Loading...
HomeMy WebLinkAboutContract 54116-CO3 CSC No.54116-CO3 1--c--'�jRT VVtf�)r"'f 1-n City of Fort Worth Change Order Request Project Name: Contract 2014 WSM-A,Part 3 City Sec No.: 54116 Project No.(s): 56002-0600430-001780 DOE No. N/A City Proj.No.: 102695 Project Description: Water/Sewer replacements and pavement rehabilitation on Oscar Ave., NE 35th St.,N.Sylvania Ave.,Akers Ave„ Morning Glory Ave.,W.Lotus Ave.,Bluebonnet Ave.,and Carnation Ave. Contractor: Woody Contractors,Inc Change Order it 0 Date: 2/3/2021 City Project Mgr,I Leon Wilson City Inspector: I Esteban Montoya Jr. Phone Number: 817-392-2387 Phone Number: 817-319-6452 Dept, Water Sewer Paving Totals Contract Time (Calender days) Original Contract Amount $2,311,332.70 $785,946.51 $856,286.57 $3,953,566.78 400 Extras to Date $10,500.00 $10,762.00 $0.00 $21,262.00 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Dale $2,321,832,70 $796,708.51 $856,286.57 $3,974,827.78 400 Amount of Proposed Change Order $57,525.00 $0.00 $0.00 $57,525.00 Revised Contract Amount $2,379,367.70 $796,708.61 $856,286.57 $4,032,352.78 400 Original Funds Available for Change Orders $115,567.00 $39,297.00 $0.00 $154,864.00 Remaining Funds Available for this CO Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.99% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,941,957.23 JUSTIFICATION(REASONS)FOR CHANGE ORDER Change Order No.3 will provide for the following: • Modified permanent pavement repair section(in lieu of City standard pavement repair) on Sylvania Avenue due to the existence of reinforced concrete base that was encountered during water main installation on the roadway.The modified section provides a cost effective alternate to the reinforced concrete base. I • Temporary right-of-entry acquisition from Fort Worth and Western Railroad. It Is understood and agreed that the acceptance of[his Change Order by the contractor constitutes an accord and satisfaction and represents payment In full(both time and money)for all costs arising out of,or Incidental to,the above Change Order. Contractor's Company Name Contractor Name Contfgetor Signature Date Woody Contractors,Inc Troy Woody - Inspector ;rFeb Date Project Mana er. Date teve Cisneros - -Director(Water Dept) Date Construction Supervisor(TPW De t Date chnstopmrHarde, ,2021 Mlchael 0. Glover 2-5-21 Assistant City Attorney Date I Assistant City Manager Date WWX+ eb 9,2021 Feb 9,2021 Council Action(If Required) OFFICIAL RECORD M&C Number N/A M&C Dale Approved N CITY SECRETARY I FT. WORTH, TX { FO P,T oR-'H City of Fort Worth � Change Order Additions � Project Name Contract 2014 WSM-A,Part 3 City Sec No.: 54116 r i Project No.(s): 56002-0600430-001780 DOE No. N/A City Proj.No.: 102695 Project WatedSewar replacements and pavement rehabilitation on Oscar Ave.,NE 35th St.,N.Sylvania Ave.,Akers Ave., E Description Morning Glory Ave.,W.Lotus Ave.,Bluebonnet Ave.,and Carnation Ave. Contractor Woody Contractors,Inc Change Order:03 Date: 2/3/2021_ City Project Mgr. Leon Wilson City Inspector FEsteban Montoya Jr. ADDITIONS DEPT Qty Unit Unit Cost Total 65 Modified Residential Asphalt Pavement Repair Water 2,975.00 LF $76.00 $226,100.00 5'wide residential trench repair(4"asphalt and 8"five sac concrete base) E 66 Modified Residential Asphalt Pavement Repair,Beyond Defined Width Water 500.00 SY $110.00 $55,000.00 5'wide residential trench repair(4"asphalt and 8"five sac concrete base) 48 Fort Worth&Western Railroad TROE Sewer 1.00 LS $15,800.00 $15,800.00 I i I I 1 f i I E I t I f t 1 E f i f i i i Water $281,100.00 Sewer $15,800.00 Paving Page 2 of 4 Additions Sub Total $296,900.00 Z,�C3 P,-F ,V"P,.-riq City of Fort Worth -- - —'�� Change Order Deletions Project Name Contract 2014 WSM-A,Part 3 City Sec No.: 54116 Project No.(s): 56002-0600430-001780 DOE No. N/A City Proj.No.: 102695 Project Description Water/Sewer replacements and pavement rehabilitation on Oscar Ave„NE 35th St.,N.Sylvania Ave.,Akers Ave., Morning Glory Ave,,W.Lotus Ave„Bluebonnet Ave.,and Carnation Ave. Contractor Woody Contractors, Inc Change Order: F3 I Date 21312021 City Project Mgr. Leon Wilson City Inspector: FlEsteban Montoya Jr. DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 33 5'Wide Asphalt Pavement Repair,Residential Water 2,555,00 LF $65,00$166,075,00 62 Water Construction Allowance Water 0.60 LS $80,000.00$48,000.00 63 Asphalt Pavement Repair Beyond Defined Width,Residential Water 100.00 SY $95.00$9,500.00 44 Sewer Construction Allowance Sewer 'ILS $50,000.00 $15,800.00 .316 I Water $223,575.00 Sewer $15,800.00 Paving Page 3 of 4 Deletions Sub Total 1$239,375.00 k 3 i� MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO E i t t } i E Total $0.00 Previous Change Orders co# DATE AMOUNT f i i i i Total $0.00 i i i 3 i i i a i r i Page 4 of 4 i I w i 4f I Contract Compliance Manager By signing I aolmowledge that I am the parson responsible for the monitoring and administration of this contract,including C enstuing all performance and reporting requirements, Signature Leon Wilson, Jr. Name of Employee i Project Manager Title i Z.z�FORT a ATTEST: pp�0°°° °°0 ° °11 °9 d ��8 °2d I g 8 Mary.], Kayser �� *o o d City Secretary d� °°°OO°°°°°°°° b E I [i I 1 1 I OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX