT NORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name Sanitary Sewer Rehabilitation,contract 82
Contract Limits Council District 2
Project Type Sewer
City Project Numbers 01501
DOE Number 6913
Estimate Number 21 Payment Number 21 For Period Ending 1/31/2020
CD
City Secretary Contract Number 49245 Contract Time 30(YD
Contract Date 8/7/2017 Days Charged to Date 390
Project Manager Conlon Contract is 83.000 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors Johnson / Garcia
Thursday,January 30,2020 Page 1 of 6
City Project Numbers 01501 DOE Number 6913
Contract Name Sanitary Sewer Rehabilitation,contract 82 Estimate Number 21
Contract Limits Council District 2 Payment Number 21
Project Type Sewer For Period Ending 1/31/2020
Project Funding
Unit I Sanitary Sewer Improvements
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 12"Sewer Pipe(SDR26)(CO#1) 2832 LF $68.50 $193,992.00 2832 $193,992.00
2 12"Sewer(DIP w/Protecto 401)(CO#1) 1001 LF $96.00 $96,096.00 1001 $96,096.00
3 10"to 12"Pipe Enlargement(HDPE) 220 LF $120.00 $26,400.00 218 $26,160.00
4 12"Sewer Pipe By Other Than Open Cu 140 LF $250.00 $35,000.00 140 $35,000.00
5 8"Sewer Pipe(SDR26) 4231 LF $50.00 $211,550.00 2633 $131,650.00
6 8"Sewer Pipe(DIP w/Protecto 401) 3179 LF $70.00 $222,530.00 584 $40,880.00
7 8"Sewer Pipe(C900 DR14) 53 LF $65.00 $3,445.00
8 6"to 8"Pipe Enlargement(HDPE) 1907 LF $100.00 $190,700.00 3425 $342,500.00
9 8"Sewer Pipe By Other Than Open Cut(CO#1) 0 LF $230.00 $0.00
10 12"Sewer Carrier Pipe(DIP)w/Spac 68 LF $75.00 $5,100.00 68 $5,100.00
11 20"Steel Casing by Other Than Open 68 LF $275.00 $18,700.00 68 $18,700.00
12 Sag Adjustment for Pipes Installed b(CO#1) 73.5 LF $600.00 $44,100.00 73 $43,800.00
13 Pre CCTV Inspection 7560 LF $4.00 $30,240.00 10073 $40,292.00
14 Exploratory Excavation of Existing U 16 EA $800.00 $12,800.00 19 $15,200.00
15 SWPPP>I acre I LS $5,000.00 $5,000.00 1 $5,000.00
16 Traffic Control 12 MO $5,500.00 $66,000.00 12 $66,000.00
17 4'Manhole 62 EA $5,000.00 $310,000.00 57 $285,000.00
18 4'Drop Manhole(Single Drop) 11 EA $5,500.00 $60,500.00 11 $60,500.00
19 4'Drop Manhole(Double Drop) 2 EA $6,000.00 $12,000.00 2 $12,000.00
20 4'Shallow Manhole 1 EA $4,000.00 $4,000.00
21 4'Extra Depth Manhole 257 VF $175.00 $44,975.00 218.17 $38,179.75
22 Epoxy Manhole Liner 263 VF $185.00 $48,655.00 152.8 $28,268.00
23 Concrete Collar 76 EA $400.00 $30,400.00 70 $28,000.00
24 Service Reinstatement,Pipe Enlargem 13 EA $1,000.00 $13,000.00 38 $38,000.00
25 4"Sewer Service 142 EA $800.00 $113,600.00 86 $68,800.00
26 4"Sewer Service,Private Relocation 90 LF $260.00 $23,400.00 210 $54,600.00
27 6"Sewer Service 49 EA $880.00 $43,120.00
28 Imported Embedment/Backfill,CSS 13 CY $50.00 $650.00 13 $650.00
29 Imported Embedment/Backfill,Select 56 CY $45.00 $2,520.00 40 $1,800.00
30 Trench Safety 11652 LF $4.00 $46,608.00 7118 $28,472.00
31 Manhole Vacuum Testing 76 EA $150.00 $11,400.00 70 $10,500.00
Thursday,January 30,2020 Page 2 of 6
City Project Numbers 01501 DOE Number 6913
Contract Name Sanitary Sewer Rehabilitation,contract 82 Estimate Number 21
Contract Limits Council District 2 Payment Number 21
Project Type Sewer For Period Ending 1/31/2020
Project Funding
32 Post-CCTV Inspection 14521 LF $3.00 $43,563.00 13459 $40,377.00
33 Remove 4'Sewer Manhole 42 EA $750.00 $31,500.00 39 $29,250.00
34 Sanitary Line Grouting for Pipe Aban 54 CY $250.00 $13,500.00
35 6"Sewer Abandonment Plug 20 EA $500.00 $10,000.00
36 8"Sewer Abandonment Plug 25 EA $550.00 $13,750.00
37 10"Sewer Abandonment Plug 4 EA $600.00 $2,400.00
38 Large Stone Riprap,dry-AS DIRECTE 100 SY $85.00 $8,500.00 95 $8,075.00
39 5'Wide Asphalt Pvmt Repair,Residen 853 LF $40.00 $34,120.00 353 $14,120.00
40 6'Wide Asphalt Pvmt Repair,Residen 123 LF $48.00 $5,904.00 30 $1,440.00
41 7'Wide Asphalt Pvmt Repair,Residen 13 LF $56.00 $728.00 35 $1,960.00
42 8'Wide Asphalt Pvmt Repair,Residen 156 LF $64.00 $9,984.00 131 $8,384.00
43 10'Wide Asphalt Pvmt Repair,Reside 661 LF $80.00 $52,880.00 370 $29,600.00
44 Asphalt Pvmt Repair Beyond Defined W 75 SY $100.00 $7,500.00 155 $15,500.00
45 5'Wide Asphalt Pvmt Repair,Arteria 34 LF $42.00 $1,428.00 34 $1,428.00
46 5'Wide Asphalt Pvmt Repair,Industr 90 LF $50.00 $4,500.00
47 6'Wide Asphalt Pvmt Repair,Industr 72 LF $60.00 $4,320.00
48 8'Wide Asphalt Pvmt Repair,Industr 38 LF $80.00 $3,040.00
49 10'Wide Asphalt Pvmt Repair,Indust 25 LF $100.00 $2,500.00
50 Asphalt Pvmt Repair Beyond Defined W 18 SY $130.00 $2,340.00
51 Airport Asphalt Pvmt Repair 413 SY $75.00 $30,975.00 416.4 $31,230.00
52 Airport Cone Pvmt Repair 35 SY $95.00 $3,325.00
53 5"Concrete Driveway 246 SF $7.00 $1,722.00 2130.7 $14,914.90
54 6"Concrete Driveway 828 SF $8.00 $6,624.00 2109.03 $16,872.24
55 Cone Pvmt Repair,Residential 135 SY $75.00 $10,125.00 60.44 $4,533.00
56 Cone Pvmt Repair,Arterial/Industria 106 SY $85.00 $9,010.00
57 4"Cone Sidewalk 198 SF $6.00 $1,188.00 553.43 $3,320.58
58 6"Flex Base,Type A,Gr-2 131 SY $12.00 $1,572.00 40 $480.00
59 6"Cone Curb and Gutter 126 LF $30.00 $3,780.00 272 $8,160.00
60 Block Sod Placement 4854 SY $6.00 $29,124.00 4850 $29,100.00
61 Seeding,Hydromulch 10479 SY $2.00 $20,958.00 10479 $20,958.00
62 6'Fences,Wood 15 LF $45.00 $675.00 15 $675.00
63 6'Chain Link,Steel 60 LF $55.00 $3,300.00 15 $825.00
64 6'Chain Link,Aluminum 136 LF $75.00 $10,200.00 30 $2,250.00
65 6'Steel Tube Fence 30 LF $80.00 $2,400.00 30 $2,400.00
Thursday,January 30,2020 Page 3 of 6
City Project Numbers 01501 DOE Number 6913
Contract Name Sanitary Sewer Rehabilitation,contract 82 Estimate Number 21
Contract Limits Council District 2 Payment Number 21
Project Type Sewer For Period Ending 1/31/2020
Project Funding
66 8'Steel Tube Fence 53 LF $90.00 $4,770.00 50 $4,500.00
67 Imported Embedment/Backfill,Crushed 150 CY $45.00 $6,750.00 80 $3,600.00
68 Imported Embedment/Backfill,Ballast 150 CY $50.00 $7,500.00 50 $2,500.00
69 6"Waterline Lowering 2 EA $5,000.00 $10,000.00
70 8"Waterline Lowering 4 EA $6,000.00 $24,000.00
71 10"Waterline Lowering 1 EA $8,500.00 $8,500.00
72 12"Waterline Lowering 2 EA $12,000.00 $24,000.00 1 $12,000.00
73 Construction Staking I LS $48,000.00 $48,000.00 1 $48,000.00
74 Construction Survey I LS $4,000.00 $4,000.00 1 $4,000.00
75 Construction Allowance 1 LS $70,000.00 $70,000.00
76 6-Inch CIPP(cured in place pipe)(CO#1) 1222 LF $62.50 $76,375.00 1154 $72,125.00
77 8-Inch CIPP(CO#1) 1094 LF $58.00 $63,452.00 1394 $80,852.00
78 10-Inch CIPP(CO#1) 496 LF $68.75 $34,100.00 78 $5,362.50
79 Internal Reconnect of Services 9 EA $480.00 $4,320.00 28 $13,440.00
--------------------------------------
Sub-Total of Previous Unit $2,699,683.00 $2,247,371.97
Unit 11 Water Improvements
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 8"Water Pipe 325 LF $60.00 $19,500.00 447 $26,820.00
2 6"x6"Tapping Sleeve&Valve 1 EA $3,000.00 $3,000.00 1 $3,000.00
3 Ductile Iron Water Fittings 0.25 TO $6,500.00 $1,625.00 0.5 $3,250.00
4 4"-12"Pressure Plug 2 EA $600.00 $1,200.00
5 5'Wide Asphalt Pvmt Repair,Residen 50 LF $40.00 $2,000.00
6 6"Concrete Driveway 175 SF $8.00 $1,400.00
7 4"Cone Sidewalk 575 SF $6.00 $3,450.00
8 6"Cone Curb and Gutter 15 LF $30.00 $450.00
9 Block Sod Placement 80 SY $6.00 $480.00
--------------------------------------
Sub-Total of Previous Unit $33,105.00 $33,070.00
--------------------------------------
Thursday,January 30,2020 Page 4 of 6
City Project Numbers 01501 DOE Number 6913
Contract Name Sanitary Sewer Rehabilitation,contract 82 Estimate Number 21
Contract Limits Council District 2 Payment Number 21
Project Type Water For Period Ending 1/31/2020
Project Funding
Contract Information Summary
Original Contract Amount $3,243,532.00
Change Orders
Change Order Number 1 $6.00
Total Contract Price $2,732,788.00
LDate — (�— Total Cost of Work Completed $2,280,441.97
C ntr ctor Less 0 %Retained $0.00
/^ 3 Net Earned $2,280,441.97
Date! Earned This Period $60,228.40
Ins ection Sup rvis
sV
SC J v 'h �tw- 1 Retainage This Period $0.00
v n Date � a12(�
Less Liquidated Damages
Project Manager
A, � Days @ /Day $0.00
MI ( Date LessPavement Deficiency $0.00
Asst.Director/lPW Less Penalty $0.00
Christopher harder Less Previous Payment $2,220,213.57
Christopher arder(Feb10,202116:05CST) Date
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $60,228.40
Thursday,January 30,2020 Page 5 of 6
FORTWORTH rev 03/05/07
WATER ENGINEERING&FISCAL SERVICES
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:21
NAME OF PROJECT: Sanitary Sewer Rehabilitation Contract 82
PROJECT NO.: 5907-0700430-C-01501-001783 CONTRACTOR: Conatser Construction TX
CITY PROJECT 1501
PERIOD FROM:08/07/17 TO: 01/30/20 FINAL INSPECTION DATE: 11/19/2019
WORK ORDER EFFECTIVE:8/7/2017 CONTRACT TIME: f-'Lf 3 qOF 0 WD Q CD
DAY OF DAYS CHARGED REASON FOR DAYS DAY OF DAYS CHARGED REASON FOR DAYS
MONTH DURING CREDITED MONTH DURING CREDITED
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS
THIS 0 0
PERIOD
PREVIOUS
300 300
PERIOD
TOTALS 300 300
TO DATE
*REMARKS:
¢ONTRAC 'OR DATE INSPECTOR DATE
Capital Projects Delivery,Water Department
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-4477•Fax: (817)392-8460
FORT WORTH
WATER ENGINEERING &FISCAL SERVICES
PIPE REPORT FOR:
PROJECT NAME: Sanitary Sewer Rehabilitation Contract 82
PROJECT NUMBER: 59601-0600430-001501-001783,59607-0700430-C1501-CO1783
DOE NUMBER: 6913
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Water 8-Inch PVC 447
FIRE HYDRANTS: 0 VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
Water 6-Inch Cast Iron 447
DENSITIES: 3
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
Sewer 12-Inch PVC-SDR 26 2972
Sewer 12-Inch DIP 1069
Sewer 12-Inch HDPE 218
Sewer 8-Inch PVC-SDR 26 2633
Sewer 8-Inch DIP 584
Sewer 8-Inch HDPE 3425
PIPE ABANDONED SIZE TYPE OF PIPE LF
Sewer 10-Inch Concrete 4259
Sewer 6-Inch VCP 6642
DENSITIES: 36
NEW SERVICES:
WATER ENGINEERING&FISCAL SERVICES
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-4477•Fax:(817)392-8460
FORTWORTHREV:02/22/07
Capital Projects Delivery,Water Department
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 30-Jan-20
Name of Contractor Project Name
Conatser Construction TX,LP Sanitary Sewer Rehabilitation Contract 82
Water Engineering Inspector Project Manager
Virginia Wade Liam Conlon
DOENionber Project Diffilculty T}pe of Contract
6913 Q Simple Q Routine QQ Complex ❑� Water D Waste Water ❑Storm Drainage ❑ Pavement
Initial ContractAniount Final ContractAniount
$2,732,782.00 $2,732,788.00
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature Inspector L V 141 N#A VM m
Signature Inspector's Supervisor
INSPECTOR'S COMMENTS
Capital Projects Delivery,Water Department
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-4477•Fax: (817)392-8460
FORTWORTHREV:02/20/07
Capital Projects Delivery,Water Department
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Conatser Construction TX LP Sanitary Sewer Rehabilitaton Contract 82
Water Engineering Inspector DOE Number
Virginia Wade 6913
Water Engineering Inspector Project Manager
Q Water Q Waste Water ❑ Storm Drainage ❑ Pavement Liam Conlon
Initial Contract Amount Project Difficulty
$2,732,782.00 0 Simple 0 Routine DQ Complex
Final Contract Amount Date
$2,732,788.00 1/30/2020
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 3 20 15
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 3 60 45
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 366
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 366
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS] x 100%) 366 / 448 = 82%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >M%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature Inspector l '�—V t�6'tN tta k/t�pty Signature Contractor
Signature Inspector's Supervisor
CONTRACTOR'S COMMENTS
Capital Projects Delivery,'Vater Department
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-4477•Fax: (817)392-8460
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Construction TX LP, known to me to be a credible person, who
being by me duly sworn, upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
CONTRACT 82
SANITARY SEWER REHABILITATION,
IMPROVEMENTS
DOE#: N/A
CFA PRJ#: N/A
CITY PROJCT #: 101507
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
A /nK I ..
Brock Huggins
Subscribed and sworn to before me this 30th day of January, 2020 ,
Notary Public in Tarrant County, Texas
BERTHA rIANULIS
Noh:ry Public,State of Texas
My Commission Expires
S ePtember 18, 20��
FORT WORTH City of Fort Worth �-.r'jY8E0REI'ARY
Change Order Request - ^,�,;Trac�. a'fS-GOa
F C� Project Name: Sanitary Sewer Rehabilitation, Contract 82 City Sec No.: F 49245
,
Project No.(s): 59601/59607-060043010700430-CO1501-CO 1783 DOE No. 6913 CityProj.No.:l 01501
Project Description: Sanitary Sewer rehabilitation located in the area south of Meacham International Airport
Contractor: Conatser Construction TX, LP Change Order# 0 Date: 1/30/2020
City Project Mgr.1 Liam Conlon City Inspector: I David Johnson
Phone Number: 817-392-6824 Phone Number 817-392-8455
Dept. Sewer Water Totals Contract Time
(Calender days)
Original Contract Amount $2,699,683.00 $33,105.00 $2,732,788.00 270
Extras to Date $6.00 $6.00 030
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $2,699,689.00 $33,105.00 $2,732,794.00 300
$0.00 $0.00 $0.00 090
Revised Contract Amount $2,699,689.00 $33,105.00 $2,732,794.00 390
Original Funds Available for Change Orders $135,000.00 $6,700.00 $141,700.00
Remaining Funds Available for this CO $134,994,00 $6,700.00 $141,694.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $3,415,985.00
JUSTIFICATION (REASONS)FOR CHANGE ORDER
The change order will provide 90 additional calendar days on the project for delays resulting from waiting for
Atmos Gas Company to relocate a gas main in direct conflict with a project sanitary sewer main.
led
OY° °'� �•t
10
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name Contractor Signature Date
Conatser Construction TX, LP Jesus Martinez
Inspector Date Projeof Man g r Date
�N Vr2�in►i�! bclitAi� 3��3-iyi Oitr. �o cr nr I n o A I Wo2V
Director(Water Dep Date Co'struction Supervisor(Water Dept) Date
Zv
As 'stant ' rney Date Assistant City Manager Date
Council Action(If Require )
M&C Number N/A —� M&C Date Approved N/A
T City of Fort Worth
Change ®ruler Additions
Project Name Sanitary Sewer Rehabilitation, Contract 82 City Sec No.: 49245
Project No.(s): 59601/59607-0600430/0700430-001501-001783 DOE No. 6913 City Proj. No.: 01501
Project Description Sanitary Sewer rehabilitation located in the area south of Meacham International Airport
Contractor Conatser Construction TX, LP I Change Order:® Date: 1/30/2020
City Project Mgr. Liam Conlon City Inspector David Johnson
ADDITIONS
fTl� LZ:l�lP1ln DEPT City Unit Unit Cost p I otal
P4
Sewer
Water
Page 2 of 4 Additions Sub Total
City of Poet Worth
Change Order Deletions
Project Name Sanitary Sewer Rehabilitation, Contract 82 City Sec No.: 49245
Project No.(s): 59601/59607-0600430/0700430-001501-00178 DOE No. 6913 City Proj. No.: 01501
Project Description Sanitary Sewer rehabilitation located in the area south of Meacham International Airport
Contractor Conatser Construction TX, LP Change Order: M Date 1/30/2020
City Project Mgr, Liam Conlon City Inspector: David Johnson
DELETIONS
I I EM DESCRIP T ION DEPT I City JUnit Unit Cost Total
Sewer
Water
Page 3 of 4 Deletions Sub Total
IWWEE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature .
Uhl u U
Name of Employee
s� cG : 1 Pr ON <<� �Q/'
Title
i
FORTWORTH
January 30,2020
Conatser Construction TX,LP
5327 Wichita St.
Fort Worth,TX 76119
Re:Acceptance Letter
Project Name: Sanitary Sewer Rehabilitation,Contract 82
Project Type: Sewer,Water
Project Ns: 01501
DOE.Ns: 6913
Contract Ns: 49245 Dated: 8/7/2017
Gentleman:
On November 19,2019 a final inspection was made on the subject project. There were punch list items
identified at the time. The punch list items were completed on December 03,2019. The final inspection and the
corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore
accepted by the City. The warranty period will start on December 03,2019,which is the date of punch list
completion and will extend for (2)years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance,please feel free to contact me at(817) 392-6054
Yours Truly,
A U c
Tony Sholola,P.E.,SR. Capital Projects Officer,Capital Projects Delivery
TS/
cc: Chris Harder,P.E.,Director,Water Department
Laura Wilson,P.E.,Deputy Director,Water Department
Captain Michael Skains,Fire Department
Bill Lundval,Sanitary Sewer Systems Superintendent,Water Department
Roger Hauser, Water Systems Superintendent,Water Department
Liam Conlon,Project Manager
David R Johnson,Supervisor, Capital Projects Delivery,Water Department
Virginia Wade,Inspector,Capital Projects Delivery,Water Department
Konstantine Bakintas,P.E.,Baird,Hampton&Brown,Inc.,Consultant
Conatser Construction TX,LP,Contractor
File
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH,TEXAS 76102
817-392-8240 * FAx 817-392-8195
Cp Printed on recycled paper